Loading...
HomeMy WebLinkAbout91-93 - Res. Six Year Transportation Improvement Program 1994 - 1999 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 MASON COUNTY HEARING DATE : 09/14/93 ADOPTION DATE: 09/14/93 COUNTY NO: 23 RESOLUTION NO: 91-93 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R (U I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRIDI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU (THRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD 16TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 1I IMASON COUNTY'S TRANSPORTATION PLAN IXIFI 671 671 671 671 2681 361 I 2321 PE 1741 58 I ITO COMPLETE THE TRANSPORTATION ELEMENT OF MASON I I MJR CLASS of WK: IR/W I I ICOUNTY'S COMPREHENSIVE PLAN AS REQUIRED BY THE GROWTH I I WORK CODES: U ICON I I IMANAGEMENT ACT. I I TOTAL LENGTH: F.A. PROJ NO. I -I - I I(4A) I I UTILITY CODES: - - ITOT 1741 58 ------------------------------------------------------------------------------------------------------------------------------------ 2I ICOUNTY WIDE PAVEMENT ON AC PAVEMENT I IFI 2391 2391 2391 7171 14341 5461 8881 I PE I I I I I MJR CLASS of WK: 5 IR/W I I I(ID-1) I I WORK CODES: BD ICON I TOTAL LENGTH: F.A. PROD NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 3I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 1361 1361 1361 4081 8161 3061 5101 I PE I I I I I MJR CLASS of WK: 5 IR/W I I I(ID-2) I I WORK CODES: ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I ®I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 4I ICOUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 2001 2001 2001 6001 12001 12001 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I(ID-3) I I WORK CODES: ABC ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 5I ICOUNTY WIDE SAFETY PROJECTS I IFI 2001 2001 2001 6001 12001 12001 I I PE I I I I I MJR CLASS of WK: IR/W I I (Includes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I I Ibikeways and guardrails I I TOTAL LENGTH: F.A. PROD NO. I -I - I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 6I ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1001 1001 1001 3001 6001 6001 I I PE I I I I I MJR CLASS of WK: IR/W I I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I -I - I I(ID-5) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 2 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI 1 OBLIGATION I IN (PROJECT IDENTIFICATION 1 IAIUI -_-EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH 1 0 1 0 TRAP I E I 1ST 14TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A 1UATA I R I 3RD 16TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR 71 (COUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 721 721 721 2161 4321 4321 1 1 PE I I I I I MJR CLASS of WK: 4 IR/W I I I(ID-6) I I WORK CODES: L ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 8109102310-0.04 PLUG MILL BRIDGE. I IFI 1041 1 1 1 1041 201 1 841 PE I 1 10.02 TO 0.07 1 1 MJR CLASS of WK: 4 IR/W I I 1New Bridge and Approaches I I WORK CODES: L ICON I I I(ID-17) I I TOTAL LENGTH: .12 F.A. PROJ NO. 1 ®1 I I UTILITY CODES: BROS-2023- ITOT 01 0 ____________________________________________________________________________________________________________________________________ 9107190100-23.35 EDDY EVERS BRIDGE I IPI 12001 1 1 1 12001 2001 1 10001 PE I 1 123.25 TO 23.50 1 1 MJR CLASS of WK: 1 IR/W I I (New Bridge and Approaches 1 IWORK CODES: L ICON I I 1(ID-9) I I TOTAL LENGTH: .25 F.A. PROJ NO. 1 -1 I I 1 1 UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 10108110000-16.60 CL09UALLUM CREEK BRIDGE I IFI 1661 1 1 1 1661 1661 1 1 PE I 1 116.58 To 16.62 1 1 MJR CLASS of WK: 4 1R/W I I (New Bridge and approaches I IWORK CODES: L ICON I I I(ID-13) I I TOTAL LENGTH: .04 F.A. PROD NO. 1 -1 I I 1 1 UTILITY CODES: - - ITOT 01 0 ---------------------------------------------------------------------------------------------------------------------------- - 11108110000 CLOOUALLUM ROAD - 3 1 IFI 11261 1 1 1 11261 7421 3841 1 PE I 1 115.60 TO 17.44 1 1 MJR CLASS of WK: 4 IR/W I I IHerman's Cloquallun Creek Bridge to mile post 17.44 1 IWORK CODES: ABD ICON I I 1Realign and Regrade I I TOTAL LENGTH: 1.84 F.A. PROJ NO. 1 ®1 I I(ID-20 RAP-76) I I UTILITY CODES: PT - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 12107128850 PICKERING ROAD - 1A I IFI 2241 1 1 1 2241 2241 1 1 PE I 1 10.37 TO 1.23 I I MJR CLASS of WK: 4 IR/W I 1 I1990 INTERSECTION PROJECT TO 1984 PROJECT I 1WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .86 F.A. PROJ NO. 1 ®1 I I(ID-53 RAP-71) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 13107128850 PICKERING ROAD - 2 1 IFI 2741 1 1 1 2741 2741 1 1 PE I 1 11.64 TO 2.45 1 I MJR CLASS of WK: 4 IR/W I I (From 1984 Project East to AC I IWORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .81 F.A. PROJ NO. 1 ®1 I I(ID-29 RAP-71) I I UTILITY CODES: - - ITOT 01 0 ---------------------------------------------------------------------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 3 MASON COUNTY P IF I I I I ___-PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP 10 I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 14108162310 TRAILS ROAD - 4 I IFI 3201 I I I 3201 3201 I I PE I I 12.55 TO 3.45 I I MJR CLASS of WK: 4 IR/W I I IMile Post 2.55 to 0.10 Mile So. Mason Lake Drive West I I WORK CODES: ARC ICON I I IRealign and Regrade I I TOTAL LENGTH: .90 F.A. PROJ NO. I -I I I(ID-36 RAP-53) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 15I07I97670 MCREAVY ROAD I IFI 1041 I I I 104I 1041 I I PE I I 10.00 TO 0.23 I I MJR CLASS of : 4 IR/W I I IS.R. #106 to 4th Street I IWORK CODES: ASO ICON I I IRealign and Regrade, including sidewalks I I TOTAL LENGTH: .23 F.A. PROJ NO. I ®I I I(ID-44 RAP-45) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 16I09I91720 JOHN'S PRAIRIE ROAD - 3 I IFI 40I I I I 401 81 I 321 PE I I 12.72 TO 2.74 I I MJR CLASS of WK: 6 IR/W I I IRailroad Crossing WORK CODES: I ICON I I I(ID-81) I I TOTAL LENGTH: .02 F.A. PROJ NO. I ®I I I I I UTILITY CODES: RRS - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 17I08I51800 MCEWAN PRAIRIE ROAD I IFI 40I I I I 401 81 I 321 PE I I 10.81 TO 0.83 I I MJR CLASS of WK: 6 IR/W I I IRailroad Crossing I I WORK CODES: I ICON I I I(ID-79) I I TOTAL LENGTH: .02 F.A. PROJ NO. I ®I I I I I UTILITY CODES: RRS - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 18I08I15500 LYNCH ROAD - 3 I IPI 331 5571 I I 5901 5901 I I PE I I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I I 10.30 North of Bay East to Totten Shores I I WORK CODES: ASO ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROJ NO. I .®I I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 19I08I15500 LYNCH ROAD - 4 I IPI 341 5861 I I 6201 6201 I I PE I I 16.85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I I (Totten Shores Road to Arcadia Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I ®I I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 20I08I86070 SAND HILL ROAD - 1 I IPI 741 4001 I I 4741 4741 I I PE I I 10.33 TO 2.66 I I MJR CLASS of WK: 4 IR/W I I (From mite post 0.33 to Transfer Station I I WORK ES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.33 F.A. PROJ No. I -I I I(ID-88) I I UTILITY CODES: - - ITOT OI 0 _______________________________________________________________________________________________________________________________ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 4 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R (U I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR -------------------------------- 21I08I79800 BEAR CREEK - DEWATTO ROAD - 1 I IPI 331 2791 I I 3121 3121 I I PE I I 16.57 TO 7.45 I I MJR CLASS of WK: 4 IR/W I I 10.07 East of Panther Lake Road to 0.16 East of I I WORK CODES: ABC ICON I I (Gold Creek Road - Realign and Regrade I I TOTAL LENGTH: .88 F.A. PROD NO. I ®I I I(ID-39 RAP-61) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 22I08I62310 TRAILS ROAD -3 I IN I 2981 I I 2981 2981 I I PE I I 11.59 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I (Traits End Drive south to Mile Post 2.55 WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .96 F.A. PROJ NO. I -I I I(ID-35 RAP-59) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 23I08I10000 CLOQUALLUM ROAD - 2 I IN 1 521 5701 I 6221 6221 I I PE I I 114.09 TO 15.60 I I MJR CLASS of WK: 4 IR/W I I (Mile post 14.09 to mile post 15.60 WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.51 F.A. PROJ NO. I ®I I I(ID-21 RAP-50) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 24IO8I10000-14.82 HERMAN'S OLD SCHOOLHOUSE BRIDGE I IN I 131 1001 I 1131 1131 I I PE I I 114.80 TO 14.84 I I MJR CLASS of WK: 4 IR/W I I (Replacement of Bridge plus new approaches WORK CODES: L ICON I I I(ID-11) ( I TOTAL LENGTH: .04 F.A. PROJ NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 25I08I10000-15.60 HERMAN'S CLOQUALLUM CREEK BRIDGE I IN I 191 1201 I 1391 1391 I I PE I I 115.58 TO 15.62 I I MJR CLASS of WK: 4 IR/W I I IReptacement of Bridge plus new approaches WORK CODES: L ICON I I I(ID-12) I I TOTAL LENGTH: .04 F.A. PROJ NO. I ®I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 26I09I77270 HAVEN WAY I IN I 42I 3001 I 3421 3421 I I PE I I 10.00 TO 0.91 I I MJR CLASS of WK: 4 IR/W I I IMt. View Drive Northeasterly to Haven Lake Drive I IWORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .19 F.A. PROD NO. I ®I I I(ID-23) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 27I08I28850 PICKERING ROAD - 3 I IN I 411 3001 I 3411 3411 I I PE I I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I I IHartstene Bridge Road South to Scenic View Road I IWORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROJ NO. I _I I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 5 MASON COUNTY - ------ ---------- ---------------- P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE P --- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF STORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 28108162310 TRAILS ROAD - 1 I IFI I 471 3501 I 3971 891 3081 I PE I I 10.00 TO 0.80 I I MJR CLASS of WK: 4 IR/W I I IS.R. #106 to mile post 0.80 I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .80 F.A. PROJ NO. I —I I I(ID-33 RAP-81 YR-85) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I07I96140 GRAPEVIEW LOOP ROAD - 6 I IPI I 341 2801 I 3141 3141 I I PE I I 16.93 TO 7.98 I I MJR CLASS of WK: 4 IR/W I I (Nelson Road to S.R. #3 I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.05 F.A. PROJ NO. I ®I I(ID-50 RAP-63) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 30I08I62310 TRAILS ROAD - 2 I IN I I 2451 I 2451 2451 I I PE I I 10.80 TO 1.59 I I MJR CLASS of WK: 4 IR/W I I (Mile post 0.80 to Traits End Drive WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .79 F.A. PROJ NO. I —I — I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I07I96140 GRAPEVIEN LOOP ROAD - 3 I IUI I I 371 2601 2971 2971 I I PE I I 13.50 TO 4.43 I I MJR CLASS of WK: 4 IR/W I I ILombard Road to Store I I WORK CODES: ASO ICON I I IReatign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I ®I I I(ID-62 RAP-73) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I09I62670 ANTHONY ROAD I IUI I I 44I 3301 3741 3741 I I PE I I 10.00 TO 1.20 I I MJR CLASS of WK: 4 IR/W I I (SR #3 North 1.20 Miles WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.20 F.A. PROJ NO. I —I I(ID-82) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33I09I62670 ANTHONY ROAD I IUI I I 441 3301 3741 3741 I I PE I I 11.20 TO 2.41 I I MJR CLASS of ILK: 4 IR/W I I IMite Post 1.20 North to 1993 Project I IWORK CODES: ABC ICON I I IReatign and Regrade I I TOTAL LENGTH: 1.21 F.A. PROD NO. I ®I - I I(ID-56) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 34I08I10000 CL06UALLUM ROAD - 1 I IUI I I 421 3701 4121 4121 I I PE I I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I I (Rock Stuff Curve 0 mile west of Butb Farm Road) WORK CODES: ASO ICON I I [Realign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROJ NO. I -I I I(ID-51 RAP-41) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 6 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP 10 I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR IYEAR 35109111600 STORY ROAD EXTENSION I IUI I I 821 8401 9221 9221 I I PE I I TEND OF STORY ROAD TO CLOOUALLUM ROAD I I MJR CLASS of WK: 1 IR/W I I (New construction from end of Story Road to I I WORK CODES: ABD ICON I I ICloquallun Road to provide access to U.S. #101 I I TOTAL LENGTH: .50 F.A. PROJ NO. I ®I I I(ID-78) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 36I07I96140-2.45 MCLANE COVE BRIDGE I IUI I I 751 4201 4951 4951 I I PE I I 12.35 To 2.55 I I MJR CLASS of WK: 4 IR/W I I IReplacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I I(ID-15) I I TOTAL LENGTH: .20 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 37I08I10000-5.85 ROCK CREEK NO.1 BRIDGE I IUI I I I 721 721 721 I I PE I I 15.83 TO 5.87 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I WORK CODES: L ICON I I I(ID-10) I I TOTAL LENGTH: .04 F.A. PROJ MO. I —I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 38I09I10290-0.35 HLIBOKI BRIDGE I IUI I I I 1291 1291 1291 I I PE I I 10.30 TO 0.40 (BULB FARM ROAD) I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-14) I I TOTAL LENGTH: .10 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 39I09I70950 TAHUYA RIVER ROAD I IUI I I I 750I 7501 7501 I I PE I I 11.61 TO 4.02 I I MJR CLASS of WK: 45 IR/W I I Ilntersection with Belfair-Tahuya Road in Sec. 22 I IWORK CODES: ABC ICON I I Inortherly 2.41 miles I I TOTAL LENGTH: 2.41 F.A. PROD NO. I ®I I I(ID-77 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------- 40ID9I86070 SAND HILL ROAD - 2 I IUI I I I 3551 3551 3551 I I PE I I 12.66 TO 3.94 I I MJR CLASS of WK: 4 IR/W I I ITransfer Station to Delmore Road I WORK CODES: ABC ICONI I IReatign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROJ NO. I ®I I I(ID-89) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 41I07I97500 BELFAIR-TAHUYA ROAD I IUI I I I 9651 9651 9651 I I PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 15 IR/W I I IKay's Corner northerly 2.00 miles I I WORK CODES: ASO ICON I I IHorizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I ®I I I(ID-19 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 7 MASON COUNTY ------------------ ------------------ -------- -------- ---- -------- ---- ---------- P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI 1 OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- 1 PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A 1UATA I R I 3RD 16TH Y I S1 I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR 42109111200 HURLEY-WALDRIP ROAD I IUI I 1 1 2061 2061 2061 1 1 PE I 1 10.00 TO 0.25 1 1 MJR CLASS of WK: 4 IR/W I I lintersection With SR #108 Realign and Regrade I I WORK CODES: ABC ICON I I I(ID-24 Yr-92) 1 1 TOTAL LENGTH: .25 F.A. PROJ NO. 1 -1 I I I 1 UTILITY CODES: - - ITOT 01 0 --•----------------------------------------------------------------•----------•----------------------------------------------------- 43117113200 WALKER PARK ROAD I IUI I 1 1 3961 3961 3961 1 1 PE I 1 10.36 TO 1.06 1 1 MJR CLASS of WK: 4 IR/W I I IRebuild Road with Curbs, Gutters and Sidewalks 1 1WORK CODES: BDFG ICON I I I(ID-16) 1 1 TOTAL LENGTH: .70 F.A. PROJ NO. 1 ®1 I I I I UTILITY CODES: - - ITOT 01 0 -------------------------------------------------------------------•--------•------•---------------•-------------------------------- 44108120900 CRESTVIEW DRIVE I IUI I 1 1 6261 6261 6261 1 1 PE I 1 10.00 TO 2.02 1 1 MJR CLASS of WK: 4 IR/W I I (Agate Store to Hiticrest Drive 1 1WORK CODES: ARC ICON I I IRealign and Regrade 1 1 TOTAL LENGTH: 2.02 F.A. PROD NO. 1 ®1 I I(ID-59 RAP-48) I I UTILITY CODES: - ITOT 01 0 ------------•----------•------------------------------------------------------------------------------------------------------------ 45109128240 SPENCER LAKE ROAD - 1 I IUI I 1 1 5821 5821 5821 1 1 PE I 1 10.00 TO 1.88 1 1 MJR CLASS of WK: 4 IR/W I I (Agate Road north to 1987 project 1 1WORK CODES: ABC ICON I I IRealign and Regrade 1 1 TOTAL LENGTH: 1.88 F.A. PROD NO. 1 -1 I I(ID-28) 1 1 UTILITY CODES: - - ITOT 01 0 -----------------------------------------------------------------•------------------------------------------------------------------ 46108128850 PICKERING ROAD - 4 1 IUI I 1 1 2601 2601 2601 1 1 PE I 1 14.51 To 5.35 1 1 MJR CLASS of WK: 4 IR/W I I (Scenic View Road to Schneider Road 1 1WORK CODES: ABC ICON I I IRealign and Regrade 1 I TOTAL LENGTH: .84 F.A. PROJ NO. 1 ®1 I I(ID-84 RAP-30) 1 I UTILITY CODES: - - ITOT 01 0 --------------------•----------------------------------------------------•--------------------------•------------------------------- 47109139410 WINGART ROAD I IUI I 1 1 1601 1601 1601 1 1 PE I 1 10.00 TO 0.52 1 1 MJR CLASS of WK: 4 IR/W I I INorth Island Drive to Jarrell Cove State Park 1 1WORK CODES: ABC ICON I I IRealign and Regrade 1 1 TOTAL LENGTH: .52 F.A. PROJ NO. 1 ®1 I I(ID-75) I I UTILITY CODES: - - ITOT 01 0 ---------------------------------•-----------------------------------------------------_---------•------------------•--------------- 48109139630 NORTH ISLAND DRIVE - 1 1 IUI I 1 1 3101 3101 3101 1 1 PE I I IMP 0.31 TO 1.31 1 1 MJR CLASS of WK: 4 IR/W I I IEnd of AC north 1 mile 1 1WORK CODES: ASO ICON I I IRealign and Regrade 1 1 TOTAL LENGTH: 1.00 F.A. PROJ NO. 1 ®1 I I(ID-68) I I UTILITY CODES: - - ITOT 01 0 ---------------------------------------------------------------------------------------------•-------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 8 MASON COUNTY P IF I I I I ----PROJECT COSTS 1N THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 49I09I39630 NORTH ISLAND DRIVE - 2 I IUI I I I 5521 5521 5521 I I PE I I 11.31 TO 3.09 I I MJR CLASS of WK: 45 IR/W I I IRealign and Regrade I I W0RK CODES: ASO ICON I I I(ID-48) I I TOTAL LENGTH: 1.78 F.A. PROD NO. I ®I I I I I UTILITY ES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 50I08I79800 BEAR CREEK - DEWATTO ROAD - 2 I IUI I I I 2951 2951 2951 I I PE I I 17.45 TO 8.45 I I MJR CLASS of WK: 4 IR/W I I 10.16 E. Gold Creek Road to 0.37 W. Tiger Mission Road WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I ®I I I(ID-40 RAP-57) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 51I08I79800 BEAR CREEK - DEWATTO ROAD - 3 I IUI I I I 3571 3571 3571 I I PE I I 18.45 TO 9.60 I I MJR CLASS of WK: 4 IR/W I I 10.37 W. of Tiger Mission Road to start of Chip Seal I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROJ NO. I ®I I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 52I07I96140 GRAPEVIEW LOOP ROAD - 2 I IUI I I I 2941 2941 2941 I I PE I I 12.78 TO 3.50 I I MJR CLASS of WK: 4 IR/W I I IMurray Road South to Lombard Road I I WORK CODES: ASO ICON I I IRealign and Regrade I I TOTAL LENGTH: .72 F.A. PROD NO. I ®I I I(ID-61 RAP-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 53I08I02000 SATSOP CLOOUALLUM ROAD I IUI I I I 4121 4121 4121 I I PE I 1 13.69 TO 6.33 I I MJR CLASS of WK: 4 IR/W I I IMinor widening & BST Surfacing I I WORK CODES: ABC ICON I I I(ID-8 Yr-92) I I TOTAL LENGTH: 2.64 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 54I09I02750 STAR LAKE ROAD I IUI I I I 3411 3.411 3411 I I PE I I I0.00 TO 1.10 I I MJR CLASS of WK: 3 IR/W I I ICLoquallum Road north 1.10 miles to Country Club I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 1.10 F.A. PROD NO. I ®I I I (ID-71) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 55I09I05850 GALLAGHER ROAD I IUI I I I 3101 3101 3101 I I PE I I ID•DO TO 1.88 I I MJR CLASS of WK: 4 IR/W I I IMinor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-22 Yr-92) I I TOTAL LENGTH: 1.88 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 9 MASON COUNTY P IF I I I I ----PROJECT COSTS 1N THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 I RAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR IYEAR 56I09I23600 SUNSET ROAD I IUI I I I 2901 2901 2901 I I PE I I 10.00 TO 1.39 I I MJR CLASS of WK: 4 IR/W I I (Minor Widening and BST surfacing I IWORK CODES: ABC ICON I I I(ID-27 Yr-92) I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 57I09I28240 SPENCER LAKE ROAD - 2 I IUI I I I 1021 1021 1021 I I PE I I 12.45 TO 2.78 I I MJR CLASS of WK: 4 IR/W I I IFrom 1987 project north to Pickering Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .33 F.A. PROJ NO. I ®I I I(ID-30) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 58I09I28370 CLAY ROAD I IUI I I I 1671 1671 1671 I I PE I I 10.99 TO 1.53 I I MJR CLASS of WK: 3 IR/W I i IPhittips Lake Loop Road to Dead End I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: .54 F.A. PROJ NO. I ®I I I(ID-72) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 59IO8I28850 PICKERING ROAD - 5 I IUI I I I 2941 2941 2941 I I PE I I 15.35 TO 6.24 I I MJR CLASS of WK: 4 IR/W I I (Schneider Road to Benson Loop Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .89 F.A. PROJ NO. I ®I I I(ID-85 RAP-36) ( I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 60I09I36360 MCMICKEN ROAD I IUI I I I 1921 1921 1921 I I PE I 1 10.00 TO 0.62 I I MJR CLASS of WK: 4 IR/W I I (Minor widening and resurfacing I I WORK CODES: ABC ICON I I I(ID-49 Yr-92) I I TOTAL LENGTH: .62 F.A. PROJ NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 61I09I47100 TERRACE ROAD I IUI I I I 2581 2581 2581 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (intersection Project with U.S. 9101 from plats of I I WORK CODES: ABC ICON I I (Canal View Terrace and White Star. I I TOTAL LENGTH: .07 F.A. PROJ NO. I ®I I I(ID-76) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 62I09I51930 JENSEN ROAD I IUI I I I 1501 1501 1501 I I PE I I . I0.00 TO 0.48 I I MJR CLASS of WK: 4 IR/W I I IBROCKDALE ROAD TO END OF COUNTY ROAD I I WORK CODES: ARC ICON I I IRealign and Regrade I I TOTAL LENGTH: .48 F.A. PROJ NO. I ®I I I(1D-87) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 10 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- ( FEDERAL R IU I ICIFI I OBLIGATION I IN [PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH [ 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A [UATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 63109164330 STRETCH ISLAND ROAD SOUTH I IUI I I I 2301 2301 2301 I I PE I I 10.00 TO 0.74 I I MJR CLASS of WK: 4 IR/W I I (Minor Widening and surfacing I I WORK CODES: ABC ICON I I I(ID-25 Yr-92) [ I TOTAL LENGTH: .74 F.A. PROJ NO. I ®I I I I [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 64[09I64500 ECKERT ROAD I IUI I I I 2601 2601 2601 I I PE I I 10.00 TO 0.84 I [ MJR CLASS of WK: 4 IR/W I I (Minor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-26 Yr-92) [ I TOTAL LENGTH: .84 F.A. PROJ NO. I ®I I I [ [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 65[09[67580 LAKELAND DRIVE I IUI I I I 831 831 831 I I PE I I 10.15 TO 0.22 CROWN OF HILL [ I MJR CLASS of WK: 4 IR/W I I (Reconstruct Vertical Curve to Improve Sight Distance I [ WORK CODES: ABC ICON I I I(ID-74) I [ TOTAL LENGTH: .07 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 66I08[70390 NORTH SHORE ROAD I IUI I I I 3101 3101 3101 I I PE I I 19.63 TO 10.63 I I MJR CLASS of WK: 4 IR/W I I IMile Post 9.63 to Belfair Tahuya Road I [ WORK CODES: ABD ICON I I [Realign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I ®I I I(ID-37 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 67[08[79800 BEAR CREEK - DEWATTO ROAD - 4 I IUI I I I 2881 2881 28-8I I I PE I I 19.75 TO 10.68 [ [ MJR CLASS of WK: 4 IR/W I I [West end of Chip Seal to Old Belfair Highway I IWORK CODES: ARC ICON I I [Realign and Regrade [ I TOTAL LENGTH: .93 F.A. PROJ NO. I ®I I I(ID-41 RAP-49) I [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 68I08[80610 ELFENDAHL PASS ROAD I IUI I I I 5751 5751 5751 I I PE I I 10.00 TO 1.85 I [ MJR CLASS of WK: 4 IR/W I I (North Shore Road to Belfair Tahuya Road [ IWORK CODES: ABC ICONI I (Realign and Regrade I I TOTAL LENGTH: 1.85 F.A. PROJ No. I �I I I(ID-86 RAP-36) [ [ UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 69I09[86070 SAND HILL ROAD - 3 I IUI I I I 5831 5831 5831 I I PE I I 13.94 TO 5.82 I I MJR CLASS of WK: 4 IR/W I I (Delmore Road to Bear Creek - Dewatto Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROJ NO. I -I I I(ID-90) I I UTILITY CODES: - - ITOT O[ 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 11 MASON COUNTY ----------------------------- P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR - ----------------------------- 70I14I90100 SHELTON - MATLOCK ROAD I IUI I I I 7401 7401 7401 I I PE I I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I I (City Limits to Gotdsborough Bridge I IWORK CODES: ABD ICON I I (Minor Widening I I TOTAL LENGTH: .47 F.A. PROJ NO. I ®I I I(ID-42 RAP-48) I I UTILITY CODES: - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 71I08I91720 JOHN'S PRAIRIE ROAD -2 I IUI I I I 4121 4121 4121 I I PE I I 13.42 TO 3.90 I I MJR CLASS of WK: 1 IR/W I I ICapitol Hilt Road to S.R. #3 I IWORK CODES: ABD ICON I I INew Construction on New Alignment I I TOTAL LENGTH: .48 F.A. PROJ NO. I ®I I I(ID-58) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 72107I96140 GRAPEVIEW LOOP ROAD - 1 I IUI I I I 3601 3601 3601 I I PE I I 11.62 TO 2.78 I I MJR CLASS of WK: 4 IR/W I I IStadium Beach Road to Murray Road South I I WORK CODES: ABO ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.16 F.A. PROJ 90. I ®I I I(ID-60 RAP-40) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 73I07I96140 GRAPEVIEW LOOP ROAD - 4 I IUI I I I 4501 4501 4501 I I PE I I 14.43 TO 5.90 I I MJR CLASS of WK: 4 IR/W I I IGrapeview Store to Cronquest Road I I WORK CODES: ASO ICON I IReatign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROJ NO. I —I I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 74I07I96140 GRAPEVIEW LOOP ROAD - 5 I IUI I I I 2371 2371 2371 I I PE I I 16.10 TO 6.93 I I MJR CLASS of WK: 4 IR/W I I ICrorpuist Road to Nelson Road I IWORK CODES: ABD ICONI I IReatign and Regrade I I TOTAL LENGTH: .83 F.A. PROD NO. I ®I I I(ID-64 RAP-39) I I UTILITY CODES: - - ITOT OI 0 ____________________________________________________________________________________________________________________________________ 75ID9I04670 LITTLE EGYPT ROAD I IUI I I I 6201 6201 6201 I I PE I I 10.00 TO 2.00 I I MJR CLASS of WK: 3 IR/W I I IShelton-Mat lock Road south to 2.00 Mile Post I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 2.00 F.A. PROD NO. I ®I I I (ID-70) I I UTILITY CODES: - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 76100INEW ROAD FROM SOUTH ISLAND DR. TO HARTSTENE IS.NO. RD. I IUI I I I 5881 5881 5881 I I PE I I I I I MJR CLASS of WK: 1 IR/W I IA New Road from South Island Drive easterly to I IWORK CODES: ABC ICON I I IHartstene Island North Road- Follows No. Line of I I TOTAL LENGTH: 1.62 F.A. PROJ NO. I ®I I ISec. 11 (ID-18) I I UTILITY CODES: - - ITOT OI 0 __________________________________________________________________________________________________________________________________ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 12 MASON COUNTY -P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR IYEAR 77100INEW RD CONNECTING TAHUYA RIVER DRIVE & TAHUYA RIVER RD I IUI I I 1 5351 5351 5351 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (Extend Tahuye River Drive (7521) Approx. 1.3 miles to WORK CODES: ABD ICON I I (intersect Tahuya River Road (7095) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. 1 ®1 I I(ID-31 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 78100INEW ROAD FROM S.R. #101 TO BROCKDALE ROAD I IUI I I 1 6951 6951 6951 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I IA New Road from S.R. #102 east to McEwan Prairie Road. I I WORK CODES: ABD ICON I I ITo provide a direct route from #101 to the Mason Lake. I I TOTAL LENGTH: 2.00 F.A. PROJ NO. 1 -1 I (area. A bypass of the City of Shelton (ID-65). I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 79[OOINEW ROAD FROM JOHN'S PRAIRIE ROAD TO MASON LAKE ROAD I IUI I I 1 4121 4121 4121 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I 10.30 mites east of railroad tracks on John's Prairie I I WORK CODES: ABD ICON I I (Road to area of Mikketsen Road on Mason Lake Road I I TOTAL LENGTH: 1.00 F.A. PROJ NO. 1 -1 I I(ID-67) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 80IOOINEW ROAD CONNECTING BINNS SWIGGER LOOP & PHILLIPS ROAD I IUI I I 1 5361 5361 5361 I I PE I I (APPROX. 1.3 MILES + BRIDGE I I MJR CLASS of WK: 1 IR/W I I 11.3 miles of New Construction WORK CODES: ICON I I I(ID-32 Yr-92) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. 1 -1 I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 81100INEW ROAD FROM MASON LAKE ROAD SOUTHEASTERLY TO I IUI I I 1 6951 6951 6951 I I PE I I IPICKERING ROAD I I MJR CLASS of WK: 1 IR/W I I INew Road from Mason Lake Road Southeasterly WORK CODES: ABDLI ICON I I Ito SR-3 at the Pickering Road I I TOTAL LENGTH: 2.20 F.A. PROJ NO. 1 ®1 I I(ID_92) I I UTILITY CODES: - - [TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------ 82100INEW ROAD FROM S.R. #3 TO GRAPEVIEW LOOP ROAD I IUI I 1 1 5411 5411 5411 1 I PE I I I I I MJR CLASS of WK: 1 IR/W I I (From S.R. #3 east to the Grapeview Loop Road I I WORK CODES: ABD ICON I I Inear the Fair Harbor Marina I I TOTAL LENGTH: 1.80 F.A. PROJ NO. 1 ®1 I I(ID-66) I I UTILITY CODES: - - ITOT 01 0 -------------------------------------------------------------------------------------------------------------------------- 83IOOINEW ROAD MCREAVY TO MASON LAKE ROAD I IUI I I 1 15551 15551 15551 I I PE I I IAPPROX. 5 MILES I I MJR CLASS of WK: 1 IR/W I I (Construct Approx. 5.0 miles of new Road from 2 mites WORK CODES: ABD ICON I I (North of Webb Hill Rd to 1/2 mi. North of Simpson I I TOTAL LENGTH: 5.00 F.A. PROJ NO. 1 ®1 I IRecreation Area (ID-55 Yr-92) [ I UTILITY CODES: - - ITOT OI 0 -------------------------------------------------------------------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 Page 13 MASON COUNTY - ---------- P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ---------------------------- 84100INEW ROAD FROM TWANOH FALLS PLAT EAST TO TRAIL ROAD/106 I IUI I I I 6181 6181 6181 I I PE I I IAPPROX. 1.5 MILES I I MJR CLASS of WKt 1 IR/W I I (Construct appoximatly 1.5 mites of r*w road WORK CODES: ABD ICON I I(ID 94 YR 92) I I TOTAL LENGTH: 1.50 F.A. PROD NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX TEAR TRANSPORTATION INPROYEMENT PROGUA 1 TO 1999 Page 14 KA CCUNTY mmaaasf++seasa•■+s+sssasaaae saaaasa saes aaasaaa am E[asEssrasaaaaassaaaaa■ssiasaaaa[assza safaaass[asa:aaaaazsaa E sass+saaV"Waassa+s+as aaa aaa I I I 1 OF COSTS ST FMIMG CATEGORY EXPENDITURE PLAX I'MOING ►WI FEDERAL OGLIGATION PLAX I I I [mamma sasaasaza c+saas[sfzas:assesses+v�s:zms:Esaas:asssf c:a:[saa asscrasaaaaaaaa�as as a[as+::ass:sYmae ammammaaasaass:a+msaaea[of auras aaa FUNDED PROJECTf I let Year 3412 I Local 6.2T5 I Years 1°3 Tears 4-6 Total® 2nd Year 1061 IRAP 692 ► E 174 54 232 I 3rd Year 1364 ICAPP 1396 I RM 0 0 0 I 4.6 Year I TIA 0 I COSST 0 0 0 I I DATA 0 I I I Fed. 380I I I I Totals ... 8745 6745 174 58 232 ...................................................................................... UN FUNDED PROJECTS I 1st Year 1374 I Local 27632 I Years 1-3 Years 4-6 Totals (Proposed and Unkrwwn) ( 2.rd Year 2321 IW 0 I P E 0 0 0 I 3rd Year 2239 ICAPP 0 I R/1r 0 0 0 I 4.6 Year 22696 I TIA 0 I COSTT 0 0 0 I I LKTA 0 I I I Fed. 1000 I I I I Totals ... 26632 2E632 0 0 0 .................................................. TOTAL ALL PROJECTS I 1st Year 4786 I local 33907 I Years 1.3 Tears 4-6 Totals I 2nd Year 3382 I RAP 692 ' P E 1T4 58 232 I 3rd Year 3603 I CAP" 1396 I R/Y 0 0 0 4-6 Year 25606 ' TIA 0 I COSTT 0 0 0 I I DATA 0 j I I Fed. 1380 I I I Totals ... 37377 3T3T7 174 58 232 r aaaf fZYSTTESa SZ�ZZSLTEZZE=iZ YBT a sea=ZY.YY8a....+SeYYiaaffif.S+aiZIIZSiiaia...ZZEBzz.......YSSa2i88S aSa88i IIY8SYSaa�= WHEREAS, in compliance with R.C.W. 36.81.121 and W.A.C. 136.14, the Board of Mason County ComrNssioners hereby cartifies that a priority arTay of potential projects on this County's arterial system was prepared by the County Engineer and available to the Board of County Commissioners during the preparation of a proposed six (6) year comprehensive road construction program for the period January 1, 1994, through December 31, 1999 , WHEREAS, in further compliance with said law, the Board has held thereon public hearing(s) dated September 14, 1993, to consider same. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six (6)Yee Construction Program for Mason County roads be adopted as set forth in detail, for the period mentioned, consisting of pages numbered 1 through 14, which are incorporated and made part of this Resolution. PASSED and unaninously adopted this 14th day of September, 1993. BOARD OF COUNTY COMMISSIONERS r MASON COUNTY, WASHINGTON Chairperson ATTEST: —�— --._- Member Clerk of the Board Member cc: Cams. I Eng'r. I CRAB Urban Arterial Board Dept. of Transp.ILocal Programs Div. h:lw pltm aintlsoc-yr.sig