HomeMy WebLinkAboutPublic Utility District No. 3 - Contract Z
PUBLIC UTILITY DISTRICT Fiber Conduit Agreement
Fiber Conduit Description:
Customer Name: Mason County Facilities and Parks
Premise address: 411 N 5th St Shelton, WA 98584
(Nearest address where conduit is located.)
Conduit Description:
SIZE: 2" rigid conduit
LENGTH: approx 100'total
LOCATION: From riser conduit located on pole GPS11690,FO Vault,to ground floor communications room.
See attached map of approximate conduit location.
Transfer of Ownership of Conduit:
Upon signature of this agreement, the customer shall grant ownership of the described conduit to Mason County
PUD No. 3. This includes any maintenance, repairs, and upgrades needed, as well as the right to occupy the
conduit facilities.
Description of Conduit Occupancy:
PUD 3 shall install a fiber optic cable utilizing the existing conduit described above.
Inclusion of Conduit into Utility Easement:
The described conduit will be included in the Mason County PUD No. 3 utility easement at the premises.
The undersigned owner of the facilities("Customer")hereby grants,conveys,and assigns to Mason County Public Utility District No.3("PUD 3")
all rights,title,and interest in the conduit,together with the right and continuing irrevocable license for PUD 3, its employees or contractors to
enter upon the premises described above to install,maintain, repair,and replace equipment and materials in the conduit described above.
The grantor hereby warrants that it is the sole owner(s)of all the property above conveyed,that it has the full power to convey the same,and
that it will defend the title of said grantee against any and all persons lawfully making claims thereto.
At the time of cancellation of the service for any reason, PUD 3, its employees or contractors shall have the right(but not the obligation)to
remove any equipment installed or placed on the premises pursuant to this agreement. CUSTOMER FURTHER AGREES THAT PUD 3 AND
ITS EMPLOYEES SHALL NOT BE LIABLE FOR ANY DAMAGES TO THE CONDUIT, RELATING TO THE INSTALLATION, MAINTENANCE,
REPAIR,OR REPLACEMENT OF MATERIALS OR EQUIPMENT EXCEPT FOR DAMAGES CAUSED BY THE NEGLIGENCE OR
INTENTIONAL MISCONDUCT OF PUD 3 OR ITS EMPLOYEES.
MarkMkN e� Cpigitally signed by Mark Neary
�/Date:2023.07.19 16:17:52-07'00' Date 7/19/2023
Revised 11/2019
r1- rr
z �
„ _ —
� t
w
r
i
_ w �
c �