HomeMy WebLinkAbout93-96 - Res. County Road Project No. 1472-R MASON COUNTYCOMIVIISSIONERS RESOLUTION NO.: 9 3-9 6
COUNTY ROAD PROJECT NO.: 1472-R
WHEREAS,on Mason County Road No. 79800 ,known locally as the Bear Creek-Dewatto Road,
and more specifically located in Sections 5&6,Township 23 North,Range 1 West,W.M.,M.P. 6.57 to M.P. 7.45 ,
work defined as "construction"in the BARS Manual,Page II-63,et seq,is determined to be necessary and proper;and,
WHEREAS,this project is identified as# 12 on the officially adopted County Annual Road Program.
THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their
intention to:
Perform Preliminary Engineering,Right-of-Way negotiations,and construction of approximately 1.3
miles of roadway through grading,draining and surfacing with asphalt concrete class B placed in 2 lifts--one
and one-half inches deep..
Said work is to be performed by day labor/contract in accordance with the Washington State Standard
Specifications for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper,and the
estimated costs of said project are herewith set out as follows:
Engineering $33,000.00
Right-of-Way $75 000.00
Road Construction $700 000.00
Bridge Construction $ N/A
Engineer's Estimate in detail is on file in the office of the County Engineer.
The County Road Project herein described is HEREBY DECLARED to be a public necessity,and the County
Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in
accordance with WAC 136-18.
ADOPTED this 9th day of July 119 96.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
Absent 7/9/96
MARY JO CADY, Chairperson
WILLIAM O.HUNTER,Commissioner
ATTEST:
M ommissioner
Clerk of the Board l/
cc: Co. Commissioners
Engineer
JOURNAL: Publ. it.: 07-11-96 (Bill Rd. Dept.)
scv h:\wp\crp\l472.crp