Loading...
HomeMy WebLinkAbout53-94 - Res. Six Year Transportation Improvement Program 1995 to 2000 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 MASON COUNTY HEARING DATE : 06/07/94 ADOPTION DATE: 06/07/94 COUNTY NO: 23 RESOLUTION NO: 53-94 P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- ' FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 11 (MASON COUNTY'S TRANSPORTATION PLAN IXIFI 501 511 511 I 1521 211 I 1311 PE 1311 I ITO COMPLETE THE TRANSPORTATION ELEMENT OF MASON I I MJR CLASS of WK: IR/W I ICOUNTY'S COMPREHENSIVE PLAN AS REQUIRED BY THE GROWTH I ( WORK CODES: U ICON I I (MANAGEMENT ACT. I I TOTAL LENGTH: F.A. PROD NO. I -I - I(4A) I I UTILITY CODES: - - ITOT 1311 0 ------------------------------------------------------------------------------------------------------------------------------------ 2I ICOUNTY WIDE PAVEMENT ON AC PAVEMENT I IFI 2461 2461 2461 7381 14761 5881 8881 I PE I MJR CLASS of WK: 5 IR/W I I(1D 1) I I WORK CODES: BD ICON I I I TOTAL LENGTH: F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 3I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 1401 1401 1401 4201 8401 3301 5101 I PE I I I I I MJR CLASS of WK: 5 IR/W I I(ID-2) I I WORK CODES: ICON I i I I I TOTAL LENGTH: F.A. PROJ NO. I _I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 4I (COUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 2061 2061 2061 6181 12361 12361 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I I(ID-3) I I WORK CODES: ABC ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 5I ICOUNTY WIDE SAFETY PROJECTS I IFI 2061 2061 2061 6181 12361 12361 I I PE I I I I I MJR CLASS of WK: IR/W I I (Includes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROD NO. I -) - I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 6I ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1031 1031 1031 3091 6181 6181 I I PE I I I I I MJR CLASS of WK: IR/W I I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROD NO. I -I I I(ID-5) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 2 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 71 ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 741 741 741 2221 4441 4441 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I I(ID-6) I I WORK CODES: L ICON I I I I I TOTAL LENGTH: F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 8I07I28850 PICKERING ROAD - 1A IXIFI 2801 I I I 2801 2801 I I PE I I 10.37 TO 1.23 I I MJR CLASS of WK: 4 IR/W I I 11990 INTERSECTION PROJECT TO 1984 PROJECT I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .86 F.A. PROD NO. I -I I I(ID-53 RAP-71) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 9I08I62310 TRAILS ROAD - 3 IXIFI 3071 I I I 3071 3071 I I PE I I 11.59 TO 2.55 I i MJR CLASS of WK: 4 IR/W I I (Trails End Drive south to Mile Post 2.55 I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .96 F.A. PROD NO. I _I - I I(ID-35 RAP-59) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 10I08I62310 TRAILS ROAD - 4 IXIFI 3301 I I I 3301 3301 I I PE I I 12.55 TO 3.45 I I MJR CLASS of WK: 4 IR/W I I IMile Post 2.55 to 0.10 Mile So. Mason Lake Drive West I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .90 F.A. PROD NO. I -I I I(ID-36 RAP-53) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 11I07I91720 JOHN'S PRAIRIE ROAD - 3 I IFI 411 I I I 411 91 I 321 PE I I 12.72 TO 2.74 I I MJR CLASS of WK: 6 IR/W I I (Railroad Crossing I I WORK CODES: I ICON I I I(ID-81) I I TOTAL LENGTH: .02 F.A. PROD NO. I -I _ I I I I UTILITY CODES: RRS - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 12I08I51800 MCEWAN PRAIRIE ROAD I IFI 411 I I I 411 91 I 321 PE I I 10.81 TO 0.83 I I MJR CLASS of WK: 6 IR/W I I IRailroad Crossing I I WORK CODES: I ICON I I I(ID-79) I I TOTAL LENGTH: .02 F.A. PROD NO. I -I I I I ( UTILITY CODES: RRS - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 13I08I15500 LYNCH ROAD - 3 I IFI 5741 I I I 5741 5741 I I PE I I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I I 10.30 North of Bay East to Totten Shores I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROD NO. I -I - I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 3 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRIDI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 [RAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 14108115500 LYNCH ROAD - 4 I IFI 6041 I I I 6041 6041 I I PE I I 16.85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I I (Totten Shores Road to Arcadia Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I ®I I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 15I08I86070 SAND HILL ROAD - 1 I IFI 6201 I I I 6201 6201 I I PE I I 10.33 TO 2.66 I I MJR CLASS of WK: 4 IR/W I I (From mile post 0.33 to Transfer Station I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.33 F.A. PROJ NO. I -I - I I(ID-88) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 16I08I79800 BEAR CREEK - DEWATTO ROAD - 1 I IFI 2871 I I I 2871 2871 I I PE I I 16.57 To 7.45 I I MJR CLASS of WK: 4 IR/W I I 10.07 East of Panther Lake Road to 0.16 East of I I WORK CODES: ABC ICON I I IGOtd Creek Road - Realign and Regrade I I TOTAL LENGTH: .88 F.A. PROJ NO. I _I - I I(ID-39 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 17I08I62310 TRAILS ROAD - 1 I IFI 481 3611 I I 4091 1011 3081 I PE I I 10.00 TO 0.80 I I MJR CLASS of WK: 4 IR/W I I IS.R. #106 to mile post 0.80 I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .80 F.A. PROJ NO. I -I - I I(ID-33 RAP-81 YR-85) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 18I08I10000 CLOQUALLUM ROAD - 2 I IPI 541 5871 I I 6411 6411 I I PE I I 114.09 TO 15.60 I I MJR CLASS of WK: 4 IR/W I I IMite post 14.09 to mite post 15.60 I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.51 F.A. PROD NO. I -I _ I I(ID-21 RAP-50) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 19I08I10000-14.82 HERMAN'S OLD SCHOOLHOUSE BRIDGE I IPI 131 2271 I I 2401 2401 I I PE I I 114.80 TO 14.84 ( I MJR CLASS of WK: 4 IR/W I I IReptacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-11) I I TOTAL LENGTH: .04 F.A. PROD NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 20I08I10000-15.60 HERMAN'S CLOQUALLUM CREEK BRIDGE I IPI 191 2271 I I 2461 2461 I I PE I I 115.58 TO 15.62 ( I MJR CLASS of WK: 4 IR/W I I (Replacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-12) I I TOTAL LENGTH: .04 F.A. PROJ NO. I - I I I I UTILITY CODES: . - ITOT 01 0 --------------------------------- ------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 4 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R (U I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 21I09IT7270 HAVEN WAY - 2 I IPI 421 4081 I I 4501 4501 I I PE I I 10.91 TO 2.30 I I MJR CLASS of WK: 4 IR/W I I IHAVEN LAKE DRIVE TO END OF AC 1993 PROJECT I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I -I I I(ID-7 Yr-94) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 22I08I28850 PICKERING ROAD - 3 I IPI 421 3091 I I 3511 3511 I I PE I I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I I IHartstene Bridge Road South to Scenic View Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROJ NO. I -1 I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 23I07I96140 GRAPEVIEW LOOP ROAD - 6 I IPI 351 2881 I I 3231 3231 I I PE I I 16.93 TO 7.98 I I MJR CLASS of WK: 4 IR/W I I INelson Road to S.R. #3 I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.05 F.A. PROD NO. I -I - I I(ID-50 RAP-63) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 24I08I10000 CLOQUALLUM ROAD - 1 I IPI 431 3811 I I 4241 4241 I I PE I I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I I (Rock Bluff Curve (1 mile west of Bulb Farm Road) I ( WORK CODES: ABD ICON I I IRealign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROJ NO. I -I I(ID-51 RAP-41) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 25I08I62310 TRAILS ROAD - 2 I IUI I 251 2271 I 2521 2521 I I PE I I 10.80 TO 1.59 I I MJR CLASS of WK: 4 IR/W I I (Mite post 0.80 to Trails End Drive I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .79 F.A. PROJ NO. I -I - I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 26I07I96140 GRAPEVIEW LOOP ROAD - 3 I IUI I 381 2681 I 3061 3061 I I PE I I 13.50 TO 4.43 I I MJR CLASS of WK: 4 IR/W I I ILombard Road to Store I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I -1 - I I(ID-62 RAP-73) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 27I07I97500 BELFAIR-TAHUYA ROAD I IUI I 641 9301 I 9941 9941 I I PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 15 IR/W I I IKay's Corner northerly 2.00 miles ( I WORK CODES: ABD ICON I I (Horizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROD NO. I -1 - I ((ID-19 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 5 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 28109139630 NORTH ISLAND DRIVE - 1 I IuI I 201 3001 I 3201 3201 I I PE I I IMP 0.31 TO 1.31 I I MJR CLASS of WK: 4 IR/W I I IEnd of AC north 1 mile I I WORK CODES: AHD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I -1 I I(ID-68) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I08I79800 BEAR CREEK - DEWATTO ROAD - 2 I IUI I 201 3001 I 3201 3201 I I PE I I 17.45 TO 8.45 I I MJR CLASS of WK: 4 IR/W I I 10.16 E. Gold Creek Road to 0.37 W. Tiger Mission Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I -I I I(ID-40 RAP-57) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 30I09I77270 HAVEN WAY I IUI I 431 3091 I 3521 3521 I I PE I I 10.00 TO 0.91 I I MJR CLASS of WK: 4 IR/W I I IMt. View Drive Southwesterly to Haven Lake Drive I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .91 F.A. PROD NO. I -I I I(ID-23) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I09I62670 ANTHONY ROAD I IUI I I 451 3401 3851 3851 I I PE I I 10.00 TO 1.20 I I MJR CLASS of WK: 4 IR/W I I ISR #3 North 1.20 Miles I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.20 F.A. PROJ NO. I _I I I(ID-82) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I09I62670 ANTHONY ROAD I IUI I I 451 3401 3851 3851 I I PE I I 11.20 TO 2.41 I I MJR CLASS of WK: 4 IR/W I I IMile Post 1.20 North to 1993 Project I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.21 F.A. PROD NO. I -I - I I(ID-56) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33I09I11600 STORY ROAD EXTENSION I IUI I I 851 8651 9501 9501 I I PE I I TEND OF STORY ROAD TO CLOQUALLUM ROAD I I MJR CLASS of WK: 1 IR/W I I INew construction from end of Story Road to I I WORK CODES: ABD ICON I I ICloquallun Road to provide access to U.S. #101 I I TOTAL LENGTH: .50 F.A. PROD NO. I ®I - I I(ID-78) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 34I07I96140-2.45 MCLANE COVE BRIDGE I IUI I I 701 4401 5101 5101 I I PE I I 12.35 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I (Replacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I I(ID-15) I I TOTAL LENGTH: .20 F.A. PROJ NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 6 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I [NJ I I 16TH I A I A IUATA I R I 3RD I6TH Y I sI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 35I09I39630 NORTH ISLAND DRIVE - 2 I IUI I I 40I 530I 570I 5701 I I PE I I 11.31 TO 3.09 I I MJR CLASS of WK: 45 IR/W I I (Realign and Regrade I I WORK CODES: ABD ICON I I I(ID-48) I I TOTAL LENGTH: 1.78 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 36I08I79800 BEAR CREEK - DEWATTO ROAD - 3 I IUI I I 30I 3381 3681 3681 I I PE I I 18.45 TO 9.60 I I MJR CLASS of WK: 4 IR/W I I 10.37 W. of Tiger Mission Road to start of Chip Seal I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROD NO. I —I I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 37I09I86070 SAND HILL ROAD - 2 I IUI I I 321 3341 3661 3661 I I PE I I 12.66 TO 3.94 I I MJR CLASS of WK: 4 IR/W I I (Transfer Station to Delmore Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROJ NO. I ®I I I(ID-89) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 38I07I91720 JOHNS PRAIRIE ROAD - SR # 3 SIGNALIZATION I IUI I I I 30I 30I 30I I I PE I I I3.80 TO 3.90 I I MJR CLASS of WK: 6 IR/W I I (INSTALL TRAFFIC SIGNAL AT JUNCTION WITH SR 3 I I WORK CODES: I ICON I I I(ID 13) I I TOTAL LENGTH: .10 F.A. PROJ NO. I ®I — I I I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 39I08I10000-5.85 ROCK CREEK NO.1 BRIDGE I IUI I I I 100I 100I 100I I I PE I I 15.83 To 5.87 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-10) I I TOTAL LENGTH: .04 F.A. PROJ NO. I .—I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 40I09I10290-0.35 HLIBOKI BRIDGE I IUI I I I 160I 160I 1601 I I PE I I I0.30 TO 0.40 (BULB FARM ROAD) I I MJR CLASS of WK: 4 IR/W I I (Replacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-14) I I TOTAL LENGTH: .10 F.A. PROD NO. I ®I _ I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 41I09I70950 TAHUYA RIVER ROAD I IUI I I I 7731 773I 7731 I I PE I I 11.61 TO 4.02 I I MJR CLASS of WK: 45 IR/W I I (Intersection with Belfair-Tahuya Road in Sec. 22 I I WORK CODES: ABC ICON I I Inortherly 2.41 miles I I TOTAL LENGTH: 2.41 F.A. PROJ NO. 1 —I I I(ID-77 Yr-92) I I UTILITY CODES: - - (TOT 0' 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 7 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 42109111200 HURLEY-WALDRIP ROAD I IUI I I I 2121 2121 2121 I I PE I I 10.00 TO 0.25 I I MJR CLASS of WK: 4 IR/W I I (Intersection With SR #108 Realign and Regrade I I WORK CODES: ABC ICON I I I(ID-24 Yr-92) I I TOTAL LENGTH: .25 F.A. PROD NO. I _I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 43I17I13200 WALKER PARK ROAD I IUI I I I 4081 4081 4081 I I PE I I 10.36 TO 1.06 I I MJR CLASS of WK: 4 IR/W I I (Rebuild Road with Curbs, Gutters and Sidewalks I I WORK CODES: BDFG ICON I I I(ID-16) I ( TOTAL LENGTH: .70 F.A. PROD NO. I -) I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 44I08I20900 CRESTVIEW DRIVE I IUI I I I 6451 6451 6451 I I PE I I 10.00 TO 2.02 I I MJR CLASS of WK: 4 IR/W I I (Agate Store to Hillcrest Drive I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROD NO. I -I I I(ID-59 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 45I09I28240 SPENCER LAKE ROAD - 1 I IUI I I I 6001 6001 6001 I I PE I I 10.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I I (Agate Road north to 1987 project I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROJ NO. I -I _ I I(1D-28) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 46I08I28850 PICKERING ROAD - 4 I IUI I I I 2681 2681 2681 I I PE I I 14.51 TO 5.35 I I MJR CLASS of WK: 4 IR/W I I IScenic View Road to Schneider Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .84 F.A. PROD NO. I -I I I(ID-84 RAP-30) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 47I09I39410 WINGART ROAD I IUI I I I 1651 1651 1651 I I PE I I 10.00 TO 0.52 I I MJR CLASS of WK: 4 IR/W I I (North Island Drive to Jarrell Cove State Park I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .52 F.A. PROD NO. I -I _ I I(ID-75) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 48I07INEW ROAD FROM TRAILS RD TO SR 3 / SR 106 I IUI I I 113801 13801 13801 I I PE I I (APPROXIMATELY 4 MILES I ' MJR CLASS of WK: 45 IR/W I I (Reconstruct the Razor Road to meet County Standards I I WORK CODES: ABD ICON I I I(ID-20) I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I ®I I I I I UTILITY CODES: PTC - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 8 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL R IU I ICIF[ I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I S[ I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR 49107196140 GRAPEVIEW LOOP ROAD - 2 [ IUI I [ [ 3031 3031 3031 [ I PE I [ 12.78 TO 3.50 I I MJR CLASS of WK: 4 IR/W I i IMurray Road South to Lombard Road I I WORK CODES: ABD ICON I I [Realign and Regrade I I TOTAL LENGTH: .72 F.A. PROJ NO. I ®I I I(ID-61 RAP-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 50I08I02000 SATSOP CLOQUALLUM ROAD I IUI I I I 4251 4251 4251 I I PE I [ 13.69 To 6.33 I I MJR CLASS of WK: 4 IR/W I I (Minor widening & BST Surfacing I I WORK CODES: ABC ICON I I I(ID-8 Yr-92) I I TOTAL LENGTH: 2.64 F.A. PROJ NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 51I09I02750 STAR LAKE ROAD I IUI I I I 3511 3511 3511 I I PE I I 10.00 TO 1.10 [ I MJR CLASS of WK: 3 IR/W I I ICloquallum Road north 1.10 miles to Country Club I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 1.10 F.A. PROD NO. I -I I I (ID-71) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 52I09I05850 GALLAGHER ROAD I IUI I I I 3201 3201 3201 [ I PE I I 10.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I I (Minor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-22 Yr-92) I I TOTAL LENGTH: 1.88 F.A. PROD NO. I ®i _ I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 53I09I23600 SUNSET ROAD I IUI I I I 3001 3001 3001 I I PE I [ 10.00 TO 1.39 I I MJR CLASS of WK: 4 IR/W I I (Minor Widening and BST surfacing I I WORK CODES: ABC ICON I I I(ID-27 Yr-92) I I TOTAL LENGTH: 1.39 F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 54I09I28240 SPENCER LAKE ROAD - 2 I IUl I I [ 1051 1051 1051 I I PE I [ 12.45 TO 2.78 I I MJR CLASS of WK: 4 IR/W I I IFrom 1987 project north to Pickering Road I I WORK CODES: ABC ICON I i IRealign and Regrade I I TOTAL LENGTH: .33 F.A. PROD NO. I -I I I(ID-30) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 55I09I28370 CLAY ROAD I IUI I I I 1721 1721 1721 I I PE I I 10.99 TO 1.53 I I MJR CLASS of WK: 3 IR/W I I IPhillips Lake Loop Road to Dead End I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: .54 F.A. PROJ NO. I -I - I I(ID-72) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 9 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 56108128850 PICKERING ROAD - 5 I IUI I I I 3031 3031 3031 I I PE I I 15.35 TO 6.24 I I MJR CLASS of WK: 4 IR/W I I ISchneider Road to Benson Loop Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .89 F.A. PROD NO. I ®I - I I(ID-85 RAP-36) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 57I09I36360 MCMICKEN ROAD I IUI I I I 1981 1981 1981 I I PE I I 10.00 TO 0.62 I I MJR CLASS of WK: 4 IR/W I I IMinor widening and resurfacing I I WORK CODES: ABC ICON I I I(ID-49 Yr-92) I I TOTAL LENGTH: .62 F.A. PROD NO. I ®I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 58I09I47100 TERRACE ROAD I IUI I I I 2661 2661 2661 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (Intersection Project with U.S. #101 from plats of I I WORK CODES: ABC ICON I I (Canal View Terrace and White Star. I I TOTAL LENGTH: .07 F.A. PROJ NO. I _I - I I(ID-76) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 59I09I51930 JENSEN ROAD I IUI I I I 1551 1551 1551 I I PE I I 10.00 TO 0.48 I I MJR CLASS of WK: 4 IR/W I I IBROCKDALE ROAD TO END OF COUNTY ROAD I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .48 F.A. PROJ NO. I -I I(ID-87) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 60I09I64330 STRETCH ISLAND ROAD SOUTH I IUI I I I 2371 2371 2371 I I PE I I 10.00 TO 0.74 I I MJR CLASS of WK: 4 IR/W I I IMinor Widening and surfacing I I WORK CODES: ABC ICON I I I(ID-25 Yr-92) I I TOTAL LENGTH: .74 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 61I09I64500 ECKERT ROAD I IUI I I I 2681 2681 2681 I I PE I I 10.00 TO 0.84 I I MJR CLASS of WK: 4 IR/W I I IMinor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-26 Yr-92) I I TOTAL LENGTH: .84 F.A. PROD NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 62I09I67580 LAKELAND DRIVE I IUI I I I 861 86I 861 I I PE I I 10.15 TO 0.22 CROWN OF HILL I I MJR CLASS of WK: 4 IR/W I I (Reconstruct Vertical Curve to Improve Sight Distance I I WORK CODES: ABC ICON I I I(ID-74) I I TOTAL LENGTH: .07 F.A. PROJ NO. I ®I _ I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 10 MASON COUNTY ---------------------- P IF i I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR [YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 63108170390 NORTH SHORE ROAD I IUI I I [ 3201 3201 3201 I I PE I I 19.63 TO 10.63 I I MJR CLASS of WK: 4 IR/W I I (Mile Post 9.63 to Belfair Tahuya Road I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I -I - I I(ID-37 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 64I08I79800 BEAR CREEK - DEWATTO ROAD - 4 I IUI I I [ 2971 2971 2971 I I PE I I 19.75 TO 10.68 I I MJR CLASS of WK: 4 IR/W I I (West end of Chip Seal to OLd Belfair Highway I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I -1 I I(ID-41 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 65I08I80610 ELFENDAHL PASS ROAD I IUI I I I 5921 5921 5921 I I PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 4 IR/W I I [North Shore Road to Belfair Tahuya Road I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.85 F.A. PROJ NO. I -I I I(ID-86 RAP-36) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 66I09I86070 SAND HILL ROAD - 3 I IUI I I [ 6001 6001 6001 I I PE I I 13.94 TO 5.82 I I MJR CLASS of WK: 4 IR/W I I IDeLmore Road to Bear Creek - Dewatto Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROD NO. [ -I I I(ID-90) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 67I14I90100 SHELTON - MATLOCK ROAD I IUI I I [ 7621 7621 7621 I I PE I I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I I (City Limits to Goldsborough Bridge I I WORK CODES: ABD ICON I I (Minor Widening I I TOTAL LENGTH: .47 F.A. PROD NO. I -1 I I(ID-42 RAP-48) [ I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 68I08I91720 JOHN'S PRAIRIE ROAD -2 I IUI I I [ 4241 4241 4241 I I PE I I 13.42 TO 3.90 I I MJR CLASS of WK: 1 IR/W I I ICapitol Hill Road to S.R. #3 I I WORK CODES: ABD ICON I I INew Construction on New Alignment I I TOTAL LENGTH: .48 F.A. PROJ NO. I -I I I(ID-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 69I07I96140 GRAPEVIEW LOOP ROAD - 1 I IUI I I I 3711 3711 3711 I I PE I I 11.62 TO 2.78 I I MJR CLASS of WK: 4 IR/W I I IStadium Beach Road to Murray Road South I I WORK CODES: ABD ICON I I IRealign and Regrade [ I TOTAL LENGTH: 1.16 F.A. PROD NO. I -I - I I(ID-60 RAP-40) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 11 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- ' FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR 70107196140 GRAPEVIEW LOOP ROAD - 4 I IUI I I I 4641 4641 4641 I I PE I I 14.43 TO 5.90 I I MJR CLASS of WK: 4 IR/W I I IGrapeview Store to Cronquest Road I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROJ NO. I ®I I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 71I07I96140 GRAPEVIEW LOOP ROAD - 5 I IUI I I I 2441 2441 2441 I I PE I I 16.10 To 6.93 I I MJR CLASS of WK: 4 IR/W I I ICronquist Road to Nelson Road I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .83 F.A. PROD NO. I -I _ I I(ID-64 RAP-39) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 72I09I04670 LITTLE EGYPT ROAD I IUI I I I 6401 6401 6401 I I PE I I 10.00 TO 2.00 I I MJR CLASS of WK: 3 IR/W I I IShelton-Matlock Road south to 2.00 Mile Post I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 2.00 F.A. PROJ NO. l -I I I (ID-70) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 73IOOINEW ROAD FROM SOUTH ISLAND DR. TO HARTSTENE IS.NO. RD. I IUI I I I 6061 6061 6061 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I IA New Road from South Island Drive easterly to ( I WORK CODES: ABC ICON I I IHartstene Island North Road- Follows No. Line of ( I TOTAL LENGTH: 1.62 F.A. PROD NO. I -I I ISec. 11 (ID-18) ( I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 74100INEW RD CONNECTING TAHUYA RIVER DRIVE & TAHUYA RIVER RD I IUI I I I 5511 5511 5511 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (Extend Tahuya River Drive (7521) Approx. 1.3 miles to I I WORK CODES: ABD ICON I I lintersect Tahuya River Road (7095) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. I -1 I I(ID-31 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 75IOOINEW ROAD FROM S.R. #101 TO BROCKDALE ROAD I IUI I l I 7161 7161 7161 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I IA New Road from S.R. #102 east to McEwan Prairie Road. I I WORK CODES: ABD ICON I I ITo provide a direct route from #101 to the Mason Lake. I I TOTAL LENGTH: 2.00 F.A. PROD NO. I -I I (area. A bypass of the City of Shelton (ID-65). I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 76IOOINEW ROAD FROM JOHN'S PRAIRIE ROAD TO MASON LAKE ROAD I IUI I I I 4251 4251 4251 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I 10.30 miles east of railroad tracks on John's Prairie I I WORK CODES: ABD ICON I I (Road to area of Mikkelsen Road on Mason Lake Road I I TOTAL LENGTH: 1.00 F.A. PROD NO. I -1 - I I(ID-67) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 12 MASON COUNTY -------------------------------------------------------- P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU Y I S I I IGI I I IYEAR L I I A IUATA I R I 3RD I6TH I L ITIA I L I YEAR IYEAR ---------------------------------------------- 77100INEW ROAD CONNECTING BINNS SWIGGER LOOP & PHILLIPS ROAD I IUI I I I 5521 5521 5521 I I PE I I IAPPROX. 1.3 MILES + BRIDGE I I MJR CLASS of WK: 1 IR/W I I 11.3 miles of New Construction I I WORK CODES: ICON I I ((ID-32 Yr-92) I I TOTAL LENGTH: 1.30 F.A. PROJ NO. I -1 I I I I UTILITY CODES: - - ITOT OI 0 ----------------------------------------------------------------------------------------------------------------------------------- 78IOOINEW ROAD FROM MASON LAKE ROAD SOUTHEASTERLY TO I IUI I I I 7161 7161 7161 I I PE I I IPICKERING ROAD I I MJR CLASS of WK: 1 IR/W I I INew Road from Mason Lake Road Southeasterly I I WORK CODES: ABDLI ICON I I Ito SR-3 at the Pickering Road I I TOTAL LENGTH: 2.20 F.A. PROD NO. I ®I s I ((ID-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 79IOOINEW ROAD FROM S.R. #3 TO GRAPEVIEW LOOP ROAD I IUI I I I 5571 5571 5571 I I PE I I I MJR CLASS of WK: 1 IR/W I I IFrom S.R. #3 east to the Grapeview Loop Road I I WORK CODES: ABD ICON I I Inear the Fair Harbor Marina I I TOTAL LENGTH: 1.80 F.A. PROD NO. I -I ((ID-66) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 80IOOINEW ROAD MCREAVY TO MASON LAKE ROAD I IUI I I 11600I 16001 16001 I I PE I I IAPPROX. 5 MILES I I MJR CLASS of WK: 1 IR/W I I (Construct Approx. 5.0 miles of new Road from 2 miles I I WORK CODES: ABD ICON I I INorth of Webb Hill Rd to 1/2 mi. North of Simpson I I TOTAL LENGTH: 5.00 F.A. PROJ NO. I -I I (Recreation Area (ID-55 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 81100INEW ROAD FROM TWANOH FALLS PLAT EAST TO TRAIL ROAD/106 I IUI I I I 6361 6361 6361 I I PE I I IAPPROX. 1.5 MILES I I MJR CLASS of WK: 1 IR/W I I IConstruct appoximatly 1.5 miles of new road I I WORK CODES: ABD ICON I I I(ID 94 YR 92) I I TOTAL LENGTH: 1.50 F.A. PROD NO. I -1 I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 82IOOINEW FRONTAGE ROADS FOR NEW STATE BELFAIR BY-PASS ROUTE I IUI I I I 401 401 401 I I PE I I (APPROXIMATELY 3 MILES OF NEW ROADS I ( MJR CLASS of WK: 1 IR/W I I (STUDY TO DETERMINE LOCATIONS FOR NEW FRONTAGE ROAD I I WORK CODES: U ICON I I IREQUIREMENTS FOR A NEW STATE ROUTE BY-PASSING BELFAIR I I TOTAL LENGTH: 3.00 F.A. PROD NO. I -1 I ION THE EAST (ID-17) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1995 TO 2000 Page 13 MASON COUNTY I SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN I FUNDED PROJECTS 1st Year 4157 ' Local 7594 ' Years 1-3 Years 4-6 Totals 2nd Year 1387 ' RAP 308 ' P E 131 0 131 3rd Year 1026 I CAPP 1398 I R/W 0 0 0 4-6 Year 2925 I TIA 0 I CONST 0 0 0 0 I UATA 0 I I Fed. 195 I I I I Totals ... 9495 9495 131 0 131 ------------------------------------------------------------------------------------------------------------------------------------ UNFUNDED PROJECTS 1st Year 248 I Local 28096 I Years 1-3 Years 4-6 Totals (Proposed and Unknown) 0 2nd Year 2637 I RAP 0 I P E 0 0 0 3rd Year 2681 I CAPP 0 I R/W 0 0 0 4-6 Year 22530 I TIA 0 I CONST 0 0 0 DATA 0 Fed. 0 I I Totals ... 28096 28096 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS 1st Year 4405 I Local 35690 I Years 1-3 Years 4-6 Totals I 2nd Year 4024 ' RAP 308 I P E 131 0 131 3rd Year 3707 ' CAPP 1398 ' R/W 0 0 0 I 4-6 Year 25455 ' TIA 0 ' CONST 0 0 0 I UATA 0 I I I Fed. 195 I I I I Totals ... 37591 37591 131 0 131 WHEREAS,in compliance with R.C.W.36.81.121 and W.A.C. 136.14, the Board of Meson Canty Commissioners issianars hereby certifies that a priority array of potential projects on this Courty's arterial system was prepared by the County Engineer and oval" to the Board of County Commissioners during the ation of a proposed sot(6)year comprahwaiva road construction program for do period January 1, 1995, though December 31,2000; WHEREAS,it further compliance with said low,the Board has held thereon pubic hearing(s)dated Jun 7. 1994. to considers . NOW,THEREFORE,BE IT HEREBY RESOLVED by the Board of Masai Canty Commissioners,in regular session assembled,that the attached Six(6)You Construction Program for Mason Canty roads be adopted as set forth it detail, for the period mentioned, consisting of pages numbered 1 though 13, which we Incrprated and merle part of this Resolution. PASSED and unanimously adopted this 7th day of June, 1994. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASH[ TON ATTEST: Chaiperson Clerk of the Board Member cc: Crmns. I Eng'r. I CRAB ' Urban Arterial Board Member Dept.of Transp.ILocai Programs Div. tOw plmaintlsix-yr.sig