Loading...
HomeMy WebLinkAboutSEPA2009-00009 Bulkhead 280' SHX2009-00006 JARPA - SEP Determinations - 3/12/2009 M From: Tammi Wright To: kim Schaumburg Date: 12/18/2008 10:58 AM Subject: Bulkhead Question on 2 lots. Kim, The permits required for a continuous bulkhead on two lots would be 2 separate building permits,2 separate MEP's, 1 Habitat Management Plan (provided it addressed each parcel)and 1 SEPA checklist. I am assuming these lots have SFR's on them...if not they may require Substantial Development permits(depending on valuation).Otherwise they would need 2 shoreline exemptions. Tammi Wright, Planner Mason County DCD PO Box 279 Shelton,WA 98584 (360)427-9670 ext.295 tam miw(a)co.mason.wa.us W AGENCY USE ONLY Q Agency Reference#: Date Received: Circulated by: (local govt.or agency) JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (JARPA) (for use in Washington State) r PLEASE TYPE OR PRINT IN BLACK INK. ® Application for a Fish Habitat Enhancement Project per requirements of RCW 77 55.290. You must submit a col completed JARPA application form and the(Fish Habitat Enhancement JARPA Addition)to your local Government Planning Department and Washington Department of Fish&Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOVERNMENTS-You must submit any comments on these projects to WDFW within 15 working days. Based on the instructions provided,I am sending copies of this application to the following: (check all that apply) ® Local Government for shoreline: Substantial Development conditional Use [3/ariance OExemption []Revision C]Floodplain Management []Critical Areas Ordinance FA Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region) [] Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal:Permit Unit) Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification [] Corps of Engineers for: [] Section 404 [] Section 10 permit [] Coast Guard for: [] General Bridge Act Permit [] Private Aids to Navigation(for non-bridge projects) [] For Department of Transportation projects only: This project will be designed to meet conditions of the most current Ecology/Department of Transportation Water Quality Implementing Agreement SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT Steve &Amy Latham MAILING ADDRESS 5648 179'h Ave SE, Bellevue WA 98006-5931 WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# If an agent is acting for the applicant during the permit process, complete#2. Be sure agent signs Section C(Signature Block) for all permit applications 2.AUTHORIZED AGENT MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# 3. Relationship of applicant to property: �x OWNER [] PURCHASER [] LESSEE 4. Name,address and phone number of property owner(s)if other than applicant: 5. Location(street address,including city,county and zip code,where proposed activity exists or will occur) 60 N Gull Place, Hoodsport, Mason County Local government with jurisdiction(city or county)Mason County Waterbody you are working in Lake Cushman Tributary of WRIA# Is this waterbody on the 303(d) List" YES NO Puget Sound 16 If YES,what parameter(s)? Shoreline designation Urban Residential http://www.ecy.wagov/programs/wq/303d/index.html Zoning designation Unknown %Section Section I Township I Range Government Lot 05 22N 04W DNR stream type if known Latitude and Longitude: Tax Parcel Number 422055200951 ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 1 r Describe the current use of the property, and structures existing on the property. Have you completed any portion of the proposed activity on this property? ❑ YES ❑x NO For any portion of the proposed activity already completed on this property, indicate month and year of completion. Asingle-family residence is located on the property. Is the property agricultural land? ❑ YES Q NO Are you a USDA program participant? ❑ YES ❑x NO 7a. Describe the proposed work that needs aquatic permits: Complete plans and specifications should be provided for all work waterward of the ordinary high water mark or line, including types of equipment to be used. If applying for a shoreline permit,describe all work within and beyond 200 feet of the ordinary high water mark. If you have provided attached materials to describe your project,you still must summarize the proposed work here. Attach a separate sheet if additional space is needed. Shoreline protection is to be constructed using steel 1-beams and treated lumber along approximately 100 lineal feet of frontage. Height of the bulkhead to be a maximum of 14 feet above the existing beach grade at the OHW elevation of 738 feet. Steel 1-beams to be augered in by hand a minimum of 6 feet(2 feet in width)and filled with concrete. Bulkhead shall be reinforced by steel tieback cables and concrete anchor blocks. Entire bulkhead to be backed with filter fabric, gravel,and topsoil running the length of the bulkhead,then planted with native vegetation. Minimal vegetation shall be disturbed. Manmade debris on the beach, including Gabion baskets, shall be removed from the site. Materials and equipment shall be driven to the site. 7. Location of proposal, and directions to the site. Give sufficient information for a person to understand the precise location of your proposed project. Take SR Hwy 101 to Hoodsport, then turn left on North Lake Cushman Rd. Turn left on Standstill Drive and follow to the site. PREPARATION OF DRAWINGS: See sample drawings and guidance for completing the drawings. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE DRAWINGS MUST BE ATTACHED. NOTE: Applicants are encouraged to submit photographs of the project site,but these DO NOT substitute for drawings. THE CORPS OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON 8-112 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES. 7b. Describe the purpose of the proposed work and why you want or need to perform it at the site. Please explain any specific needs that have influenced the design. The proposed bulkhead replacement, as per the owner's request, is for protection of the bluff,which is eroding due to wave action from boat wake and wind. The design has been chosen, because the bluff is too steep and unstable to support a traditional rock bulkhead. 7c. Describe the potential impacts to characteristic uses of the water body. These uses may include fish and aquatic life,water quality, water supply, recreation and aesthetics. Identify proposed actions to avoid, minimize, and mitigate detrimental impacts and provide proper protection of fish and aquatic life. Identify which guidance documents you have used. Attach a separate sheet if additional space is needed. The proposal will result in minimal negative impacts to the waterbody,which shall be mitigated through the use of BMP's and the planting of native vegetation. 7d. For in water construction work,will your project be in compliance with the State of Washington water quality standards for turbidity WAC 173.201A-110? ❑x YES ❑ NO (See USEFUL DEFINITIONS AND INSTRUCTIONS) 8. Will the project be constructed in stages? YES NO ❑x Proposed starting date: ASAP after all permits have been obtained Estimated duration of activity: Less than 30 days. 9. Check if any temporary or permanent structures will be placed: Waterward of the ordinary high water mark or line for fresh or tidal waters AND/OR ❑ Waterward of the mean higher high water for tidal waters? 10.Will fill material(rock,fill, bulkhead,or other material) be placed: No ❑ Waterward of the ordinary high water mark or line for fresh waters? If YES,VOLUME(cubic yards) /AREA (acres) ❑ Waterward of the mean higher high water for tidal waters? If YES,VOLUME(cubic yards) /AREA (acres) ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 2 11, Will'material be placed in wetlands? ❑ YES 0 NO If YES: A. Impacted area in acres: B. Has a delineation been completed? If YES,please submit with application. YES NO C. Has a wetland report been prepared? If YES, please submit with application YES NO D. Type and composition of fill material(e.g.,sand,etc.) E. Material source: F. List all soil series(type of soil)located at the project site, and indicate if they are on the county's list of hydric soils. Soils information can be obtained from the natural Resources Conservation Service(NRCS). G WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑ YES ❑ NO If YES, IMPACTED AREA IS ACRES OF DRAINED WETLANDS. NOTE:If your project will impact greater than%of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form. NOTE:A 401 water quality certification will be required from Ecology in addition to an approved mitigation plan if your project impacts wetlands that are: a)greater than%acre in size, or b)tidal wetlands or wetlands adjacent to tidal water. Please submit the DARPA form and mitigation plan to Ecology for an individual 401 certification if a)or b)applies. 12. Stormwater Compliance for Nationwide Permits Only: This project is(or will be)designed to meet ecology's most current stormwater manual,or an Ecology approved local stormwater manual. E] YES ❑ NO If YES—Which manual will your project be designed to meet? If NO—For clean water act Section 401 and 404 permits only—Please submit to Ecology for approval, along with this JARPA application, documentation that demonstrates the stormwater runoff from your project or activity will comply with the water quality standards,WAC 173.201(A) 13.Will excavation or dredging be required in water or wetlands? YES ® NO If YES: A. Volume: (cubic yards)/area (acre) B. Composition of material to be removed: C. Disposal site for excavated material: D. Method of dredging: 14. Has the State Environmental Policy Act(SEPA)been completed rx-1 YES E] NO SEPA Lead Agency: Mason County SEPA Decision: DNS,MDNS, EIS,Adoption, Exemption Decision Date(end of comment period) SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION 15. List other Applications, approvals or certifications from other federal, state or local agencies for any structures, construction discharges or other activities described in the application (i.e. preliminary plat approval, health district approval,building permit, SEPA review, federal energy regulatory commission license(FERC), Forest practices application, etc.). Also, indicate whether work has been completed and indicate all existing work on drawings. NOTE: For use with Corps Nationwide Permits, identify whether your project has or will need an NPDES permit for discharging wastewater and/or stormwater. TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETED? NO. Shoreline Exemption Permit Mason County HPA WDFW MEP & HMP Mason County 16. Has any agency denied approval for the activity you're applying for or for any activity directly related to the activity described herein? E] YES EJx NO If YES,explain: ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 SECTION B - Use for Shoreline and Corps of Engineers permits only: 17a.Total cost of project. This means the fair market value of the project, including materials, labor, machine rentals, etc. Unknown. 17b. If a project or any portion of a project receives funding from a federal agency,that agency is responsible for ESA consultation. Please indicate if you will receive federal funds and what federal agency is providing those funds. See instructions for information on ESA." 3 FEDERAL FUNDING ❑ YES ❑x NO If YES,please list the federal agency. 18. Local government with jurisdiction: Mason County 19. For Corps,Coast Guard and DNR permits,provide names,addresses and telephone numbers of adjoining property owners,lessees, etc. Please note: Shoreline Management Compliance may require additional notice—consult your local government. NAME ADDRESS PHONE NUMBER SECTION C-This section MUST be completed for any permit covered by this aAWICRdOn 0. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am familiar with the information contained in this application,and that to the best of my knowledge and belief,such information is true,complete,and accurate. I further certify that I possess the authority to undertake the proposed activities. I hereby grant to the agencies to which this application is made,the right to enter the above-described location to inspect the proposed,in-progress or completed work. I agree to start work ONLY after all necessary permits have been received. DATE SIbNATURE LICANT DATE SIGNATURE OF AUTHORIZED AGENT I HEREBY DESIGNATE TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PERMITS . I UNDERSTAN THAT IF A FEDERAL PERMIT IS ISSUED, I MUST SIGN THE PERMIT. SI ATURE OF APPLICANT DATE NATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS,E.G.DNR) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED. 18 U.S.0§1001 provides that: Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. COMPLETED BY LOCAL OFFICIAL A. Nature of the existing shoreline. (Describe type of shoreline,such as marine,stream,lake,lagoon,marsh,bog swamp,flood plain,floodway,delta;type of beach,such as accretion,erosion,high bank,low bank,or dike;material such as sand.gravel, mud,clay, rock,riprap;and extent and type of bulkheading,if any) B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level, indicate the approximate location of and number of residential units,existing and potential,that will have an obstructed view: C. If the application involves a conditional use or variance,set forth in full that portion of the master program which provides that the proposed use may be a conditional use,or,in the case of a variance,from which the variance is being sought: These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions ECY 070-15(Rev. 11104) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 3601407-7037 or 800/917-0043 4 S1AT, RECEIVED MAR 2 7 2009 0 y STATE OF WASHINGTON MCC D - PLANNING DEPARTMENT OF ECOLOGY PO Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 March 26,2009 Ms.Tammi Wright ' ; Your address Mason County IS in the Department of Community Development ��� esh- Planning Division Dosewallips PO Box 279 watershed Shelton,WA 98584 Dear Ms.Wright: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the DeLeo Bulkhead project (SEP2009-00008) located at 61 North Gull Place in Hoodsport as proposed by Therese DeLeo. The Department of Ecology(Ecology) reviewed the environmental checklist and has the following comment(s): SEPA REGIONAL PROJECT LEAD: Sarah Lukas(360)407-7459 The applicant should consider alternatives to treated wood or other chemically treated wood for in- water construction of wooden structures. Over time,treated wood may contaminate nearby sediment and cause toxicity for aquatic organisms. Fresh uncured concrete in direct contact with the water is toxic to aquatic life. All concrete shall be poured in the dry and allowed to cure a minimum of seven (7) days before contact with water. Erosion control measures must be in place prior to any clearing,grading,or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48,Water Pollution Control, and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. During construction, all releases of oils, hydraulic fluids,fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter Lake Cushman or cause water quality degradation of state waters. If the applicant has questions regarding Water Quality Regulations or Erosion Control Measures, please contact Derek Rockett with the Water Quality program at the Southwest Regional office at (360)407-6697 or email at droc461 ecy.wa.Rov. $ STA MASON COUNTY IL M�P�oN O F°� DEPARTMENT OF COMMUNITY DEVELOPMENT o n U y= Planning Division o T Z P O Box 279, Shelton, WA 98584 y�0 N Y o~ (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) P SEP2009-00009 � M Description of Proposal: Construction of approximately 280 lineal feet of I-beam pile and wood bulkhead on two neighboring lots on Lake Cushman. Construction is within a Fish & Wildlife Habitat Conservation Area and a Landslide Hazard Area. Proponent: STEVE LATHAM Site Address (If Assigned): 60 N GULL PL HOODSPORT Directions to Site: TAKE HWY 101 TO HOODSPORT TURN LEFTON N CUSHMAN RD THEN LEFT AT DIV 19 AND FOLLOW ADDRESSES TO SITE Parcel Number: 422055200951 Legal Description: LAKE CUSHMAN #19 PTN OF LOT 50 TR C OF SP #1953 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS):is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency_ This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED_ Please contact Tammi Wright at ext. 295 with any questions. This DNS is issued:under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 3/26/2009. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Auth rized Local Government Official Date MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2009-00009 10) Debris or deleterious material resulting from construction shall be removed from the beach area and project site and shall not be allowed to enter waters of the State. X 11) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 12) A Hydraulic Project Approval from the Washington Department of Fish and Wildlife shall be obtained prior to work on the banks of or within the waters of the State. X March 26, 2009 Page 2 Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments, please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:09-1444) cc: Sarah Lukas, SEA Therese DeLeo (Proponent) Kim Schaumburg(Contact) MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2009-00009 CONDITIONS OF THIS DETERMINATION 1) All provisions of the Habitat Management Plan shall be enacted. X 2) Minimum vegetation shall be removed. Native vegetation shall be planted along the top of the bulkhead as identified in the Habitat Management Plan. X 3) Holes for the posts will be augered by hand with hand tools: X 4) No construction to take place when the water level of Lake Cushman is elevated (approximately May 26th to October 1 st). X 5) Geosynthetic filter fabric shall be used to "back" the bulkhead as identified in the Habitat Management Plan. X 6) Aquatic friendly sealant shall be applied to the concrete used in the project. X 7) Existing woody debris shall be anchored along the toe of the bulkhead to lessen toe erosion, after construction is completed. A site plan of the placement/location of the wood debris shall be submitted to the County prior to building permit issuance. X 8) ACZA treated wood used in the project shall undergo one or more of the following .BMP's to minimize leaching of contaminants: 1 Aqua-Ammonia Steaming Cycle (AASC); 2. Post Treatment Kiln Drying; 3. Minimum Plant Holding Time (MPHT). In addition to recommendations for the ACZA BMP's-Amendment #1 for MPHT treatment, all ACZA treated wood shall be held under cover a minimum of 3 weeks at constant temperature that meets or exceeds 60degrees F. If the ambient temperature is less than 60 degrees F, then ACZA treated wood must undergo the Post Treatment Kiln Drying, noted above; 4. In-Retort Ammonia Removal Plus Plan Holding Time; as conditioned in previous section (3), but held under cover for a minimum of 1 week, at constant temperature that meets or exceeds 60 degrees F; 5. ACZA wood treatment methods shall be verified by providing a signed and dated certification from a third party. X 9) Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts.X SEPA Contact List • MASON COUNTY DCD Sent SEPA, 7TMlk��'1�1 to (check all that apply)on Skokomish Tribal Nation WA Department of Ecology Natural Resources Dept. Environmental Review Section ATTN: Randy Lumper PO BOX 47703 N 541 Tribal Center Rd. Olympia,WA 98504-7703 Skokomish Nation,WA 98584 sepaunit@ecy.wa.gov rlumper@skokomish.org U.S.Army Corps of Engineers Tribal Historic Preservation Officer SEPA Reviewer-John Pell Attn: Kris Miller PO Box C-3755 80 N Tribal Center Rd Seattle,WA 98124 Skokomish Nation,WA 98584 shlanayl@skokomish.org WA Dept. of Fish and Wildlife ATTN: Margie Schirato (saltwater) Quinault Indian Nation 2391 W Deegan Rd. ATTN: Mark Mobbs Shelton,WA 98584 PO Box 189 schirmms@dfw.wa.gov Tahola,WA 98587 mmobbs@quinault.org ED WA Dept. of Fish &Wildlife ATTN: Gloria Rogers,Area Habitat Biologist Squaxin Tribal Nation 48 Devonshire Rd Natural Resources Dept. Montesano, WA 98563-9618 2952 SE Old Olympic Highway rogergsr@dfw.wa.gov Shelton,WA 98584 jdickison@squaxin.nsn.us M WA Dept.of Transportation Alana Hess, Development Review Engineer The Confederated Tribe of the Chehalis P.O. Box 47440 ATTN: SEPA Reviewer-Glen Connelly Olympia,WA 98504-7440 420 Howanut Rd. HESSA@wedot.wa.gov Oakville,WA 98568 gconnelly@chehalistribe.org City of Shelton 525 West Cota St. Shannon Soto Shelton,WA 98584 WA DNR, South Puget Sound Region jasond@ci.shelton.wa.us 950 Farman Avenue North Enumclaw,WA 98022-9282 Port of Shelton shannon.soto@dnr.wa.gov Attn: Patti Miller-Crowley 21 West Sanderson Way Elizabeth Ellis Shelton,WA 98584 WA DNR,Aquatic Resources pattimc@portofshelton.com PO BOX 47027 Olympia,WA 98504-7027 Office of Archaeology&Historic Preservation elizabeth.ellis@dnr.wa.gov ATTN: Lance Wollwage P.O. Box 48343 Fn Boyd Powers Olympia,WA 98504-8343 WA DNR,SEPA Center Lance.Wollwage@dahp.wa.gov PO BOX 47015 Olympia,WA 98504-7015 Tacoma Public Utilities boyd.powers@dnr.wa.gov Real Property Services Attn: Dave Letterman Olympic Region Clean Air Agency, John Kelly 3628 S 35th St 2940-B Limited Ln. NW Tacoma,WA 98409-3192 Olympia,WA 98502 dletterm@cityoftyacoma.org john@orcaa.org Agent: &`. rf�f1An 6k1F�� �11635(:�CtVihAtIlei, 0 Mason County Transit School District: {Icy PO Box 1880 Mason Cty P.W. ATTN: Shelton,WA 98584 Mason Cty E.H. AT doconnell@masontransit.org Mason County Bldg ttnRla 61& FS Applicant: .'Dkla i- 5 4r 1 rYM 'e SE A-e1tVUe LOP gROTL _r-A.Zi MASON COUNTY ENVIRONMENTAL CHECKLIST MASON CO. ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Latham bulkhead project. 2. Name of applicant: Steve & Amy Latham. 3. Address and phone number of applicant and contact person: Kim Schaumburg, 10112 Bayview Rd KPN, Vaughn WA 98394, 253.884.5776. 4. Date checklist prepared: 2-1-09 5. Agency requesting checklist: Mason County 6. Proposed timing or schedule (including phasing, if applicable): No phasing. Work to be completed ASAP upon receiving all required permits. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: if yes, explain. No. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. An HMP & an MEP. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No. 10. List any government approvals or permits that will be needed for your proposal, if known. A Mason County Shoreline Substantial Permit and building permit, and an HPA from the WDFW. 11. Give a brief, complete description of your proposal, including the proposed uses and the size Of the project and site. There are several MASON COUNTY ENVIRONMENTAL CHECKLIST 3 C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know classification of agricultural soils, specify them and note any prime farmland. Sand and gravel. d. Are there surface indications of history of unstable soils in the immediate vicinity: If so, describe. Yes, the bluff exhibits signs of erosion. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. The bulkhead shall be backfilled with gravel and topsoil. f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. WSDE's BMP's will be followed during construction to protect water quality at the site. About what percentage of the site will be covered with impervious 9� p 9 p surfaces after project constructions (for example, asphalt or buildings)? The bulkhead shall be pervious to water. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: WSDE's Best Management Practices shall be followed during construction, and thle WDFW's NPA provisions shall be strictly adhered to. 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. duct, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. Emissions from any heavy equipment use shall be minor. MASON COUNTY ENVIRONMENTAL CHECKLIST 4 b. Are there any off-site sources of emissions or odors that may affect your proposal? if so, generally describe. No. C. Proposed measures to reduce or control emissions or other impacts to air, if any: Work to be completed as quickly as possible. 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Lake Cushman. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. No fill will be added or removed from surface water or wetlands. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Unknown, but the proposed project site is on the waterfront. MASON COUNTY ENVIRONMENTAL CHECKLIST 5 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage, industrial, containing the following chemicals...,agricultural, etc.)> Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None will be discharged. C. Water runoff(including storm water): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Here will this water flow? Will this flow into other waters? If so, describe. None. 2) Gould waste materials enter ground or surface waters: if so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: The top of the bulkhead will be planted with native vegetation. 4. PLANTS: a. Check or circle types of vegetation found on the site: x_deciduous tree: alder, maple, aspen, other MASON COUNTY ENVIRONMENTAL CHECKLIST 6 x_evergreen tree: fir, cedar, pine, other x_shrubs x_ grass pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other _water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Minimal native vegetation will be disturbed. C. List threatened or endangered species known to be on or near the site. Unknown. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: The top of the bulkhead will be planted with native vegetation. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other Mammals: deer, bear, elk, beaver, other Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. The marbled murrelet(Brachyramphus marmoratus marmoratus), the bull trout(Salvelinus confluentus), Puget Sound Chinook salmon (Oncorhynchus tshawiytscha), the Puget Sound Steelhead (Oncorhynchus mykiss), and the Northern Spotted Owl (Strix Occidentalis). C. Is the site part of a migration route? If so, explain. No. MASON COUNTY ENVIRONMENTAL CHECKLIST 7 d. Proposed measures to preserve or enhance wildlife, if any: The top of the bulkhead will be planted with native vegetation. 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None. b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. No. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None. 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, which could occur as a result of this proposal? If so, describe. WSDE's Best Management Practices shall be followed during construction to insure water quality at the site. 1) Describe special emergency services that might be required. An ambulance in the event of a construction accident. 2) Proposed measures to reduce or control environmental health hazards, if any: None. b. Noise: 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None. MASON COUNTY ENVIRONMENTAL CHECKLIST 8 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Construction noise will occur for a short time (several working days) during daylight hours. 3) Proposed measures to reduce or control noise impacts, if any" Work to be completed as quickly as possible. 8) LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Residentiallrecreational. b. Has the site been used for agriculture? If so, describe. No. C. Describe any structures on the site. A single-family residence is currently proposed for the site. d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification of the site? Unknown. f. What is the current comprehensive plan designation of the site? Unknown. g. If applicable, what is the current Shoreline Master Program designation of the site? Rural. h. Has any part of the site been classified as an "Environmentally sensitive" area? If so, specify. Unknown. MASON COUNTY ENVIRONMENTAL CHECKLIST 9 i. Approximately how many people would reside or work in the completed project? None. j. Approximately how may people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: None. i. Proposed measure to ensure the proposal is compatible with existing and projected land uses and plans, if any: Bulkheads, PRFs, and shoreline access stairs are normal to waterfront single-family residences. 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None. b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income housing. None. C. Proposed measures to reduce or control housing impacts, if any: None. 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The proposed bulkhead shall be a maximum of 3 feet above grade in height. The access stairs and landings shall follow the bluff contour, insofar as it is possible while keeping all stairs and landings level (i.e. the back edge of all stairs and landings will be less than 30 MASON COUNTY ENVIRONMENTAL CHECKLIST 10 inches in height, while the front edge may be over 30 inches above grade in order to compensate for steep slopes). b. What views in the immediate vicinity would be altered or obstructed? None. C. Proposed measure to reduce or control aesthetic impacts, if any: The bulkhead shall be constructed of large woody debris, a natural material. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. C. What existing off-site sources of light or glare may affect your proposal: None. d. Proposed measures to reduce or control light and glare impacts, if any: None. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Boating, fishing, etc. MASON COUNTY ENVIRONMENTAL CHECKLIST 11 b. Would the proposed project displace any existing recreational uses? If so, describe. No. C. Proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the project or applicant, if any.- The shoreline access stairs and the PRF will increase recreational opportunities at the site. 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None. Proposed measures to reduce or control impacts, if an C. Propo :p Y None. 14. TRANSPORTATION a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. No public streets or highways access the site. b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. No. MASON COUNTY ENVIRONMENTAL CHECKLIST 12 C. How many parking spaces would the completed project have? How many would the project eliminate? None. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project. If known, indicated when peak volumes would occur. None. g. Proposed measures to reduce or control transportation impacts, if any: None. 15. PUBLIC SERVICES a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No. b. Proposed measures to reduce or control direct impacts on public services, if any: None. 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: MASON COUNTY ENVIRONMENTAL CHECKLIST 13 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date submitted: Z ESA LISTED N SALMONIDS CHECKLIST Applicant Information Project Information Name Steve&Amy Latham Name Latham Bulkhead Proiect. Phone please contact Kim Schaumburg. Location 60 N Gull Place, Hoodsport (253)884-5776 Description Install I-beam and lumber bulkhead along bluff toe for lake shoreline erosion protection. This worksheet was designed to help project Proponents and government agencies identify when a project needs further analysis regarding adverse effects On ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA listed salmonids" is defined as fish species listed as endangered, threatened or being considered for listing . If ESA listed species are present or ever were present in the watershed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project The fish Program Manager at the appropriate Department of Fish and Wildlife (DEW) regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? Yes X No_ Please describe. Puget Sound Chinook, Puget Sound Steelhead, and Bull Trout. 2. Has there ever been an ESA listed Salmonid stock present in this watershed? Yes X No Puget Sound Chinook, P.S. Steelhead, and Bull Trout. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist PROJECT SPECIFICS: The questions in this section are specific to the project and vicinity. 1. Name of watershed: Hood Canal 2 Name of nearest waterbody: Lake Cushman September 1999 1 3. What is the distance from this project to the nearest body of water? The proposed new structure will be constructed along the bluff toe at Lake Cushman. Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use between the project and the potentially affected water body (parking lots, farmland, etc.) ? A single-family residence is currently located at the site. 5. Is the project above a: • natural permanent barrier (water fall) Yes_ No X • • • • • • • a • natural temporary barrier (beaver pond) Yes_ No X • • • • • • • • • natural temporary barrier (beaver pond) Yes_ No_X • • • • • • • • • other (explain) : • N/A • 6. If yes, are there any resident salmonid populations above the blockage? Yes No Don't know • N/A • • • • 7 What percent of the project will be impervious surface (including pavement & roof area) ? • None • • FISH MIGRATION: the following questions will help determine if this project could interfere with migration of adult juvenile fish. • • • Both increases and decreases in water flows can affect fish migration. • • 1. Does the project require the withdrawal of: • i. Surface water? Yes No X a a a Amount • • • Name of surface Water body • • ii. Ground water? Yes No X • mount • • • from where • • • Depth of well • • 2 Will any Water be rerouted? Yes No _X_ • • • If yes, will this require a channel change? • • 3. Will there be retention or detention ponds? Yes_ No X • • • If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? • N/A September 1999 2 • • • • If to a surface water discharge, please give the name of the waterbody • • N/A • • • • 4. Will this project require the building of new roads? • Yes No_X_Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. • • 5. Are culverts proposed as part of this project? Yes_ No X • • 6. Will topography changes affect the duration/direction of runoff flows? Yes No x If yes, describe the changes. • • 7. Will the project involve any reduction of the floodway or €loodplain by filling or other partial blockage of flows? Yes _ No_X_ • If yes, how will the loss of flood storage be mitigated by your project? • • WATER QUALITY: The following questions will help determine if this project could adversely impact water quality. Such impacts can cause problems for listed species. • Water quality can be made worse by runoff from impervious surfaces, altering water temperature, discharging contaminants, etc. • • 1. Do you know of any problems with water quality in any of the streams within this watershed? Yes No X If yes, describe. • • • 2. Will your project either reduce or increase shade along or over a waterbody? Yes_ _ No x • Existing large vegetation shall be protected and additional vegetation shall be planted as a result of the proposed project. • • 3. Will the project increase nutrient loading or have the potential to increase nutrient loading or contaminants {fertilizers, other waste discharges, or runoff} to the waterbody? Yes No X • • • • 4. Will turbidity be increased because of construction of the project or during operation of the project? Yes_X No_ _ • WDEW's construction requirements will be strictly adhered to. • • 5. Will your project require long term maintenance, i.e. bridge cleaning, September 1999 3 highway salting, chemical sprays for vegetation management, clearing parking lots? • Yes _ No x If yes, please describe. • • • • VEGETATION: The following questions are designed to determine, if the project will affect riparian vegetation, thereby, adversely impacting salmon. • • 1. Will the project involve the removal of any vegetation from the stream banks? Yes No X • • If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. • • 2. If any vegetation is removed, do you plan to replant? Yes_x_ No _ If yes, what types of plants will you use? • Native trees and shrubs. September 1999 4 STATE 0� 4 " � ��`�1RR9 aQy State of Washington DEPARTMENT OF FISH AND WILDLIFE 48 Devonshire Road$Montesano,Washington 98563-9618$(360)249-4628,TDD(360)902-2207,Fax(360)664-0689 March 25, 2009 Mason County Department of Community Development Tammi Wright Post Office Box 279 Shelton, WA 98584 Dear Ms. Wright: SUBJECT: Review of the State Environmental Protection Act(SEPA), SEP2009-00008 and SEP2009-00009, Bulkhead located at 61 and 60 N Gull Place, Hoodsport, WA; Lake Cushman; Section 05,Township 22 North, Range 04 West, Mason County, WRIA 16.6002 The Washington Department of Fish and Wildlife(WDFW)has reviewed the SEPA checklists for these two proposals. They include the construction of a 280 lineal feet of I-beam pile and ACZA treated wood bulkhead on two neighboring lots. The plans show a straight wall located beyond the toe of the slope within the ordinary high water line(OHWL) and rising 20 feet high on a slope heavily vegetated with native woody shrubs and young conifer trees. WDFW has the following comments to offer. The Habitat Management PIans(HMP) acknowledges the structure and construction will have impacts such as the loss of benthic habitat, contamination from leaching of the wood preservatives, the loss of native vegetation and changes in the hydraulics. Mitigation for these impacts is not adequately addressed in the plan. In addition, the Geotechnical Report does not appear to support the need of a structure of this magnitude. • 46 "properties display minor sloughing"and"trees on the steep hillside were found to be growing reasonably straight with no indications of truck curvature typically associated with mass landslide movements". • #7 "properties is stable in its present geometry and condition and does not present a landslide or geological hazard to the existing residential improvements on the subject properties" • #12 "existing improvements are safe"concluding with"the wall(s) is proposed to reduce the continual erosion of the lake shoreline..." WDFW recommends the proponents modify their proposal to include the following: • Minimize the height of the wall to protect only the toe of the slope. • Place the structure at the toe of the slope and follow the contour of the bank. • Establish roughness along the wail by installing large woody material. • Use material other treated wood. • Identify and minimize number of access slides to reduce disturbance to the bank and bank vegetation from sliding building materials down the bank. • Provide a revegetation plan for all disturbed bank area and riparian area, not just for five feet along the edge. Include in the plan tree species, not just shrubs. Thank you for the opportunity to provide these comments. If you have any questions or need further information,please contact me at 360-249-4628 x 249. Sincerely, 61 Gloria Rogers Area Habitat Biologist Cc: Dave Kloempken, WDFW,Assistant Regional Habitat Program Manager(email) Teresa Eturaspe,WDFW, SEPA Coordinator(email) Chris Clemmons, Skokomish Tribe(email) WRIA 16 File, Olympia(email) Ctknr�I U�, SEPA Contact List MASON COUNTY DCD �, Sent SEPA-�'''r'�`��--r�„ % 't� to(check all that apply)on Skokomish Tribal Nation WA Department of Ecology Natural Resources Dept. Environmental Review Section ATTN: Randy Lumper PO BOX 47703 N 541 Tribal Center Rd. Olympia,WA 98504-7703 Skokomish Nation,WA 98584 sepaunit@ecy.wa.gov 6(V rlumper@skokomish.org U.S.Army Corps of Engineers Tribal Historic Preservation Officer SEPA Reviewer-John Pell Attn: Kris Miller PO Box C-3755 80 N Tribal Center Rd Seattle,WA 98124 Skokomish Nation,WA 98584 shlanay1@skokomish.org WA Dept. of Fish and Wildtite ATTN: Margie Schirato (saltwater) Quinault Indian Nation 2391 W Deegan Rd. ATTN: Mark Mobbs Shelton, WA 98584 PO Box 189 schirmms@dfw.wa.gov Tahola,WA 98587 mmobbs@quinault.org WA Dept. of Fish&Wildlife ATTN: Gloria Rogers,Area Habitat Biologist Squaxin Tribal Nation 48 Devonshire Rd Natural Resources Dept. Montesano,WA 98563-9618 2952 SE Old Olympic Highway rogergsr@dfw.wa.gov Shelton,WA 98584 jdickison@squaxin.nsn.us WA Dept. of Transportation Alana Hess, Development Review Engineer The Confederated Tribe of the Chehalis P.O. Box 47440 ATTN: SEPA Reviewer- Glen Connelly Olympia,WA 98504-7440 420 Howanut Rd. HESSA@wedot.wa.gov Oakville,WA 98568 gconnelly@chehalistribe.org City of Shelton 525 West Cota St. Shannon Soto Shelton,WA 98584 WA DNR, South Puget Sound Region jasond@ci.shelton.wa.us 950 Farman Avenue North Enumclaw,WA 98022-9282 Port of Shelton shannon.soto@dnr.wa.gov Attn: Patti Miller-Crowley 21 West Sanderson Way Elizabeth Ellis Shelton, WA 98584 UJ WA DNR,Aquatic Resources pattimc@portofshelton.com PO BOX 47027 Olympia,WA 98504-7027 M Office of Archaeology& Historic Preservation elizabeth.ellis@dnr.wa.gov ATTN: Lance Wollwage P.O. Box 48343 Boyd Powers Olympia, WA 98504-8343 WA DNR, SEPA Center Lance.Wollwage@dahp.wa.gov PO BOX 47015 Olympia,WA 98504-7015 Tacoma Public Utilities boyd.powers@dnr.wa.gov Real Property Services Attn: Dave Letterman Olympic Region Clean Air Agency, John Kelly 3628 S 35th St 2940-B Limited Ln. NW Tacoma, WA 98409-3192 Olympia,WA 98502 dletterm@cityoftacoma.org john@orcaa.org Agent r Ij�(thrn: (kimbei 11635•, Ctrikoj ti. Mason County Transit School District: f PO Box 1880 Mason Cty P.W. ATTN: Shelton,WA 98584 Mason Cty E.H. ATTN: doconnell@masontransit.org d Mason County Bldg Attn: �.il_ Applicant ` ' t 564 r rph IlVe S &_ VIAL WA 'WA, -5131 �'.'. i �Yr»� Tf .✓. �i t-`_N t t�$t` -/F!,r. t;'+�_---.-,-'+=+�-.Y a :'f�„«.X �« �.��� .. �. - ,k t� It LI Y fY- M•I-«•r-«r rr•s-. -.fJ"44: tr. ,�-I-r+-.."1-•.-4 y. J'J•F ♦.►•-h.r-•+-+.(--b •i-+- -4♦ '���~I _". _�-4 ^w.(./4 l•f-i�i•f-�•� Y } ir i..y.��1..4 A..r..'�..1... .J..i.ri '4.-M.4..-Ir�w`..4 A.-..tom.• Skokomish Indian True Natural Resources Department (360) 877-5213 N. 541 Tribal Center Road Fax (360) 877-5148 Skokomish Nation,WA 98584 February 13,2009 Enviromnental Review Application No.: MEP2009-00004 Project Name: Deleo &Latham Bulkhead Project Description of Proposal: Construction of approximately 280 lineal feet of I-beam pile and wood bulkhead on two neighboring lots on Lake Cushman. Location: Lots 60 &61 N. Gull Place,Lake Cuslunan,Hoodsport, WA. Proponent: Therese DeLeo &Steve&Amy Latham Dear Ms Wright, It has been determined that the above project will have multiple negative environmental impacts to the Skokomish Tribe and/or their resources¢' including multiple Federal and State listed species. These impacts are listed in detail be and should be thoroughly considered before any permits are issued by the permitting agencies and/or construction begins. • Bulkheads may disrupt the migratory and rearing behavior of juvenile salmonids • Bulkheads prevent the recruitment of native sediment to the lake,resulting in a loss of heterogenous substrate,and resulting in shoreline erosion at the toe or along the shore downwind of the bulkhead. This could affect:the availability of spawning and rearing habitat, and the forage base for a variety of fish species. Bulkheads eliminate shallow-water habitat,which is critical a�refuge and foraging habitat for juvenile salmonids and other small fish. • Bulkheads reflect wave energy at the shoreline,resulting in the scour of sdiment oat the bulkhead toe, and creating an inhospitable high-energy environment for juvenile fish. • The removal of vegetation during bulkhead construction could eliminate a potential source of cover and food for juvenile salmonids,foliage fish and native char. Vegetation removed is typically not replaced with native woody species that could provide a future source of woody debris to the lake thereby reducing the availability of complex refuge habitat for small fish, and attachment surfaces for periphyton. • The temporary turbidity associated with bulkhead construction may reduce water quality to the detriment of juvenile fish species. I • Pile driving may disrupt the distribution and behavior of,or injure juvenile fish species. • Best Management Practices instituted by the Western Wood Pieservers Institute (WWPl)should by employed for the use of ACZA treated wood when used in the aquatic environment. • A key to the treating process for ACZA treated wood is the presence of ammonia, which facilitates carrying the active ingredients into the cell structure of the wood during treatment. Evaporation and removal of the ammonia following treatment is critical for the remaining ingredients to become stabilized,thereby minimizing the opportunity for leaching from the product in its end use. • It is recommended that several key pieces of large woody deb is(LWD) depicted in the enclosed Habitat Management Plan(HMP)be anchoredlappropriately along the shoveling to fin-ther deflect wave energy away from the proposed struture. • In addition it is reconunended that the concrete for the proposed piles have an aquatic friendly sealant applied to them. • The west slope of the proposed properties is the most stable according to the enclosed geo-report. This slope should be preserved as a Best Management Practice(BMP)for this site's stonnwater runoff. Dispersing stonnwater into vegetated areas of the yard should be employed as the primary stonnwater BMP for this site and location. • The existing bare slope above the proposed retaining wall loc tion should receive a cover of geosynthetic filter fabric to keep the natural 1ullsid6 soils in place and allow the seeping of groundwater through the gravel backfill ater that will be installed between the completed retailing wall and the existing hillside slope. • All proposed work is to be accomplished during the lake's low level period in the late Winter and early Spring before Tacoma City Light raises the lake's water surface elevation for summertime recreational purposes. • The Smith-DeLeo/Latham properties,though in the vicinity of slopes identified as hazard areas by Mason County tenninology,is stable in its present condition as indicated in the Talija Engineering accompanying report. The Skolcomish Tribes Tribal Historic Preservation Officer(Kris Mi ler)will be providing comment as to the potential cultural impacts of this document and you should not move forward with the above project until you receive those comments. Thank you for including the Skokomish Tribe in the planning process,if you have any questions about the comments provided herein please contact Randy N. Lump r(Aquatic Resources Enhancement Biologist) at 1-360-877-5213 ext#508 or email them to rlurnper@skokomish.org. Sincerely, Joseph Pavel Director Skokomish Natural Resources Department (References Cited:) Kahler Tom, Grassley Martin, and Beauchamp David. 2000. A Summary of the Effects of Bulkheads,Piers,and Other.Artificial Structures and Shorezone Development on ESA-listed Salmonids in Lakes. Final Report,Prepared for the City of Bellvue by the Watershed Company pgs.2-3. Western Wood Preservers Institute. 2006. Best.Management Practices for the use of treated wood in aquatic and other sensitive environments.pgs.11-12 i Page 1 of 3 YYW 2,C0 ct PERMIT NO.: 00 ooq_ DATE RECEIVED: MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE(Chapter 17.01 MCC) 411 N.5TH Street/P.O.Box 279,Shelton, WA 98584 ENVIRONMENTAL PERMIT AP LICATION MASON ENVIRONMENTAL PERMIT CONDITIONAL USE ❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1.APPLICANT NAME: ��f�' / SIGNATURE: MAILING ADDRESS S-6 R e Gl e/ft`.(-2- 1411,� �t d d 6— 1 ?/ WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# If an agent is acting for the applicant during the permit process,complete#2. 2.AUTHORIZE D AGENT NAME: SIGNATURE: MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# s.SITE ADDRESS A) � U C L 1�6(e t � S'POlt PARCEL NUMBER L� Z z�SsQ � LEGAL DESCRIPTION� C ({ jJv /y�T� D�L(Sj 14 DIRECTIONS TO SITE: Li� ) le# 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Wetlands,Chapter 17.01.070 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Aquifer Recharge Area,Chapter 17,01.080 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Se is Hazard Areas,Chapter 17.01.102 ❑ In-Holding Lands,Chapter 17.01.062 Fish a Wildlife Habitat Conservation Areas,Chapter 17.01.110 Page 2 of 3 5. Identify current use of the property with existing improvements: . 6. Identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions, and other pertinent information(attach additional sheets,if needed): �- C'2 rs see ' 7. Describe why the action requiring this permit cannot be avoid . 8. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No ET--- 9. Identify any surface waterL adjacent to property: ❑ Saltwater f Lake ❑ Stream ❑ Pond ❑ Wetland ❑ Drainage Ditch 10. If septic is located on project site,include records. ❑ Connect to Septic ❑ Community Septic ❑ Public Water Supply ❑ Well 11. Type b: New ❑ Add ❑ Alteration ❑Repair ❑ Demolition ❑ Other: This permit is granted pursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescindedpursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $630.00/$380.00(with another permit) MASON CONDITIONAL USE ENVIR.PERMIT: S1,520.00 HABITAT MANAGEMENT PLAN REVIEW: $455.00 1APLANNINGTAOFORMS REVISED Dec.2008