Loading...
HomeMy WebLinkAboutGoldwater Properties Drainage Plan - BLD Plot / Site Plans - 12/17/2016'NEYSUCKL LN DAYTON AIRP❑RT RD EELLS HILL RD VICINITY MAP N.T.S. 3AL DESCRIPTI❑N SE SW SURVEY 5/69 "E ADDRESS DWATER PR❑PERTIES LLC HONEYSUCKLE LANE _TON, WASHINGT❑N, 98584 :EL 43132-34-03000 IGEND EXISTING TOPOGRAPHY PROPOSED TOPOGRAPHY • PROPERTY CORNER S❑IL TEST PIT PROPERTY LINE TP1 —D • ROW/ EASEMENT AVERAGE SLOPES SILT FENCE VEGETATI❑N BUFFER BUILDING SETBACK CLEARING LIMITS DRAINAGE DIRECTI❑N ELEVATI❑N I\DEX OF SHEETS SHEET 1 OF 3 SHEET 2 OF 3 SHEET 3 OF 3 TYPE 50 C.B. I,E, N IN: 357,46 I.E. E IN: 357,67 I.E. S OUT: 357.46 DATUM: NAVD 88 PROPOSED STRUCTURE (TYP) ROOF AREA = 3000 SQ. FT. FF = 362 FT ROOF DRAINAGE SYSTEM 6" S❑LID PVC PIPE L= 262' S= 0,5% TYPE 50 C,B. LE, IN: 357,69 I.E. OUT: 357,69 6" S❑LID PVC PIPE (TYP) L= 47' S= 0,5% TYPE 50 C.B. I,E, N IN: 357,22 I.E. E IN: 357,67 I,E, S OUT: 357.22 6" S❑LID PVC PIPE L= 53' S=6,1% COVER SHEET; VICINITY MAP, EXISTING/ PROPOSED C❑NDITI❑NS DETAILS AND NOTES TEMPORARY AND PERMANENT ER❑SI❑N CONTROL +1 aJ co R SIFT; LWAT R A 76' D R XISTI\ PF RTI 2' DEEP BI❑—INFILTRATI❑N SWALE (SEE DETAILS) 6" S❑LID PVC PIPE L= 268" S= 0,5% 6' DEEP INFILTRATI❑N FACILITY ESTIVATE OF QUANTITIES CUT FILL = 40 CY = 40 CY 660± /PR S LL:, SFD DRaI \DI \A 1- 5' FILTER STRIP (SEE DETAILS) o-■ PROPOSED PARKING PROPOSED SEPTIC DRAINFIELD - t4TP1 TP2 PROPOSED STRUCTURE ROOF AREA = 1000 SQ, FT. FF = 362 FT. PROPOSED STRUCTURE (TYP) ROOF AREA = 1000 SQ. FT. FF = 362 FT CLEARING LIMITS \S 40' INFILTRATI❑N TRENCH (SEE DETAILS) F❑GTITE CATCHBASIN (SEE DETAILS) PROPOSED STRUCTURE ROOF AREA = 1292 SQ,FT, FF = 362 FT, PROPOSED DRIVEWAY 5' FILTER STRIP (SEE DETAILS) PROPOSED SINGLE FAMILY RESIDENCE ROOF AREA = 3276 SQ. FT. FF = 362 FT, 12" F❑GTITE CATCHBASIN (SEE DETAILS) +i cu co (2) 50' INFILTRATI❑N TRENCHES (SEE DETAILS) S❑IL LOG: TP1: BROWN SILTY GRAVEL (GM) WITH SAND. GRAVEL 60%, SAND 25%, SILT 15%. TP2: BROWN SILTY GRAVEL (GM) WITH SAND. GRAVEL 60%, SAND 25%, SILT 15%. SCALE:1"=60' 0 15 30 60 CALL DEFDRE YOU DIG! CALL 2 W❑RKING DAYS BEFORE YOU DIG! 811 UTILITIES UNDERGROUND L❑CATI❑N CENTER W W W,CALLBEF❑REY❑UDIG,C❑M PROJECT: G❑LDWA T ER PR❑PERTIE� LLC DRAI\AGE PLAN OWNER: G❑LDWATER PR❑PERTIE� LLC P❑ BOX 3390 RENT❑N, WA 98056 PHONE: 425-941-3684 ENGINEER: ENVIR❑TECH ENGINEERING PUB❑X 984 BELFAIR, WASHINGT❑N 98528 PHONE: (360) 275-9374 FAX: (360) 275-4789 DRAWN BY: RJM DESIGNED BY: RJM/MCS CHECKED BY: Michael Staten, P,E, DATE 2/17/ DATE 2/17/ DATE 2/17/ REVISI❑NS: REV, DESCRIPTI❑N BY DATI SHEET 1 SHEET 1 OF 3 GENERAL NOTES: 1, STORMWATER MANAGEMENT PLAN APPROVAL AND NECESSARY PERMITS REQUIRED BY THE REGULATING AGENCY SHALL BE OBTAINED BY THE CIWNER/C❑NTRACT❑R PRIOR TO THE INITIATION OF CONSTRUCTION, 2, OWNER/CONTRACTOR IS RESP❑NSIBLE FOR LOCATING AND CONFIRMING THE DEPTHS OF ALL EXISTING UTILITIES WITHIN THE LIMITS OF THE PROJECT, AND MAINTAIN APPROPRIATE SETBACKS, 3, ALL C❑NSTRUCTI❑N MATERIALS, W❑RKMANSHIP AND INSTALLATION PRACTICES INCLUDING BUT NOT LIMITED TO BACKFILL MATERIAL, BEDDING MATERIAL, COMPACTION EFFORT AND UTILITIES SHALL BE COMPLETED PER APPLICABLE CODES, LOCAL STANDARDS, COUNTY STANDARDS, AND/OR THE STATE OF WASHINGT❑N STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION. 4, IT IS RECOMMENDED THAT ALL SURVEYING AND CONSTRUCTION STAKING BE PERFORMED OR SUPERVISED BY A PROFESSIONAL LICENSED SURVEYOR FROM THE STATE OF WASHINGT❑N, OWNER IS RESPONSIBLE FOR ASSURING ALL WORK IS WITHIN THE OWNER'S PROPERTY AND REQUIRED SETBACKS, 5, OWNER/CONTRACTOR SHALL BE RESP❑NSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS OR ANY OTHER REQUIRED ACTIONS TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC IN CONNECTION WITH THE PERFORMANCE OF WORK ON THESE CONSTRUCTION PLANS. TRAFFIC CONTROL MAY BE REQUIRED PER THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL C❑NSTRUCTI❑N, 6, OWNER/CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN THE EVENT OR DISCOVERY OF POOR DRAINING SOILS, STANDING GROUNDWATER, OR SEVERE DISCRPANCIES FROM S❑IL INFORMATION PRESENTED ON THESE PLANS, 7, SURVEY INFORMATION PRESENTED ON THESE PLANS WERE GATHERED FOR T❑P❑GRAPHIC PURPOSES ONLY, AND SHALL NOT BE INTERPRETED AS A BOUNDARY SURVEY, PROPERTY LINES MUST BE VERIFIED, AND APPLICALBLE SETBACKS MUST BE ADHERED TO. 8, OWNER/CONTRACTOR MUST VERIFY THE QUANTITY ESTIMATES AS PRESENTED ON SHEET 1 OF THESE PLANS. 9, OWNER/CONTRACTOR SHALL DEFINE CLEARING LIMITS. DELINEATION MAY BE ACCOMPLISHED BY FLAGGING OR OTHER IDENTIFICATION. 10, THESE CONSTRUCTION PLANS ARE APPROVED BY THE REGULATING ENTITY AND MAY REQUIRE THE CORRECTION OF ERRORS IN THE PLANS WHERE SUCH ERRORS ARE SUBSEQUENTLY FOUND TO BE IN VIOLATION OF ANY LAW, ORDINANCE, HEALTH, SAFETY OR OTHER DESIGN ISSUE. 11, A COPY OF THESE APPROVED STORMWATER MANAGEMENT PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS, 12, THE STORMWATER MANAGEMENT SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THESE APPR❑VEI) PLANS. ANY SIGNIFICANT DEVIATION FROM THESE APPROVED PLANS SHALL REQUIRE WRITTEN APPROVAL FROM THE REGULATING AGENCY AND/OR ENGINEER. 13, EXISTING SOILS AND TERRAIN, AND PROPOSED STORMWATER MANAGEMENT FACILITIES AND LAND MODIFICATIONS AS SHOWN ON THESE CONSTRUCTION PLANS ARE DESIGNED PER THE 2005 "STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN," CALCULATIONS INDICATE THAT ALL POLLUTED RUNOFF DUE TO A 24-HOUR, 6-MONTH STORM EVENT WILL BE TREATED AND INFILTRATED ❑N-SITE, 14, IN ADDITION TO STAKING DRAINAGE FACILIITES, SEPTIC DRAINFIELDS OR SEWER LINES SHALL BE DESIGNED AND APPROVED PRIOR TO SITING BUILDINGS AND DRAINAGE FACILIES IN ORDER TO MAINTAIN NECESSARY SETBACKS. PAVEMENT NOTES: 1, ALL W❑RKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL C❑NSTRUCTI❑N (WSDOT/ APWA), 2, ASPHALT CONCRETE SHALL BE CLASS 'B' AND ALL ASPHALT PAVING SHALL CONFORM TO THE SPECIFICATIONS OUTLINED IN WSDOT/ APWA, 3, SURFACING COARSE AND BASE COARSE MATERIALS SHALL BE WITHIN ACCORDANCE OF THE WSDOT/ APWA. 4, SUBGRADE BENEATH PAVEMENTS SHALL BE COMPACTED TO 95% MAXIMUM DENSITY. UNSUITABLE SUBGRADE MATERIAL SHALL BE REMOVED, REPLACED AND COMPACTED WITH GRAVEL BORROW PER WSDOT/ APWA. 5, THE PAVEMENT STRUCTURAL SECTION SHOULD BE SMOOTHED OR ROUNDED AT GRADE BREAKS TO ENHANCE DRIVEABILITY, INFILTRATION BASIN NOTES: 1, THE 25 FEET BY 76 FEET BASIN SIZE REFERS TO THE FLOOR AREA OF THE BASIN. 2, SIDESL❑PES FOR INFILTRATION BASIN SHALL BE A MINIMUM OF 3:1, 3, INITIAL BASIN EXCAVATION SHOULD BE CARRIED TO WITHIN 1 FOOT OF THE FINAL ELEVATION OF THE BASIN FLOOR. FINAL EXCAVATION TO THE FINISHED GRADE SHOULD BE DEFERRED UNTIL ALL DISTURBED AREAS IN THE WATERSHED HAVE BEEN STABILIZED OR PROTECTED. 4, IF REQUIRED BY THE COUNTY, A HEALTHY STAND OF VEGETATION IS TO BE ESTABLISHED ON THE BASIN FLOOR AND SIDESL❑PES. 2° COMPACTED ASPHALT _ CONCRETE PAVEMENT, CLASS A 2" MIN CRUSHED SURFACING COARSE 6" MIN COMPACTED GRAVEL BASE COARSE CLASS 'B' PER WSDOT/APWA NATIVE SUBGRADE, REC❑MPACTED, SURFACING COURSE REQUIREMENTS: SURFACING COURSE REQUIREMENTS SHALL BE PER WSDOT 9-03.9(3)CRUSHED SURFACING, US STAND. SIEVE XFINER(BY WT.) 3/4' 1/2' NO, 4 NO, 40 NO, 200 PROPERTY Y FRACTURE (US #10+) SAND EQUIVALENT LA WEAR DEGRADATION FACTOR 100 80-100 46-66 8-24 10,0 MAX SURFACING 75 MIN. 40 MIN, 35% MAX 25 MIN BASE COURSE REQUIREMENTS: GRAVEL FOR BASE COURSE REQUIREMENTS SHALL BE PER WSDOT 9-03.12(1)B CLASS B GRAVEL, US STAND. SIEVE XFINER(BY WT.) 2' NO. 4 NO, 200 75-100 22-100 0-10 PROPERTY SPECIFICATIONS DUST RATIO SAND EQUIVALENT 2/3 MAX 30 MIN, GRAVEL FOR PIPE ZONE BEDDING: GRAVEL BACKFILL FOR PIPE ZONE BEDDING SHALL BE PER WSDOT 9-03.12(3), US STAND. SIEVE XFINER(BY WT.) 1 1/2' 1' 5/8' ND. 4 NO. 40 NO. 200 100 75-100 50-100 20-80 3-24 0-10 PROPERTY SPECIFICATIONS SAND EQUIVALENT 35 MIN, C❑NSTRUCTI❑N SEQUENCE: TYPE 1 CATCH BASIN NOTES: 1, AS ACCEPTABLE ALTERNATIVES TO THE REBAR SHOWN IN THE PRECAST BASE SECTION, FIBERS (PLACED ACCORDING TO THE STANDARD SPECIFICATIONS), OR WIRE MESH HAVING A MINIMUM AREA OF 0,12 SQUARE INCHES PER FOOT SHALL BE USED WITH THE MINIMUM REQUIRED REBAR SHOWN REBAR SHOWN IN THE ALTERNATIVE PRECAST BASE SECTION, WIRE MESH SHALL NOT BE PLACED IN THE KNOCKOUTS. 2, THE KNOCKOUT DIAMETER SHALL NOT BE GREATER THAN 20'. KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2' MINIMUM TO 2.5' MAXIMUM, PR❑VIDE A 1,5" MINIMUM GAP BETWEEN THE KNOCKOUT WALL AND THE OUTSIDE OF THE PIPE. AFTER THE PIPE IS INSTALLED, FILL THE GAP WITH JDINT MORTAR IN ACCORDANCE WITH STANDARD SPECIFICATION 9,04.3. 3, THE MAXIMUM DEPTH FROM THE FINISHED GRADE TO THE LOWEST PIPE INVERT SHALL BE 5', 4, THE FRAME AND GRATE MAY BE INSTALLED WITH THE FLANGE UP OR DOWN. THE FRAME MAY BE CAST INT❑ THE ADJUSTMENT SECTION. 5, THE PRECAST BASE SECTION MAY HAVE A ROUNDED FLOOR, AND THE WALLS MAY BE SLOPED AT A RATE OF 1:24 OR STEEPER. 6, THE OPENING SHALL BE MEASURED AT THE TOP OF THE PRECAST BASE SECTION, 7, THE FOLLOWING PIPE ALLOWANCES SHALL BE ADHERED TO: PIPE MATERIAL MAX, INSIDE DIAMETER REINFORCED OR PLAIN CONCRETE 12' ALL METAL PIPE 15' CPSSP* (STD. SPEC. 9-05.20) 12' S❑LID WALL PVC: (STD. SPEC. 9-05.12(1)) 15' PR❑FILE WALL PVC (STD. SPEC. 9-05.12(2)) 15' *CORRUGATED POLYETHYLENE STORM SEWER PIPE 1, CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE. 2, EXCAVATE TO INITIAL INFILTRATION BASIN DEPTH, 3, PERFORM INITIAL EARTHWORK, SUBEXCAVATI❑N, FILL, AND ROUGH GRADING BASED ON APPROVED DESIGN, 4, INSTALL ADDITI❑NAL TEMPORARY EROSION CONTROL FACILITIES, IF NECESSARY, 5, MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL FACILITIES, AS NEEDED, IN ORDER TO PROVIDE THE REQUIRED PROTECTION OF DOWNSTREAM WATER QUALITY. 6, INSTALL CULVERT, 7, PLACE AND COMPACT BASE MATERIAL AND ASPHALT C❑NCRETE, 8, COMPLETE PERMANENT EROSION CONTROL IN ORDER TO STABILIZE THE PROJECT. 9, REMOVE TEMPORARY EROSION SEDIMENTATION CONTROL FACILITIES AFTER CONSTRUCTION IS COMPLETE, THE SITE IS SUFFICIENTLY STABILIZED, AND ACCEPTED BY THE C❑UNTY, BUILDING ROOF DRAIN 4' DIA, MIN,. SOLID PVC GRATE LID FINE MESH SCREEN 11' 12,5' y � 11' 12,5' F❑GTITE CATCH BASIN - DETAIL N.T.S. GROUND SURFACE " MIN F❑GTITE CATCH BASIN 12X12 YARD DRAIN ►•••••••• • • • •••••••••••••••k. 114)4•••••Vddad4401444•DAU. UNSUITABLE SUBGRADE SHALL BE REMOVED (SEE NOTES) PAVEMENT DETAIL N.T.S. 10 FT MIN BACKFILL ENCOMPASS DRAINR❑CK WITH FILTER FABRIC 111 DIA, MIN. S❑LID PVC ROOF DRAINAGE DETAILS N.T.S. 4' CRUSHED SURFACING COARSE, COMPACTED COMPACTED STRUCTUAL FILL, DEPTH VARIES TO BRING TO GRADE, STRONGLY SUGGEST 4' OF GRAVEL BASE COARSE, CLASS B PER WSDOT/APWA FOR FUTURE PAVEMENT UNDISTURBED COMPETENT SUBGRADE, OR RE -COMPACTED UPPER 8' TO 95%, FREE OF DELETERI❑US MATERIAL AND TOP S❑IL 3/4' - 1 1/2' WASHED DRAIN ROCK TRENCH BOTTOM TO BE 1 FT MIN. ABOVE SEASONAL HIGH GROUNDWATER OR IMPERVI❑US SURFACE HOUSE ROADWAY -DETAIL NOT TO SCALE PROPOSED BUILDING 2 PROPOSED BUILDING 2 i 6 FT TYPICAL GRADING BETWEEN BUILDINGS - CROSS SECTION N.T.S. ROOF DRAIN. SEE ROOF DOWNSPOUT C❑NNECTI❑N DETAIL S❑LID LID 4" DIA. MIN. S❑LID PVC 7' KNOCKOUTS 4 SIDES GRASS -LINED SWALE TOP SOIL, 8' MIN THICKNESS (SEE NOTES) 0,5% MAX FINE MESH SCREEN DESIGNED WATER HEIGHT 100YR 24HR STORM 25FT 5 FT INFILTRATION BASIN SECTION A -A N.T.S. TYPE 1 CATCH BASIN ROOF DRAINAGE DETAILS N.T.S. NOTES: 1, VEGETATE GROUND UPSL❑PE FROM GRASS LINED SWALE, (SEE NOTES) 24' MIN (6) 4' DIA. MIN PERFORATED PVC PIPE " MIN ' MIN SWALE DETAIL NTS GROUND SURFACE �11=111�v 4' 4' DIA. PVC S❑LID WALL PIPE GROUND SURFACE 0, 5% MAX x S❑LID PIPE PER PLAN. ENCASE w/ LARGER PIPE OR GROUT BENEATH DRIVEWAYS. 34' 6' ONE #3 BAR HOOP FOR 6' HEIGHT TWO #3 BAR HOOP FOR 12' HEIGHT #3 BAR EACH CORNER PRECAST BASE SECTION #3 BAR EACH SIDE 24' 26' (SEE NOTE 6) /22. (SEE NOTE 6) C� TYPE CH BAS 30' 20' oa0 #3 BAR EACH WAY ROOF DOWNSPOUT 6' OR 12' RECTANGULAR ADJUSTMENT SECTION TYPE 1 CATCH BASIN DETAIL N.T.S. UNGLUED CAP, CUTOUT NEATLY TO ACCEPT DOWNSPOUT 4' DIA. PVC 45° ELBOW ROOF DOWNSPOUT C❑NNECTI❑N CLEAN❑UT DETAILS N.T.S. FRAME AND VANED GRATE CALL BEFORE YOU DIG! CALL 2 WORKING DAYS BEFORE YOU DIG! 811 UTILITIES UNDERGROUND LOCATION CENTER W W W,CALLBEFOREYGUDIG,C❑M PROJECT' G❑LDWA-ER PROPERTIES LLC DRAI\AGE PLAN OWNER' G❑LDWATER PR❑PERTIES LLC P❑ BOX 3390 RENT❑N, WA 98056 PHONE: 425-941-3684 ENGINEER: ENVIR❑TECH ENGINEERING P,❑,B❑X 984 BELFAIR, WASHINGT❑N 98528 PHONE' (360) 275-9374 FAX: (360) 275-4789 DRAWN BY: RJM DATE: 2/17/16 DESIGNED BY: RJM/MCS DATE: 2/17/16 CHECKED BY: Michael Staten, P.E. DATE: 2/17/16 REVISIONS' REV, DESCRIPTION BY DATE SHEET SHEET 2 OF 3 1 GENERAL NOTES MINIMUM EROSION AND SEDIMENTATION CONTROL REQUIREMENTS NETS AND MATS PLASTIC C❑VERING R 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO THE MOST CURRENT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL C❑NSTRUCTI❑N PREPARED BY WSDOT AND APWA AS ADOPTED BY THE KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS (KCPW). 2. - ANY REVISIONS TO THE ACCEPTED CONSTRUCTION DRAWINGS MUST BE APPROVED BY THE PROJECT ENGINEER, 3, THE CONTRACTOR SHALL MAINTAIN A SET OF THE ACCEPTED C❑NTRUCTI❑N DRAWINGS ❑N-SITE AT ALL TIMES WHILE C❑NSTRUCTI❑N IS IN PROGRESS. 4, IT SHALL BE THE RESP❑NSIBILTY OF THE CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS FROM THE KCPW PRIOR TO COMMENCING ANY WORK WITHIN COUNTY RIGHT-OF-WAY. 5, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL AT ALL TIMES DURING CONSTRUCTION ALONGSIDE OR WITHIN ALL PUBLIC ROADWAYS, TRAFFIC FLOW ON EXISTING PUBLIC ROADWAYS SHALL BE MAINTAINED AT ALL TIMES, UNLESS PERMISSION IS OBTAINED FROM THE KCPW FOR ROAD CLOSURE AND/OR DET❑URS, 6. THE L❑CATIONS OF EXISTING UTILITIES ON THIS PLAN IS APPROXIMATE ONLY, THE CONTRACTOR SHALL CONTRACT THE 'UNDERGROUND LOCATE' CENTER AT PH: 811 AND NON -SUBSCRIBING INDIVIDUAL UTILITY COMPANIES 48 HOURS IN ADVANCE OF THE COMMENCEMENT OF ANY C❑NSTRUCTI❑N ACTIVITY. THE CONTRACTOR SHALL PROVIDE FOR PROTECTION OF EXISTING UTILITIES FROM DAMAGE CAUSED BY THE CONTRACTOR'S ❑PERATI❑NS, 7, ROCKERIES OR OTHER RETAINING FACILITIES EXCEEDING 4 FT. HEIGHT REQUIRE A SEPARATE BUILDING PERMIT. 8. A 'FORESTRY PRACTICES' PERMIT MAY BE REQUIRED PRIOR TO CLEARING OF THE SITE. 9. IT IS RECOMMENDED THAT ALL SURVEYING AND C❑NSTRUCTI❑N STAKING BE PERFORMED OR SUPERVISED A PROFESSI❑NAL LICENSED SURVEYOR FROM THE STATE OF WASHINGT❑N, 10. OWNER/CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARDS OR ANY OTHER REQUIRED ACTIONS TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC IN CONNECTION WITH THE PERFORMANCE OF WORK ON THESE CONSTRUCTION PLANS. TRAFFIC CONTROL MAY BE REQUIRED PER THE STATE OF WASHINGT❑N STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL C❑NSTRUCTI❑N. 11. OWNER/CONTRACTOR SHALL N❑TIFY THE PROJECT ENGINEER IN THE EVENT OR DISC❑VERY OF POOR DRAINING S❑ILS, STANDING GROUNDWATER, OR SEVERE DISCRPANCIES FROM S❑IL INFORMATION PRESENTED ON THESE PLANS, 12. SURVEY INFORMATION PRESENTED ON THESE PLANS WERE GATHERED FOR TOPOGRAPHIC PURPOSES ONLY, AND SHALL NOT BE INTERPRETED AS A BOUNDARY SURVEY, PROPERTY LINES MUST BE VERIFIED, AND APPLICALBLE SETBACKS MUST BE ADHERED TO. 13. OWNER/CONTRACTOR MUST VERIFY THE QUANTITY ESTIMATES AS PRESENTED ON SHEET 1 OF THESE PLANS. 14. THESE CONSTRUCTION PLANS ARE APPROVED BY THE COUNTY AND MAY REQUIRE THE CORRECTION OF ERRORS IN THE PLANS WHERE SUCH ERRORS ARE SUBSEQUENTLY FOUND TO BE IN VIOLATION OF ANY LAW, ORDINANCE, HEALTH, SAFETY OR OTHER DESIGN ISSUE, 15. IN ADDITION TO STAKING DRAINAGE FACILIITES, SEPTIC DRAINFIELDS SHOULD BE DESIGNED AND APPROVED PRIOR TO SITING BUILDINGS IN ORDER TO MAINTAIN NECESSARY SETBACKS. DRAINAGE NOTES 1. THE CONTRACTOR SHALL ENSURE THAT THE DRAINAGE IS INSTALLED AND OPERATIONAL PRIOR TO COMMENCEMENT OF PAVING WORK, 2, ALL STEEL PIPE AND PARTS SHALL BE GALVANIZED, ALL SUBMERGED STEEL PIPES AND PARTS SHALL BE GALVANIZED AND HAVE ASPHALT TREATMENT #1 OR BETTER, 3. DRAINAGE STUBOUTS ON INDIVDUAL LOTS SHALL BE LOCATED WITH A FIVE FOOT HIGH 2'X 4' STAKE MARKED 'STORM'. THE STUBOUT SHALL EXTEND ABOVE SURFACE LEVEL AND BE SECURED TO THE STAKE, GRADING NOTES 1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN THE EVENT OR DISC❑VERY OF POOR S❑ILS, GROUNDWATER OR DISCREPANCIES IN THE EXISTING CONDITIONS AS NOTED ON THE PLANS. 2. MAXIMUM SLOPE STEEPNESS SHALL BE 211 HORIZONTAL: VERTICAL FOR CUT AND FILL SLOPES. 3. UNLESS OTHERWISE SPECIFIED, ALL EMBANKMENTS IN THE PLAN SET SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 2-03.3 (14) B OF THE WSDOT STANDARD SPECIFICATIONS. EMBANKMENT COMPACTIONS SHALL CONFORM TO SECTION 2-03.3 (14) C, METHOD B OF SAID STANDARD SPECIFICATIONS, 4, EMBANKMENTS DESIGNED TO IMP❑UND WATER SHALL BE COMPACTED 95% MAXIMUM DENSITY PER SECTION 2-03.3(14) C, METHOD C OF WSDOT STANDARD SPECIFICATIONS. 5. ALL AREAS RECEIVING FILL MATERIAL SHALL BE PREPARED BY REM❑VING VEGETATION, NONCOMPLYING FILL, TOPSOIL AND OTHER UNSUITABLE MATERIAL, BY SCARIFYING THE SURFACE TO PR❑VIDE A BOND WITH THE NEW FILL, AND WHERE SLOPES ARE STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL AND THE HEIGHT IS GREATER THAN 5 FT BY BENCHING INTO SOUND COMPETENT MATERIAL AS DETERMINED BY A S❑IL ENGINEER. GENERAL EROSION AND SEDIMENTATION CONTROL NOTES 1. THE F❑LL❑WING EROSION AND SEDIMENTATION CONTROL NOTES APPLY TO ALL CONSTRUCTION SITE ACTIVITIES AT ALL TIMES, UNLESS OTHERWISE SPECIFIED ON THESE PLANS. 2. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL PLAN DOES NOT CONSTITUTE AN ACCEPTANCE OF THE PERMANENT ROAD OR DRAINAGE DESIGN. 3. THE OWNER AND HIS/HER CONTRACTOR SHALL BE RESPONSIBLE AT ALL TIMES FOR PREVENTING SILT -LADEN RUNOFF FROM DISCHARGING FROM THE PROJECT SITE, FAILURE BY THE OWNER AND/OR CONTRACTOR CAN RESULT IN A FINE. THE DESIGNATED TEMPORARY CONTACT PERSON NOTED ON THIS PLAN MUST BE AVAILABLE FOR CONTACT BY PHONE ON A 24 HOUR BASIS THROUGHOUT C❑NSTUCTI❑N AND UNTIL THE PROJECT HAS BEEN COMPLETED AND ACCEPTED BY THE COUNTY. 4. THE IMPLENTATION OF THESE ESC PLANS AND THE C❑NSTRUCTI❑N, MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE FACILITIES IS THE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR FROM THE BEGINNING OF C❑NSTRUCTI❑N UNTIL ALL IS COMPLETED AND ACCEPTED BY THE COUNTY AND THE SITE IS STABILIZED. 5, PRIOR TO BEGINNING ANY WORK ON THE PROJECT SITE, A PRECONSTUCTION CONFERENCE MUST BE HELD, AND SHALL BE ATTENDED BY THE GENERAL CONTRACTOR, THE PROJECT ENGINEER,REPRESENTATIVES FROM THE AFFECTED UTILITIES, AND A REPRESENTATIVE OF KITSAP C❑UNTY, 6. THE EROSION AND SEDEMENTATI❑N CONTROL FACILITIES SHOWN ON THIS PLAN ARE TO BE C❑NSIDERED ADEQUATE BASIC REQUIREMENTS FOR THE ANTICIPATED SITE CONDITIONS. DURING C❑NSTUCTI❑N, DEVIATIONS FROM THIS PLAN MAY BE NECESSARY IN ORDER TO MAINTAIN WATER QUALITY. MINOR DEPARTURES FROM THIS PLAN ARE PERMITTED SUBJECT TO THE APPROVAL OF THE COUNTY INSPECTOR. HOWEVER, EXECPT FOR EMERGENCY SITUATIONS, ALL OTHER DEVIATIONS FROM THIS PLAN MUST BE DESIGNED BY THE PROJECT ENGINEER AND APPROVED BY KITSAP COUNTY PRIOR TO INSTALLATION, 7. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED BY THE OWNER AND/OR CONTRACTOR ON A FREQUENT BASIS IMMEDIATELY AFTER EACH RAINFALL, AND MAINTAINED AS NESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. ALL SEDIMENT MUST BE REMOVED FROM SILT FENCES, SEDIMENT PONDS, ETC, PRIOR TO THE SEDIMENT REACHING A DEPTH OF 6 INCHES, 8. AT NO TIME SHALL CONCRETE, CONCRETE BY-PRODUCTS, VEHICLE FLUIDS, PAINT, CHEMICALS, OR OTHER POLLUTING MATTER BE PERMITTED TO DISCHARGE TO THE TEMPORARY OR PERMANENT DRAINAGE SYSTEM, OR TO DISCHARGE FROM THE PROJECT SITE. 9, PERMANENT DETENTION/RETENTION PONDS, PIPES, TANKS, OR VAULTS MAY ONLY BE USED FOR SEDIMENT CONTAINMENT WHEN SPECIFICALLY INDICATED ON THESE PLANS. TEMPORARY EROSION AND SEDIMENTATION CONTROL MAINTENANCE REQUIREMENTS 1. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE INSPECTED AFTER EACH STORM EVENT AND DAILY DURING PROLONGED RAINFALL. 2. NECESSARY REPAIR OR REPLACMENT OF FACILITIES SHALL BE ACC❑MPLISHED PROMPTLY, 3, SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT OR WHEN LEVEL OF DEPOSITION REACHES APPR❑XIMATELY ONE-HALF THE MAXIMUM POTENTIAL DEPTH. 4. SEDIMENT DEP❑SITS REMAINING IN PLACE AFTER THE ESC FACILITIES ARE NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 5, TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE MAINTANED BY; ANDREW WHYTE 6409 BALZ❑W ROAD NE SUQUAMISH, WASHINGT❑N 98392 ANDREW WHYTE 24HR EMERGENCY CONTACT NUMBER (206) 877-3234 INSPECTION SCHEDULE THE CONTRACTOR SHALL N❑TIFY COMMUNITY DEVELOPMENT TO ARRANGE FOR INSPECTION OF THE VARIOUS PHASES OF WORK CHECKED BELOW. ALL INSPECTIONS SHALL BE COMPLETED PRIOR TO PROCEEDING WITH THE NEXT PHASE OF WORK, 1. CLEARING LIMITS. 2. IMPLEMENTATION OF THE VARI❑US PHASES OF THE EROSION AND SEDIMENTATION CONTROL PLAN. 3. PLACEMENT OF DRAINAGE STRUCTURES PRIOR TO BACK FILLING, INCLUDING POND EMBANKMENTS. 4. FINAL INSPECTION. 5. INSPECTION OF PREPARED SUB -GRADE, 6. INSPECTION OF GRAVEL BASE PLACEMENT. 7. INSPECTION OF FINE GRADING PRIOR TO PAVING. 8. INSPECTION OF PAVING ❑PERATI❑NS. 9. FINAL INSPECTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK PERFORMED AND SHALL ENSURE THAT C❑NSRUCTI❑N IS ACCECTIBLE TO KITSAP C❑UNTY, IF INSPECTION IS NOT CALLED FOR PRIOR TO COMPLETION OF ANY ITEM OF WORK S❑ DESIGNATED, SPECIAL DESTRUCTIVE AND/OR N❑N-DESTRUCTIVE TESTING PROCEDURES MAY BE REQUIRED TO ENSURE THE ACCEPTABILITY OF THE WORK. IF SUCH PROCEDURES ARE REQUIRED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE TESTING AND/OR RESTORATION OF THE W❑RK, C❑NSTUCTI❑N SEQUENCE 1. APPLY FOR AND PICK UP ANY RIGHT OF WAY PERMITS, IF PROJECT REQUIRES, FROM KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS. 2. C❑NSTUCT STABILIZED CONSTRUCTION ENTRANCE(S) AS SOON AS POSSIBLE. 3. CONSTRUCT FILTER FENCE BARRIERS, IF NECESSARY, 4, CONSTRUCT SEDIMENT BASINS, IF NECESSARY, 5. C❑NSTUCT RUNOFF INTERCEPTION AND DIVERSION DITCHES. 6, CLEAR AND GRADE THE MINIMUM SITE AREA REQUIRED FOR C❑NSTUCTI❑N OF THE VARI❑US PHASES OF WORK. 7. PR❑VIDE TEMPORARY HYDROSEEDING OR OTHER SOURCE CONTROL STABILIZATION MEASURES ON ALL DISTURBED S❑ILS. 8. MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL FACILITIES TO PR❑VIDE THE REQUIRED PROTECTION OF DOWNSTREAM WATER QUALITY. 9, ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING, THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. 10. PROVIDE PERMANENT SITE STABILIZATION, 11. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL NOT BE REMOVED UNTIL C❑NSTUCTI❑N IS COMPLETE AND ACCEPTED BY KITSAP COUNTY. 1. STABILIZATION AND SEDIMENT TRAPPING. ALL EXPOSED AND UNWORKED SOILS, INCLUDING SOIL STOCKPILES, SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMPS WHICH PROTECT SOIL FROM THE EROSIVE FORCES OF RAINDROP IMPACT AND FL❑WING WATER. APPLICABLE PRACTICES INCLUDE, BUT ARE NOT LIMITED TO VEGETATIVE ESTABLISHMENT, MULCHING, PLASTIC C❑VERING, AND THE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. FROM OCTOBER 1 TO APRIL 30, NO S❑ILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPTEMBER 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 7 DAYS, 2, AT ALL TIMES OF THE YEAR, THE CONTRACTOR SHALL HAVE SUFFICIENT MATERIALS, EQUIPMENT AND LABOR ON -SITE TO STABILIZE AND PREVENT EROSION FROM ALL DENUDED AREAS WITHIN 12-HOURS AS SITE AND WEATHER CONDITIONS DICTATE. 3. FROM OCTOBER 1ST TO APRIL 30TH, THE PROJECT ENGINEER SHALL VISIT THE DEVELOPMENT SITE A MINIMUM OF ONCE PER WEEK FOR THE PURPOSE OF INSPECTING THE EROSION AND SEDIMENTATION CONTROL FACILITIES, REVIEWING THE PROGRESS OF CONSTRUCTION, AND VERIFYING THE EFFECTIVENESS OF THE EROSION CONTROL MEASURES BEING UNDERTAKEN. THE PROJECT ENGINEER SHALL IMMEDIATELY INFORM THE DIRECTOR OF ANY PROBLEMS OR POTENTIAL PROBLEMS OBSERVED DURING SAID SITE VISITS, AS WELL AS OF ANY RECOMMENDED CHANGES IN THE EROSION CONTROL MEASURES TO BE UNDERTAKEN. WHEN REQUESTED BY THE DIRECTOR, THE PROJECT ENGINEER SHALL PR❑VIDE THE DIRECTOR WITH WRITTEN RECORDS OF SAID WEEKLY SITE VISITS, INCLUDING DATES OF VISITS AND NOTED SITE OBSERVATIONS, 4. IN THE EVENT THAT GROUND ON A PROJECT SITE IS LEFT BARE AFTER SEPTEMBER 30TH, THE COUNTY MAY ISSUE A STOP WORK ORDER FOR THE ENTIRE PROJECT UNTIL SATISFACTORY CONTROLS ARE PROVIDED. IN ADDITION, THE OWNER WILL BE SUBJECT TO THE PENALTIES PROVIDED IN SECTION 10 AND SECTION 11 OF THE KITSAP COUNTY STORMWATER ORDINANCE, 5, IN THE EVENT THAT GROUND ON A PROJECT SITE IS LEFT BARE AFTER SEPTEMBER 30TH, AND THE COUNTY IS UNSUCCESSFUL IN CONTACTING THE OWNER OR HIS/HER DESIGNATED EMERGENCY CONTACT PERSON, THE COUNTY MAY ENTER THE PROJECT SITE AND INSTALL TEMPORARY GROUND COVER MEASURES AND BILL THE OWNER FOR ALL EXPENSES INCURRED BY THE COUNTY. THESE COSTS WILL BE IN ADDITION TO ANY MONETARY PENALTIES LEVIED AGAINST THE OWNER, 6. DELINEATION OF CLEARING AND EASEMENT LIMITS. CLEARING LIMITS, SETBACKS, BUFFERS, AND SENSITIVE OR CRITICAL AREAS SUCH AS STEEP SLOPES, WETLANDS AND RIPARIAN CORRIDORS SHALL BE CLEARLY MARKED IN THE FIELD AND INSPECTED BY KITSAP COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT PRIOR TO COMMENCEMENT OF LAND CLEARING ACTIVITIES, 7. PR❑TECTI❑N OF ADJACENT PR❑PERTIES. ADJACENT PR❑PERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION BY APPR❑PRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPR❑PRIATE BMPS, 8, TIMING AND STABILIZATION OF SEDIMENT TRAPPING MEASURES. SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER BMPS INTENDED TO TRAP SEDIMENT ❑N-SITE SHALL BE CONSTRUCTED AS A FIRST STEP IN GRADING. THESE BMPS SHALL BE FUNCTIONAL BEFORE LAND DISTURBING ACTIVITIES TAKE PLACE, EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE STABILIZED ACCORDING TO THE TIMING INDICATED IN ITEM (1) ABOVE. 9. SLOPE STABILIZATION. CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION, ROUGHENED S❑IL SURFACES ARE PREFERRED TO SMOOTH SURFACES. INTERCEPTORS SHOULD BE CONSTRUCTED AT THE TOP OF LONG, STEEP SLOPES WHICH HAVE SIGNIFICANT AREAS ABOVE THAT CONTRIBUTE RUNOFF. CONCENTRATED RUNOFF SHOULD NOT BE ALLOWED TO FLOW DOWN THE FACE OF A CUT OR FILL SLOPE UNLESS CONTAINED WITHIN AN ADEQUATE CHANNEL OR PIPE SLOPE DRAIN. WHEREVER A SLOPE FACE CROSSES A WATER SEEPAGE PLANE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHOULD BE PROVIDED. IN ADDITION, SLOPES SHOULD BE STABILIZED IN ACCORDANCE WITH ITEM Cl) ABOVE, 10. C❑NTR❑LLING OFF -SITE EROSION, PR❑PERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE VOLUME, VEL❑CITY, AND PEAK FLOW RATE OF STORMWATER RUNOFF FROM THE DEVELOPMENT SITE BY THE IMPLEMENTATION OF APPR❑PRIATE BMPS TO MINIMIZE ADVERSE DOWNSTREAM IMPACTS. 11. STABILIZATION OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS, ALL TEMPORARY ❑N-SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED TO PREVENT EROSION FROM THE EXPECTED FLOW VEL❑CITY FROM A 2-YEAR FREQUENCY, 24-HOUR DURATION STORM FOR THE POST -DEVELOPMENT CONDITION. STABILIZATION ADEQUATE TO PREVENT EROSION OF OUTLETS, ADJACENT STREAMBANKS, SLOPES AND DOWNSTREAM REACHES SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS, 12. STORM DRAIN INLET PR❑TECTI❑N. ALL STORM DRAIN INLETS MADE OPERABLE DURING C❑NSTRUCTI❑N SHALL BE PROTECTED SO THAT STORMWATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITH❑UT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. AFTER PROPER WRITTEN APPLICATION, THE REQUIREMENT FOR INLET PR❑TECTI❑N MAY BE WAIVED BY THE DIRECTOR ON A SITE -SPECIFIC BASIS WHEN THE CONVEYANCE SYSTEM DOWNSTREAM OF THE INLET DISCHARGES TO AN APPR❑PRIATE SEDIMENT CONTAINMENT BMP AND THE CONVEYANCE SYSTEM CAN BE ADEQUATELY CLEANED FOLL❑WING SITE STABILIZATION. 13. UNDERGROUND UTILITY C❑NSTRUCTI❑N. THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL BE LIMITED, WHERE FEASIBLE, TO NO MORE THAN 500 FEET OF OPEN TRENCH AT ANY ONE TIME. WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS, EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF THE TRENCH, DEWATERING DEVICES SHALL DISCHARGE TO AN APPROPRIATE SEDIMENT TRAP OR POND, PRECEDED BY ADEQUATE ENERGY DISSIPATION, PRIOR TO RUNOFF LEAVING THE SITE. 14. CONSTRUCTED ACCESS R❑UTES, WHEREVER CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED ROADS, PROVISIONS MUST BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT (MUD) ONTO THE PAVED ROAD BY USE OF APPR❑PRIATE BMP'S SUCH AS A STABILIZED CONSTRUCTION ENTRANCE. IF SEDIMENT IS TRANSPORTED ONTO A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY, AS A MINIMUM, AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 15. REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON -SITE, DISTURBED SOIL AREAS RESULTING FROM REMOVAL OF TEMPORARY BMPS SHALL BE PERMANENTLY STABILIZED. THE REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MAY NOT BE REQUIRED FOR THOSE PROJECTS, SUCH AS SINGLE FAMILY PLATS, THAT WILL BE FOLLOWED BY ADDITIONAL CONSTRUCTION UNDER A DIFFERENT PERMIT. IN THESE CIRCUMSTANCES, THE NEED FOR REM❑VING OR RETAINING THE MEASURES WILL BE EVALUATED ON A SITE -SPECIFIC BASIS. 16. DEWATERING C❑NSTRUCTI❑N SITES. DEWATERING DEVICES SHALL DISCHARGE INTO AN APPROPRIATE SEDIMENT TRAP OR POND, DESIGNED TO ACCEPT SUCH A DISCHARGE PRECEDED BY ADEQUATE ENERGY DISSIPATION, PRIOR TO RUNOFF LEAVING THE SITE. 17. CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES, ALL POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ❑N-SITE DURING CONSTRUCTION SHALL BE HANDLED AND LEGALLY DISP❑SED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM OR SURFACE WATERS. POLLUTANTS OF CONCERN INCLUDE, BUT ARE NOT LIMITED TO, FUELS, LUBRICANTS, SOLVENTS, CONCRETE BI-PR❑DUCTS AND CONSTRUCTION MATERIALS 18. MAINTENANCE. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE C❑NTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE WITH THE MANUAL. THE APPLICANT SHALL BE RESPONSIBLE FOR ASSURING THAT ANY SUCH FACILITIES DAMAGED DURING FLOODS, STORMS OR OTHER ADVERSE WEATHER CONDITIONS ARE IMMEDIATELY RETURNED TO NORMAL OPERATING C❑NDITI❑N. 19. FINANCIAL LIABILITY. A PERFORMANCE COVENANT OR PERFORMANCE SURETY, SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLAN, AS OUTLINED IN SECTION 4.0 OF THE KITSAP COUNTY STORMWATER ORDINANCE, 1. ON SHALLOW SLOPE, NETTING MAY BE APPLIED ACROSS THE SLOPE. (SLOPES UP TO L1). 2. ON STEEP SLOPES, APPLY STRIPS OF NETTING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY, (SLOPES GREATER THAN 1:1) 3, WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE NETTING OVER THE BERM AND ANCHOR IT BEHIND THE BERM, 4, BRING THE NETTING DOWN TO A LEVEL AREA BEFORE TERMINATING THE INSTALLATION, TURN THE END UNDER 6' AND STAPLE AT 12' INTERVALS. 5, IN DITCHES, APPLY NETTING PARALLEL TO THE DIRECTION OF FLOW. USE CHECK SLOTS EVERY 15 FEET. DO NOT J❑IN STRIPS IN THE CENTER OF THE DITCH. 6, NETS AND MATS USED ALONE, WITHOUT MULCH, DO NOT RETAIN S❑IL TEMPPERATURE, 7, IT IS CRITICAL DURING INSTALLATION TO ❑BTAIN FIRM, CONTINUOUS CONTACT BETWEEN THE NET/MAT MATERIAL AND THE SOIL. WITHOUT SUCH CONTACT, THE MATERIAL IS USELESS AND EROSION OCCURS. 8, WHEN ANCHORING MATERIAL, IT IS IMPORTANT TO USE AN ADEQUATE NUMBER OF STAPLES AND TO ROLL THE MATERIAL AFTER LAYING IT TO ENSURE THAT THE S❑IL IS PR❑TECTED, NETTING SHOULD BE SECURELY ANCHORED TO THE S❑IL WITH NO. 11 GAUGE WIRE STAPLES AT LEAST 6-INCHES LONG, WITH AN OVERLAP OF 3-INCHES. 9, SITE PREPARATION IS THE SAME AS FOR TEMPORARY SEEDING, 10. WHERE S❑IL IS HIGHLY ERODIBLE, NETS SHOULD ONLY BE USED IN CONJUNCTION WITH ORGANIC MULCH, 11. JUTE NETS SHOULD BE HEAVY, UNIFORM CLOTH WOVEN OF SINGLE JUTE YARN, WHICH, IF 36-TO 48-INCHES WIDE, SHALL WEIGH AN AVERAGE OF 1.2 LBS, PER LINEAR YARD, JUTE MATTING MUST BE APPLIED SO THAT IT IS IN COMPLETE CONTACT WITH THE S❑IL, OTHERWISE EROSION WILL OCCUR BENEATH IT. 12, WOOD FIBER CELLULOSE BLANKETS ARE C❑NSIDERED PROTECTIVE MULCHES AND MAY BE USED ALONE ON ERODIBLE SOILS AND DURING ALL TIMES OF THE YEAR. SURFACE ROUGHENING 1, SURFACE ROUGHENING IS INTENDED TO AID IN THE ESTABLISHMENT OF VEGETATIVE COVER, WHICH IN TURN IS INTENDED TO PROTECT THE FACE OF THE SLOPE FROM RAINFALL IMPACT AND SEEDFLOW, BIND THE SURFACE OF THE SLOPE TO RETARD EROSION, AND REDUCE THE VELOCITY OF SURFACE RUNOFF, SURFACE ROUGHENING IS NOT INTENDED TO ACCOMPLISH ANY OF THE ABOVE BY ITSELF, AND DEFINITELY SHOULD NOT BE USED TO DIRECTLY REDUCE THE VEL❑CITY OF SURFACE RUNOFF, 2, GRADED SLOPES STEEPER THAN 3:1 BUT LESS THAN 2:1 SHOULD BE ROUGHENED BEFORE SEEDING. THIS CAN BE ACC❑MPLISHED IN A VARIETY OF WAYS, INCLUDING 'TRACK -WALKING', OR DRIVING A CRAWLER TRACTOR UP AND DOWN THE SLOPE, LEAVING A PATTERN OF CLEAT IMPRINTS PARALLELTO SLOPE CONTOURS, THE TREAD IMPRINTS ARE IDEAL PLACES TO TRAP SEEDS AND ENCOURAGE PLANTS TO BECOME ESTABLISHED. 3, GRADED AREAS STEEPER THAN 211 SHOULD BE STAIR -STEPPED WITH BENCHES, THE STAIR -STEPPING WILL HELP VEGETATION BECOME ESTABLISHED AND ALSO TRAP SOIL ERODED FROM THE SLOPES ABOVE, FILTER FABRIC FENCE INLET BARRIER 1. THIS DEVICE IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY SMALL(LESS THAN 1 ACRE) FLAT AREA (LESS THAN 5% SLOPE) 2. PLACE 2' X 2' WOODEN STAKES AROUND THE PERIMETER OF THE INLET A MAXIMUM OF 3-FEET APART AND DRIVE THEM AT LEAST 18 INCHES INTO THE GROUND. THE STAKES MUST BE AT LEAST 3-LONG. 3, EXCAVATE A TRENCH APPDXIMATELY 8-INCHES WIDE AND 12- INCHES DEEP AROUND THE OUTSIDE PERIMETER OF THE STAKES, 4, STAPLE THE FABRIC FILTER TO THE WOODEN STAKES S❑ THAT 32-INCHES OF THE FABRIC EXTENDS AND CAN BE FORMED INTO THE TRENCH. USE HEAVY-DUTY WIRE STAPLES AT LEAST 3 -INCH LONG. 5. BACKFILL THE TRENCH WITH 3/4 -INCH MINUS WASHED GRAVEL ALL THE WAY AROUND. 6. DO NOT PLACE FABRIC UNDER THE GATE, AS THE COLLECTED SEDIMENT MAY FALL INTO THE DRAIN WHEN THE FABRIC IS RETIEVED. TRENCHING 1. FOR TRENCHES ON A D❑WNSLOPE OF MORE THAN 5%, NO MORE THAN 500-FEET OF TRENCH SHOULD BE OPENED AT ONE TIME, 2, PLACE EXCAVATED MATERIAL FROM TRECHES ON THE UPHILL SIDE OF THE TRENCH WHEN SAFETY AND SPACE C❑NSRAINTS ALLOW. A NOTE TO THIS EFFECT SHOULD BE INCLUDED ON THE ESC PLAN, 3. DIRECT THE DISCHARGE OF DEWATERING DEVICES FROM TRENCHES OR OTHER AREAS S❑ AS NOT TO ADVERSELY IMPACT FL❑WING STREAMS, DRAINAGE SYSTEMS OR OFF -SITE PROPERTY, DEWATERING DEVICES SHALL NOT DISCHARGE TO SANITARY SEWERS. MULCHING 1. MATERIALS USED FOR MULCHING ARE RECOMMENDED TO BE WOOD FIBER CELLULOSE, AND SHOULD BE APPLIED AT A RATE OF 1000 POUNDS PER ACRE, 2, MULCH SHOULD BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1 (HORIZ❑NTAL:VERTICAL). 3. MULCHING SHOULD BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. ALL AREAS REQUIRING MULCH SHALL BE COVERED BY NOVEMBER 1, ST❑CKPILE MANAGEMENT 1. ST❑CKPILE SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31. 2, IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. 3, TOPS❑IL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY C❑NDITI❑N, WHEN THE SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. 4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE T❑PSOILED SHALL BE MAINTAINED ACC❑RDING TO THE APPROVED PLANS. 2'x2' WOOD POST (TYP) OR EQUIVALENT OR BETTER 2 6 FT MAX. O.C. EXISTING GROUND SURFACE 12' DEEP, 8' WIDE TRENCH FILLED WITH NATIVE VEGETATION BOTTOM EXTENTS OF GE❑TEXTILE FABRIC GE❑TEXTILE FABRIC WRAP AROUND TRENCH TO AT LEAST ENTIRE BOTTOM OF TRENCH BEFORE BACKFILLING GE❑TEXTILE FABRIC AND WIRE MESH I. 6 FT ---I e,ii1i�1i1i1i1i1iii1 .I.I.I.I..I.I.I.I.I.I.I.I,44 A0441g.1.1.1.1.1.0.1.1.1.1.1.1.1.1.E ::r::::::e.::::::.s:r:::;: ?:: 12' DEEP, 8' WIDE TRENCH FILLED WITH NATIVE VEGETATION FLOW DIRECTION SILT FENCE - DETAIL N.T.S. 2.5 FT 2.5 FT 0.5 FT 2 FT 1$T 4 1- 2.5 FT 2'x2'x5' WOOD POST OR EQUIVALENT OR BETTER EXISTING GROUND SURFACE SILT FENCE - CROSS SECTION N.T.S. 1, PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MLS AND SHALL MEET THE REQUIREMENTS OF THE STATE STANDARD SPECIFICATIONS SECTION 9-15.5. 2, COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE B` USING SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-F:ET GRID SPACING IN ALL DIRECTIONS. ALL SEAMS SHALL BE TAPED ❑R WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE AT LEAST A 12 INCH OVERLAP OF ALL SEAMS. 3, CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED, 4, WHEN THE C❑VERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE UNTIL THE NEXT SEEDING PER:OD, 5, PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS, 6, PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS. SILT FENCE L FILTER FABRIC SHALL BE PURCHASED IN A CONTINU❑US ROLL AND CUT TO THE LENGTH OF THE BARRIER TO AV❑ID USE OF JOINTS, WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6-INCH OVERLAP, AND SECURELY FASTENED AT BOTH ENDS TO THE POST, 2, POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 30 INCHES), 3. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8 INCHES WIDE AND 12 INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER, THIS TRENCH SHALL BE BACKFILLED WITH NATIVE VEGETATION. 4, WHEN STANDARD STRENGTH FILTER FABRIC IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4 INCHES AND SHALL NOT EXTEND MORE THAN 24 INCHES ABOVE THE ORIGINAL GROUND SURFACE. 5, THE STANDARD STRENGTH FILTER FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE, AND 20 INCHES OF THE FABRIC SHALL BE EXTENDED :NT❑ THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 24 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES, 6, FILTER FABRIC FENCES SHALL NOT BE REMOVED BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 7, FILTER FABRIC FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL, ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY, 8, SILT FENCES WILL BE INSTALLED PARALLEL TO ANY SLOPE CONTOURS, 9, CONTRIBUTING LENGTH TO FENCE WILL NOT BE GREATER THAN 100 FEET, 10, DO NOT INSTALL BELOW AN OUTLET PIPE OR WEIR, 11. INSTALL D❑WNSL❑PE OF EXPOSED AREAS, 12. DO NOT DRIVE OVER OR FILL OVER SILT FENCES, PERMANENT EROSION CONTROL SEEDING 1. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND SEDIMENT BASINS, 2, THE SEED BED SHALL BE FIRM WITH FAIRLY FINE SURFACE, FOLL❑WING SURFACE ROUGHENING, PERFORM ALL OPERATIONS ACCROSS OR PERPENDICULAR TO THE SLOPE, 3, SEEDING MIXTURE SHALL BE AS SHOWN BELOW, AND SHALL BE APPLIED AT THE RATE OF 120 POUNDS PER ACRE, 4, SEED BEDS PLANTED BETWEEN MAY 15 AND AUGUST 15 WILL REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE. 5, SEED BEDS PLANTED BETWEEN NOVEMBER 1 AND APRIL 30, ARMORING OF THE SEED BED WILL BE NECESSARY, (e.g., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC C❑VERING). 6, FERTILIZERS ARE TO BE USED ACC❑RDING TO SUPPLIERS' RECOMMENDATIONS, AMOUNTS SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS, USE THE FOLLOWING RECOMMENDED SEED MIXTURE FOR EROSION CONTROL, OR A KITSAP COUNTY APPROVED ALTERNATE SEED MIXTURE. PROPORTIONS PURITY NAME BY WEIGHT (%) (%) KENTUCKY BLUEGRASS (POA PRATENSIS) 15 PERENNIAL RYE (LOLIUM PERENNE ) 30 CHEWING FESCUE 15 (FESTUCA RUBRA COMMUTATA) (JAMESTOWN, BANNER, SHADOW, KOKET) TALL FESCUE 40 (FESTUCA ARUNDINCEA) STABILIZED CONSTRUCTION ENTRANCE 85 95 95 GERMINATION (%) 80 90 90 95 90 1. TEMPORARY STABILIZED CONSTRUCTION INGRESS/ EGRESS SHALL BE LIMITED TO ONE LOCATION, IF POSSIBLE, AND BE CONSTRUCTED PER THE 'STABILIZED C❑NSTRUCTI❑N ENTRANCE' DETAIL ON THIS SHEET, ADDITI❑NAL ROCK SHALL BE ADDED PERIODICALLY TO MAINTAIN PROPER FUNCTION OF THE PAD. 2. THE WIDTH OF THE TEMPORARY CONSTRUCTION ENTRANCE SHALL BE A MINIMUM OF 15 FEET WIDE WITH A 25 FT RADIUS. HOWEVER, THIS AREA SHALL BE INCREASED IF NECESSARY TO ACCOMODATE CONSTRUCTION EQUIPMENT ENTERING AND LEAVING THE C❑NSTRUCTI❑N SITE, 3. IF THE STABILIZED CONSTRUCTION ENTRANCE PAD DOES NOT ADEQUATELY REMOVE MUD FROM THE VEHICLE WHEELS, THE WHEELS SHALL BE HOSED OFF BEFORE LEAVING THE PROJECT SITE, THE WASHING SHALL BE COMPLETED OVER QUARRY SPALLS OR CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR SILT FENCE. 4 IN TO 8 IN QUARRY SPALLS PLACED AT 12 IN MINIMUM DEPTH R=25 FT MIN 20 FT MIN PAVED ROADWAY 50 FT MIN STABILIZED C❑NSTRUCTI❑N ENTRANCE N.T.S. ADDRESS ANDREW WHYTE XXX NW COSTA VIDA WAY PAULSB❑, WASHINGT❑N, 98370 PARCEL 042601-2-044-2005. 042601-2-036-2005 CALL 3EE❑RE YOU DIG! CALL 2 WORKING DAYS BEFORE YOU DIG! 811 UTILITIES UNDERGROUND LOCATION CENTER WWW.CALLBEF❑REY❑UDIG,C❑M _��✓ATER PR❑PE LLC DRAI\AGE PLA RTIES OWNER: G❑LDWATER PR❑PERTIES LLC P❑ BOX 3390 RENT❑N, WA 98056 PHONE: 425-941-3684 ENGINEER: ENVIR❑TECH ENGINEERING P.❑.B❑X 984 BELFAIR, WASHINGT❑N 98528 PHONE: (360) 275-9374 FAX: (360) 275-4789 DRAWN BY: RJM DATE: 2/17/16 DESIGNED BY: RJM/MCS DATE: 2/17/16 CHECKED BY: Michael Staten, PE, DATE: 2/17/16 REVISIONS: REV. DESCRIPTION BY DATE SHEET SHEET 3 OF 3 J