HomeMy WebLinkAbout58-96 - Res. Amend the Annual Construction Program for 1996 RESOLUTION NO. 58-96
WHEREAS, the Board of County Commissioners have determined that it is
necessary to amend the Annual Construction Program for 1996, to add, modify
and delete items to be in compliance with the 1996 construction budget; and,
WHEREAS, WAC 136-16-142 outlines the procedures to modify an Annual
Construction Program.
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Board of Mason County
Commissioners, that the Annual Construction Program for 1996 be revised as
shown in Attachment A, which is incorporated herein by this reference.
The individual changes are as follows:
Item 12: Modified to correct the funding source and to add RAP funds.
BE IT FURTHER RESOLVED that the County Engineer is hereby directed to
distribute copies of the Revised Annual Construction Program for 1996 to all
required agencies.
DATED this 16th day of April, 1996.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
1AARY JO , Chairper
V
M. FAUGHENDER, ommissioner
i
ATTEST:
WILLIAM O. HUNTER, Commissioner
A'
REBEL A S. ROGERS
Clerk of the Board
ROVED AS TO FORM:
MICHAEL CLIFT
Deputy Prosecuting Attorney
cc: Auditor
Assessor
General Services
Public Works
REVISED - ANNUAL CONSTRUCTION PROGRAM FOR 1996
AGENCY ACTION
COUNTY:............................ MASON
(7)TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM-columns(14)+(15) = $4,941,000.00 Recommended Program.. 04/16/96
B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) _ $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS C TOTAL DAY LABOR CONSTRUCTION PROGRAM-column 1 $ 302,000.00 Assessement.......... 8/8/1995
D. A.C./P.C.C. PAVEMENT I. BRIDGES **Line C must be smaller than line B ** Date of Final Adoption. 04/16/96
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 58-96
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1 000
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK VS FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) CS I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge#) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
codes) N S 1 000's 1 000's SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
COUNTY WIDE PROJECTS
1 1 N/A MASON COUNTY'S TRANSPORTATION PLAN N/A N/A 7 44 ISTEA 51 51
To complete the transportation element D>
of Mason County's Comprehensive Plan as
required by the Growth Management Act.
c�
2 2&3 AC PAVING VAR D E 170 232 CAPP 402 402
10000 Cloquallum Road mp 1.75 to 2.00 0.25 08 D E
70390 North Shore Road mp 9.74 to 11.44 1.70 08 D E n
90100 Shelton Matlock Road mp 1.62 to 3.12 1.50 07 D E
and mp 7.50 to 9.10 1.60 07 D E
3 4 BST PAVING-2 shots VAR C E 66 66 66
03890 Olympic View mp 0.00 to 0.11 0.11 09 C E
16940 Somers Drive mp 0.75 to 0.97 0.22 09 C E
20240 Larchmont Place mp 0.00 to 0.07 0.07 09 C E
22860 Dogwood Place mp 0.00 to 0.04 0.04 09 C E
23930 Benson Loop mp 0.67 to 1.20 0.53 09 C E
27490 Scenic View Drive mp 0.00 to 0.06 0.06 09 C E
27580 Scenic View Road mp 0.00 to 0.15 0.15 09 C E
2431 2761 01 511 01 4021 661 519
CRAB FORM NO. 3(REV 11/91) Page 1 of 4
REVISED - ANNUAL CONSTRUCTION PROGRAM FOR 1996
AGENCY ACTION
COUNTY:............................ MASON
(7)TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM-columns(14)+(15) = $4,941,000.00 Recommended Program.. 04/16/96
B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) _ $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS C TOTAL DAY LABOR CONSTRUCTION PROGRAM-column 1 $ 302,000.00 Assessement.......... 8/8/1995
D. A.C./P.C.C. PAVEMENT I. BRIDGES **Line C must be smaller than line B ** Date of Final Adoption. 04/16/96
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 58-96
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1 000
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD NA WORK VS FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) CS I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge#) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
codes) N S 1 000's 1 000's SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
3 4 BST PAVING-2 shots(continued) VAR C E
70670 Tahuya Blacksmith mp 6.66 to 7.22 0.56 08 C E
3A 4 BST PAVING-3rd Shot(1995 2 Shot) VAR C E 60 60 60
02000 Satsop-Cloquallum Road 2.64 08 C E
21770 Soundview Drive 0.45 09 C E
24360 Bertleson Road 0.95 09 C E
24480 Julian Road 0.26 09 C E
4 5 COUNTY WIDE SAFETY PROJECTS VAR FGH E 214 6 6 202 214
Traffic Control-Drainage-Walks
Bikeways-Guardrail Program
5 6 -- MINOR CONSTRUCTION VAR AC E 107 5 102 107
6 7 -- BRIDGE&LARGE CULVERT CONSTRUCTION VAR A 1 77 3 74 77
ROADS&BRIDGES(New Construction)
7 8* 91720 Johns Prairie Road-Railroad Crossing 0.02 07 G E 10 33 FED-HAZ 43 43
mp 2.72 to 2.74
8 9* 51800 McEwen Prairie Road-RR Crossing 0.02 08 G E 10 33 FED-HAZ 43 43
mp 0.81 to 0.83
9 10 15500 Lynch Road-3 mp 4.95 to 6.85 1.90 08 ABD 1 597 597 597
1075 66 0 9 11 885 236 1141
CRAB FORM NO. 3(REV 11/91) Page 2 of 4
REVISED - ANNUAL CONSTRUCTION PROGRAM FOR 1996
AGENCY ACTION
COUNTY:............................ MASON
(7)TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM-columns(14)+(15) _ $4,941,000.00 Recommended Program.. 04/16/96
B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) _ $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS C TOTAL DAY LABOR CONSTRUCTION PROGRAM-column 1 $ 302,000.00 Assessement.......... 8/8/1995
D. A.C./P.C.C. PAVEMENT I. BRIDGES **Line C must be smaller than line B ** Date of Final Adoption. 04/16/96
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 58-96
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1 000
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK VS FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) CS I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge#) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
codes) N S 1 000's 1 000's SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
ROADS&BRIDGES(New Construction)[Cont.]
10 11 15500 Lynch Road-4 mp 6.85 to 8.88 2.03 08 ABD 1 628 628 628
11 12" 86070 Sand Hill Road-1 mp 0.33 to 2.66 2.33 09 ABD 1 645 645 645
12 13" 79800 Bear Creek-Dewatto Road- 1 mp 6.57 to 7.45 0.88 08 ABC 1 42 258 RATA 300 300
13 14 10000 Cloquallum Road-2 mp 14.09 to 15.60 1.51 08 ABD 1 318 292 RATA 610 610
14 15 10000 10000-14.82 Herman's Old Schoolhouse Bridge 0.04 08 1 1 236 236 236
mp 14.80 to 14.84
15 16* 10000 10000-15.60 Herman's Cloquallum Creek Bridge 0.04 08 1 1 236 236 236
mp 15.58 to 15.62
16 17 96140 Grapeview Loop Road-6 mp 6.93 to 7.98 1.05 07 ABD 1 22 277 RATA 299 299
17 18 10000 Cloquallum Road-1 mp 11.75 to 12.47 0.72 08 ABD 1 398 398 398
ROADS&BRIDGES(P\E&R\W only)
18 19 54650 St.Andrews Drive-Railroad Crossing 0.02 09 G E 3 3 3
mp 2.01 to 2.03
19 20 28850 Pickering Road-3 mp 3.41 to 4.51 1.10 08 ABD 1 44 20 24 44
20 21 97500 Belfair-Tahuya Road mp 0.00 to 1.85 1.85 07 ABD 1 67 30 37 67
21 22 39630 North Island Drive-1 mp 0.31 to 1.31 1.00 09 ABC 1 21 8 13 21
22 23 79800 Bear Creek-Dewatto Road-2 mp 7.45 to 8.45 1.00 08 ABD 1 21 8 13 21
"Carry over from 1995 PAGE TOTALS==>1 25281 8271 01 31 01 33521 01 3355
CRAB FORM NO. 3(REV 11/91) Page 3 of 4
REVISED - ANNUAL CONSTRUCTION PROGRAM FOR 1996
AGENCY ACTION
COUNTY:............................ MASON
(7)TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING&DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM-columns(14)+(15) _ $4,941,000.00 Recommended Program.. 04/16/96
B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) _ $ 800,000.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS C TOTAL DAY LABOR CONSTRUCTION PROGRAM-column 1 $ 302,000.00 Assessement.......... 8/8/1995
D. A.C./P.C.C. PAVEMENT I. BRIDGES —Line C must be smaller than line B ** Date of Final Adoption. 04/16/96
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 58-96
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1 000
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD NA WORK VS FUNDS
ITEM ITEM LOG (include brief termini description or (Miles) CS I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge#) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
codes) N S 1 000's 1 000's SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
ROADS&BRIDGES(P\E&R\W only)[cont.]
23 24 x)o= New Road From SR#3 to Grapeview Loop Road 1.00 07 ABD 1 50 25 25 50
24 25 91720 Johns Prairie Road-SR#3 Signalization 0.10 07 G E 20 20 20
mp 3.80 to 3.90
25 46* 62310 Trails Road- 1 (Trails, Rasor to SR 106) 4.00 08 ABD 1 48 30 18 48
*Carry over from 1995 PAGE TOTALS==> 118 0 0 75 431 0 0 118
PROGRAM TOTALS==>1 39641 11691 01 1381 541 46391 3021 5133
CRAB FORM NO. 3(REV 11/91) Page 4 of 4