CONSTRUCTION NOTES
1, ALL WORK SHALL BE IN CONFORMANCE WITH THE LATEST REVISION OF THE
"2001" STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION
AS JOINTLY ADOPTED BY WASHING TON STATE DEPARTMENT OF TRANSPORTATION
AND THE AMERICAN PUBLIC WORKS ASSOCIA TION (WASHINGTON STA TE CHAPTER).
2. CONTRACTOR SHALL LOCATE ALL EXISTING UTILITIES PRIOR TO COMMENCING WORK.
3. CONTRACTOR /S RESPONSIBLE FOR ALL SITE SAFETY AND PROVIDING SAFE
EXCA VA TION AND ALL REQUIRED, TEMPORARY SHORING.
4. DRAINAGE SYSTEM SHALL BE INSTALLED AND FUNCTIONING PRIOR TO BACKFILL.
5. ALL SLOPES SHALL BE MAXIMUM 2: 1 (UNLESS OTHERWISE NOTED).
6. ROCKS SHALL BE PLACED SO THERE ARE NO CONTINUOUS JOINT PLANES
IN El THER VERTICAL OF? LATERAL DIRECTIONS.
7. MAXIMUM VOID BETWEEN ADJACENT ROCKS SHALL BE 6 INCHES. WHERE VOIDS
OF 6 INCHES ARE FOUND, CHINKING ROCKS SHALL BE KEYED BETWEEN THE ROCKS
TO FILL THE VOID.
8. ALL FILL MUST BE COMPACTED TO MINIMUM OF 959 DRY DENSITY.
9. PLACE BOTTOM ROCK ON FIRM UNDISTURBED GROUND, A MINIMUM OF 1 FOOT
BELOW GRADE.
10. CON TRA C TOR MUS T ENSURE ALL REQUIRED PERMITS (L OCAL & STA TE) HA VE BEEN
ACQUIRED PRIOR TO COMMENCING WORK. WORK IS TO BE PERFORMED IN
CONFORMANCE W/ PERMIT REQUIREMENTS.
11. CONNTRACTOR /S RESPONSIBLE FOR SHORING MEANS & METHODS AS NECESSARY
TO PERFORM WORK.
•
130-
.; ,, EX. GROUND •
` 1$'_ MIN. -
- - -BENCH
: -.._
120
- -PROPOSED GRADE
--
,�i--.�1
•: :
1 `- _
PROPOS:
D
: :
('>-". �,
-- 10' MIN
RESID=N
E
l` `-.-
110
'
'.�-
: SWALE DRAINAGE AWAY
: FROM RESIDENCE
•
10' 20' 30' 40' 50'
ROCKWALL DETAIL
SCALE: 1 '=10'
-
-
- - - -
REVEGETATE CUT SLOPE
Lot D
Short Plat No. 92-106
- -
- -
- -
PARCEL 4112331-23-90070
BACKFILL FOR ROCKWALLS
2" TO 6" "SHOT ROCK"
WSDOT 9-13.7(2)
SLOPE AS NECESSARY FOR
•
TEMPORARY & PERMANENT H YDROSEEDING
1. PERMANENT H YD,ROSEED/NG - IN AREAS NOT INCLUDED WITHIN THE
PROJECT BOUNDARY OR NOT INCLUDED IN THE PROPOSED LANDSCAPE
PLAN SHALL ADHERE TO THE FOLLOWING SPECS:
MINIMUM 80 LBS./ACRE MIXTURE OF::
15% KENTUCKY BLUEGRASS
40% TALL FESCUE
30% PERENNIAL RYE
15% CHEWINGS FESCUE
FERTILIZER - 400 LBS./ACRE OF 10-20-20
MULCH - .2000 LBS./ACRE
2. TEMPORARY HYD:ROSEEDING - IN ALL AREAS DISTURBED DURING
CONSTRUCTION THAT WILL RECEIVE PERMANENT LANDSCAPING SHALL BE
SEEDED WITH RYE GRASS AS REQUIRED TO PRODUCE A SUITABLE
TEMPORARY GROUND COVER.
ROCKWALL SECTION A -A -
(SEE SECTION THIS SHEET)
BENCH MARK
ELEV.=137.08
TOP OF 3/4" I.D. IRON
PIPE WITH PLASTIC CAP.
S 89°41'59" E 1 277.34'
FENCE
(BY OTHERS)
MN ...�R -
S 89°41'59" E 282.72'
ROCK SIZE PER
WSDOT 8-24.3(5)
STABILITY DURING CONSTRUCTION
NA
GROUND\
18" MIN.
FILTER FABRIC
GRAVEL BACKFILL FOR DRAINS
WSDOT 9-03.12(4) OR BETTER
4"0 PERFORATED
DRAINPIPE
FIRM, UNDISTURBED GROUND
NATIVE ,\ VIM\
kgi
vim■
1 4u.MAN
rJ/ \
3,MAN
31MAN
SECTION A -A
NO SCALE
133 LFN ROCKWALL
(8' MAX HEIGHT)
NOTE:
TW=119.0
BW=111.0
(0 8' SECTION)
-
LANDSCAPE/YARD
CONSTRUCTION SEQUENCE
1. APPLY FOR AND PICK UP ANY REQUIRED PERMITS FROM
MASON COUNTY DEPT. OF PUBLIC WORKS.
2. CONSTRUCT EROSION CONTROL B.M. P. 's.
3. CLEAR AND GRADE.
4. PROVIDE TEMPORARY H YDROSEED/NG OR OTHER SOURCE
CONTROL STABILIZATION MEASURES ON ALL DISTURBED SOILS.
5. MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL
FACILITIES TO PROVIDE THE REQUIRED PROTECTION OF
DOWNSTREAM WATER QUALITY.
6. PROVIDE PERMANENT SITE STABILIZATION.
7. EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL
NOT BE REMOVED UNTIL CONSTRUCTION IS COMPLETE AND
ACCEPTED BY MASON COUNTY.
NOTE: TW=TOP OF WALL
BW=BOTTOM OF WALL
EX. TEL
55 LFN ROCKWALL-\
(4' MAX HEIGHT)
122-��
12
um
MI NM
116
114
-
BENCH MARK
ELEV.=100.73
r
TOP OF 3/4" I.D. IRON I
PIPE WITH PLASTIC CAP.
30
30.77'
5'
MIN
30'
14
I Q',
DGEOFX.
-
55 LFN 12"0
CMP CULVERT
V!CINI T Y MAP
NO SCALE
GENERAL EROSION AND SEDIMENTATION CONTROL NO TES
THE FOLLOWING EROSION AND SEDIMENTATION CONTROL NOTES APPLY
TO ALL CONSTRUCTION SITE ACTIVITIES AT ALL TIMES, UNLESS
OTHERWISE SPECIFIED ON THESE PLANS:
1. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL PLAN
DOES NOT CONSTITUTE AN ACCEPTANCE OF THE PERMANENT ROAD
OR DRAINAGE DESIGN.
2. THE OWNER AND HIS/HER CONTRACTOR SHALL BE RESPONSIBLE AT
ALL TIMES FOR PREVENTING SILT -LADEN RUNOFF FROM DISCHARGING
FROM THE PROJECT SITE. FAILURE BY THE OWNER AND/OR
CONTRACTOR CAN RESULT IN A FINE.
3. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION,
MAINTENANCE, REPLACEMENT AND UPGRADING OF THESE FACILITIES
IS THE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR FROM
THE BEGINNING OF CONSTRUCTION UNTIL ALL CONSTRUCTION IS
COMPLETED AND ACCEPTED BY THE COUNTY AND THE SITE IS
STABILIZED.
4. PRIOR TO BEGINNING ANY WORK ON THE PROJECT SITE, A PRE -
CONSTRUCTION CONFERENCE MUST BE HELD, AND SHALL BE ATTENDED
BY THE GENERAL CONTRACTOR, THE PROJECT ENGINEER, REPRE-
SEN TA TI VES FROM THE AFFEC TED U TIL / TIES, AND A REPRESEN TA TI VE
Of: MASON GC>iUIVI'Y. -----
5. THE EROSION AND SEDIMENTATION CONTROL FACILITIES SHOWN
ON THIS PLAN ARE TO BE CONSIDERED ADEQUATE BASIC
REQUIREMENTS FOR THE ANTICIPA TED SITE CONDITIONS. DURING
CONSTRUCTION, DEVIATIONS FROM THIS PLAN MAY BE NECESSARY
IN ORDER TO MAINTAIN WATER QUALITY. MINOR DEPARTURES FROM
THIS PLAN ARE PERMITTED SUBJECT TO THE APPROVAL OF THE
COUNTY INSPECTOR. HOWEVER EXCEPT FOR EMERGENCY SITUATIONS,
ALL OTHER DEVIATIONS FROM THIS PLAN MUST BE DESIGNED BY
THE PROJECT ENGINEER AND APPROVED BY MASON COUNTY PRIOR
TO INSTALLATION.
6. ALL EROSION AND SEDIMENTA TION CONTROL MEASURES SHALL BE
INSPECTED BY THE OWNER AND/OR CONTRACTOR ON A FREQUENT
BASIS AND IMMEDIATELY AFTER EACH RAINFALL, AND MAINTAINED
AS NECESSARY TO INSURE THEIR CONTINUED FUNCTIONING. ALL
SEDIMENT MUST BE REMOVED FROM THE SILT FENCES', STRA W
BALES, SEDIMENT PONDS, ETC. PRIOR TO THE SEDIMENT REACHING
1/2 ITS MAXIMUM POTENTIAL DEPTH.
7. AT NO TIME SHALL CONCRETE, CONCRETE BYPRODUCTS, VEHICLE
FLUIDS, PAINT, CHEMICALS, OR OTHER POLLUTING MATTER BE
PERMITTED TO DISCHARGE TO THE TEMPORARY OR PERMANENT
DRAINAGE SYSTEM, OR TO DISCHARGE FROM THE PROJECT SITE.
8. PERMANENT DETENTION/RETENTION PONDS, PIPES, TANKS OR VAUL TS
MAY ONLY BE USED FOR SEDIMENT CONTAINMENT WHEN SPECIFICALLY
INDICATED ON THESE PLANS.
GRADING NOTES
1. THE CON TRACTOR SHALL NOTIFY THE ENGINEER IN THE EVENT OR
DISCOVERY OF POOR SOILS, GROUNDWA TER OR DISCREPANCIES
IN THE EXISTING CONDITIONS AS NOTED ON THE PLANS.
2. MAXIMUM SLOPE STEEPNESS SHALL BE 2: 1 HORIZONTAL: VERTICAL
FOR CUT AND FILL SLOPES.
3. ALL AREAS RECEIVING FILL MATERIAL SHALL BE PREPARED BY
REMOVING VEGETATION, NONCOMPLYING FILL, TOPSOIL AND OTHER
UNSUITABLE MATERIAL, BY SCARIFYING THE SURFACE TO PROVIDE
A BOND WITH THE NEW FILL, AND WHERE THE SLOPES ARE
STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL AND THE HEIGHT
IS GREATER THAN 5 FT., BY BENCHING INTO SOUND COMPETENT
MATERIAL AS DETERMINED BY A SOILS ENGINEER.
4. ANY SITE RECEIVING OVER 150 CY OF EXPORTED MATERIAL MUST OBTAIN
A SITE DEVELOPMENT PERMIT.
REVISIONS
NO.
DATE
BY
DESCRIPTION
DESIGNED
DRAWN
CHECKED
APPROVED
ACCEPTED
BY
DATE
NL 0/I
7/02
JAN
7/02
NL 0/I
7/02
A
kut N.L.OIson&Associ ates,Inc.
Engineering, Planning and Surveying
(360) 876-2284
24-53 Bethel Avenue, P.O. Box 637, Port Orchard, WA 98366
EXPIRES: 11-07-03
SITE AND GRADING PLAN
MASON PROPER T Y
PORTION OF GO VERNMEN T LOT 2, SECTION 31,
T 23 N, R 1 W, WM., MASON COUNTY, WA SHING TON'
FILE NAME
FOR:
RI CHA RD & JA NI CE MASON
P.O. BOX 108
BELFAIR, WA 98528
Phone: (360) 275-3698
FAX: (360) 277-0256
(JAN 07/30/02) JOB NO: 5555-02
5555_1_SITE GRADING PLAN.d
SCALE: AS SHOWN
DATE: 07-15-02
DRAWING NUMBER
005555-
40,3036