HomeMy WebLinkAbout78-96 - Res. Six Year Transportation Improvement Program RESOLUTION NO. 78 -96
Six year Transportation Improvement Program
WHEREAS, in compliance with W.A.C. 136-15 Mason County has
prepared the attached Six Year Transportation Improvement Program
for the period January 1, 1997, through December 31, 2002; and
WHEREAS, in compliance with R.C.W. 36. 81 . 121 and W.A.C. 136-
14, the Board of Mason County Commissioners hereby certifies that
the priority array of potential projects on this County' s road
system, including bridges, was prepared by the County Engineer
and was available to the Board of County Commissioners during the
preparation of the said Six Year Transportation Improvement
Program; and
WHEREAS, in further compliance with said law, the Board has
held, thereon a public hearing dated June 11, 1996, to consider
the same;
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason
County Commissioners, in regular session assembled, that the
attached Six Year Transportation Improvement Program for Mason
County roads be adopted, as set forth in detail, for the period
mentioned, consisting of pages numbered 1 - 9, which are hereby
incorporated and made part of this Resolution.
BE IT FURTHER RESOLVED that the County Engineer is hereby
directed to distribute copies of the Six Year Transportation
Improvement Program for 1996 to all required agencies .
DATED this llth day of June 1996.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
MARY �,d C-Z'DY, Chairperson
/ G
M. FAUGHE DE Commissioner
ATTEST:
;7,/12�L-tl
WILLIAM O. HUNT R, Commissioner
REBECCA S. ROGERS
Clerk of the Board
ROVED AS TO FORM:
MICHAEL CLIFT
Deputy Prosecuting Attorney
cc: Auditor
Assessor
General Services
Public Works
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002
MASON COUNTY HEARING DATE : 06/11/96
ADOPTION DATE: 06/11/96
COUNTY NO: 23 RESOLUTION NO: 78-96
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
1I ICOUNTY WIDE PAVEMENT ON AC PAVEMENT I IFI 2641 2641 2641 792[ 15841 6501 9341 I PE I
I I I I MJR CLASS of WK: 5 CAPP IR/W I
I I(ID-1) I I WORK CODES: BD ICON I
I I I I TOTAL LENGTH: F.A. PROJ NO. I _I
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
2I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 1501 1501 1501 4501 9001 3761 5241 I PE I
I I I I MJR CLASS of WK: 5 CAPP IR/W I
I I(ID-2) I I WORK CODES: ICON I
TOTAL LENGTH: F.A. PROD NO. I -I -
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
3I ICOUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 2201 2201 2201 6601 13201 13201 I I PE I
I I I I MJR CLASS of WK: 4 IR/W I
I(ID-3) I I WORK CODES: ABC ICON I
I I I I TOTAL LENGTH: F.A. PROD NO. I -I -
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
4I ICOUNTY WIDE SAFETY PROJECTS I IFI 2201 2201 2201 6601 13201 13201 I I PE I
I I I I MJR CLASS of WK: IR/W I
I (Includes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I
I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROD NO. I -I -
I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
5I ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1101 1101 1101 3301 6601 6601 I I PE I
I I I I MJR CLASS of WK: IR/W I
I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I
I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I -I -
I I(1D-5) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
6I ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 791 791 791 2371 4741 4741 I I PE I
I I I I MJR CLASS of WK: 4 IR/W I
I(ID-6) I I WORK CODES: L ICON I
TOTAL LENGTH: F.A. PROD NO. I -I
I I I I UTILITY CODES: - - ITOT OI 0
-----------------------------------------------------------------------------------------------------------------------=------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 2
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I (CIFI I OBLIGATION
I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
7108186070 SAND HILL ROAD - 1 I IFI 9321 I I I 9321 9321 I I PE I
I 10.33 TO 2.66 I I MJR CLASS of WK: 4 IR/W I
I (From mile post 0.33 to Transfer Station I I WORK CODES: ABD ICON I
I IReaLign and Regrade I I TOTAL LENGTH: 2.33 F.A. PROJ NO. I -I -
I I(ID-88) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
8I08I15500 LYNCH ROAD - 3 I IFI 7601 I I I 7601 7601 I I PE I
I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I
I 10.30 North of Bay East to Totten Shores I I WORK CODES: ABD ICON I
I IReaLign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROD NO. I -1 -
I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
9I09I54650 ST. ANDREWS DR I IFI 44I I I I 441 OI I 441 PE I
I 12.00 TO 2.04 I I MJR CLASS of WK: 6 IR/W I
I (Railroad Crossing I I WORK CODES: I ICON I
I I(ID-95) I I TOTAL LENGTH: .04 F.A. PROJ NO. I -I -
I I I I UTILITY CODES: RRS - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
10I07INEW ROAD FROM S.R. #3 TO GRAPEVIEW LOOP ROAD I IFI 4051 I I I 4051 4051 I I PE I
I I I I MJR CLASS of WK: 1 IR/W I
I (From S.R. #3 east to the Grapeview Loop Road I I WORK CODES: ABD ICON I
I Iat the Cronquist Road I I TOTAL LENGTH: .90 F.A. PROJ NO.
I I(ID-66) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
11I08I10000 CLOQUALLUM ROAD - 1 I IFI 5601 I I I 5601 5601 I I PE I
I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I
I (Rock Bluff Curve (1 mile west of Butb Farm Road) I I WORK CODES: ABD ICON I
I IReaLign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROJ NO. I -1 -
I I(ID-51 RAP-41) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
12I08I15500 LYNCH ROAD - 4 I IFI I 8001 I I 8001 8001 I I PE I
I 16.85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I
I ITotten Shores Road to Arcadia Road I I WORK CODES: ABC ICON I
I IReaLign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I -1 -
I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
13I08I28850 PICKERING ROAD - 3 I IPI 631 6361 I I 6991 6991 I I PE I
I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I
I IHartstene Bridge Road South to Scenic View Road I I WORK CODES: ABC ICON I
I IReaLign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROJ NO. I -I -
I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 3
MASON COUNTY
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
14107191720 JOHNS PRAIRIE ROAD - SR # 3 SIGNALIZATION I IPI 201 1401 I I 1601 1601 I I PE I
I 13.80 TO 3.90 I I MJR CLASS of WK: 6 IR/W I
I (INSTALL TRAFFIC SIGNAL AT JUNCTION WITH SR 3 I I WORK CODES: I ICON I
I I(ID 13) I I TOTAL LENGTH: .10 F.A. PROD NO. I -I -
I I I I UTILITY CODES: PT - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
15I08I20900 CRESTVIEW DRIVE I IPI 801 8001 I I 8801 8801 I I PE I
I 10.00 TO 2.02 I I MJR CLASS of WK: 4 IR/W I
I (Agate Store to Hillcrest Drive I I WORK CODES: ABC ICON I
I IRealign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROJ NO. I ®I
I ((ID-59 RAP-48) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
16I07I97500 BELFAIR TAHUYA RD -2 I IPI 431 4301 I I 4731 4731 I I PE I
I 16.40 TO 7.26 I I MJR CLASS of WK: 4 IR/W I
I ICOLIins Lake Rd to New ACP I I WORK CODES: ABC ICON I
I IRealign and Regrade I I TOTAL LENGTH: .86 F.A. PROJ NO. I -I -
I(ID-8) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
17I08I79800 BEAR CREEK - DEWATTO ROAD - 2 I IPI 401 4001 I I 4401 4401 I I PE I
I 17.45 To 8.45 I I MJR CLASS of WK: 4 IR/W I
I 10.16 E. Gold Creek Road to 0.37 W. Tiger Mission Road I I WORK CODES: ABC ICON I
I (Realign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I ®I
I I(ID-40 RAP-57) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
18I09I39630 NORTH ISLAND DRIVE - 1 I IUI I 451 4501 I 4951 4951 I I PE I
I IMP 0.31 TO 1.31 I I MJR CLASS of WK: 4 IR/W I
I (End of AC north 1 mile I I WORK CODES: ABD ICON I
I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I _I -
I I(ID-68) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
19I07I96140 GRAPEVIEW LOOP ROAD - 3 I IUI I 371 3721 I 4091 1261 2831 I PE I
I 13.50 To 4.43 I I MJR CLASS of WK: 4 RAP IR/W I
I (Lombard Road to Store I I WORK CODES: ABD ICON I
I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I -I
I I(ID-62 RAP-73) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
20I07I96140 GRAPEVIEW LOOP ROAD - 4 I IUI I 581 5801 I 6381 2311 4071 I PE I
I 14.43 TO 5.90 I I MJR CLASS of WK: 4 RAP IR/W I
I IGrapeview Store to Cronquest Road I I WORK CODES: ABD ICON I
I IRealign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROJ NO. I _I
I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 4
MASON COUNTY
P IF I I I I "---PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRIDI I T I L I I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A (UATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
21109186070 SAND HILL ROAD - 2 I IUI I 511 5121 I 5631 5631 I I PE I
I 12.66 TO 3.94 I I MJR CLASS of WK: 4 IR/W I
I (Transfer Station to Delmore Road I I WORK CODES: ABC ICON I
I IRealign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROJ NO. I ®I -
I(ID-89) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
22I09I10290-0.35 HLIBOKI BRIDGE I IUI I 331 1501 I 1831 1831 I I PE I
I 10.30 TO 0.40 (BULB FARM ROAD) I I MJR CLASS of WK: 4 IR/W I
I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I
I I(ID-14) I I TOTAL LENGTH: .10 F.A. PROJ NO. I -1
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
23I09I14010 OLD OLYMPIC HWY I IUI I 321 3281 I 3601 3601 I I PE I
I 10.00 TO 1.50 I I MJR CLASS of WK: 4 IR/W I
I ISR 101 to Bloomfield Road I I WORK CODES: ABD ICON I
I IRealign and Regrade I I TOTAL LENGTH: 1.50 F.A. PROD NO. I ®I
I I(ID-96) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
24I08I62310 TRAILS ROAD - 2 I IUI I 351 3501 I 3851 3851 I I PE I
I 10.80 TO 1.59 I ( MJR CLASS of WK: 4 IR/W I
I (Mile post 0.80 to Trails End Drive I I WORK CODES: ABC ICON I
I IRealign and Regrade I I TOTAL LENGTH: .79 F.A. PROJ NO. I -I -
I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
25I07INEW ROAD "WT-BUDDING ROAD" - PHASE 1 I IPI 251 221 10001 I 10471 10471 I I PE I
I (APPROXIMATELY 2.5 MILES I I MJR CLASS of WK: 45 IR/W I
I (New road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I
I (Phase 1: From Traits Rd out 2.5 miles of proposed I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I -I -
I Ialignment. (ID-82) I I UTILITY CODES: PTC - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
26I09I77270 HAVEN WAY - 1 I IUI I I 341 3601 3941 3941 I I PE I
I 10.00 TO 0.91 I I MJR CLASS of WK: 4 IR/W I
I IMt. View Drive Southwesterly to Haven Lake Drive I I WORK CODES: ABD ICON I
I IReatign and Regrade I I TOTAL LENGTH: .91 F.A. PROJ NO. I -I -
I I(ID-23) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
27I07I97500 BELFAIR-TAHUYA ROAD I IUI I I 961 9961 10921 10921 I I PE I
I 10.00 TO 1.85 ( I MJR CLASS of WK: 15 IR/W I
I IKay's Corner northerly 2.00 miles I I WORK CODES: ABD ICON I
I IHorizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I _I
I I(ID-19 RAP-51) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 5
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
28109170950 TAHUYA RIVER ROAD I IUI I I 961 9641 10601 10601 I I PE I
I 11.61 TO 4.02 I I MJR CLASS of WK: 45 IR/W I
I (Intersection with Belfair-Tahuya Road in Sec. 22 I I WORK CODES: ABC ICON I
I Inortherly 2.41 mites I ( TOTAL LENGTH: 2.41 F.A. PROD NO. I -1 -
I I(ID-77 Yr-92) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
29I09I39410 WINGART ROAD I IUI I I 211 2061 2271 2271 I I PE I
I 10.00 TO 0.52 I I MJR CLASS of WK: 4 IR/W I
I INorth Island Drive to Jarrell Cove State Park I I WORK CODES: ABC ICON I
I IRealign and Regrade I I TOTAL LENGTH: .52 F.A. PROJ NO. I -I -
I I(ID-75) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
30I08I28850 PICKERING ROAD - 4 I IUI I I 501 5001 5501 5501 I I PE I
I 14.51 TO 5.35 I I MJR CLASS of WK: 4 IR/W I
I IScenic View Road to Schneider Road I I WORK CODES: ABC ICON I
I IRealign and Regrade I I TOTAL LENGTH: .84 F.A. PROD NO. I -1 -
I I(ID-84 RAP-30) I [ UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
31I08I10000-5.85 ROCK CREEK NO.1 BRIDGE I IUI I I 221 1001 1221 1221 I I PE I
I 15.83 TO 5.87 I I MJR CLASS of WK: 4 IR/W I
I (Replacement of Bridge plus new approaches I I WORK CODES: L ICON I
I I(ID-10) I I TOTAL LENGTH: .04 F.A. PROJ NO. I -I -
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
32I09I77270 HAVEN WAY - 2 I IUI I 1 551 5501 6051 6051 I I PE I
I 10.91 TO 2.30 I I MJR CLASS of WK: 4 IR/W I
I IHAVEN LAKE DRIVE TO END OF AC 1993 PROJECT ( I WORK CODES: ABD ICON I
I IRealign and Regrade I I TOTAL LENGTH: 1.39 F.A. PROD NO. I _I -
I(ID-7 Yr-94) I I UTILITY CODES: PT - - ITOT 01 0
------------------------------------------------------------------------------------------------------------------------------------
33I07I96140-2.45 MCLANE COVE BRIDGE I IUI I I I 6751 6751 6751 I I PE I
I 12.35 TO 2.55 I I MJR CLASS of WK: 4 IR/W I
I (Replacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I
I I(ID-15) I I TOTAL LENGTH: .20 F.A. PROJ NO. I -1
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
34I07I96140 GRAPEVIEW LOOP ROAD - 1 I IUI I I I 5221 5221 5221 I I PE I
I 11.62 TO 2.78 I I MJR CLASS of WK: 4 IR/W I
I IStadium Beach Road to Murray Road South I I WORK CODES: ABD ICON I
I (Realign and Regrade ( I TOTAL LENGTH: 1.16 F.A. PROJ NO. I _I -
I(ID-60 RAP-40) I I UTILITY CODES: - - [TOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 6
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I S I I INI I I 16TH I A I A I UATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
35I08I79800 BEAR CREEK - DEWATTO ROAD - 3 I IUI I I I 506I 506I 506I I I PE I
I 18.45 TO 9.60 I I MJR CLASS of WK: 4 IR/W I
I 10.37 W. of Tiger Mission Road to start of Chip Seat I I WORK CODES: ABC ICON I
I (Realign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROD NO. I -I -
I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
36I09I67580 LAKELAND DRIVE I IUI I I I 90I 90I 90I I I PE I
I 10.15 TO 0.22 CROWN OF HILL I I MJR CLASS of WK: 4 IR/W I
I (Reconstruct Vertical Curve to Improve Sight Distance I I WORK CODES: ABC ICON I
I I(ID-74) I I TOTAL LENGTH: .07 F.A. PROJ NO. I ®I
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
37I09I39630 NORTH ISLAND DRIVE - 2 I IUI I I I 770I 770I 770I I I PE I
I 11.31 TO 3.09 I I MJR CLASS of WK: 45 IR/W I
I (Realign and Regrade I I WORK CODES: ABD ICON I
I(ID-48) I I TOTAL LENGTH: 1.78 F.A. PROD NO. I -I
UTILITY CODES: - - ITOT 01 0
------------------------------------------------------------------------------------------------------------------------------------
38I07INEW ROAD "WT-BUDDING ROAD" - PHASE 2 I IUI 151 20I I 6991 7341 7341 I I PE I
I (APPROXIMATELY 1.5 MILES I I MJR CLASS of WK: 45 IR/W I
I (New road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I
I (Phase 2: From end of Phase 1 to SR 3 south of I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I -I -
I ISR 106 (ID-20) I I UTILITY CODES: PTC - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
39I09I28240 SPENCER LAKE ROAD - 1 I IUI I I I 6571 6571 6571 I I PE I
I I0.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I
I (Agate Road north to 1987 project I I WORK CODES: ABC ICON I
I (Realign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROD NO. I -I -
I I(ID-28) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
40I07I96140 GRAPEVIEW LOOP ROAD - 5 I IUI I I I 3751 3751 3751 I I PE I
I I6.10 TO 6.93 I I MJR CLASS of WK: 4 IR/W I
I ICronquist Road to Nelson Road I I WORK CODES: ABD ICON I
I (Realign and Regrade I I TOTAL LENGTH: .83 F.A. PROJ NO. I -I -
I I(ID-64 RAP-39) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
41I09I11200 HURLEY-WALDRIP ROAD I IUI I I I 2251 2251 2251 I I PE
I I0.00 TO 0.25 I I MJR CLASS of WK: 4 IR/W
I (Intersection With SR #108 Realign and Regrade I I WORK CODES: ABC ICON
I I(ID-24 Yr-92) I I TOTAL LENGTH: .25 F.A. PROD NO. I -I -
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 7
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
------------------------------------------------------------------------------------------------------------------------------------
42I09I02750 STAR LAKE ROAD I IUI I I I 5501 5501 5501 I I PE I
I 10.00 TO 1.10 I I MJR CLASS of WK: 3 IR/W I
I ICloquallum Road north 1.10 mites to Country Club I I WORK CODES: ABC ICON I
I IRegrade, drain and surface I I TOTAL LENGTH: 1.10 F.A. PROD NO. I -I -
I I (ID-71) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
43I09I47100 TERRACE ROAD I IUI I I I 1541 1541 1541 I I PE I
I I I I MJR CLASS of WK: 1 IR/W I
I (Intersection Project with U.S. #101 from plats of I I WORK CODES: ABC ICON I
I ICanal View Terrace and White Star. I I TOTAL LENGTH: .07 F.A. PROJ NO. I ®I -
I ((ID-76) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
44I09I64500 ECKERT ROAD I IUI I I I 1851 1851 1851 I I PE I
I 10.00 TO 0.84 I I MJR CLASS of WK: 4 IR/W I
I (Minor widening and surfacing I I WORK CODES: ABC ICON I
I I(ID-26 Yr-92) I I TOTAL LENGTH: .84 F.A. PROJ NO. I _I
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
45I14I90100 SHELTON - MATLOCK ROAD I IUI I I I 8151 8151 8151 I I PE I
I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I
I (City Limits to Goldsborough Bridge I I WORK CODES: ABD ICON I
I (Minor Widening I I TOTAL LENGTH: .47 F.A. PROJ NO. I _I -
I I(ID-42 RAP-48) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
46I09I51930 JENSEN ROAD I IUI I I I 2201 2201 2201 I I PE I
I 10.00 TO 0.48 I I MJR CLASS of WK: 4 IR/W I
I IBROCKDALE ROAD TO END OF COUNTY ROAD I I WORK CODES: ABC ICON I
I (Realign and Regrade I I TOTAL LENGTH: .48 F.A. PROJ NO. I -I
I(ID-87) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
47I08I79800 BEAR CREEK - DEWATTO ROAD - 4 I IUI I I I 4401 4401 4401 I I PE I
I 19.75 TO 10.68 I I MJR CLASS of WK: 4 IR/W I
I (West end of Chip Seal to OLd Belfair Highway I I WORK CODES: ABC ICON I
I (Realign and Regrade I I TOTAL LENGTH: .93 F.A. PROD NO. I -I -
I ((ID-41 RAP-49) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
48I09I64330 STRETCH ISLAND ROAD SOUTH I IUI I I I 3301 3301 3301 I I PE I
I 10.00 TO 0.74 I I MJR CLASS of WK: 4 IR/W I
I (Minor Widening and surfacing I I WORK CODES: ABC ICON I
I I(ID-25 Yr-92) I I TOTAL LENGTH: .74 F.A. PROJ NO. I -I -
I I I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 8
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL
R IU I ICIFI I OBLIGATION
I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN
0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I
R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH
I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU
T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH
Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
49I09I23600 SUNSET ROAD I IUI I I I 3051 3051 3051 I I PE I
I 10.00 TO 1.39 I I MJR CLASS of WK: 4 IR/W I
I IMinor Widening and BST surfacing ( I WORK CODES: ABC ICON I
I(ID-27 Yr-92) I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I -) -
UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
50I07I96140 GRAPEVIEW LOOP ROAD - 2 I IUI I I I 3161 3161 3161 I I PE I
I I2.78 To 3.50 I I MJR CLASS of WK: 4 IR/W I
I IMurray Road South to Lombard Road I I WORK CODES: ABD ICON I
I (Realign and Regrade I I TOTAL LENGTH: .72 F.A. PROD NO. I -I -
I I(ID-61 RAP-58) I I UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
51100INEW FRONTAGE ROADS FOR NEW STATE BELFAIR BY-PASS ROUTE I IUI I I I 431 431 431 I I PE I
I (APPROXIMATELY 3 MILES OF NEW ROADS I I MJR CLASS of WK: 1 IR/W I
I (STUDY TO DETERMINE LOCATIONS FOR NEW FRONTAGE ROAD I I WORK CODES: U ICON I
I IREQUIREMENTS FOR A NEW STATE ROUTE BY-PASSING BELFAIR I I TOTAL LENGTH: 3.00 F.A. PROJ NO. I -I -
I ION THE EAST (ID-17) ( ( UTILITY CODES: - - ITOT OI 0
------------------------------------------------------------------------------------------------------------------------------------
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 9
MASON COUNTY
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
FUNDED PROJECTS 1st Year 3744 Local 8257 I Years 1-3 Years 4-6 Totals
2nd Year 1843 RAP 0 I P E 0 0 0
3rd Year 1043 CAPP 1458 I R/W 0 0 0
4-6 Year 3129 TIA 0 I CONST 0 0 0
DATA 0
Fed. 44
Totals ... 9759 9759 0 0 0
------------------------------------------------------------------------------------------------------------------------------------
UNFUNDED PROJECTS 1st Year 286 Local 18004 Years 1-3 Years 4-6 Totals
(Proposed and Unknown) 2nd Year 2739 RAP 690 P E 0 0 0
3rd Year 4116 CAPP 0 R/W 0 0 0
4-6 Year 11553 I TIA 0 CONST 0 0 0
UATA 0
Fed. 0
Totals ... 18694 18694 0 0 0
------------------------------------------------------------------------------------------------------------------------------------
TOTAL ALL PROJECTS 1st Year 4030 Locat 26261 Years 1-3 Years 4-6 Totals
2nd Year 4582 ( RAP 690 P E 0 0 0
3rd Year 5159 CAPP 1458 R/W 0 0 0
4-6 Year 14682 TIA 0 CONST 0 0 0
UATA 0
Fed. 44
Totals ... 28453 28453 0 0 0
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------