HomeMy WebLinkAbout123A-94 - Res. Amending Annual Construction Program for 1995 RESOLUTION NO. 123A-9 WHEREAS, the Board of County Commissioners have determined that it is necessary to amend the Annual Construction Program for 1995, to add, modify and delete items to be in compliance with the 1995 construction budget; and, WHEREAS, WAC 136-16-142 outlines the procedures to modify an Annual Construction Program. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason County Commissioners, that the Annual Construction Program for 1995 be revised as shown in Attachment A, which is incorporated herein by this reference. The individual changes are as follows: New item 2A: Added to show the carry over of the 1994 AC Paving Contract. Item 7: Modified to show construction funding only, as the design engineering contract was completed and paid for in 1994. Item 12: Modified to show correct funding source. Item 13: Modified to show correct funding source including new RAP fund distribution. Old item 14: becomes new item 15. Old item 15: becomes new item 16. Old item 16: becomes new item 17. Old item 17: becomes new item 14: Modified to add construction funding to help balance the budget. BE IT FURTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Revised Annual Construction Program for 1995 to all required agencies. DATED this 15th day of November, 1995. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON M. L. FAUGHENDER, Chairperson IS_- LAURA E. PORTER, Commissioner ATTEST: 6 c� ILLIAM 0. HUNTER, Commissioner R BE A S. ROGERS U e ',k of the Board /APPR VED AS TO FORM: 1IM r MICHAEL CLIFT Deputy Prosecuting Attorney c: Auditor Assessor General Services Public Works REVISED ANNUAL CONSTRUCTION PROGRAM FOR 1995 AGENCY ACTION COUNTY:.............. MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 5,444,000.00 Recommended Program 11/15/1994 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15 = $ 378,000.00 Assessement......... 11/15/1994 D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date - Final Adoption 11/15/1994 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution Number 123A-94 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) ' (15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,00 ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) N S (1,0001s) (1,00018), SOURCE 1 595.10 595.20 CONTRACT DAY LABOR All 595. COUNTY WIDE PROJECTS 1 N/A MASON COUNTY'S TRANSPORTATION PLAN N/A N/A 7 43 ISTEA so 50 To complete the transportation element of Mason County's Comprehensive Plan as required by the Growth Management Act. *2A (2 & 3) AC PAVING (1994 CARRY OVER) VAR D E 97 233 CAPP 330 330 04450 Highland Road mp 2.43 to 4.43 2.00 08 D E 41640 Skokomish Valley Road mp 3.88 to 5.60 1.72 08 D E 79800 Bear Creek-Dewatto Road mp 7.65 to 10.53 2.88 08 D E 2 2 & 3 AC PAVING VAR 150 236 CAPP 386 386 50820 Springwood Court mp 0.00 to 0.02 0.02 09 D E 50830 Springwood Drive mp 0.00 to 0.20 0.20 09 D E 50840 Springwood Lane mp 0.00 to 0.07 0.07 09 D E 67620 County Club Drive mp 0.00 to 0.21 0.21 09 D E 66950 Lakeshore Drive mp 0.00 to 0.60 0.60 09 D E Carry Over From 1994 Annual Program 254 512 50 1 716 1 766 11 CRAB FORM NO. 3 (REV 11/91) PAGE 1 OF 6 REVISED ANNUAL CONSTRUCTION PROGRAM FOR 1995 AGENCY ACTION COUNTY:.............. MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) = $ 5,444,000.00 Recommended Program 11/15/1994 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) = $ 800,000.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) = $ 378,000.00 Assessement......... 11/15/1994 D. A.C. P.C.C. PAVEMENT I. BRIDGES Line (C) must be smaller than line (B) Date - Final Adoption 11/15/1994 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution Number 123A-94 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,00 ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) N S (1,000's) 1,00010) SOURCE 1 595.10 595.20 CONTRACT DAY LABOR All 595. AC Paving (Continued) 67650 Rainier Drive mp 0.00 to 0.52 0.52 09 D E 80620 View Ridge Drive mp 0.00 to 0.13 0.13 09 D E 80620 Rainbow Place South mp 0.13 to 0.20 0.07 09 D E 80630 Rainier Place South mp 0.00 to 0.08 0.08 09 D E 80640 Viewridge Drive West mp 0.00 to 0.07 0.07 09 D E 80650 Rainier Place North mp 0.00 to 0.15 0.15 09 D E 80660 Fir Lane mp 0.00 to 0.08 0.08 09 D E 80670 Rainbow Place North mp 0.00 to 0.13 0.13 09 D E 87290 Mahonia Drive mp 0.00 to 0.21 0.21 09 D E 87300 Riverhill Lane mp 0.00 to 0.22 0.22 09 D E 91100 Arcadia Road mp 6.23 to 7.07 0.74 07 D E 97500 Belfair Tahuya Road mp 8.62 to 11.93 3.31 07 D E Misc. -Misc. Hot patches (500 ton maximum) 0.50 D E CRAB FORM NO. 3 (REV 11/91) PAGE 2 OF 6 REVISED ANNUAL CONSTRUCTION PROGRAM FOR 1995 AGENCY ACTION COUNTY:.............. MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) = $ 5,444,000.00 Recommended Program 11/15/1994 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) = $ 800,000.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) = $ 378,000.00 Assessement......... 11/15/1994 D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date - Final Adoption 11/15/1994 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution Number 123A-94 (1) (2) (3) (4) (5) (6) (7) (a) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($11000) ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. NO. MP's or Bridge ) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) N S (1,000's) 1,000's) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595. 3 4 VAR BST PAVING - 2 shots VAR D E 153 153 153 02000 Satsop - Cloquallum Road 2.64 08 D E 03890 Olympic View Road 0.11 09 D E 16940 Somers Road 0.22 09 D E 21770 Soundview Drive 0.45 09 D E 22860 Dogwood Place 0.04 09 D E 70670 Tahuya Blacksmith Road 0.56 08 D E 3A 4 BST PAVING - 3rd Shot (1994 2 Shot) VAR D E 53 53 53 00270 Blackberry Lane mp 0.00 to 0.19 0.19 09 D E 57530 Webb Hill Road mp 1.24 to 1.74 0.50 09 D E 76370 Tee Lake Road mp 0.00 to 1.33 1.33 09 D E 89110 Captain Kidds Court mp 0.00 to 0.07 0.07 09 D E 89210 Harpoon Court mp 0.00 to 0.05 0.05 09 D E PAGE TOTALS==> 206 206 2061 CRAB FORM NO. 3 (REV 11/91) PAGE 3 OF 6 REVISED ANNUAL CONSTRUCTION PROGRAM FOR 1995 AGENCY ACTION COUNTY .............. MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) = $ 5,444,000.00 Recommended Program 11/15/1994 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) = $ 800,000.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) = $ 378,000.00 Assessement......... 11/15/1994 D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date - Final Adoption 11/15/1994 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution Number 123A-94 (1) (2) (3) (4) (5) (6)1 (7) (8) (9)- (10) (14) 1 (15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1,000 ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL codes) N S (1,0001s) _�1,000,$) SOURCE 1 595.10 595.20 CONTRACT DAY LABOR All 595. 4 5 COUNTY WIDE SAFETY PROJECTS VAR FGH E 206 5 5 196 206 Traffic Control - Drainage - Walks Bikeways - Guardrail Program 5 6 MINOR CONSTRUCTION VAR AC E 103 3 100 103 6 7 BRIDGE & LARGE CULVERT CONSTRUCTION VAR A 1 74 2 72 74 ROADS & BRIDGES (New Construction) 7 (9)* 90100 90100-23.35 Ever's Bridge mp 23.85 to 23.51 0.66 07 1 1 916 1024 BRS-TBRN 1940 1940 STPF-FAS 8 8 28850 Pickering Road - 1A mp 0.37 to 1.23 0.86 07 ABD 1 275 275 275 9 9 & 10 62310 Trails Road -3 & -4 mp 1.59 to 3.45 0.90 08 ABC 1 630 630 630 10 11 91720 John's Prairie Road - Railroad crossing mp 2.7 0.02 07 G E 9 32 FED-HAZ 41 41 11 12 51800 McEwen Prairie Road - Railroad crossing mp 0.8 0.02 08 G E 9 32 FED-HAZ 41 41 12 15 86070 Sand Hill Road - 1 mp 0.33 to 2.66 2.33 09 ABD 1 620 620 620 13 16 79800 Bear Creek-Dewatto Road - I mp 6.57 to 7.45 0.88 08 ABC 1 29 258 RAP 287 287 14 20 10000 10000-15.60 Herman's Cloquallunk Creek Bridge 0.04 08 1 1 339 19 320 339 mp 15.58 to 15.62 Carry Over From 1994 Annual Program PAGE TOTALS==> 3210 1346 26 8 4350 172 4556 CRAB FORM NO. 3 (REV 11/91) PAGE 4 OF 6 REVISED ANNUAL CONSTRUCTION PROGRAM FOR 1995 AGENCY ACTION COUNTY .............. MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) = $ 5,444,000.00 Recommended Program 11/15/1994 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) = $ 800,000.00 Date of Environmental C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) = $ 378,000.00 Assessement......... 11/15/1994 D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date - Final Adoption 11/15/1994 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution Number 123A-94 (2) (3) (5) (7) (10) (13) _(14) 1 (15) (16) (1) (4) ( 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1100 ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS PRELIM. RIGHT GRAND ITEM ITEM LOG (Include brief termini description or (Miles) C S I E AMOUNT PROGRAM ENGR. OF WAY TOTAL NO. NO. NO. MP's or Bridge #) T S (See work R S codes) N S (1,000,81 SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595. 17000UONIT ROADS & BRIDGES (P\E & R\W only) 15 17 62310 Trails Road - 1 (Trails, Rasor to SR 106) 4.00 08 ABD 1 48 30 18 48 16 18 10000 Cloquallum Road - 2 mp 14.09 to 15.60 1.51 08 ABD 1 54 24 30 54 17 19 10000 10000-14.82 Herman's old Schoolhouse Bridge 0.04 08 1 1 13 13 13 mp 14.80 to 14.84 18 21 77270 Haven Way - 2 mp 0.91 to 2.30 1.39 09 ABD 1 42 20 22 42 19 22 28850 Pickering Road - 3 mp 3.41 to 4.51 1.10 08 ABD 1 42 20 22 42 20 23 96140 Grapeview Loop Road - 6 mp 6.93 to 7.98 1.05 07 ABD 1 35 20 15 35 21 24 10000 Cloquallum Road -1 mp 11.75 to 12.47 0.72 08 ABD 1 43 23 20 43 PAGE TOTALS==> 277 150 1 127 i 27771 CRAB FORM NO. 3 (REV 11/91) PAGE 5 OF 6 REVISED ANNUAL CONSTRUCTION PROGRAM FOR 1995 AGENCY ACTION COUNTY:.............. MASON (7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) = $ 5,444,000.00 Recommended Program 11/15/1994 B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) = $ 800,000.00 Date of Environmental C. BITUH SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) = $ 378,000.00 Assessement......... 11/15/1994 D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) ow Date - Final Adoption 11/15/1994 E. CURBS AND GUTTERS J. FERRY FACILITIES Resolution Number 123A-94 (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) = (14) 1 �(15) (16) 6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000) ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION PROGRAM ROAD N A WORK V S FUNDS ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND NO. NO. MP's or Bridge #) T S (See work R S 7 NO. (17OUNT PROGRAM ENGR. OF WAY TOTAL 1 1 codes) IN S (1,000'S) 000 s) SOURCE 595.10 595.20 CONTRACT DAY LABOR A11 595. PROGRAM TOTALS==> Ir 3947 1858 226 1=1 _50066 E�378 5805 W Note: As per WAC 136-16-030, a list of all major equipment purchases contemplated for the year 1995 is attached hereto, with the E R & R Budget Submitted separately and by this reference made a part of this Annual Construction Program. ADOPTED AND APPROVED BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON M. L. FAUGHEN d LAURA E. PORTER WIdIA14 O. HUNTER Chairperson Commissioner Commissioner CRAB FORM NO. 3 (REV 11/91) PAGE 6 OF 6