HomeMy WebLinkAboutBLD2022-00067 - BLD Plot / Site PlansSUMMARY OF WORK:
LOCATION: M2627 GLENVIEW LOT 8 520 SUNNY MEADOWS DR. CLE ELUM WASHINGTON
LATERAL ANALYSIS AND DESIGN FOR SINGLE FAMILY RESIDENCE
DESIGN LOADS:
CODE: 2018 IBC
USE OR OCCUPANCY OF BUILDINGS AND STRUCTURES RISK CATEGORY (ASCE TABLE 1.5-1): II
WIND SPEED Vult: 110 MPH EXPOSURE 'B', Vasd = 85 MPH (IBC EQUATION 16-33)
SEISMIC DESIGN CATEGORY: 'D'
ROOF SNOW LOAD: 115 PSF
ROOF DEAD LOAD: 17 PSF
FLOOR LIVE LOAD: 40 PSF
FLOOR DEAD LOAD: 10 PSF
SOIL BEARING PRESSURE: 1500 PSF
SOIL PASSIVE SOIL PRESSURE: 200 PSF
FRAMING REQUIREMENTS:
1. WALL STUDS TO BE 2X6 DFL-#2 @ 16" O.C., TYPICAL U.N.O.
2. ROOF SHEATHING TO BE 15/32" APA RATED CDX SHEATHING OR OSB. INSTALL PANELS HORIZONTALLY. SPACE 8d
NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS, SPACE 8d NAILS MAXIMUM 12" O.C. ON
INTERMEDIATE SUPPORTS.
3. TYPICAL WALL SHEATHING (TSN) TO BE 15/32" APA RATED CDX SHEATHING OR OSB. ALL PANEL EDGES TO BE
BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING. INSTALL PANELS HORIZONTALLY OR VERTICALLY. SPACE 8d
NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES. FOR OTHER CONDITIONS AND PANEL THICKNESSES, SPACE 8d NAILS
MAXIMUM 12" O.C. ON INTERMEDIATE SUPPORTS.
4. FLOOR SHEATHING TO BE /8" APA RATED CDX SHEATHING OR OSB. SPACE 8d NAILS MAXIMUM 6" O.C. ALONG
PANEL EDGES. FOR OTHER CONDITIONS, SPACE 8d NAILS MAXIMUM 12" O.C. ON INTERMEDIATE SUPPORTS.
5. SILL PLATE TO BE 2X P.T. U.N.O. (REFER TO SILL BOLT SPACING IN SCHEDULE BELOW).
6. FOR NAIL SIZES REFER TO BELOW.
SHEAR WALL SCHEDULE: (1)(2)
(4) SDPWS
TABLE 4.3A
PANEL
NOTATION
SHEATHING
THICKNESS
(IN.)
NAILS/
SPACING
DBL. STUD
CONN.
(FACE NAIL)
SILL BOLT (3)
SPACING
SHEAR
CAPACITY
(SEISMIC)
SHEAR
CAPACITY
(WIND)
D6
15/37"`8)
8d @ 6" 0/C
16d @ 9" 0/C
1/2" 0 @ 36" 0/C
260 PLF
365 PLF
D4 (3)
1532"'$)
8d @ 4" 0/C
16d @ 6" 0/C
1/2" 0 @ 24" 0/C
380 PLF
532 PLF
D3'3'
1532"($'
8d @ 3" 0/C
16d @ 4" 0/C
%2" 0 @ 18" 0/C
490 PLF
685 PLF
D2(3)
1532,.(a)
8d @ 2" 0/C
16d @ 3" 0/C
%2" 0 @ 16" 0/C
640 PLF
895 PLF
E2 (6)
15/32"
l0d @ 2" 0/C
N/A
V2" O @ 14" 0/C(6)
770 PLF
1077 PLF
D3X2(6)(7)
15/32" EACH
8d @ 3" 0/C
N/A
1/2" 0 @ 12" 0/C
980 PLF
1370 PLF
FACE
(2) ROWS
D2X2(6)(7)
1%2" EACH
8d @ 2" 0/C
N/A
12" 0 @ 9" 0/C
1280 PLF
1790 PLF
FACE
(2) ROWS
NOTES:
NAIL
6d 8d 10d 16d
0.113"
.131" .148" .162"
(1) SHEATHING TO
BE APA RATED SHEATHING OR OSB (GRADE C-C OR C-D STRUCTURAL II OR BET I ER).
LENGTH
2" 2'/2" 3" 3Y2"
(2) ALL PANEL EDGES TO BE BACKED WITH 2-INCH NOMINAL OR WIDER FRAMING (DFL-#2)- INSTALL PANELS EITHER
(9) COMMON OR GALVANIZED BOX
HORIZONTALLY OR VERTICALLY. SPACE NAILS MAXIMUM 6" O.C. ALONG PANEL EDGES FOR STUDS ;:PACED 24" O.C.
FOR OTHER CONDITIONS AND PANEL THICKNESSES, SPACE NAILS MAXIMUM 12" O.C. ON INTERMEDIATE SUPPORTS.
(3) FRAMING AT ADJOINING PANEL EDGES SHALL BE A SINGLE 3" NOMINAL MEMBER OR (2) 2-INCH NOMINAL MEMBER FASTENED TOGETHER WITH
16d NAILS (SPACING ABOVE) TYPICAL ENTIRE HEIGHT OF DBL. STUD. NAILS SHALL BE STAGGERED WHERE NAILS ARE SPACED 2" O.C.
(4) AT SHEAR WALL LOCATIONS, REFER RW/S1 AND FF/S1 FOR ROOF TO WALL AND FLOOR TO FLOOR FRAMING.
(5) INSTALL 3" SQUARE X 1/a" STEEL PLATE WASHER.
(6) FRAMING AT ADJOINING PANEL EDGES SHALL BE SINGLE 3X NOMINAL FRAMING MEMBERS AT EACH END OF THE PANEL. NAILS SHALL BE
STAGGERED WHERE NAILS ARE SPACED 2" O.C. INSTALL MIN. 3X P.T. SILL PLATE, U.N.O.
(7) PLYWOOD TO BE INSTALLED ON BOTH SIDES OF PANEL.
(8) IF 7/6" NOMINAL THICK PLYWOOD OR OSB IS USED, STUDS TO BE SPACED AT 1'-4" 0/C, TYPICAL.
(9) GALVANIZED NAILS SHALL BE HOT -DIPPED OR TUMBLED.
HOLD-DOWN SCHEDULE:`2"3)(4'
HOLDOWN
NOTATION
'SIMPSON'
HOLDOWN TYPE
INSTALLATION
INSTRUCTIONS
2
HDU2
(3075#)
STD. 'SB % X 24' MIN. 18" EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND
LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS (MLN. 24}" EDGE DISTANCE).
FASTEN STUDS TOGETHER WITH 16d NAILS @ 6" 0/C ENTIRE HEIGHT OF STUD. INSTALL
HOLDOWN PER MANUFACTURER'S SPECIFICATIONS.
4
HDU4
(4565#)
STD. 'SB 6/8 X 24' MIN. 18" EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND
LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS (MIN. 2%' EDGE DISTANCE).
FASTEN STUDS TOGETHER WITH 16d NAILS @ 6" 0/C ENTIRE HEIGHT OF STUD. INSTALL
HOLDOWN PER MANUFACTURER'S SPECIFICATIONS.
5
HD U 5
(5645#)
STD. 'SB % X 24' MIN. 18" EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND
LOCATED ALONG CENTER LINE OF (2)2X6 DFL-#2 WALL STUDS (MIN. 2%" EDGE DISTANCE).
FASTEN STUDS TOGETHER WITH 16d NAILS @ 6" 0/C ENTIRE HEIGHT OF STUD. INSTALL
HOLDOWN PER MANUFACTURER'S SPECIFICATIONS.
8
HDU8
5980#,6970#, 7870#
( )
STD. 'SB %X 24' MIN. 18" EMBEDMENT (le) CONCRETE. ANCHOR TO BE INSTALLED PLUMB AND
LOCATED ALONG CENTER LINE OF (3)2X6 DFL-#2 WALL STUDS (MIN. 2%" EDGE DISTANCE).
FASTEN STUDS TOGETHER WITH 16d NAILS @ 6" 0/C ENTIRE HEIGHT OF STUD. INSTALL
HOLDOWN PER MANUFACTURER'S SPECIFICATIONS.
28
M STC2 8
INSTALL STRAP ACROSS FLOOR LINE, INSTALL MIN. (8) 16d NAILS INTO DOUBLE WALL STUDS
NAILSABOVE
INTO MIDDLFLOOR AND E INTO THIRD DOUBLE
F WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL
40
MSTC40
INSTALL STRAP ACROSS FLOOR LINE, INSTALL MIN. (16) 16d NAILS INTO DOUBLE WALL STUDS
ABOVE FLOOR AND INTO DOUBLE WALL STUDS BELOW. CENTER STRAP ON STUDS TO INSTALL
NAILS INTO MIDDLE THIRD OF STUD.
NOTES-
.
TO BOTS.' BOLTS ANCHOR BOLTS TO BE A307 OR 'A36' THREADED ROD WITH STD NUT AND 2" X 2" X 3X5' STEEL
FASTENED TO DOUBLE STUDS (CONTINUOUS FROM SILL PLATE TO DOUBLE TOP PLATE) AT
SHOULD HAVE PANEL EDGE NAILING FROM SHEAR WALL SHEATHING.
6, AND 8 ARE INSTALLED FROM FLOOR TO FLOOR, REFER TO DETAIL FF/S1.
CONTINUOUS HORIZONTAL TOP BAR 3" DOWN FROM TOP OF WALL AT ALL IiOLDOWN ANCHORS. EXTEND BAR MIN. 5'-0"
DIRECTIONS (BEND BAR AROUND AT CORNER CONDITION). FOR THIS 10'-0" SECTION INSTALL (1)-#4 VERTICAL BAR @ 24"
TO HORIZONTAL TOP BAR.
SON'SSOM
)) IN LIEU OF IMPONSON
PLAT(2) HOLDOWNS TO BE
PANEL ENDS. WALL STUDS
(3) IF HOLDOWNS 2, 5,
(4) U.N.O., INSTALL (1)-#4
PAST HOLDOWN IN BOTH
O.C. TIE HOLDOWN ANCHOR
SHEAR WALL / HOLDOWN NOTATION DIAGRAM
EDGE OF WINDOW,
DOOR, OR CORNER
MINIMUM
CONTINUOUS
SHEAR WALL PANEL
D#
PANEL LENGTH
HOLDOWN TYPE
EDGE OF WINDOW,
DOOR, OR CORNER
9`I'Z4�
�'1�4,
?)
%2" EDGE DISTANCE
FROM STEM WALL
FACE TO EDGE OF
SILL PLATE WASHER
P.T. SILL PLATE AND
ANCHOR BOLT PER
SHEAR WALL
SCHEDULE
CONCETE WALL
IN LIEU OF CAST IN PLACE
INSTALL SIMPSON 'STRONG
BOLT 2', EMBED MIN. 3"
S1 S FDN. SILL PLATE SECTION
SIMPSON 'A35'
CLIP @ 2'-0" 0/C
2X BLOCK
MANUFACTURED
TRUSS (BY OTHERS)
SIMPSON H2.5A, TRUSS TO
PLATE AND PLATE TO STUD
BELOW (IF STUD IS NOT
DIRECTLY UNDER TRUSS,
INSTALL SIMPSON H2.5A AT
EACH STUD LEFT AND RIGHT OF
TRUSS BEARING POINT)
PANEL EDGE
NAILING
FACE NAIL PLATES WITH
16d NAILS @ 4" 0/C
SHEAR WALL SHEATI-LING,
BREAK ON DBL. TOP PLATE
PANEL EDGE NAILING
DBL. TOP PLATE
K W 1 ROOF TO SHEAR WALL SECTION
S 1 / RAISED HEEL OPTION
ROOF SHEATHING
PER ARCH. PLANS
SIMPSON H2.5A, TRUSS TO
PLATE AND PLATE TO STUD
BELOW (IF STUD IS NOT
DIRECTLY UNDER TRUSS,
INSTALL SIMPSON H2.5A AT
EACH STUD LEFT AND RIGHT OF
TRUSS BEARING POINT)
Si
2X STUDS
PER PLAN
SIMPSON 'A35' CLIP
(SPACING PER SCHEDULE
BELOW), EACH CLIP WITH
TOTAL OF (12) 8d 11/2" NAILS
ROOF EDGE (RE)
NAILING PER SCHEDULE
BELOW
EXTENDED EAVES
PER ARCH. PLANS
2X BLOCK
2X DOUBLE TOP PLATE,
TYPICAL PER PLAN
SHEAR WALL
SHEATI-LING AND
PANEL EDGE NAILING
PER PLAN
ROOF TO SHEAR WALL SECTION
SILL PLATE 'SP' NAILING
PER SCHEDULE BELOW
SIMPSON 'A35' CLIP (SPACING
PER SCHEDULE BELOW),
EACH CLIP WITH TOTAL OF
(12) 8d 1%2" NAILS, (2) ROWS
PER SCHEDULE
FLOOR
SHEATHING
PER PLAN
FLOOR JOISTS
PER PLAN
CFF
S 1
2X WALL STUDS PER
PLAN, DBL. 2X WALL
STUDS AT HOLD-DOWN
LOCATIONS
BOLTED OR STRAP
HOLDOWN PER PLAN
FOR FLOOR -TO -FLOOR
CONNECTION
UPPER SHEAR WALL
SHEATHING AND
PANEL EDGE NAILING
PER PLAN
SILL PLATE NAILING (2ND
ROW PER SCHEDULE)
NOTE #1 BELOW
2X BLOCKING OR RIM
JOIST (DBL. BLOCK PER
SCHEDULE)
LOWER SHEAR WALL
SHEATHING AND PANEL
EDGE NAILING PER PLAN
2X WALL STUDS PER
PLAN, DBL. 2X WALL
STUDS AT HOLDOWN
LOCATIONS
HOLDOWN, SAME
TYPE AS ABOVE
FLOOR TO FLOOR SECTION AT SHEAR WALL
NOTE:
1. IN LIEU OF CLIPS, BREAK SHEAR WALL
PANELS AT BLOCKING OR RIM JOIST (INSTALL
PANEL EDGE NAILING AT BREAK).
PANEL
TYPE
'SP' NAIL
SPACING
SIMPSON CLIP
SPACING
'RE' NAIL
SPACING
D6
16d @ 8" O.C.
1'-8" O.C.
8d @ 8" O.C.
D4
16d @ 4" O.C.
1'-2" O.C.
8d @ 4" O.C.
D3
16d @ 3" O.C.
0'-11" O.C.
8d @ 3" O.C.
D2
16d @ 3" O.C.
8" O.C.
8d @ 21/2" O.C.
E2
16d @ 2" O.C.
7" O.C.
8d @ 2" O.C.
D3X2
16d @ 3" O.C. (2) ROWS
1'-0" O.C. (2) ROWS
8d @ 3" O.C. (2) ROWS
D2X2
16d @ 2" O.C. (2) ROWS
10" O.C. (2) ROWS
8d @ 2" O.C. (2) ROWS
OU1
1-STORY
1-STORY
UPPER FLOOR SHEARWALL PLAN
NOTE: -
1. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING
AND NAILING, ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND
NAILING REQUIREMENTS.
FOUNDATION NOTES
1. REFER TO MAIN FLOOR SHEAR WALL PLAN FOR HOLDOWN SIZE.
2. THIS DRAWING IS FOR LATERAL INFORMATION ONLY, REFER TO ARCHITECTURAL
PLANS FOR ALL OTHER INFORMATION.
MATERIALS:
CONCRETE: MIN. 28-DAY CONCRETE STRENGTH = 2500 psi.
GRADE BEAMS, PIERS, AND SPREAD FOOTINGS SHALL BE POURED ONTO
UNDISTURBED, NATIVE SOIL WHICH IS FREE FROM ANY MATERIAL THAT WILL
ADVERSELY AFFECT THE SOIL DESIGN BEARING PRESSURE REFERENCED ABOVE. ALL
NON-STRUCTURAL WEATHER PROOFING AND FINISH MATERIAL TO BE DETERMINED "BY
OTHERS".
SLAB CONTROL JOINTS: PER OWNERS REQUIREMENTS OR DIRECTION:
MISC. SITE PREPARATIONS:
OBTAIN AND OBEY ALL APPLICABLE REGULATIONS REGARDING GRADING AND
EXCAVATION. IDENTIFY, MARK, AND PROTECT FROM DAMAcrE ALL EXISTING
UNDERGROUND PIPES, CONDUITS, AND CABLE (WATER SUPPLY, SANITARY SEWER,
STORM SEWER, GAS, STEAM, ELECTRICAL AND COMMUNICATION CABLE). REMOVE
SOIL WITH ORGANIC MATTER. PERFORM BACKFILL AND COMPACTION IN A SYSTEMATIC
PATTERN, TO ASSURE COMPLETE AND CONSISTENT WORK. IF ANY OVER -EXCAVATION
ACCIDENTALLY OCCURS, CORRECT IT WITH WELL -COMPACTED BACKFILL. PROVIDE
TESTING AND INSPECTION OF BACKFILL AND COMPACTION. LAYER BACKFILL IN 6 IN. TO
12 IN INCREMENTS. COMPACT ALL FILL. USE STABLIZED FILL MATERIAL OF AN
APPROVED TYPE AND FROM AN APPROVED SOURCE. TEST AND APPROVE MATERIAL
DELIVERED FROM OTHER SITES. DO NOT ALLOW ANY DEBRIS TO BE MIXED WITH FILL.
CURE CONCRETE TO FULL REQUIRED STRENGTH BEFORE BACKFILLING. PROVIDE
DRAINAGE CATCHERS PER ARCHITECTURAL DRAWINGS.
SPECIAL INSPECTION: NONE
CD
MIN. MIN.`
4'-2" 4-11"
MIN. MIN.
6'-6" 6'-6"
MAIN FLOOR SHEARWALL PLAN
NOTE:
1. REFER TO FRAMING REQUIREMENTS FOR TYPICAL EXTERIOR SHEATHING
AND NAILING, ROOF SHEATHING AND NAILING AND FLOOR SHEATHING AND
NAILING REQUIREMENTS.
PARTIAL FOUNDATION PLAN
adCO o
_ cv
Cr)
0 cv
otib
o Z
o
C.D �--o W
a)'' O
U — cs-5- i.3
CC CD
U r`.
C
w _.: =N,'
J X U
-- =- U
_ w 0- W n�,
DESCRIPTION
1
N
N
06/21/22
N
LLJ
„
,
I -
CO'
Q
CN
CO
N
M
VJ
C-
O
O
co
zaaa‹
N.
.0
W_
5-
z
w
CD
N
CID
0
0
J
D
2 Cr)
oz
za
< 0
J J
J J
Q Q
CC LC
W
cn cn
!
W
Z
1
ENGINEERS
9
,figovwAskj
STAMP
3 AMES,
1
6�
Vi
%'s
GISTE ,Ici
EXPIRES OCT 20, 2023
ISSUE
CD
DESIGNED BY
RJT
DRAWN BY
RJT
CHECKED BY
RJT
DATE
02/26/21
PROJECT NO.
R21128
SHEET NO.
s1.o