HomeMy WebLinkAboutGoldwater Properties Drainage Plan - BLD Plot / Site Plans - 12/17/2016'NEYSUCKL LN
DAYTON AIRP❑RT RD
EELLS HILL RD
VICINITY MAP
N.T.S.
3AL DESCRIPTI❑N
SE SW SURVEY 5/69
"E ADDRESS
DWATER PR❑PERTIES LLC
HONEYSUCKLE LANE
_TON, WASHINGT❑N, 98584
:EL 43132-34-03000
IGEND
EXISTING TOPOGRAPHY
PROPOSED TOPOGRAPHY
• PROPERTY CORNER
S❑IL TEST PIT
PROPERTY LINE
TP1
—D
•
ROW/ EASEMENT
AVERAGE SLOPES
SILT FENCE
VEGETATI❑N BUFFER
BUILDING SETBACK
CLEARING LIMITS
DRAINAGE DIRECTI❑N
ELEVATI❑N
I\DEX OF SHEETS
SHEET 1 OF 3
SHEET 2 OF 3
SHEET 3 OF 3
TYPE 50 C.B.
I,E, N IN: 357,46
I.E. E IN: 357,67
I.E. S OUT: 357.46
DATUM: NAVD 88
PROPOSED STRUCTURE (TYP)
ROOF AREA = 3000 SQ. FT.
FF = 362 FT
ROOF DRAINAGE SYSTEM
6" S❑LID PVC PIPE
L= 262'
S= 0,5%
TYPE 50 C,B.
LE, IN: 357,69
I.E. OUT: 357,69
6" S❑LID PVC PIPE (TYP)
L= 47'
S= 0,5%
TYPE 50 C.B.
I,E, N IN: 357,22
I.E. E IN: 357,67
I,E, S OUT: 357.22
6" S❑LID PVC PIPE
L= 53'
S=6,1%
COVER SHEET; VICINITY MAP, EXISTING/
PROPOSED C❑NDITI❑NS
DETAILS AND NOTES
TEMPORARY AND PERMANENT ER❑SI❑N CONTROL
+1
aJ
co
R SIFT;
LWAT R
A
76'
D
R
XISTI\
PF RTI
2' DEEP
BI❑—INFILTRATI❑N SWALE
(SEE DETAILS)
6" S❑LID PVC PIPE
L= 268"
S= 0,5%
6' DEEP INFILTRATI❑N
FACILITY
ESTIVATE OF QUANTITIES
CUT
FILL
= 40 CY
= 40 CY
660±
/PR
S LL:,
SFD
DRaI
\DI
\A 1-
5' FILTER STRIP
(SEE DETAILS)
o-■
PROPOSED PARKING
PROPOSED SEPTIC
DRAINFIELD -
t4TP1
TP2
PROPOSED STRUCTURE
ROOF AREA = 1000 SQ, FT.
FF = 362 FT.
PROPOSED STRUCTURE (TYP)
ROOF AREA = 1000 SQ. FT.
FF = 362 FT
CLEARING LIMITS
\S
40' INFILTRATI❑N TRENCH
(SEE DETAILS)
F❑GTITE CATCHBASIN
(SEE DETAILS)
PROPOSED STRUCTURE
ROOF AREA = 1292 SQ,FT,
FF = 362 FT,
PROPOSED DRIVEWAY
5' FILTER STRIP
(SEE DETAILS)
PROPOSED SINGLE FAMILY RESIDENCE
ROOF AREA = 3276 SQ. FT.
FF = 362 FT,
12" F❑GTITE CATCHBASIN
(SEE DETAILS)
+i
cu
co
(2) 50' INFILTRATI❑N
TRENCHES (SEE
DETAILS)
S❑IL LOG:
TP1: BROWN SILTY GRAVEL (GM) WITH SAND. GRAVEL 60%, SAND 25%, SILT 15%.
TP2: BROWN SILTY GRAVEL (GM) WITH SAND. GRAVEL 60%, SAND 25%, SILT 15%.
SCALE:1"=60'
0 15 30 60
CALL DEFDRE YOU DIG!
CALL 2 W❑RKING DAYS
BEFORE YOU DIG!
811
UTILITIES
UNDERGROUND
L❑CATI❑N CENTER
W W W,CALLBEF❑REY❑UDIG,C❑M
PROJECT:
G❑LDWA T ER PR❑PERTIE�
LLC
DRAI\AGE PLAN
OWNER:
G❑LDWATER PR❑PERTIE�
LLC
P❑ BOX 3390
RENT❑N, WA 98056
PHONE: 425-941-3684
ENGINEER:
ENVIR❑TECH ENGINEERING
PUB❑X 984
BELFAIR, WASHINGT❑N 98528
PHONE: (360) 275-9374
FAX: (360) 275-4789
DRAWN BY:
RJM
DESIGNED BY:
RJM/MCS
CHECKED BY:
Michael Staten, P,E,
DATE
2/17/
DATE
2/17/
DATE
2/17/
REVISI❑NS:
REV,
DESCRIPTI❑N
BY
DATI
SHEET
1
SHEET 1 OF 3
GENERAL NOTES:
1, STORMWATER MANAGEMENT PLAN APPROVAL AND NECESSARY PERMITS
REQUIRED BY THE REGULATING AGENCY SHALL BE OBTAINED BY THE
CIWNER/C❑NTRACT❑R PRIOR TO THE INITIATION OF CONSTRUCTION,
2, OWNER/CONTRACTOR IS RESP❑NSIBLE FOR LOCATING AND CONFIRMING THE
DEPTHS OF ALL EXISTING UTILITIES WITHIN THE LIMITS OF THE PROJECT,
AND MAINTAIN APPROPRIATE SETBACKS,
3, ALL C❑NSTRUCTI❑N MATERIALS, W❑RKMANSHIP AND INSTALLATION
PRACTICES INCLUDING BUT NOT LIMITED TO BACKFILL MATERIAL, BEDDING
MATERIAL, COMPACTION EFFORT AND UTILITIES SHALL BE COMPLETED PER
APPLICABLE CODES, LOCAL STANDARDS, COUNTY STANDARDS, AND/OR THE
STATE OF WASHINGT❑N STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND
MUNICIPAL CONSTRUCTION.
4, IT IS RECOMMENDED THAT ALL SURVEYING AND CONSTRUCTION STAKING
BE PERFORMED OR SUPERVISED BY A PROFESSIONAL LICENSED SURVEYOR
FROM THE STATE OF WASHINGT❑N, OWNER IS RESPONSIBLE FOR ASSURING
ALL WORK IS WITHIN THE OWNER'S PROPERTY AND REQUIRED SETBACKS,
5, OWNER/CONTRACTOR SHALL BE RESP❑NSIBLE FOR PROVIDING ADEQUATE
SAFEGUARDS OR ANY OTHER REQUIRED ACTIONS TO PROTECT THE LIFE,
HEALTH AND SAFETY OF THE PUBLIC IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THESE CONSTRUCTION PLANS. TRAFFIC CONTROL
MAY BE REQUIRED PER THE STATE OF WASHINGTON STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL C❑NSTRUCTI❑N,
6, OWNER/CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN THE
EVENT OR DISCOVERY OF POOR DRAINING SOILS, STANDING GROUNDWATER,
OR SEVERE DISCRPANCIES FROM S❑IL INFORMATION PRESENTED ON THESE
PLANS,
7, SURVEY INFORMATION PRESENTED ON THESE PLANS WERE GATHERED FOR
T❑P❑GRAPHIC PURPOSES ONLY, AND SHALL NOT BE INTERPRETED AS A
BOUNDARY SURVEY, PROPERTY LINES MUST BE VERIFIED, AND APPLICALBLE
SETBACKS MUST BE ADHERED TO.
8, OWNER/CONTRACTOR MUST VERIFY THE QUANTITY ESTIMATES AS
PRESENTED ON SHEET 1 OF THESE PLANS.
9, OWNER/CONTRACTOR SHALL DEFINE CLEARING LIMITS. DELINEATION MAY
BE ACCOMPLISHED BY FLAGGING OR OTHER IDENTIFICATION.
10, THESE CONSTRUCTION PLANS ARE APPROVED BY THE REGULATING ENTITY
AND MAY REQUIRE THE CORRECTION OF ERRORS IN THE PLANS WHERE SUCH
ERRORS ARE SUBSEQUENTLY FOUND TO BE IN VIOLATION OF ANY LAW,
ORDINANCE, HEALTH, SAFETY OR OTHER DESIGN ISSUE.
11, A COPY OF THESE APPROVED STORMWATER MANAGEMENT PLANS MUST BE
ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS,
12, THE STORMWATER MANAGEMENT SYSTEM SHALL BE CONSTRUCTED
ACCORDING TO THESE APPR❑VEI) PLANS. ANY SIGNIFICANT DEVIATION FROM
THESE APPROVED PLANS SHALL REQUIRE WRITTEN APPROVAL FROM THE
REGULATING AGENCY AND/OR ENGINEER.
13, EXISTING SOILS AND TERRAIN, AND PROPOSED STORMWATER MANAGEMENT
FACILITIES AND LAND MODIFICATIONS AS SHOWN ON THESE CONSTRUCTION
PLANS ARE DESIGNED PER THE 2005 "STORMWATER MANAGEMENT MANUAL
FOR THE PUGET SOUND BASIN," CALCULATIONS INDICATE THAT ALL
POLLUTED RUNOFF DUE TO A 24-HOUR, 6-MONTH STORM EVENT WILL BE
TREATED AND INFILTRATED ❑N-SITE,
14, IN ADDITION TO STAKING DRAINAGE FACILIITES, SEPTIC DRAINFIELDS OR
SEWER LINES SHALL BE DESIGNED AND APPROVED PRIOR TO SITING
BUILDINGS AND DRAINAGE FACILIES IN ORDER TO MAINTAIN NECESSARY
SETBACKS.
PAVEMENT NOTES:
1, ALL W❑RKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH
THE CURRENT EDITION OF THE STATE OF WASHINGTON STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL C❑NSTRUCTI❑N
(WSDOT/ APWA),
2, ASPHALT CONCRETE SHALL BE CLASS 'B' AND ALL ASPHALT PAVING
SHALL CONFORM TO THE SPECIFICATIONS OUTLINED IN WSDOT/ APWA,
3, SURFACING COARSE AND BASE COARSE MATERIALS SHALL BE WITHIN
ACCORDANCE OF THE WSDOT/ APWA.
4, SUBGRADE BENEATH PAVEMENTS SHALL BE COMPACTED TO 95%
MAXIMUM DENSITY. UNSUITABLE SUBGRADE MATERIAL SHALL BE
REMOVED, REPLACED AND COMPACTED WITH GRAVEL BORROW PER
WSDOT/ APWA.
5, THE PAVEMENT STRUCTURAL SECTION SHOULD BE SMOOTHED OR
ROUNDED AT GRADE BREAKS TO ENHANCE DRIVEABILITY,
INFILTRATION BASIN NOTES:
1, THE 25 FEET BY 76 FEET BASIN SIZE REFERS
TO THE FLOOR AREA OF THE BASIN.
2, SIDESL❑PES FOR INFILTRATION BASIN SHALL
BE A MINIMUM OF 3:1,
3, INITIAL BASIN EXCAVATION SHOULD BE
CARRIED TO WITHIN 1 FOOT OF THE FINAL
ELEVATION OF THE BASIN FLOOR. FINAL
EXCAVATION TO THE FINISHED GRADE SHOULD BE
DEFERRED UNTIL ALL DISTURBED AREAS IN THE
WATERSHED HAVE BEEN STABILIZED OR
PROTECTED.
4, IF REQUIRED BY THE COUNTY, A HEALTHY
STAND OF VEGETATION IS TO BE ESTABLISHED
ON THE BASIN FLOOR AND SIDESL❑PES.
2° COMPACTED ASPHALT _
CONCRETE PAVEMENT, CLASS A
2" MIN CRUSHED SURFACING COARSE
6" MIN COMPACTED GRAVEL BASE COARSE
CLASS 'B' PER WSDOT/APWA
NATIVE SUBGRADE, REC❑MPACTED,
SURFACING COURSE REQUIREMENTS:
SURFACING COURSE REQUIREMENTS SHALL BE
PER WSDOT 9-03.9(3)CRUSHED SURFACING,
US STAND. SIEVE XFINER(BY WT.)
3/4'
1/2'
NO, 4
NO, 40
NO, 200
PROPERTY
Y FRACTURE (US #10+)
SAND EQUIVALENT
LA WEAR
DEGRADATION FACTOR
100
80-100
46-66
8-24
10,0 MAX
SURFACING
75 MIN.
40 MIN,
35% MAX
25 MIN
BASE COURSE REQUIREMENTS:
GRAVEL FOR BASE COURSE REQUIREMENTS
SHALL BE PER WSDOT 9-03.12(1)B CLASS B
GRAVEL,
US STAND. SIEVE XFINER(BY WT.)
2'
NO. 4
NO, 200
75-100
22-100
0-10
PROPERTY SPECIFICATIONS
DUST RATIO
SAND EQUIVALENT
2/3 MAX
30 MIN,
GRAVEL FOR PIPE ZONE BEDDING:
GRAVEL BACKFILL FOR PIPE ZONE BEDDING
SHALL BE PER WSDOT 9-03.12(3),
US STAND. SIEVE XFINER(BY WT.)
1 1/2'
1'
5/8'
ND. 4
NO. 40
NO. 200
100
75-100
50-100
20-80
3-24
0-10
PROPERTY SPECIFICATIONS
SAND EQUIVALENT 35 MIN,
C❑NSTRUCTI❑N SEQUENCE:
TYPE 1 CATCH BASIN NOTES:
1, AS ACCEPTABLE ALTERNATIVES TO THE REBAR SHOWN IN THE PRECAST
BASE SECTION, FIBERS (PLACED ACCORDING TO THE STANDARD
SPECIFICATIONS), OR WIRE MESH HAVING A MINIMUM AREA OF 0,12 SQUARE
INCHES PER FOOT SHALL BE USED WITH THE MINIMUM REQUIRED REBAR
SHOWN REBAR SHOWN IN THE ALTERNATIVE PRECAST BASE SECTION, WIRE
MESH SHALL NOT BE PLACED IN THE KNOCKOUTS.
2, THE KNOCKOUT DIAMETER SHALL NOT BE GREATER THAN 20'. KNOCKOUTS
SHALL HAVE A WALL THICKNESS OF 2' MINIMUM TO 2.5' MAXIMUM, PR❑VIDE
A 1,5" MINIMUM GAP BETWEEN THE KNOCKOUT WALL AND THE OUTSIDE OF
THE PIPE. AFTER THE PIPE IS INSTALLED, FILL THE GAP WITH JDINT
MORTAR IN ACCORDANCE WITH STANDARD SPECIFICATION 9,04.3.
3, THE MAXIMUM DEPTH FROM THE FINISHED GRADE TO THE LOWEST PIPE
INVERT SHALL BE 5',
4, THE FRAME AND GRATE MAY BE INSTALLED WITH THE FLANGE UP OR
DOWN. THE FRAME MAY BE CAST INT❑ THE ADJUSTMENT SECTION.
5, THE PRECAST BASE SECTION MAY HAVE A ROUNDED FLOOR, AND THE
WALLS MAY BE SLOPED AT A RATE OF 1:24 OR STEEPER.
6, THE OPENING SHALL BE MEASURED AT THE TOP OF THE PRECAST BASE
SECTION,
7, THE FOLLOWING PIPE ALLOWANCES SHALL BE ADHERED TO:
PIPE MATERIAL MAX, INSIDE DIAMETER
REINFORCED OR
PLAIN CONCRETE 12'
ALL METAL PIPE 15'
CPSSP*
(STD. SPEC. 9-05.20) 12'
S❑LID WALL PVC:
(STD. SPEC. 9-05.12(1)) 15'
PR❑FILE WALL PVC
(STD. SPEC. 9-05.12(2)) 15'
*CORRUGATED POLYETHYLENE STORM SEWER PIPE
1, CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE.
2, EXCAVATE TO INITIAL INFILTRATION BASIN DEPTH,
3, PERFORM INITIAL EARTHWORK, SUBEXCAVATI❑N, FILL, AND
ROUGH GRADING BASED ON APPROVED DESIGN,
4, INSTALL ADDITI❑NAL TEMPORARY EROSION CONTROL
FACILITIES, IF NECESSARY,
5, MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL
FACILITIES, AS NEEDED, IN ORDER TO PROVIDE THE REQUIRED
PROTECTION OF DOWNSTREAM WATER QUALITY.
6, INSTALL CULVERT,
7, PLACE AND COMPACT BASE MATERIAL AND ASPHALT C❑NCRETE,
8, COMPLETE PERMANENT EROSION CONTROL IN ORDER TO
STABILIZE THE PROJECT.
9, REMOVE TEMPORARY EROSION SEDIMENTATION CONTROL
FACILITIES AFTER CONSTRUCTION IS COMPLETE, THE SITE IS
SUFFICIENTLY STABILIZED, AND ACCEPTED BY THE C❑UNTY,
BUILDING
ROOF DRAIN
4' DIA, MIN,.
SOLID PVC
GRATE
LID
FINE MESH
SCREEN
11'
12,5'
y �
11'
12,5'
F❑GTITE CATCH BASIN - DETAIL
N.T.S.
GROUND
SURFACE
" MIN
F❑GTITE CATCH
BASIN
12X12 YARD DRAIN
►•••••••• • • • •••••••••••••••k.
114)4•••••Vddad4401444•DAU.
UNSUITABLE SUBGRADE SHALL BE REMOVED
(SEE NOTES)
PAVEMENT DETAIL
N.T.S.
10 FT MIN
BACKFILL
ENCOMPASS
DRAINR❑CK WITH
FILTER FABRIC
111 DIA, MIN.
S❑LID PVC
ROOF DRAINAGE DETAILS
N.T.S.
4' CRUSHED SURFACING
COARSE, COMPACTED
COMPACTED STRUCTUAL FILL, DEPTH
VARIES TO BRING TO GRADE, STRONGLY
SUGGEST 4' OF GRAVEL BASE COARSE,
CLASS B PER WSDOT/APWA FOR FUTURE
PAVEMENT
UNDISTURBED COMPETENT SUBGRADE,
OR RE -COMPACTED UPPER 8' TO 95%,
FREE OF DELETERI❑US MATERIAL AND
TOP S❑IL
3/4' - 1 1/2'
WASHED DRAIN
ROCK
TRENCH BOTTOM
TO BE 1 FT MIN.
ABOVE SEASONAL
HIGH
GROUNDWATER OR
IMPERVI❑US
SURFACE
HOUSE
ROADWAY -DETAIL
NOT TO SCALE
PROPOSED
BUILDING
2
PROPOSED
BUILDING
2
i
6 FT
TYPICAL GRADING BETWEEN BUILDINGS - CROSS SECTION
N.T.S.
ROOF DRAIN. SEE
ROOF DOWNSPOUT
C❑NNECTI❑N
DETAIL S❑LID
LID
4" DIA. MIN.
S❑LID PVC
7' KNOCKOUTS
4 SIDES
GRASS -LINED SWALE
TOP SOIL, 8' MIN
THICKNESS
(SEE NOTES)
0,5% MAX
FINE MESH
SCREEN
DESIGNED WATER HEIGHT
100YR 24HR STORM
25FT
5 FT
INFILTRATION BASIN SECTION A -A
N.T.S.
TYPE 1 CATCH
BASIN
ROOF DRAINAGE DETAILS
N.T.S.
NOTES:
1, VEGETATE GROUND UPSL❑PE FROM
GRASS LINED SWALE, (SEE NOTES)
24' MIN
(6) 4' DIA. MIN
PERFORATED PVC
PIPE
" MIN
' MIN
SWALE DETAIL
NTS
GROUND
SURFACE
�11=111�v
4'
4' DIA. PVC
S❑LID WALL
PIPE
GROUND
SURFACE
0, 5% MAX
x
S❑LID PIPE PER
PLAN. ENCASE w/
LARGER PIPE OR
GROUT BENEATH
DRIVEWAYS.
34'
6'
ONE #3 BAR HOOP FOR 6' HEIGHT
TWO #3 BAR HOOP FOR 12' HEIGHT
#3 BAR EACH CORNER
PRECAST BASE
SECTION
#3 BAR EACH SIDE
24'
26' (SEE NOTE 6) /22. (SEE NOTE 6)
C� TYPE
CH BAS
30'
20'
oa0
#3 BAR EACH WAY
ROOF DOWNSPOUT
6' OR 12'
RECTANGULAR ADJUSTMENT
SECTION
TYPE 1 CATCH BASIN DETAIL
N.T.S.
UNGLUED CAP, CUTOUT
NEATLY TO ACCEPT
DOWNSPOUT
4' DIA. PVC 45°
ELBOW
ROOF DOWNSPOUT C❑NNECTI❑N CLEAN❑UT DETAILS
N.T.S.
FRAME AND VANED GRATE
CALL BEFORE YOU DIG!
CALL 2 WORKING DAYS
BEFORE YOU DIG!
811
UTILITIES
UNDERGROUND
LOCATION CENTER
W W W,CALLBEFOREYGUDIG,C❑M
PROJECT'
G❑LDWA-ER PROPERTIES
LLC
DRAI\AGE PLAN
OWNER'
G❑LDWATER PR❑PERTIES
LLC
P❑ BOX 3390
RENT❑N, WA 98056
PHONE: 425-941-3684
ENGINEER:
ENVIR❑TECH ENGINEERING
P,❑,B❑X 984
BELFAIR, WASHINGT❑N 98528
PHONE' (360) 275-9374
FAX: (360) 275-4789
DRAWN BY:
RJM
DATE:
2/17/16
DESIGNED BY:
RJM/MCS
DATE:
2/17/16
CHECKED BY:
Michael Staten, P.E.
DATE:
2/17/16
REVISIONS'
REV,
DESCRIPTION
BY
DATE
SHEET
SHEET 2 OF 3
1
GENERAL NOTES
MINIMUM EROSION AND SEDIMENTATION CONTROL REQUIREMENTS
NETS AND MATS
PLASTIC C❑VERING
R
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE MOST CURRENT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE
AND MUNICIPAL C❑NSTRUCTI❑N PREPARED BY WSDOT AND APWA AS ADOPTED BY THE KITSAP COUNTY DEPARTMENT OF PUBLIC
WORKS (KCPW).
2. - ANY REVISIONS TO THE ACCEPTED CONSTRUCTION DRAWINGS MUST BE APPROVED BY THE PROJECT ENGINEER,
3, THE CONTRACTOR SHALL MAINTAIN A SET OF THE ACCEPTED C❑NTRUCTI❑N DRAWINGS ❑N-SITE AT ALL TIMES WHILE
C❑NSTRUCTI❑N IS IN PROGRESS.
4, IT SHALL BE THE RESP❑NSIBILTY OF THE CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS FROM THE KCPW PRIOR TO
COMMENCING ANY WORK WITHIN COUNTY RIGHT-OF-WAY.
5, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL AT ALL TIMES DURING CONSTRUCTION
ALONGSIDE OR WITHIN ALL PUBLIC ROADWAYS, TRAFFIC FLOW ON EXISTING PUBLIC ROADWAYS SHALL BE MAINTAINED AT ALL
TIMES, UNLESS PERMISSION IS OBTAINED FROM THE KCPW FOR ROAD CLOSURE AND/OR DET❑URS,
6. THE L❑CATIONS OF EXISTING UTILITIES ON THIS PLAN IS APPROXIMATE ONLY, THE CONTRACTOR SHALL CONTRACT THE
'UNDERGROUND LOCATE' CENTER AT PH: 811 AND NON -SUBSCRIBING INDIVIDUAL UTILITY COMPANIES 48 HOURS IN ADVANCE OF
THE COMMENCEMENT OF ANY C❑NSTRUCTI❑N ACTIVITY. THE CONTRACTOR SHALL PROVIDE FOR PROTECTION OF EXISTING
UTILITIES FROM DAMAGE CAUSED BY THE CONTRACTOR'S ❑PERATI❑NS,
7, ROCKERIES OR OTHER RETAINING FACILITIES EXCEEDING 4 FT. HEIGHT REQUIRE A SEPARATE BUILDING PERMIT.
8. A 'FORESTRY PRACTICES' PERMIT MAY BE REQUIRED PRIOR TO CLEARING OF THE SITE.
9. IT IS RECOMMENDED THAT ALL SURVEYING AND C❑NSTRUCTI❑N STAKING BE PERFORMED OR SUPERVISED A PROFESSI❑NAL
LICENSED SURVEYOR FROM THE STATE OF WASHINGT❑N,
10. OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS OR ANY OTHER REQUIRED ACTIONS TO
PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC IN CONNECTION WITH THE PERFORMANCE OF WORK ON THESE
CONSTRUCTION PLANS. TRAFFIC CONTROL MAY BE REQUIRED PER THE STATE OF WASHINGT❑N STANDARD SPECIFICATIONS FOR
ROAD, BRIDGE AND MUNICIPAL C❑NSTRUCTI❑N.
11. OWNER/CONTRACTOR SHALL N❑TIFY THE PROJECT ENGINEER IN THE EVENT OR DISC❑VERY OF POOR DRAINING S❑ILS,
STANDING GROUNDWATER, OR SEVERE DISCRPANCIES FROM S❑IL INFORMATION PRESENTED ON THESE PLANS,
12. SURVEY INFORMATION PRESENTED ON THESE PLANS WERE GATHERED FOR TOPOGRAPHIC PURPOSES ONLY, AND SHALL NOT BE
INTERPRETED AS A BOUNDARY SURVEY, PROPERTY LINES MUST BE VERIFIED, AND APPLICALBLE SETBACKS MUST BE ADHERED
TO.
13. OWNER/CONTRACTOR MUST VERIFY THE QUANTITY ESTIMATES AS PRESENTED ON SHEET 1 OF THESE PLANS.
14. THESE CONSTRUCTION PLANS ARE APPROVED BY THE COUNTY AND MAY REQUIRE THE CORRECTION OF ERRORS IN THE PLANS
WHERE SUCH ERRORS ARE SUBSEQUENTLY FOUND TO BE IN VIOLATION OF ANY LAW, ORDINANCE, HEALTH, SAFETY OR OTHER
DESIGN ISSUE,
15. IN ADDITION TO STAKING DRAINAGE FACILIITES, SEPTIC DRAINFIELDS SHOULD BE DESIGNED AND APPROVED PRIOR TO SITING
BUILDINGS IN ORDER TO MAINTAIN NECESSARY SETBACKS.
DRAINAGE NOTES
1. THE CONTRACTOR SHALL ENSURE THAT THE DRAINAGE IS INSTALLED AND OPERATIONAL PRIOR TO COMMENCEMENT OF PAVING
WORK,
2, ALL STEEL PIPE AND PARTS SHALL BE GALVANIZED, ALL SUBMERGED STEEL PIPES AND PARTS SHALL BE GALVANIZED AND
HAVE ASPHALT TREATMENT #1 OR BETTER,
3. DRAINAGE STUBOUTS ON INDIVDUAL LOTS SHALL BE LOCATED WITH A FIVE FOOT HIGH 2'X 4' STAKE MARKED 'STORM'. THE
STUBOUT SHALL EXTEND ABOVE SURFACE LEVEL AND BE SECURED TO THE STAKE,
GRADING NOTES
1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN THE EVENT OR DISC❑VERY OF POOR S❑ILS, GROUNDWATER OR
DISCREPANCIES IN THE EXISTING CONDITIONS AS NOTED ON THE PLANS.
2. MAXIMUM SLOPE STEEPNESS SHALL BE 211 HORIZONTAL: VERTICAL FOR CUT AND FILL SLOPES.
3. UNLESS OTHERWISE SPECIFIED, ALL EMBANKMENTS IN THE PLAN SET SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION
2-03.3 (14) B OF THE WSDOT STANDARD SPECIFICATIONS. EMBANKMENT COMPACTIONS SHALL CONFORM TO SECTION 2-03.3 (14)
C, METHOD B OF SAID STANDARD SPECIFICATIONS,
4, EMBANKMENTS DESIGNED TO IMP❑UND WATER SHALL BE COMPACTED 95% MAXIMUM DENSITY PER SECTION 2-03.3(14) C, METHOD
C OF WSDOT STANDARD SPECIFICATIONS.
5. ALL AREAS RECEIVING FILL MATERIAL SHALL BE PREPARED BY REM❑VING VEGETATION, NONCOMPLYING FILL, TOPSOIL AND
OTHER UNSUITABLE MATERIAL, BY SCARIFYING THE SURFACE TO PR❑VIDE A BOND WITH THE NEW FILL, AND WHERE SLOPES
ARE STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL AND THE HEIGHT IS GREATER THAN 5 FT BY BENCHING INTO SOUND
COMPETENT MATERIAL AS DETERMINED BY A S❑IL ENGINEER.
GENERAL EROSION AND SEDIMENTATION CONTROL NOTES
1. THE F❑LL❑WING EROSION AND SEDIMENTATION CONTROL NOTES APPLY TO ALL CONSTRUCTION SITE ACTIVITIES AT ALL
TIMES, UNLESS OTHERWISE SPECIFIED ON THESE PLANS.
2. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL PLAN DOES NOT CONSTITUTE AN ACCEPTANCE OF THE PERMANENT
ROAD OR DRAINAGE DESIGN.
3. THE OWNER AND HIS/HER CONTRACTOR SHALL BE RESPONSIBLE AT ALL TIMES FOR PREVENTING SILT -LADEN RUNOFF FROM
DISCHARGING FROM THE PROJECT SITE, FAILURE BY THE OWNER AND/OR CONTRACTOR CAN RESULT IN A FINE. THE
DESIGNATED TEMPORARY CONTACT PERSON NOTED ON THIS PLAN MUST BE AVAILABLE FOR CONTACT BY PHONE ON A 24 HOUR
BASIS THROUGHOUT C❑NSTUCTI❑N AND UNTIL THE PROJECT HAS BEEN COMPLETED AND ACCEPTED BY THE COUNTY.
4. THE IMPLENTATION OF THESE ESC PLANS AND THE C❑NSTRUCTI❑N, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE
FACILITIES IS THE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR FROM THE BEGINNING OF C❑NSTRUCTI❑N UNTIL ALL
IS COMPLETED AND ACCEPTED BY THE COUNTY AND THE SITE IS STABILIZED.
5, PRIOR TO BEGINNING ANY WORK ON THE PROJECT SITE, A PRECONSTUCTION CONFERENCE MUST BE HELD, AND SHALL BE
ATTENDED BY THE GENERAL CONTRACTOR, THE PROJECT ENGINEER,REPRESENTATIVES FROM THE AFFECTED UTILITIES, AND A
REPRESENTATIVE OF KITSAP C❑UNTY,
6. THE EROSION AND SEDEMENTATI❑N CONTROL FACILITIES SHOWN ON THIS PLAN ARE TO BE C❑NSIDERED ADEQUATE BASIC
REQUIREMENTS FOR THE ANTICIPATED SITE CONDITIONS. DURING C❑NSTUCTI❑N, DEVIATIONS FROM THIS PLAN MAY BE
NECESSARY IN ORDER TO MAINTAIN WATER QUALITY. MINOR DEPARTURES FROM THIS PLAN ARE PERMITTED SUBJECT TO THE
APPROVAL OF THE COUNTY INSPECTOR. HOWEVER, EXECPT FOR EMERGENCY SITUATIONS, ALL OTHER DEVIATIONS FROM THIS
PLAN MUST BE DESIGNED BY THE PROJECT ENGINEER AND APPROVED BY KITSAP COUNTY PRIOR TO INSTALLATION,
7. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED BY THE OWNER AND/OR CONTRACTOR ON A
FREQUENT BASIS IMMEDIATELY AFTER EACH RAINFALL, AND MAINTAINED AS NESSARY TO ENSURE THEIR CONTINUED
FUNCTIONING. ALL SEDIMENT MUST BE REMOVED FROM SILT FENCES, SEDIMENT PONDS, ETC, PRIOR TO THE SEDIMENT
REACHING A DEPTH OF 6 INCHES,
8. AT NO TIME SHALL CONCRETE, CONCRETE BY-PRODUCTS, VEHICLE FLUIDS, PAINT, CHEMICALS, OR OTHER POLLUTING MATTER
BE PERMITTED TO DISCHARGE TO THE TEMPORARY OR PERMANENT DRAINAGE SYSTEM, OR TO DISCHARGE FROM THE PROJECT
SITE.
9, PERMANENT DETENTION/RETENTION PONDS, PIPES, TANKS, OR VAULTS MAY ONLY BE USED FOR SEDIMENT CONTAINMENT WHEN
SPECIFICALLY INDICATED ON THESE PLANS.
TEMPORARY EROSION AND SEDIMENTATION CONTROL MAINTENANCE REQUIREMENTS
1. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE INSPECTED AFTER EACH STORM EVENT AND DAILY DURING
PROLONGED RAINFALL.
2. NECESSARY REPAIR OR REPLACMENT OF FACILITIES SHALL BE ACC❑MPLISHED PROMPTLY,
3, SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT OR WHEN LEVEL OF DEPOSITION REACHES
APPR❑XIMATELY ONE-HALF THE MAXIMUM POTENTIAL DEPTH.
4. SEDIMENT DEP❑SITS REMAINING IN PLACE AFTER THE ESC FACILITIES ARE NO LONGER REQUIRED SHALL BE DRESSED TO
CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED.
5, TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE MAINTANED BY;
ANDREW WHYTE
6409 BALZ❑W ROAD NE
SUQUAMISH, WASHINGT❑N 98392
ANDREW WHYTE
24HR EMERGENCY CONTACT NUMBER (206) 877-3234
INSPECTION SCHEDULE
THE CONTRACTOR SHALL N❑TIFY COMMUNITY DEVELOPMENT TO ARRANGE FOR INSPECTION OF THE VARIOUS PHASES OF WORK
CHECKED BELOW. ALL INSPECTIONS SHALL BE COMPLETED PRIOR TO PROCEEDING WITH THE NEXT PHASE OF WORK,
1. CLEARING LIMITS.
2. IMPLEMENTATION OF THE VARI❑US PHASES OF THE EROSION AND SEDIMENTATION CONTROL PLAN.
3. PLACEMENT OF DRAINAGE STRUCTURES PRIOR TO BACK FILLING, INCLUDING POND EMBANKMENTS.
4. FINAL INSPECTION.
5. INSPECTION OF PREPARED SUB -GRADE,
6. INSPECTION OF GRAVEL BASE PLACEMENT.
7. INSPECTION OF FINE GRADING PRIOR TO PAVING.
8. INSPECTION OF PAVING ❑PERATI❑NS.
9. FINAL INSPECTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK PERFORMED AND SHALL ENSURE THAT C❑NSRUCTI❑N IS ACCECTIBLE TO
KITSAP C❑UNTY,
IF INSPECTION IS NOT CALLED FOR PRIOR TO COMPLETION OF ANY ITEM OF WORK S❑ DESIGNATED, SPECIAL DESTRUCTIVE
AND/OR N❑N-DESTRUCTIVE TESTING PROCEDURES MAY BE REQUIRED TO ENSURE THE ACCEPTABILITY OF THE WORK. IF SUCH
PROCEDURES ARE REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE TESTING AND/OR
RESTORATION OF THE W❑RK,
C❑NSTUCTI❑N SEQUENCE
1. APPLY FOR AND PICK UP ANY RIGHT OF WAY PERMITS, IF PROJECT REQUIRES, FROM KITSAP COUNTY DEPARTMENT OF PUBLIC
WORKS.
2. C❑NSTUCT STABILIZED CONSTRUCTION ENTRANCE(S) AS SOON AS POSSIBLE.
3. CONSTRUCT FILTER FENCE BARRIERS, IF NECESSARY,
4, CONSTRUCT SEDIMENT BASINS, IF NECESSARY,
5. C❑NSTUCT RUNOFF INTERCEPTION AND DIVERSION DITCHES.
6, CLEAR AND GRADE THE MINIMUM SITE AREA REQUIRED FOR C❑NSTUCTI❑N OF THE VARI❑US PHASES OF WORK.
7. PR❑VIDE TEMPORARY HYDROSEEDING OR OTHER SOURCE CONTROL STABILIZATION MEASURES ON ALL DISTURBED S❑ILS.
8. MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL FACILITIES TO PR❑VIDE THE REQUIRED PROTECTION OF DOWNSTREAM
WATER QUALITY.
9, ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING, THE CLEANING OPERATION SHALL NOT
FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.
10. PROVIDE PERMANENT SITE STABILIZATION,
11. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL NOT BE REMOVED UNTIL C❑NSTUCTI❑N IS COMPLETE AND
ACCEPTED BY KITSAP COUNTY.
1. STABILIZATION AND SEDIMENT TRAPPING. ALL EXPOSED AND UNWORKED SOILS,
INCLUDING SOIL STOCKPILES, SHALL BE STABILIZED BY SUITABLE APPLICATION
OF BMPS WHICH PROTECT SOIL FROM THE EROSIVE FORCES OF RAINDROP
IMPACT AND FL❑WING WATER. APPLICABLE PRACTICES INCLUDE, BUT ARE NOT
LIMITED TO VEGETATIVE ESTABLISHMENT, MULCHING, PLASTIC C❑VERING, AND
THE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. FROM
OCTOBER 1 TO APRIL 30, NO S❑ILS SHALL REMAIN UNSTABILIZED FOR MORE
THAN 2 DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALL REMAIN
UNSTABILIZED FOR MORE THAN 7 DAYS,
2, AT ALL TIMES OF THE YEAR, THE CONTRACTOR SHALL HAVE SUFFICIENT
MATERIALS, EQUIPMENT AND LABOR ON -SITE TO STABILIZE AND PREVENT
EROSION FROM ALL DENUDED AREAS WITHIN 12-HOURS AS SITE AND WEATHER
CONDITIONS DICTATE.
3. FROM OCTOBER 1ST TO APRIL 30TH, THE PROJECT ENGINEER SHALL VISIT THE
DEVELOPMENT SITE A MINIMUM OF ONCE PER WEEK FOR THE PURPOSE OF
INSPECTING THE EROSION AND SEDIMENTATION CONTROL FACILITIES, REVIEWING
THE PROGRESS OF CONSTRUCTION, AND VERIFYING THE EFFECTIVENESS OF THE
EROSION CONTROL MEASURES BEING UNDERTAKEN. THE PROJECT ENGINEER
SHALL IMMEDIATELY INFORM THE DIRECTOR OF ANY PROBLEMS OR POTENTIAL
PROBLEMS OBSERVED DURING SAID SITE VISITS, AS WELL AS OF ANY
RECOMMENDED CHANGES IN THE EROSION CONTROL MEASURES TO BE
UNDERTAKEN. WHEN REQUESTED BY THE DIRECTOR, THE PROJECT ENGINEER
SHALL PR❑VIDE THE DIRECTOR WITH WRITTEN RECORDS OF SAID WEEKLY SITE
VISITS, INCLUDING DATES OF VISITS AND NOTED SITE OBSERVATIONS,
4. IN THE EVENT THAT GROUND ON A PROJECT SITE IS LEFT BARE AFTER
SEPTEMBER 30TH, THE COUNTY MAY ISSUE A STOP WORK ORDER FOR THE
ENTIRE PROJECT UNTIL SATISFACTORY CONTROLS ARE PROVIDED. IN ADDITION,
THE OWNER WILL BE SUBJECT TO THE PENALTIES PROVIDED IN SECTION 10
AND SECTION 11 OF THE KITSAP COUNTY STORMWATER ORDINANCE,
5, IN THE EVENT THAT GROUND ON A PROJECT SITE IS LEFT BARE AFTER
SEPTEMBER 30TH, AND THE COUNTY IS UNSUCCESSFUL IN CONTACTING THE
OWNER OR HIS/HER DESIGNATED EMERGENCY CONTACT PERSON, THE COUNTY
MAY ENTER THE PROJECT SITE AND INSTALL TEMPORARY GROUND COVER
MEASURES AND BILL THE OWNER FOR ALL EXPENSES INCURRED BY THE
COUNTY. THESE COSTS WILL BE IN ADDITION TO ANY MONETARY PENALTIES
LEVIED AGAINST THE OWNER,
6. DELINEATION OF CLEARING AND EASEMENT LIMITS. CLEARING LIMITS,
SETBACKS, BUFFERS, AND SENSITIVE OR CRITICAL AREAS SUCH AS STEEP
SLOPES, WETLANDS AND RIPARIAN CORRIDORS SHALL BE CLEARLY MARKED IN
THE FIELD AND INSPECTED BY KITSAP COUNTY DEPARTMENT OF COMMUNITY
DEVELOPMENT PRIOR TO COMMENCEMENT OF LAND CLEARING ACTIVITIES,
7. PR❑TECTI❑N OF ADJACENT PR❑PERTIES. ADJACENT PR❑PERTIES SHALL BE
PROTECTED FROM SEDIMENT DEPOSITION BY APPR❑PRIATE USE OF VEGETATIVE
BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY
A COMBINATION OF THESE MEASURES AND OTHER APPR❑PRIATE BMPS,
8, TIMING AND STABILIZATION OF SEDIMENT TRAPPING MEASURES. SEDIMENT
PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER BMPS
INTENDED TO TRAP SEDIMENT ❑N-SITE SHALL BE CONSTRUCTED AS A FIRST
STEP IN GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND
DISTURBING ACTIVITIES TAKE PLACE, EARTHEN STRUCTURES SUCH AS DAMS,
DIKES, AND DIVERSIONS SHALL BE STABILIZED ACCORDING TO THE TIMING
INDICATED IN ITEM (1) ABOVE.
9. SLOPE STABILIZATION. CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A
MANNER THAT WILL MINIMIZE EROSION, ROUGHENED S❑IL SURFACES ARE
PREFERRED TO SMOOTH SURFACES. INTERCEPTORS SHOULD BE CONSTRUCTED AT
THE TOP OF LONG, STEEP SLOPES WHICH HAVE SIGNIFICANT AREAS ABOVE
THAT CONTRIBUTE RUNOFF. CONCENTRATED RUNOFF SHOULD NOT BE ALLOWED
TO FLOW DOWN THE FACE OF A CUT OR FILL SLOPE UNLESS CONTAINED
WITHIN AN ADEQUATE CHANNEL OR PIPE SLOPE DRAIN. WHEREVER A SLOPE
FACE CROSSES A WATER SEEPAGE PLANE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHOULD BE PROVIDED. IN ADDITION, SLOPES SHOULD BE
STABILIZED IN ACCORDANCE WITH ITEM Cl) ABOVE,
10. C❑NTR❑LLING OFF -SITE EROSION, PR❑PERTIES AND WATERWAYS DOWNSTREAM
FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO
INCREASES IN THE VOLUME, VEL❑CITY, AND PEAK FLOW RATE OF STORMWATER
RUNOFF FROM THE DEVELOPMENT SITE BY THE IMPLEMENTATION OF
APPR❑PRIATE BMPS TO MINIMIZE ADVERSE DOWNSTREAM IMPACTS.
11. STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS, ALL
TEMPORARY ❑N-SITE CONVEYANCE CHANNELS SHALL BE DESIGNED,
CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED
FLOW VEL❑CITY FROM A 2-YEAR FREQUENCY, 24-HOUR DURATION STORM FOR
THE POST -DEVELOPMENT CONDITION. STABILIZATION ADEQUATE TO PREVENT
EROSION OF OUTLETS, ADJACENT STREAMBANKS, SLOPES AND DOWNSTREAM
REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS,
12. STORM DRAIN INLET PR❑TECTI❑N. ALL STORM DRAIN INLETS MADE OPERABLE
DURING C❑NSTRUCTI❑N SHALL BE PROTECTED SO THAT STORMWATER RUNOFF
SHALL NOT ENTER THE CONVEYANCE SYSTEM WITH❑UT FIRST BEING FILTERED
OR OTHERWISE TREATED TO REMOVE SEDIMENT. AFTER PROPER WRITTEN
APPLICATION, THE REQUIREMENT FOR INLET PR❑TECTI❑N MAY BE WAIVED BY
THE DIRECTOR ON A SITE -SPECIFIC BASIS WHEN THE CONVEYANCE SYSTEM
DOWNSTREAM OF THE INLET DISCHARGES TO AN APPR❑PRIATE SEDIMENT
CONTAINMENT BMP AND THE CONVEYANCE SYSTEM CAN BE ADEQUATELY
CLEANED FOLL❑WING SITE STABILIZATION.
13. UNDERGROUND UTILITY C❑NSTRUCTI❑N. THE CONSTRUCTION OF UNDERGROUND
UTILITY LINES SHALL BE LIMITED, WHERE FEASIBLE, TO NO MORE THAN 500
FEET OF OPEN TRENCH AT ANY ONE TIME. WHERE CONSISTENT WITH SAFETY
AND SPACE CONSIDERATIONS, EXCAVATED MATERIAL SHALL BE PLACED ON THE
UPHILL SIDE OF THE TRENCH, DEWATERING DEVICES SHALL DISCHARGE TO AN
APPROPRIATE SEDIMENT TRAP OR POND, PRECEDED BY ADEQUATE ENERGY
DISSIPATION, PRIOR TO RUNOFF LEAVING THE SITE.
14. CONSTRUCTED ACCESS R❑UTES, WHEREVER CONSTRUCTION VEHICLE ACCESS
ROUTES INTERSECT PAVED ROADS, PROVISIONS MUST BE MADE TO MINIMIZE
THE TRANSPORT OF SEDIMENT (MUD) ONTO THE PAVED ROAD BY USE OF
APPR❑PRIATE BMP'S SUCH AS A STABILIZED CONSTRUCTION ENTRANCE. IF
SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE
CLEANED THOROUGHLY, AS A MINIMUM, AT THE END OF EACH DAY. SEDIMENT
SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE
TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING
SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER.
15. REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT
CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE
STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER
NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON -SITE,
DISTURBED SOIL AREAS RESULTING FROM REMOVAL OF TEMPORARY BMPS SHALL
BE PERMANENTLY STABILIZED. THE REMOVAL OF TEMPORARY EROSION AND
SEDIMENT CONTROL BMPS MAY NOT BE REQUIRED FOR THOSE PROJECTS, SUCH
AS SINGLE FAMILY PLATS, THAT WILL BE FOLLOWED BY ADDITIONAL
CONSTRUCTION UNDER A DIFFERENT PERMIT. IN THESE CIRCUMSTANCES, THE
NEED FOR REM❑VING OR RETAINING THE MEASURES WILL BE EVALUATED ON A
SITE -SPECIFIC BASIS.
16. DEWATERING C❑NSTRUCTI❑N SITES. DEWATERING DEVICES SHALL DISCHARGE
INTO AN APPROPRIATE SEDIMENT TRAP OR POND, DESIGNED TO ACCEPT SUCH A
DISCHARGE PRECEDED BY ADEQUATE ENERGY DISSIPATION, PRIOR TO RUNOFF
LEAVING THE SITE.
17. CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES,
ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ❑N-SITE DURING
CONSTRUCTION SHALL BE HANDLED AND LEGALLY DISP❑SED OF IN A MANNER
THAT DOES NOT CAUSE CONTAMINATION OF STORM OR SURFACE WATERS.
POLLUTANTS OF CONCERN INCLUDE, BUT ARE NOT LIMITED TO, FUELS,
LUBRICANTS, SOLVENTS, CONCRETE BI-PR❑DUCTS AND CONSTRUCTION
MATERIALS
18. MAINTENANCE. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT
CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE
C❑NTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND
REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. THE
APPLICANT SHALL BE RESPONSIBLE FOR ASSURING THAT ANY SUCH FACILITIES
DAMAGED DURING FLOODS, STORMS OR OTHER ADVERSE WEATHER CONDITIONS
ARE IMMEDIATELY RETURNED TO NORMAL OPERATING C❑NDITI❑N.
19. FINANCIAL LIABILITY. A PERFORMANCE COVENANT OR PERFORMANCE SURETY,
SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE
APPROVED EROSION AND SEDIMENT CONTROL PLAN, AS OUTLINED IN SECTION
4.0 OF THE KITSAP COUNTY STORMWATER ORDINANCE,
1. ON SHALLOW SLOPE, NETTING MAY BE APPLIED ACROSS THE SLOPE.
(SLOPES UP TO L1).
2. ON STEEP SLOPES, APPLY STRIPS OF NETTING PARALLEL TO THE
DIRECTION OF FLOW AND ANCHOR SECURELY, (SLOPES GREATER THAN 1:1)
3, WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE
NETTING OVER THE BERM AND ANCHOR IT BEHIND THE BERM,
4, BRING THE NETTING DOWN TO A LEVEL AREA BEFORE TERMINATING THE
INSTALLATION, TURN THE END UNDER 6' AND STAPLE AT 12' INTERVALS.
5, IN DITCHES, APPLY NETTING PARALLEL TO THE DIRECTION OF FLOW. USE
CHECK SLOTS EVERY 15 FEET. DO NOT J❑IN STRIPS IN THE CENTER OF
THE DITCH.
6, NETS AND MATS USED ALONE, WITHOUT MULCH, DO NOT RETAIN S❑IL
TEMPPERATURE,
7, IT IS CRITICAL DURING INSTALLATION TO ❑BTAIN FIRM, CONTINUOUS
CONTACT BETWEEN THE NET/MAT MATERIAL AND THE SOIL. WITHOUT
SUCH CONTACT, THE MATERIAL IS USELESS AND EROSION OCCURS.
8, WHEN ANCHORING MATERIAL, IT IS IMPORTANT TO USE AN ADEQUATE
NUMBER OF STAPLES AND TO ROLL THE MATERIAL AFTER LAYING IT TO
ENSURE THAT THE S❑IL IS PR❑TECTED, NETTING SHOULD BE SECURELY
ANCHORED TO THE S❑IL WITH NO. 11 GAUGE WIRE STAPLES AT LEAST
6-INCHES LONG, WITH AN OVERLAP OF 3-INCHES.
9, SITE PREPARATION IS THE SAME AS FOR TEMPORARY SEEDING,
10. WHERE S❑IL IS HIGHLY ERODIBLE, NETS SHOULD ONLY BE USED IN
CONJUNCTION WITH ORGANIC MULCH,
11. JUTE NETS SHOULD BE HEAVY, UNIFORM CLOTH WOVEN OF SINGLE JUTE
YARN, WHICH, IF 36-TO 48-INCHES WIDE, SHALL WEIGH AN AVERAGE OF
1.2 LBS, PER LINEAR YARD, JUTE MATTING MUST BE APPLIED SO THAT IT
IS IN COMPLETE CONTACT WITH THE S❑IL, OTHERWISE EROSION WILL
OCCUR BENEATH IT.
12, WOOD FIBER CELLULOSE BLANKETS ARE C❑NSIDERED PROTECTIVE
MULCHES AND MAY BE USED ALONE ON ERODIBLE SOILS AND DURING ALL
TIMES OF THE YEAR.
SURFACE ROUGHENING
1, SURFACE ROUGHENING IS INTENDED TO AID IN THE ESTABLISHMENT OF
VEGETATIVE COVER, WHICH IN TURN IS INTENDED TO PROTECT THE
FACE OF THE SLOPE FROM RAINFALL IMPACT AND SEEDFLOW, BIND THE
SURFACE OF THE SLOPE TO RETARD EROSION, AND REDUCE THE
VELOCITY OF SURFACE RUNOFF, SURFACE ROUGHENING IS NOT INTENDED
TO ACCOMPLISH ANY OF THE ABOVE BY ITSELF, AND DEFINITELY
SHOULD NOT BE USED TO DIRECTLY REDUCE THE VEL❑CITY OF SURFACE
RUNOFF,
2, GRADED SLOPES STEEPER THAN 3:1 BUT LESS THAN 2:1 SHOULD BE
ROUGHENED BEFORE SEEDING. THIS CAN BE ACC❑MPLISHED IN A VARIETY
OF WAYS, INCLUDING 'TRACK -WALKING', OR DRIVING A CRAWLER
TRACTOR UP AND DOWN THE SLOPE, LEAVING A PATTERN OF CLEAT
IMPRINTS PARALLELTO SLOPE CONTOURS, THE TREAD IMPRINTS ARE
IDEAL PLACES TO TRAP SEEDS AND ENCOURAGE PLANTS TO BECOME
ESTABLISHED.
3, GRADED AREAS STEEPER THAN 211 SHOULD BE STAIR -STEPPED WITH
BENCHES, THE STAIR -STEPPING WILL HELP VEGETATION BECOME
ESTABLISHED AND ALSO TRAP SOIL ERODED FROM THE SLOPES ABOVE,
FILTER FABRIC FENCE INLET BARRIER
1. THIS DEVICE IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY
SMALL(LESS THAN 1 ACRE) FLAT AREA (LESS THAN 5% SLOPE)
2. PLACE 2' X 2' WOODEN STAKES AROUND THE PERIMETER OF THE INLET
A MAXIMUM OF 3-FEET APART AND DRIVE THEM AT LEAST 18 INCHES
INTO THE GROUND. THE STAKES MUST BE AT LEAST 3-LONG.
3, EXCAVATE A TRENCH APPDXIMATELY 8-INCHES WIDE AND 12- INCHES
DEEP AROUND THE OUTSIDE PERIMETER OF THE STAKES,
4, STAPLE THE FABRIC FILTER TO THE WOODEN STAKES S❑ THAT
32-INCHES OF THE FABRIC EXTENDS AND CAN BE FORMED INTO THE
TRENCH. USE HEAVY-DUTY WIRE STAPLES AT LEAST 3 -INCH LONG.
5. BACKFILL THE TRENCH WITH 3/4 -INCH MINUS WASHED GRAVEL ALL THE
WAY AROUND.
6. DO NOT PLACE FABRIC UNDER THE GATE, AS THE COLLECTED SEDIMENT
MAY FALL INTO THE DRAIN WHEN THE FABRIC IS RETIEVED.
TRENCHING
1. FOR TRENCHES ON A D❑WNSLOPE OF MORE THAN 5%, NO MORE THAN
500-FEET OF TRENCH SHOULD BE OPENED AT ONE TIME,
2, PLACE EXCAVATED MATERIAL FROM TRECHES ON THE UPHILL SIDE OF
THE TRENCH WHEN SAFETY AND SPACE C❑NSRAINTS ALLOW. A NOTE TO
THIS EFFECT SHOULD BE INCLUDED ON THE ESC PLAN,
3. DIRECT THE DISCHARGE OF DEWATERING DEVICES FROM TRENCHES OR
OTHER AREAS S❑ AS NOT TO ADVERSELY IMPACT FL❑WING STREAMS,
DRAINAGE SYSTEMS OR OFF -SITE PROPERTY, DEWATERING DEVICES
SHALL NOT DISCHARGE TO SANITARY SEWERS.
MULCHING
1. MATERIALS USED FOR MULCHING ARE RECOMMENDED TO BE WOOD FIBER
CELLULOSE, AND SHOULD BE APPLIED AT A RATE OF 1000 POUNDS PER ACRE,
2, MULCH SHOULD BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER
THAN 2:1 (HORIZ❑NTAL:VERTICAL).
3. MULCHING SHOULD BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS
WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. ALL AREAS REQUIRING
MULCH SHALL BE COVERED BY NOVEMBER 1,
ST❑CKPILE MANAGEMENT
1. ST❑CKPILE SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER
APPROVED DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31.
2, IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE
PREVENTED.
3, TOPS❑IL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY
C❑NDITI❑N, WHEN THE SUBGRADE IS EXCESSIVELY WET, OR WHEN
CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER
GRADING OR PROPOSED SODDING OR SEEDING.
4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE T❑PSOILED
SHALL BE MAINTAINED ACC❑RDING TO THE APPROVED PLANS.
2'x2' WOOD POST (TYP)
OR EQUIVALENT OR BETTER
2 6 FT MAX. O.C.
EXISTING
GROUND SURFACE
12' DEEP, 8' WIDE
TRENCH FILLED WITH
NATIVE VEGETATION
BOTTOM EXTENTS OF
GE❑TEXTILE FABRIC
GE❑TEXTILE FABRIC
WRAP AROUND TRENCH
TO AT LEAST ENTIRE
BOTTOM OF TRENCH
BEFORE BACKFILLING
GE❑TEXTILE FABRIC
AND WIRE MESH
I. 6 FT ---I
e,ii1i�1i1i1i1i1iii1
.I.I.I.I..I.I.I.I.I.I.I.I,44 A0441g.1.1.1.1.1.0.1.1.1.1.1.1.1.1.E
::r::::::e.::::::.s:r:::;: ?::
12' DEEP, 8' WIDE TRENCH
FILLED WITH NATIVE
VEGETATION
FLOW DIRECTION
SILT FENCE - DETAIL
N.T.S.
2.5 FT
2.5 FT
0.5 FT
2 FT
1$T 4
1- 2.5 FT
2'x2'x5' WOOD POST OR
EQUIVALENT OR BETTER
EXISTING
GROUND SURFACE
SILT FENCE - CROSS SECTION
N.T.S.
1, PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MLS AND
SHALL MEET THE REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS
SECTION 9-15.5.
2, COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE B`
USING SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-F:ET GRID
SPACING IN ALL DIRECTIONS. ALL SEAMS SHALL BE TAPED ❑R WEIGHTED
DOWN FULL LENGTH AND THERE SHALL BE AT LEAST A 12 INCH OVERLAP
OF ALL SEAMS.
3, CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS
SEEDED BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL
VEGETATION IS FIRMLY ESTABLISHED,
4, WHEN THE C❑VERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT
IN PLACE UNTIL THE NEXT SEEDING PER:OD,
5, PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF
SLOPES IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS,
6, PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND
DISLODGED ENDS.
SILT FENCE
L FILTER FABRIC SHALL BE PURCHASED IN A CONTINU❑US ROLL AND CUT TO
THE LENGTH OF THE BARRIER TO AV❑ID USE OF JOINTS, WHEN JOINTS
ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A
SUPPORT POST, WITH A MINIMUM 6-INCH OVERLAP, AND SECURELY
FASTENED AT BOTH ENDS TO THE POST,
2, POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN
SECURELY INTO THE GROUND (MINIMUM OF 30 INCHES),
3. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8 INCHES WIDE AND 12
INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE
BARRIER, THIS TRENCH SHALL BE BACKFILLED WITH NATIVE VEGETATION.
4, WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH
SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF
THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG,
TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A
MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 24 INCHES
ABOVE THE ORIGINAL GROUND SURFACE.
5, THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED
TO THE FENCE, AND 20 INCHES OF THE FABRIC SHALL BE EXTENDED :NT❑
THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 24 INCHES
ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE
STAPLED TO EXISTING TREES,
6, FILTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE
AREA HAS BEEN PERMANENTLY STABILIZED.
7, FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH
RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL, ANY
REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY,
8, SILT FENCES WILL BE INSTALLED PARALLEL TO ANY SLOPE CONTOURS,
9, CONTRIBUTING LENGTH TO FENCE WILL NOT BE GREATER THAN 100 FEET,
10, DO NOT INSTALL BELOW AN OUTLET PIPE OR WEIR,
11. INSTALL D❑WNSL❑PE OF EXPOSED AREAS,
12. DO NOT DRIVE OVER OR FILL OVER SILT FENCES,
PERMANENT EROSION CONTROL SEEDING
1. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES
SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL
SPREADERS AND SEDIMENT BASINS,
2, THE SEED BED SHALL BE FIRM WITH FAIRLY FINE SURFACE, FOLL❑WING
SURFACE ROUGHENING, PERFORM ALL OPERATIONS ACCROSS OR
PERPENDICULAR TO THE SLOPE,
3, SEEDING MIXTURE SHALL BE AS SHOWN BELOW, AND SHALL BE APPLIED
AT THE RATE OF 120 POUNDS PER ACRE,
4, SEED BEDS PLANTED BETWEEN MAY 15 AND AUGUST 15 WILL REQUIRE
IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND
PROTECT THE ROOT STRUCTURE.
5, SEED BEDS PLANTED BETWEEN NOVEMBER 1 AND APRIL 30, ARMORING OF
THE SEED BED WILL BE NECESSARY, (e.g., GEOTEXTILES, JUTE MAT,
CLEAR PLASTIC C❑VERING).
6, FERTILIZERS ARE TO BE USED ACC❑RDING TO SUPPLIERS'
RECOMMENDATIONS, AMOUNTS SHOULD BE MINIMIZED, ESPECIALLY ADJACENT
TO WATER BODIES AND WETLANDS,
USE THE FOLLOWING RECOMMENDED SEED MIXTURE FOR EROSION CONTROL,
OR A KITSAP COUNTY APPROVED ALTERNATE SEED MIXTURE.
PROPORTIONS PURITY
NAME BY WEIGHT (%) (%)
KENTUCKY BLUEGRASS (POA PRATENSIS) 15
PERENNIAL RYE (LOLIUM PERENNE ) 30
CHEWING FESCUE 15
(FESTUCA RUBRA COMMUTATA)
(JAMESTOWN, BANNER, SHADOW, KOKET)
TALL FESCUE 40
(FESTUCA ARUNDINCEA)
STABILIZED CONSTRUCTION ENTRANCE
85
95
95
GERMINATION
(%)
80
90
90
95 90
1. TEMPORARY STABILIZED CONSTRUCTION INGRESS/ EGRESS SHALL BE
LIMITED TO ONE LOCATION, IF POSSIBLE, AND BE CONSTRUCTED PER
THE 'STABILIZED C❑NSTRUCTI❑N ENTRANCE' DETAIL ON THIS SHEET,
ADDITI❑NAL ROCK SHALL BE ADDED PERIODICALLY TO MAINTAIN PROPER
FUNCTION OF THE PAD.
2. THE WIDTH OF THE TEMPORARY CONSTRUCTION ENTRANCE SHALL BE
A MINIMUM OF 15 FEET WIDE WITH A 25 FT RADIUS. HOWEVER, THIS
AREA SHALL BE INCREASED IF NECESSARY TO ACCOMODATE
CONSTRUCTION EQUIPMENT ENTERING AND LEAVING THE C❑NSTRUCTI❑N
SITE,
3. IF THE STABILIZED CONSTRUCTION ENTRANCE PAD DOES NOT
ADEQUATELY REMOVE MUD FROM THE VEHICLE WHEELS, THE WHEELS
SHALL BE HOSED OFF BEFORE LEAVING THE PROJECT SITE, THE
WASHING SHALL BE COMPLETED OVER QUARRY SPALLS OR CRUSHED
ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR SILT
FENCE.
4 IN TO 8 IN
QUARRY SPALLS
PLACED AT 12 IN
MINIMUM DEPTH
R=25 FT MIN
20 FT MIN
PAVED ROADWAY
50 FT MIN
STABILIZED C❑NSTRUCTI❑N ENTRANCE
N.T.S.
ADDRESS
ANDREW WHYTE
XXX NW COSTA VIDA WAY
PAULSB❑, WASHINGT❑N, 98370
PARCEL 042601-2-044-2005. 042601-2-036-2005
CALL 3EE❑RE YOU DIG!
CALL 2 WORKING DAYS
BEFORE YOU DIG!
811
UTILITIES
UNDERGROUND
LOCATION CENTER
WWW.CALLBEF❑REY❑UDIG,C❑M
_��✓ATER PR❑PE
LLC
DRAI\AGE PLA
RTIES
OWNER:
G❑LDWATER PR❑PERTIES
LLC
P❑ BOX 3390
RENT❑N, WA 98056
PHONE: 425-941-3684
ENGINEER:
ENVIR❑TECH ENGINEERING
P.❑.B❑X 984
BELFAIR, WASHINGT❑N 98528
PHONE: (360) 275-9374
FAX: (360) 275-4789
DRAWN BY:
RJM
DATE:
2/17/16
DESIGNED BY:
RJM/MCS
DATE:
2/17/16
CHECKED BY:
Michael Staten, PE,
DATE:
2/17/16
REVISIONS:
REV.
DESCRIPTION
BY
DATE
SHEET
SHEET 3 OF 3
J