HomeMy WebLinkAbout95-94 - Res. Annual Construction Program for 1995 ANNUAL CONSTRUCTION PROGRAM FOR 1995
AGENCY ACTION
COUNTY:............... MASON
(7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 4,794,000.00 Recommended Program. 8/23/1994
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) $ 378,000.00 Assessement......... 8/23/1994
D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date of Final Adoption 9/13/1994
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution N 95-94
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16)
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000)
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PRO-GRAM ROAD N A WORK V S FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
I codes) IN S (1,000's) (1,0001s) SOURCE 595.10 595.20_ CONTRACT DAY LABOR All 595.
COUNTY WIDE PROJECTS
1 1 N/A MASON COUNTY'S TRANSPORTATION PLAN N/A N/A 7 43 ISTEA 50 50
To complete the transportation element 0
of Mason County's Comprehensive Plan as 0
required by the Growth Management Act. 0
2 2 & 3 AC PAVING VAR 150 236 CAPP 386 386
50820 Springwood Court mp 0.00 to 0.02 0.02 09 D E
50830 Springwood Drive mp 0.00 to 0.20 0.20 09 D E
50840 Springwood Lane mp 0.00 to 0.07 0.07 09 D E
67620 County Club Drive mp 0.00 to 0.21 0.21 09 D E
66950 Lakeshore Drive mp 0.00 to 0.60 0.60 09 D E
67650 Rainier Drive mp 0.00 to 0.52 0.52 09 D E
80620 View Ridge Drive mp 0.00 to 0.13 0.13 09 D E
80620 Rainbow Place South mp 0.13 to 0.20 0.07 09 D E
80630 Rainier Place South mp 0.00 to 0.08 0.08 09 D E
157 1 279 1 0 1 50 0 1 386 0 17777747361
CRAB FORM NO. 3 (REV 11/91) PAGE 1 OF 6
ANNUAL CONSTRUCTION PROGRAM FOR 1995
AGENCY ACTION
COUNTY:............... MASON
(7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 4,794,000.00 Recommended Program. 8/23/1994
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) $ 378,000.00 Assessement......... 8/23/1994
D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date of Final Adoption 9/13/1994
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution N 95-94
(1) (2) (3) (4) (5) (6) (7) (8) - (9) (10) (11) (12) 1 (13) (14) 1 (15) (16)
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000)
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK V S FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
I codes) IN S (1,000's) (1,000's) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
AC Paving (Continued)
80640 Viewridge Drive West mp 0.00 to 0.07 0.07 09 D E
80650 Rainier Place North mp 0.00 to 0.15 0.15 09 D E
80660 Fir Lane mp 0.00 to 0.08 0.08 09 D E
80670 Rainbow Place North mp 0.00 to 0.13 0.13 09 D E
87290 Mahonia Drive mp 0.00 to 0.21 0.21 09 D E
87300 Riverbill Lane mp 0.00 to 0.22 0.22 09 D E
91100 Arcadia Road mp 6.23 to 7.07 0.74 07 D E
97500 Belfair Tahuya Road mp 8.62 to 11.93 3.31 07 D E
Misc. Misc. Hot patches (500 ton maximum) 0.50 D E
3 4 BST PAVING - 2 shots VAR D E 153 153 153
02000 Satsop - Cloquallum Road 2.64 08 D E
03890 Olympic View Road 0.11 09 D E
16940 Somers Road 0.22 09 D E
153 0 0 0 0 0 153 153
CRAB FORM NO. 3 (REV 11/91) PAGE 2 OF 6
ANNUAL CONSTRUCTION PROGRAM FOR 1995
AGENCY ACTION
COUNTY:............... MASON
(7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 4,794,000.00 Recommended Program. 8/23/1994
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) $ 378,000.00 Assessement......... 8/23/1994
D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date of Final Adoption 9/13/1994
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution N 95-94
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16)
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000)
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK V S FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
I codes) N S1 (1,000's) (1,000's) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
BST PAVING - 2 shots
(continued)
21770 Soundview Drive 0.45 09 D E
22860 Dogwood Place 0.04 09 D E
70670 Tahuya Blacksmith Road 0.56 08 D E
3A 4 BST PAVING - 3rd Shot (1994 2 Shot) VAR D E 53 53 53
00270 Blackberry Lane mp 0.00 to 0.19 0.19 09 D E
57530 Webb Hill Road mp 1.24 to 1.74 0.50 09 D E
76370 Tee Lake Road mp 0.00 to 1.33 1.33 09 D E
89110 Captain Kidds Court mp 0.00 to 0.07 0.07 09 D E
89210 Harpoon Court mp 0.00 to 0.05 0.05 09 D E
4 5 COUNTY WIDE SAFETY PROJECTS VAR FGH E 206 5 5 196 206
Traffic Control - Drainage - Walks
Bikeways - Guardrail Program 0
5 6 -- MINOR CONSTRUCTION VAR AC E 103 3 100 103
PAGE TOTALS==, L 362 0 0 5 8 196 153 362
CRAB FORM NO. 3 (REV 11/91) PAGE 3 OF 6
ANNUAL CONSTRUCTION PROGRAM FOR 1995
AGENCY ACTION
COUNTY:............... MASON
(7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 4f794r000.00 Recommended Program. 8/23/1994
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) $ 378,000.00 Assessement......... 8/23/1994
D. A.C. P.C.C. PAVEMENT I. BRIDGES Line (C) must be smaller than line (B) Date of Final Adoption 9/13/1994
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution N 95-94
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16)
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000)
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION_
PROGRAM ROAD N A WORK V S FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
codes) IN S (1,0001s) (1,000's) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
6 7 -- BRIDGE & LARGE CULVERT CONSTRUCTION VAR A 1 74 2 72 74
ROADS & BRIDGES (New Construction)
7 1994 90100 90100-23.35 Ever's Bridge mp 23.85 to 23.51 0.66 07 1 1 976 1100 BRS 136 1940 2076
carry TBRN
over STPF
FAS
8 8 28850 Pickering Road - 1A mp 0.37 to 1.23 0.86 07 ABD 1 280 5 275 280
9 9 & 10 62310 Trails Road -3 & -4 mp 1.59 to 3.45 0.90 08 ABC 1 637 7 630 637
10 11 91720 John's Prairie Road - Railroad Crossing mp 2.72 0.02 07 G E 9 32 FED-HAZ 41 41
11 12 51800 McEwen Prairie Road - Railroad Crossing mp 0.81 0.02 08 G E 9 32 FED-HAZ 41 41
12 15 86070 Sand Hill Road - 1 mp 0.33 to 2.66 2.33 09 ABD 1 62 558 CAPP 620 620
13 16 79800 Bear Creek - Dewatto Road mp 6.57 to 7.45 0.88 08 ABC 1 45 242 CAPP 287 287
ROADS & BRIDGES (P\E & R\W only)
14 17 62310 Trails Road - I (Trails, Rasor to SR 106) 4.00 08 ABD 1 48 30 18 48
15 18 10000 Cloquallum Road - 2 mp 14.09 to 15.60 1.51 08 ABD 1 54 24 30 54
-j PAGE TOTALSt=> 2194 1964 1 01 192 60 3834 1 72 4158
CRAB FORM NO. 3 (REV 11/91) PAGE 4 OF 6
ANNUAL CONSTRUCTION PROGRAM FOR 1995
AGENCY ACTION
COUNTY:............... MASON
(7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 4,794,000.00 Recommended Program. 8/23/1994
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) $ 378,000.00 ASsessement......... 8/23/1994
D. A.C. P.C.C. PAVEMENT I. BRIDGES Line (C) must be smaller than line (B) Date of Final Adoption 9/13/1994
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution N 95-94
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16)
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000)
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK V S FUNDS
ITEM ITEM LOG (include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
I codes) IN S (1,0001s) (1,0001s) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
ROADS & BRIDGES (P\E & R\W only)
(continued)
16 19 10000 10000-14.82 Herman's Old Schoolhouse Bridge 0.04 08 1 1 13 13 13
mp 14.80 to 14.84
17 20 10000 10000-15.60 Herman's Cloquallum Creek Bridge 0.04 08 1 1 19 19 19
mp 15.58 to 15.62
ROADS & BRIDGES (P\E & R\W only)
18 21 77270 Haven Way - 2 mp 0.91 to 2.30 1.39 09 ABD 1 42 20 22 42
19 22 28850 Pickering Road - 3 mp 3.41 to 4.51 1.10 08 ABD 1 42 20 22 42
20 23 96140 Grapeview Loop Road - 6 mp 6.93 to 7.98 1.05 07 ABD 1 35 20 15 35
21 24 10000 Cloquallum Road -1 mp 11.75 to 12.47 0.72 08 ABD 1 43 23 20 43
PAGE TOTALS==> 194 0 0 115 79 0 0 194
CRAB FORM NO. 3 (REV 11/91) PAGE 5 OF 6
ANNUAL CONSTRUCTION PROGRAM FOR 1995
AGENCY ACTION
COUNTY ............... MASON
(7) TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING & DRAINING F. SIDEWALKS (A) TOTAL CONSTRUCTION PROGRAM - columns (14) + (15) $ 4,794,000.00 Recommended Program. 8/23/1994
B. BASE & TOP COURSE G. TRAFFIC FACILITIES (B) COMPUTED DAY LABOR LIMIT (see back of page) $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS & BIKEWAYS (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column (15) $ 378,000.00 Assessement......... 8/23/1994
D. A.C. P.C.C. PAVEMENT I. BRIDGES -- Line (C) must be smaller than line (B) Date of Final Adoption 9/13/1994
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution N 95-94
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 1 (13) (14) 1 (15) (16)
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES ($1,000)
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK V S FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) C S I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge #) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
1 codes) IN S 1 (1,0001s) (1,0001s) SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
PROGRAM TOTALS==>
Note:
As per WAC 136-16-030, a list of all major equipment purchases contemplated for
the year 1995 is attached hereto, with the E R & R Budget Submitted separately
and by this reference made a part of this Annual Construction Program.
ADOPTED AND "PROVED
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
L
M. L. FAUGHFJDER LAURA E. PORTER WILLIAM O. HUNTER
Chairperson Commissioner commissioner
CRAB FORM NO. 3 (REV 11/91) PAGE 6 OF 6