HomeMy WebLinkAbout19-93 - Res. Six Year Transportation Improvement Program 1993 - 1998 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98
A M E IN D E D
MASON COUNTY HEARING DATE : 09/08/92 Hearing Date: 02-09-93
ADOPTION DATE: 09/08/92 Adoption: 02-09-93
COUNTY NO: 23 RESOLUTION NO: 90-92 Resolution No: 19-93
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR
----------------------------------------------------------------- -
11 ICOUNTY WIDE PAVEMENT ON AC I IFI 2651 2651 2651 7951 15901 15901 I 1 PE I
I I I I MJR CLASS of WK: 5 JR/W I
I Ion all class of existing asphalt pavements I I WORK CODES: BD ICON I
I I(ID 1) I I TOTAL LENGTH: F.A. PROJ NO. I —1 _
I I I I UTILITY CODES: - - TOT OI 0
------------------------------------------------------------------------------------------------------------------
2I ICOUNTY WIDE AC PAVEMENT ON BST I IPI 1501 1501 1501 4501 9001 9001 I 1 PE I
I I I I MJR CLASS of WK: 5 IR/W I
I (AC pavement plus shoulder widening on all classes of ( I WORK CODES: ICON I
I (existing BST surfaced roads with high volumes I I TOTAL LENGTH: F.A. PROJ NO. I —1 —
I I(ID-2) I I UTILITY CODES: - - ITOT OI 0
-------------------------------------------------------------------------------------------------------------
3I ICOUNTY WIDE BST I IPI 1701 1701 1701 5101 10201 10201 I I PE I
I I I I MJR CLASS of WK: 4 (R/W I
I (Eliminate high cost gravel maintenance by grading, ( I WORK CODES: ABC ICON I
I I draining and surfacing ( I TOTAL LENGTH: F.A. PROJ NO. 1 —1 _
I I(ID-3) I I UTILITY CODES: - - ITOT OI 0
---------------------------------------------------------------------------------------------------------------- -
4I ICOUNTY WIDE SAFETY PROJECTS I IPI 2201 2201 2201 6601 13201 13201 I I PE I
I I I I MJR CLASS of WK: IR/W I
I (includes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I
I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROJ NO. I I _
I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0
----------------------------------------------------------------------------------------------------------
5I ICOUNTY WIDE MINOR CONSTRUCTION I IPI 951 951 951 2851 5701 5701 I I PE I
I I I I MJR CLASS of WK: IR/W
I IReconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I
I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I —1 —
I (Projects primarily within traveled way (ID-5) I I UTILITY CODES: - - ITOT OI 0
--------------------------------------------------------------------------------------------------------
6I ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IPI 701 701 701 2101 4201 4201 1 I PE I
I I MJR CLASS of WK: 4 IR/W
(ID-6) I I WORK CODES: L ICON I
TOTAL LENGTH: F.A. PROJ NO. I —I —
I I I UTILITY CODES: - - ITOT OI 0
----------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 13
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 (RAP I E I 1ST I4TH
I I Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
84100INEW ROAD FROM MASON LAKE ROAD SOUTHEASTERLY TO I IUI I I I 6751 6751 6751 I I PE I
IPICKERING ROAD I I MJR CLASS of WK: 1 IR/W I
I (New Road from Masan Lake Road Southeasterly I I WORK CODES: ABDLI ICON I
I Ito SR-3 at the Pickering Road I I TOTAL LENGTH: 2.20 F.A. PROJ NO. I -1
I I(ID-92) I I UTILITY CODES: - - (TOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
85100INEW ROAD FROM S.R. #3 TO GRAPEVIEW LOOP ROAD I IUI I I I 5251 5251 5251 I I PE I
I I I I MJR CLASS of WK: 1 IR/W I
I (From S.R. #3 east to the Grapeview Loop Road I I WORK CODES: ABD ICON I
I Inear the Fair Harbor Marina I I TOTAL LENGTH: 1.80 F.A. PROJ NO. I -1
I I(ID-66) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
86I INEW ROAD MCREAVY TO MASON LAKE ROAD I I I I I 11500I 15001 15001 I I PE I
I IAPPROX. 5 MILES I I MJR CLASS of WK: 4 IR/W I
I IConstr•uct Approx. 5.0 miles of new Road from 2 mi. I I WORK CODES: ABD ICON I
I (North of Webb HiLI Rd to 1/2 mi. North of Simpson I i TOTAL LENGTH: 5.00 F.A. PROJ NO. I -1 -
I (Recreation Area (ID-55 Yr-92) I I UTILITY CODES: - - ITOT OI 0
---------•--------------------------------------------------------------------------------------------------------------------------
87100INEW ROAD FROM TWANOH FALLS PLAT EAST TO TRAIL ROAD/106 I IUI I I I 6001 6001 6001 I I PE I
I IAPPROX. 1.5 MILES I I MJR CLASS of WK: 1 IR/W I
I (Construct appoximatly 1.5 miles of new road I I WORK CODES: ABD ICON I
I I(ID 94 YR 92) I I TOTAL LENGTH: 1.50 F.A. PROJ NO. I -1 -
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
88I (MASON COUNTY'S TRANSPORTATION PLAN I IPI 671 671 671 671 2681 361 I 2321 PE 1741 58
I ITO COMPLETE THE TRANSPORTATION ELEMENT OF MASON I I MJR CLASS of WK: IR/W I
ICOUNTY'S COMPREHENSIVE PLAN AS REQUIRED BY THE GROWTH I I WORK CODES: U ICON I
I (MANAGEMENT ACT. THIS TASK WILL FACILITATE LONG RANGE ( I TOTAL LENGTH: F.A. PROJ NO. I -1 -
I (PLANNING EFFORTS FOR EFFECTIVE FUTURE LAND USE (4A) ( I UTILITY CODES: - - ITOT 1741 58
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 14
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN
FUNDED PROJECTS 1st Year 3561 local 4393 Years 1-3 Years 4-6 Totals
2nd Year 1045 RAP 315 P E 0 0 0
3rd Year 265 CAPP 0 R/W 0 0 0
4-6 Year 795 TIA 0 CONST 0 0 0
DATA 0
Fed. 796
Totals ... 5666 5504 0 0 0
------------------------------------------------------------------------------------------------------------------------------------
UNFUNDED PROJECTS 1st Year 1720 Local 25544 Years 1-3 Years 4-6 Totals
(Proposed and Unknown) 2nd Year 4988 RAP 2938 P E 174 58 232
3rd Year 5281 CAPP 0 R/W 0 0 0
4-6 Year 18000 TIA 0 CONST 0 0 0
UATA 825
Fed. 532
Totals ... 29989 29839 174 58 232
------------------------------------------------------------------------------------------------------------------------------------
TOTAL ALL PROJECTS 1st Year 5281 Local 29937 Years 1-3 Years 4-6 Totals
2nd Year 6033 RAP 3253 P E 174 58 232
3rd Year 5546 CAPP 0 R/W 0 0 0
4-6 Year 18795 TIA 0 CONST 0 0 0
DATA 825
Fed. 1328
Totals ... 35655 35343 174 58 232
--------------------------------------------------------------------------------------------------------------------------------------
WHEREAS, in compliance with R.C.W. 36.81.121 and W.A.C. 136-14, the Board of Mason County Commissioners
hereby certifies that an amendment to the priority array of potential projects on this County`s road system was
prepared by the County Engineer and was available to the Board of County Commissioners during the preparation
of the amendment to the Six Year Transportation Improvement Program for the period January 1, 1993, through
December 31, 1998; and
WHEREAS, in further compliance with said law, the Board has held thereon public hearing(s) dated
February 9, 1993, to consider same.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason County Commissioners, in regular session
assembled, that the attached amendment to the Six Year Transportation Improvement Program for Mason County roads
be adopted, as set forth in detail, for the period mentioned, consisting of pages numbered 1, 13 and 14, which
are incorporated and made part of this Resolution..
Passed and unanimously adopted this LA day of February, 1993.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
ATTEST:
WILLIAM 0.HUNTER,Chairperson
REBECCA S.ROGERS, Clerk of the Board V
c: Cmms. LAURA E.PORTER,Commissioner
Engineer
CRAB
Urban Arterial Board _
Dept.of TronsJLocal Programs Div.
M.L FAUGHENDER, Comroissionir