Loading...
HomeMy WebLinkAboutCOM2014-00132 EXPIRED Change of Use from Garage to I-502 Grow and Processing - COM Inspections - 8/2/2017 0 0 00 CONCRETE MECHANICAL MANUFACTURED HOME CD Date By 0 Footings I Setbacks Gas Piping Ribbons X C:) Intenor Date By interior-Date By Date P.,i Ci) C� ;& co Exterior Date By Exterior-Date By Set-up Point Load I Isolated Footings INSULATION Date By BG I SLAB INSULATION n Date By FIRE DEPARTMENT > Date By X Foundation Walls Floors Date By 9 Date By Data By DECKS C/) FRAMING Walls Date By Date By Data By PROPANE TANKS PLUMBING Vault Date By Date By OTHER Groundwork Attic Data By DIMS By Typo Data By DRYWALL Type- 0 0 Int Brace Wall Date By Date By B ic Date y FINAL INSPECTION Water Line Fire Seperation 9 Date By Date By Date By 1A C) Pass or Request Inspect. C? -Type of Insp. Fail Date Date Done By Comments f w Q Z_ 36-7 0,160z- 14A Y 15C, grS,o.SS,. "rwi- -7�, j�c-r r ... t2j, 1 -1 eccoer -ZCSC 40,(��r— L jzq'y row, co 0 co MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(S13u)4Ll-izuz cob Phone: (360)427-9670, ext. 352 Mason County 615 W Alder St Shelton, WA 98584 IR.54 COMMERCIAL BUILDING PERMIT COM2014-00132 OWNER: BLACKSMITH FARMS RECEIVED: 9/25/2014 CONTRACTOR: LICENSE: EXP: ISSUED: 2/2/2017 SITE ADDRESS: 13 NE TRUDEAU MOUNTAIN RD BELFAIR EXPIRES: 8/2/2017 PARCEL NUMBER: 223021390023 LEGAL DESCRIPTION: LOT C OF SP#1117 PTN TR 2 OF S 1/200 PROJECT DESCRIPTION: DIRECTIONS TO SITE: CHANGE OF USE, GARAGE TO 1-502 GROW& FOLLOW ST RT 3 TO BELFAIR, L ON ST RT 300, STRAIGHT ONTO OLD PROCESSING BELFAIR HWY, L ON BEARCREEK DEWATTO RD, L ON TRUDEAU MOUNTAIN RD TO 1ST ADDRESS ON THE LEFT SIDE General Information Construction&Occupancy Information No. of Units: Type of Constr.: VB Type of Use: I-502 Insp.Area: No. of Bathrooms: Occ. Group: F-1 Type of Work: ALT Fire Dist.: 2 No. of Stories: Exit Design. Load: 3 Valuation: $ 47,388.00 Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: 880 Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline&Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: Ft. SEPA?:No Comp. Plan Desig.: Rural Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: ? Emergency Key Box?: Y Standpipe?: N Auto Fire Sprinkler System?: N Access Road?: Y Fire Extinguishers?: Y Fixed Fire Suppression System?: N Fire Hydrants?: N Fire Lanes?: N COM2014-00132 Please refer to the following pages for conditions of this permit. Page 1 of 8 Plumbing Fixtures Mechanical Fixtures rrra Type Qty. Type Qty. Type By Date Amount Receipt Exhaust Hood 2 Plan Check Fee nnnna Qnr,i?n1A Qdnr,11 S1,nlAnn Heat Pump 1 Planning Review Fee nnnnn Q19F1?n1a as'An nn S1gnlann IFC Plan Check Fee (-nnnn Q1?r,19n1a 09n?FF q1?n1Ann EH Minor Plan Review R.IR Qnr,nnla Linn nn R79nldnn Building State Fee ni r 110n0nl. Oa Fn s1,nl7nn Building Permit Fee ni(,. 11 t9n/9n1, ,kF?s FF q1?n17nn Mechanical Permit Fee ni r. 11i?nnn1, 14ee sn g19n17nn Mechanical Base Fee ni r. 11ign/9m. t9A g;n q1?n17nn Total $1,739.11 CASE NOTES FOR COM2014-00132 CONDITIONS FOR COM2014-00132 1) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/rewerve requires a 10' setback from all footings/foundation. B. Septic tanks rquire 5' setback from all footings and foundadations. C. No foundation drains within 30', down gradient of drainfield/reserve area. X 2) Contr for registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.,Th person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) All approved plans are/required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be haWo and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 4) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. / X L 5) ALL CO STRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE_PF U OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x G COM2014-00132 Page 2 of 8 b) The demolition and disposal of debris must meet the regulations of Mason county ana viympic Negion dean Air Agency It is unlawful for any person to cause or allow the demolition (or major renovation) of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org X 7) Chan s to approved building plans that affect compliance to the current Washington State Energy Code (WSEC), ventilationrequirements), Building/PJu bin /Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X �% 8) CONST UCTION PROCESS TO BE FIELD CORRECTEDAS REQUIRED PER MASON COUNTY BUILDING DEPARTMENTAND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County building Inspector shall be made prior to requesting additional inspections. X 9) All build ng permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-co plant wjth Mason County ordinances and building regulations. XG 10) All per its expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. 11) Recycla le materials 8, Solid Waste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area shall be designed o meet e the needs of the occupancy, efficiency of pick-up, and shall be available to occupants and haulers.X ' T 12) This project is OT approved to create marijuana extract within the facility. A separate permit shall be required, approved, and issued prior to installing extraction equipment and/or performing extraction. To obtain a permit for an extraction operation contact Mason County Department of Community Development to obtain information required to obtain permits. COM2014-00132 Page 3 of 8 13) The structure is subject to inspection by the Mason County Fire Marshal. All corrections deemed necessary oy the Tire iviarsnai, to assure the minimum fire and life safety requirements as adopted by Mason County and Washington State may be required. POR ABLE FIRE EXTINGUISHERS: Install 2A10BC fire extinguishers with a maximum travel distance of 75 feet in any direction mounted no more than 60 inches above the floor to the top of the unit. Portable fire extinguishers shall be maintained and inspected annually. X i .Izi FENCES/GATES Gates shall be provided with an approved key box/knox box installed in accordance with the 2012 International Fire Code Section 506. Please contact the local fire district for more information and to discuss inspections for installation of the lock box system. X 14) Interior all and ceiling finishes shall be classified for fire performance and smoke development in accordance with ASTM E 84 or UL 723. Rooms created by 6-mil fire retardant material shall have a flame spread rating of 0-25 and a smoke developed index of 0-450 evidenced by manufacturer specifications is approved subject to the following criteria: 1)Walls and ceilings shall be fastened in such a manner that the materials will not readily become detached where subjected to room temperatures of 200 degrees fahrenheit for not less than 30-minutes (ref IBC 803.10) 2) Interior finish materials shall be installed in accordance with it's intended use with product mounting system or as approved otherwise. (IBC 803) 3) Interior wall and ceiling finish materials less than 1/4-inch thick shall be applied directly onto a wall, ceiling, or structural element without the use of furring strips and shall not be suspended away from the building element to which it is applied except where exceptions of IBC803.11.4 apply. See code information provided with approved construction plan. Provide compliance information at inspection prepared and sealed by the licensed design professional. X COM2014-00132 Page 4 of 8 15) The site and buildings shall be accessible to persons witn pnysicai aisaimities in accoraance wan it_u H i i t. i. Hccessime routes wnnin tree site shall be provided in accordance with IBC Section 1104 and not less than 60% of all entrances shall be accessible. PARKING: Accessible parking spaces shall be located on the shortest accessible route of travel form adjacent parking to an accessible entrance in accordance the 2012 International Building Code Section 1106. Spaces shall be constructed in accordance with Section 1101.2/ICC A117.1. An accessible parking space shall be provided in accordance with Table 1106.1 Construction and design shall be completed in accordance with ICC All 7.1, Section 502. Accessible parking spaces shall be located on the shortest accessible route of travel from adjacent parking to an accessible building entrance. Car parking shall be not less than 96-inches wide and access aisles not less than 60-inches wide shall be properly marked. Parking surfaces shall be firm, stable, and slip resistant material and shall not be steeper than 1 A8. Accessible parking spaces shall be clearly identified by signs containing the International Symbol of Accessibility placed not less than 60-inches above ground surface, measured from the bottom of the sign. X 11 Z�2 /,� 16) Lightin provided in habitable spaces shall comply with the 2012 International Energy Conservation Code as amended by Washington State (IECC/WSEC), Section C101.4.3.1 Lights provided in non-plant growing area occupying 440 sq ft shall not exceed 1.2 watts per sq. ft or 520 watts. control shall be installed and capable of automatic shut-off. Light wattgage is determined based upon light output which includes the ballast and lamp wattage. When incandescent lamps fixtures are used the wattage shall be the manufacturer listed wattage posted on the fixture. X �✓ 17) Storage/racks greater than 69" and up to 60" in height shall be installed in accordance to manufacturer specifications for seismic attachment. When seismic attachment is not provided by the manufacturer an engineered design and attachment details shall be required. Installation specifications or engineer's design shall be available during inspections performed by the Mason County Building Department. Storage racks greater than 8-ft in height shall require an engineer's design addressing seismic conditions and attachment. In addition, storage racks 8-ft tall or more shall require special inspection performed by the design professional or an approved representative. The special inspection report and engineered design shall be provided to the Mason County Building Department for approval prior to the final occupancy inspection. COM2014-00132 Page 5 of 8 .18) ENVELUPE: All existing areas provided with new heating systems shall comply 2012 International Energy Conservation Code/Washington State Energy Code (IECC/WSEC) as follows: Roof: New attic spaces shall be insulated to not less than R-49 unless approved otherwise. Walls: R-21 or better in existing 2x6 walls or min. R-15 in existing 2x4 walls, Fenestration including new doors and windows, including store door(s) shall have a U-Factor as follows: Non metal framing U-0.30 or less, metal framed-fixed/non operable windows U-38 and operable metal windows U-0.40or less, entrance doors U-0.60 or less and skylights U-0.50 or less. Solar heat gain coefficient(SHGC) 0.40 or better except skylights SHGC 0.35 or better. OTHER DOORS: Other than entry doors U-0.37 or less and roll-up or sliding doors min. R-4.75. MECHANICAL SYSTEMS: All new mechanical systems and equipment serving heating, cooling, ventilating equipments shall comply with IECC/WSEC Section C403. The output of heating and cooling equipment shall be sized in accordance with C403.2. Provide a schedule of equipment that identifies type and efficiency information demonstrating compliance to IECC/WSEC X Z"/' 19) Interi r spaces intended for human occupancy shall be provided with a space heating system capable of maintaining a minimum interior temperature of 68-degrees Fahrenheit at a point 3-feet above the floor. Areas that are provided with the required heating system shall comply with the International Energy Conservation Code as amended by Washington State (IECC/WSEC). X �. 20) Appr ed per dimensions and setbacks for existing garage structure (not greenhouse or hoop houses) on submitted site plan. Setbacks are measur$� om t furthest projection of the structure. 21) All co ruction and demolition debris must be removed from the shore area after project completion. Proper disp I of debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X 22) All property lines shall be clearly identified at the time of foundation inspection. X 23) Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Zoning is Rural Residential 5 zone., X 24) Tempor erosion control measures must be implemented to prevent water quality degradation of adjacent waters or rop rt.es. Silt fencing, straw, or surface matting must be installed and maintained until upland vegetation has become established. X COM2014-00132 Page 6 of 8 25) HARDWARE REQUIREUAl UUUKS. Lever hardware is required at doors. The unlatching of any door shall not require more than ONE operation. Hardware with locks must open with a single action from the egress side of the door. Door hardware shall allow egress doors to be readily open able from the egress side without the use of a key or special knowledge or effort. Handles, pulls, latches, locks and other operable parts on accessible doors shall have a shape that is easy to grasp with one hand and does not require tight-grasping, pinching, or twisting of the wrist to operate. MEANS OF EGRESS DOORS All doors shall be pivoted or side hinged and swing in the direction of exit travel. Means of egress doors shall be readily distinguishable from the adjacent construction and finishes such that the doors are easily recognizable as doors. Egress doors shall be side-hinged unless specifically exempted in the International Building Code, Section 1010.1.2 EXITS & EXIT ACCESS DOORS ALL exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. All exit signs shall be internally or externally illuminated at all times and equipped with to ensure continued illumination for duration of at least 90-minutes. LOCKS AND LATCHES In an Assembly Occupancy group with less than 300 occupant load, occupancy groups B, F, M, and S you may only use a lock that prevents operation of the door at the MAIN door ONLY. In "Main" door(front door, primary door). It is intended to be limited to the door that customers come in. The main door only, a lock is allowed ONLY if the following three criteria are satisfied: 1. The lock is readily distinguishable as locked (storefront door deadbolts that have an indicator that reads OPEN/LOCKED) and 2. A readily visible sign with 1" letters high on a contrasting background. "THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED." and 3. The provision of key-locking doors allowance may be revoked by the building official. OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. r ature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) COM2014-00132 Page 7 of 8 330'+/- :: ..' Y. w. a W O TMG:D( P_IyA COVERO PORCH \\. 2 BED o w HOUSE C7 i• f A p�.e EXISTING '4 y\[Xr:?CS SHED E%IS WGR N HOUSE NO FOUN'A 1 k' EXISTING E%ISTWO SHED + r---- ------------ + SHED 10 0 UN �\ - EXISTING O/F M : ; Figure 1.Site Plan Requirements Checklist '•: All site plans shall be clearly and accurately drawn to 1'=20',30', M., n I 49,or 50'scale on paper no larger than 11"X17",and must Indicate 100%RESERVE all of the following information.For each Item below,mark'Shown. I �\ or"N/A'as appropriate for your project.This checklist must be { completed and Included on all site plans.Any site plan without this checklist will be rejected and returned to the applicant for oorreclion. ,G, ` �- SHOWN NIA PARCEL 22302-13-90023 NUMBER A. General Property Information: - \ X Property lines and dimensions TANK APEARS TO BE IN GOOD SHAPE DRAIN FIELD APEARS TO BE IN GOOD WORKING ORDER 100' TO WELL XElevations of property and direction of natural drainage XSlopes that exceed 15%,including all cut banks greater than 4'in height XNorth arrow and site plan scale \ XMarine waters,lakes,&ponds,and their /00, �+ associated high water marks \ EXISTING WELL XStreams,creeks,wetlands,and their associated bufferareas B. Existing Property Improvements: - 0 QppRov EAST Location of all existing structures,to include .A/ ' Pug, `C H A Xlocations of existing structures on adjacent waterfront properties SEp 2 PROPERTY OWNER NOTE: CAREFULLY REVIEW ALL ASPECTS OF THIS SEPTIC Location of all existing wells and their well radii, DESIGN. ANY COSTS INCURRED DUE TO CHANGES TO X including those wells on adjacent properties r `w' THIS DESIGN AFTER SUBMISSION TO KCHD AND DCD V� ARE THE SOLE RESPONSIBILITY OF THE PROPERTY OWNER. within 100'of property lines G Location of existing all drainfields,including the X t o'wing Build Zone',as well as the locations of THIS-IS NOT ASURVEY, ALL PROPERTY ES/BOUNDAR/ES HA VE existing drainfields on adjacent properties within tLo'cat any well BEEN DEMONS TRA TIED B Y THE OWNERS) A /OR THEIR A GENT(S). XLocation of existing drainage facilities,including all sub-surface infiltration filtration systems X driveway of all existing and abutting roadways APPROVED driveways,easements,buffers,and required open spaces - 330' UEtI_IC HEALTH X Location of all existing water,sewer,and utility S E P 2 9 2014 lines C. Proposed Property Improvements: Location and dimensions of all proposed structures or building envelopes in relation to X property lines,other structures,etc. X Location of all proposed wells,including their 100' A C M Em! GN well radii,and all water lines • SATE- 24 SEP 14 S1 GN C Location of all proposed septic tanks,pump tanks, X p pre-Ireatment units,and drainfields,including the / .0. BOX 2954 10'"No-Build Zone* CC�:�,t ao r, q,0 6 NAME- BRANT SlL I/ERDALE, WA. XLocation and dimensions of all proposed �8✓8✓ drainage and infiltration systems TAX ID- 22302-13-90023 7 Location,dimensions,surfacing materials,and X drivcleaewayng s,side all ks,an roaed d areas, STREET- 6251 NE BEAR CREEK DEWATTO RD TEL. J60-698-8488 driveways,sidewalks,and road approaches XLocation of all proposed water,sewer,and utility SCALE: 111=5 0' SITE PLAN ROD@ ACNESEPTIC.CON lines _ „ PLAN K I N G RECE D i�X�r J��I7y/ SEP 426 W. 2�i�I� 1`'•'�oc�Ss/JiI4 � U bCe UP�.tJe'Y, .�'�-+cIGLE S'�atY '�l" O�Gu��,✓cy� s��vG� -S.-o� ��o ��ftscw acGU��•rlc y y-�.E�so.� o�� v�'.yc%y O A)v SMD�,J/1�(►� 7'0 � �-- Z 0g- V(:-Al .VT 11G,—�o AJ "Yee�SS/,S'L� A/G,v/.S�/�t i�C4o.S,S. I AJ J��jUT� SXUT-oi-r C qof 2 . 1 . 2. _r 2012 Washin ton State Energy ner Code Com fiance Forms for Commercial Grou R1 and P. JoWni N3G Mechanical Summary MECH-SUM 2012 Washington State Energy Code Compliance Forms for Commercial,Group R1,and>3 story R2&R3 Revised June 2013 Project Info Project Address ` E ! Date For Building Dept.Use Applicant Name: C J Applicant Address: Applicant Phone: g—2--z — ei�S) Project Description V40V /Lulls t Briefly describe mechanical system type and features. Includes Plans Include documentation requiring compliance with commissioning provisions per Section C408. Compliance Option imple System complex System Oystems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans,fill in the required information below. Cooling Equipment Schedule Equip. Equip Capacity, OSA CFM SEER Econmizer Heat ID Type Brand Name' Model No.' Btu/h or Econo? or EER IPLV3 Option or Recovery Exception" Y/N SPGI V Heating Equipment Schedule Equip. Equip Capacity' OSA cfm Heat ID Type Brand Name' Model No.' Btu/h or Econo? Input Btuh Output Btuh Efficiency° Recovery Y/N Fan E ui ment Schedule Equip. Equip ID Type Brand Name' Model No.' CFM SP' HP/BHP Flow Control' Location of Service Z -ZIN V 1 00 S-D �/ 'I /ZON 1)017-71W 8 Service Water Heating Equipment Schedule Equip. Equip Input Sub- ID Type Brand Name' Model No.' Capacity Category EF' Location of Service If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP,HSPF,Combusti �aerr ,yra� applicable. 5 Flow control types:variable air volume(VAV),constant volume(CV),or variable speed(VS). 6 Economi a do j b p Systems C403.3.1 or Complex Systems C403.4.1. 'Efficiency Factor per Table C404.2. SEP 2 9 2014 426 W. CEDAR ST. , Mechanical Permit Plans Checklist - Page 1 of 3 MECH-CHKi 2012 Washington State Energy Code Compliance Forms for Commercial,Group R1,and>3 story R2&R3 Revised June 2013 Project Address Date The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE:Define print area In Excel prior to printing MECH-CHK pages. Applicability Location on Building Department (yes,no,na) Code Section Code Provision Information Required Plans Notes GENERAL PROVISIONS Equipment Sizing&Performance C403.2.1 Load calculations Load calculations performed per ASHRAE Still 183 or equivalent per Chapter 3 C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads,note exceptions taken C403.2.5 Minimum ventilation Ventilation(natural or mechanical)provided per IMC;indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC C403.2.3& Provide equipment schedules or complete MECH-SUM tables with type, C403.2.3.2& Equipment minimum efficiencq capacity,efficiency,test standard(or other efficiency source)for all mechanical C403.2.12.1 equipment C403.2.13 Electric motor efficiency Provide equipment schedule with hp,rpm,efficiency for all motors;note except - C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) C403.2.10.3 Fractional h fan motors Indicate fan motors 1/12 to 1 h &C403.2.13 P P are ECM type or meet minimum efficiency req C403.2.3 Maximum air cooled chiller Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit caDacitv C403.2.1 Non-standard water-cooled Full-load and NPLV values for water-cooled centrifugal chiller adjusted for non- chillers standard operational conditions C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s)meet efficiency requirements for axial fan open circuit cooling towers C403.2.3 Forced air furnace and unit Indicate intermittent ignition or IID,flue/draft damper&jacket loss heaters C403.2.3.3 Packaged electric ui ment Ust equipment required to be heat pumps on schedule heatin coolin C403.2.3.4 I Humidification Indicate method of humidification(note requirements for systems with economizer HVAC System Controls&Criteria C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans,including perimeter systems C403.2.4.1.1 Heat pump supplementary Indicate staged heating(compression/supplemental)&outdoor lock-out temp heat C403.2.4.2 Setpoint overlap(deadband) Indicate 5°F deadband minimum for systems controlling both heating&cooling C403.2.4.3 Automatic setback and Indicate zone t-stat controls with required automatic setback&manual override shutdown C403.2AZ3 Automatic(optimum)start Indicate system controls that adjust equip start time to match load conditions C402.4.5.2& Indicate location of OSA,exhaust,relief and return air dampers;include AMCA C403.2.4.4 Dampers rated leakage and control motorized or gravity;note exceptions taken C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions C403.2.4.6 Combustion heating Indicate modulating or staged control equipment C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room automatic setback&set-up of 5°F minimum C403.2.4.8/g Group R2/R3 dwelling unit Indicate 5-2 programmable thermostats in primary spaces with minimum of two systems setbackperiods;note exceptions taken C403.2.5.1 Demand controlled ventilation Indicate high-occupancy spaces and systems requiring DCV C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy-based system control and method;or altemate means rovided to automatically reduce OSA when partially occupied Enclosed loading Indicate enclosed loading dock and enclosed parking garage ventilation system C403.2.5.3 dockiparking garage ventilation activation and control method C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air;indicate make-up air source and conditioning method C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery,method&efficiency;or alternative method taken(VAV,semi-conditioned makeup,or CERM calculation) C403.2.6.1 Energy recovery. ventilation Indicate ventilation systems requiring ER,method&efficiency;note exceptions systems C403.2.6.2 Energy recovery-condensate Indicate on-site steam heating systems requiring energy recovery systems C403.2.6.3 Energy recovery-condenser Indicate remote refrig.condensers requiring ER and use of captured energy s stems Mechanical Permit Plans Checklist - Page 2012 Washington State Energy Code Compliance Forms for Commercial,Group R1,and>3 story R2&R3 Revised June 2013 Project Address Date The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE:Define print area in Excel prior to printing MECH-CHK pages. Applicability Location on Building Department Code Section Code Provision Information Required (yes,no,na) I I I Plans Notes GENERAL PROVISIONS,CONTINUED HVAC System Controls&Criteria,Continued C403.2.12 Variable flow control- Indicate fan&pump motors requiring VF control&method(VSD or equiv fans/pumps controls C403.2.12.1 Variable flow control-cooling Indicate cooling tower fans requiring variable flow control and method towers C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand;or exception taken C403.2.12.2 Single zone AC systems Indicate method of cooling demand-based fan control for sys.>110,000 btuh C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand response set point adjustment Ducting Systems C4032.7.1& Duct construction Indicate all ductwork constructed and sealed per IMC,C402 leakage 0403.2.7.3 requirements and IBC vapor retarder requirements C403.2.7.3.1-2 Duct pressure classifications Identify location of low,medium and high pressure ductwork on plans C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans;provide test test results to jurisdiction when completed C403.2.7.1/2 Duct insulation Indicate R-value of insulation on ductwork Piping Systems C403.2.8 Piping insulation Indicate R-value of insulation on piping C403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/degredation weather SIMPLE SYSTEMS Qualifying Systems C403.3 Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits,does not systems have active humidification or simultaneous heating/cooling C403.3 Qualifying 2-pipe heating Verify 2-pipe heating-only system does not exceed capacity limits systems C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls;note in equip sched. C403.3.1.1.1 Air economizer rapacity Indicate modulating OSA control capability up to 100%OSA,or exception C403.3.1.1.3 Air economizer high limit Indicate high limit shut-off control method per Table C403.3.1.1.3(2) controls C403.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for systems with capacity operation >65,000 btuh C403.3.1 Air economizer exceptions Indicate eligible exception(s)taken and provisions to comply with exception(s) COMPLEX SYSTEMS Complex System Economizers C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls;note in equip sched. C403.4.1.4 Economizer heating system Verify control method of HVAC systems with economizers does not increase Impact building heating energy usage during normal operation C403A.1.3 Integrated economizer Indicate capability for partial economizer operation for air or water econo operation systems Moved Water economizer capacity Indicate water econo capable of 100%cooling capacity at 50°F db/45°F wb OSA C403.4.12 Water economizer maximum Indicate precooling coils and heat exchangers do not exceed pressure drop limit pressure drop C403.3.1 Air economizer exceptions Indicate eligible exception(s)taken and provisions to comply with exception(s) Mechanical Permit ' Page 3 of 2012 Washington State Energy Code Compliance Forms for Commercial,Group R1,and>3 story R2&R3 Revised June 2013 Project Address Date The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE:Define print area in Excel prior to printing MECH-CHK pages. Applicability Location on Building Department Code Section Code Provision Information Required (yes,no,na) Plans Notes COMPLEX SYSTEMS,CONTINUED Specific System Requirements C403.4.2& Variable flow control-fans Indicate fans requiring variable flow control and method C403.2.12 C403.4.2.1 VAV fan static pressure Indicate sensor locations on plans;include at least one sensor per major dud sensors branch C403.4.2.2 VAV fan static pressure Indicate fan system static pressure setpoint based on zone requiring most setpoint pressure C403.4.5 VAV systems serving mufti- Indicate supply air systems serving multiple zones that are required to be VAV, zones method of primary air control,and zones served;note exceptions taken C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads C403.4 Large capacity cooling Indicate method of multi-stage or variable control for building cooling system systems capacity>300 tons C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method C403.4.3 Large capacity boiler systems Indicate multi-stage or modulating burner for single boilers>500,000 btuh C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers C403.4.3.5 Chiller/boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow isolation through chillers&boilers when not in use C403.4.2& Variable flow control-pumps Indicate pumps requiring variable flow control&method C403.4.3.6 C403.2.12.1 Variable flow control-cooling Indicate cooling tower fans requiring variable flow control and method &C403.4.4 towers C403.4.3.4 Hydronic system part load Indicate heating&chilled water systems have the capability to automatically controls reset supply water temp AND reduce flow by z 50%for systems>300,000 btuh C403.4.3.2 Two-pipe changeover Indicate deadband,heating/cooling mode scheduling and changeover systems temperature range C403A.3.3.1 Water loop heat pump- Indicate capability of central equipment to provide min.207 water supply temp deadband deadband between heat rejection and heat addition modes C403.4.3.3 Water loop heat pump-heat Provide heat exchanger that separates Cooling tower and heat pump loop in refection Climate Zone 5 C403.4.3.3.3 Water loop heat pump- Indicate 2-way isolation valve on each heat pump and variable flow control for isolation systems with total pump power>10 h C403.4.6 Condenser water heat Indicate system provided to pre-heat service water and efficiency recovery C403.5 Cooler/freezer-anti-sweat Indicate w/sf&control method for walk-in coolertfreezer door anti-sweat heaters heaters C403.5/6 Cooler/freezer-evaporator Indicate motor type for evaporator and condenser fans<1 hp and condenser fans SERVICE WATER HEATING Service Water Systems C404 2 Water-heating equip min. Provide equipment schedule or complete MECH-SUM table with type,capacity, efficiency efficiency,test standard or other efficiency source C404.3 Temperature controls Indicate temperature controls have required setpoint capability C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply&discharge C404.5 Insulation under water heater Indicate R-10 insulation under tank C404 6 Service water piping in Indicate R-value of insulation on i insulation piping;9 note exceptions taken C404 7/6 Circulation systems and heat Indicate shut-off capability based on occupancy and periods of limited demand trace shutoff C404 9 Group R-2 service hot water Indicate method of usage metering for dwell.units served by central HW system meters Pools&In-Ground Permanently Installed Spas C404 101 Pool heating equip min. Provide equipment schedule or complete MECH-SUM table with type,capacity, efficiency efficiency,test standard(or other eff.source);heat pump heaters z 4 COP C404.10.1/2 Pool heater on/off controls Indicate automatic on/off control based on scheduling&accessible on/off switch on heater that operates independent of thermostat setting;or exception taken C404.10.3 Pod covers Indicate vapor retardant cover and insulation rating as required C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to>90°F C404.10.4 Heat recovery Indicate method,exhaust air temperature reduction and recovered energy use I MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street PO Box 279, Shelton, WA 98584 www.co.masonma.us Shelton (360)427-9670 Belfair(360)275-4467 Elma (360)482-5269 November 20,2014 Robert Mackenzie 2741 Marine Dr. Bremerton,WA 98312 E-Mail: Rmackenzie1175@grnail.com Mason County Building Permit Number: COM2014-00132 Dear Mackenzie, Thank you for submitting the building permit application referenced above to change the use of an existing private garage to grow and process marijuana. In order to complete the building department review additional information will be needed which is listed below PLAN REVIEW REQUIREMENT COMMENTS: 1. The information provided specifies that reactive processing will take place using icewater reduction method and an ethanol solution method. It appears that you are describing an extraction process that will require additional information. When an extraction process is used additional compliance shall be required. Please review the "Marijuana Extraction Operation"checklist enclosed and provide compliance information as specified including an engineered design for the area where the process will take place and manufacturer specifications for the processing equipment. \ , 2. The information provided indicates that hazardous materials will be stored in the barn. Please provide a floor plan, drawn to scale,of the barn that clearly identifies rooms,use of rooms,hazardous material storage locations and anticipated quantities. 3. Interior finishes shall comply with building code specifications. The following condition has been added to your permit. Please review and confirm that you will be able to comply or provide compliance information. Interior wall and ceiling finishes shall be classified for fire performance and smoke development in accordance with ASTM E 84 or UL 723. Rooms created by 6-mil fire retardant material shall have a flame spread rating of 0- 25 and a smoke developed index of 0-450 evidenced by manufacturer specifications is approved subject to the following criteria: 1)Walls and ceilings shall be fastened in such a manner that the materials will not readily become detached where subjected to room temperatures of 200 degrees Fahrenheit for not less than 30-minutes(ref IBC 803.10) 2)Interior finish materials shall be installed in accordance with it's intended use with product mounting system or as approved otherwise. (IBC 803) 3)Interior wall and ceiling finish materials less than 1/4-inch thick shall be applied directly onto a wall, ceiling,or structural element without the use of furring strips and shall not be suspended away from the building element to which it is applied except where exceptions of IBC803.11.4 apply.See code information provided with approved construction plan.Provide compliance information at inspection prepared and sealed by the licensed design professional. 4. Interior spaces intended for human occupancy shall be provided with a space heating system capable of maintaining a minimum interior temperature of 68-degrees Fahrenheit at a point 3-feet above the floor. Areas that are provided with the required heating system shall comply with the International Energy Conservation Code as amended by Washington State(IECC/WSEC). Heated spaces shall be provided with R-49 insulation in the attic area,walls insulated with not less than R-15 insulation in 2x4 walls and R-21 in 2x6 walls. In addition windows shall have a U- factor of 0.30 or less and doors not more than U-0.37. Please confirm compliance. When you have compiled the requested information please submit it to the Mason County Building Department,attention D. Coker. Please respond to comments,in writing,in the order listed. Revisions,required as a result of this letter must be transferred onto proposed building plans. Where required,please return two sets of revised plans and documents along with two sets of calculations,as needed. If you have questions please contact me at(360)427-9670 ext. 510 or via e-mail at: DLC@co.mason.wa.us Sincerely, TDeera Coker Mason County Building Department Building Inspector IV Word/COM2014-00138,bldg dept.comments Encl.: Marijuana Extraction operation compliance checklist Page 1 of 2 Barbara Adkins -Followup from our meeting From: Robert Mackenzie <rmackenziel 175@gmail.com> To: Barbara Adkins <BarbarA@co.mason.wa.us>, <TW@co.mason.wa.us> Date: 8/15/2016 7:46 AM Subject: Followup from our meeting Attachments: Barn floor plan.pdf; Barn stg shelves.pdf; Proc rm wall x-scet.pdf; Blacksmith Farms potentially hazardous list.xlsx;Americover Fire Resistant Poly.pdf Hi Tricia and Barbara, Here is information that we talked about the other day regarding the points that were highlighted in Debra Coker's letter of Nov 20, 2014. I hope it's helpful. Please let me know if there are things I still need to do. My impression from Debra was that it was complete,but from what you said the other day, my take-away might have been different from that which Debra meant. 1.Regarding ethanol extraction engineering: We want to avoid anything that requires high-tech equipment and the associated permitting because we're just a small enterprise. So,we're not going to do ethanol extractions if they require engineering, etc. I mentioned this to Debra and she seemed ok with it. 2.Regarding the hazardous materials stored in the barn: The hazardous materials are small amounts(less than around a gallon at a time) of commercially available pesticides that are all approved by the LCB and the WA Dept of Ag for either use on cannabis or use on non-cannabis plants and surfaces. Most are organic. I'm not sure which ones need to be classified as hazardous, but attached is a list of what we have at the present that I think could be classified as possibly hazardous. This list is smaller than the list presented earlier because we didn't know at that time which pesticides we would actually be using. We are moving towards using beneficial insects and natural flower oils for natural pest control on the cannabis, as it's our goal to be as organic as possible. The floor plan of the barn should have been in your files already, as it was given to Debra earlier. If it isn't in your files,here is another copy. The sketch of the wall showing the shelving is new and can be added to your files. 3.Regarding interior finishes for the processing room: Attached is a letter from the manufacturer to Americover,the vendor through whom we bought the fire retardant wall poly. Attached is a sketch of a cross-section of a typical wall showing the existing wall and the new poly covering on the inside surface. Sub-notes 1,2,3) Wall and ceiling sections are stapled on and will not readily detach when subjected to 200-degree Farenheit temperatures. 4.Heat for the room is supplied by a 4 kw electric heater, which keeps the room toasty warm in the 1 Page 2 of 2 winter. The ceiling (6"of rock wool) and most of the walls (4"of rock wool)were insulated when the property was purchased. These amounts of insulation filled the space available. Additional insulation was added where needed where the walls were previously uninsulated. I really hope that we'll be able to reinstate the old permits for completion, as I truly thought that we had already completed the permitting process. My wife was there when I asked Debra if there was anything else I needed to do and she recalls Debra getting irritated with me for double-checking so much to make sure I had completed everything I needed to and to make sure we were vested after giving her the information above(except for the new sketches of the barn wall,the cross-section of the processing room wall, and the spec sheets on the fire-retardant poly that you just requested yesterday.). Again,please let me know if you'd like more information or if you think that I should do anything. Please let me know where things stand, so I can do what I can to make things go right. Thanks a lot, Bob Mackenzie Blacksmith Farms 518-221-8851 rackenzie 117 5 a email.com A4 s e-- ......3 a i..-- i t i g� t� a i t F i n .._._._....... 1 i 1 F t i i' 1 , a 1 i X i + fi i 4 i i t i S ` i f j x W yy Case Activity Listing 10/25/2017 10:41:40AM Case#: COM2014-00132 Parcel#: 223021390023 IF, Description: CHANGE OF USE, GARAGE TO 1-502 GROW& PROCESSING Assigned Done Activity Description,, Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By COMB210 Water Adequacy 9;2912014 929,12014 None DONE CEW 9/29/2014 CEW private well,less than 25 employees COMB200 Environmental Health Review 9/29/2014 9/29/2014 None DONE CEW 9/29/2014 CEW current maint on file,see condition COMA010 Application Received 9/29/2014 9/29/2014 None DONE GMM 10/16/2014 GMM COMB130 Planning Review 9/29/2014 11/26/2014 None DONE AHB AHB 11/26/2014 AHB Site plan with existing garage repurposed(not greenhouses/hoop houses);other conditions added. AHB COMB110 Building Plan Review 9/29/2014 1/27/2017 None DONE DLC TW 1/27/2017 TW 1.27.17 conditional sign off 9.20.16 see notes on Hold activity Letter prepared for mail and email. See document attached to this case-dlc 11.20.2014 COMB009 Fire Marshal Review 9/29/2014 1/27/2017 None DONE JNH TW 1/27/2017 TW conditioned for wall covering and fire flow received. COMA200 HOLD 9/1/2016 1/27/2017 Hold DONE TW 1/27/2017 TW 9.20.16 validity issues resolved.Send email to Mr.Mackensie asking for informwation related to wall coverings and complete the Fire Flow worksheet per FM review dated November 14,2014.Pending response 8.15.16 received document in accordance with the email/letter Deberra Coker has previously sent.My review will be on hold until issues related to validity are resolved.I will complete the review at that time. TW Case/parcel file in hold bin for Building.In accordance with 2012 IBC Section[A]103.3.2 this application is null and void.Barbara Adkins is working on issues related to this application.Pending further information. Met with owner in the office,explained the situation.A reinstatement fee may be offered if he can resolve his issues with the Planning Department. Page 1 of 2 CaseActivity..rpt Case Activity Listing 10/25/2017 10:41:40AM Case#: COM2014-00132 ` Parcel#: 223021390023 Description: CHANGE OF USE, GARAGE TO 1-502 GROW& PROCESSING Assigned Done Activity Description s Date 1, Date 2 Date 3 Hold Disp To _ By Updated COMA100 Approved for Issuance 1/31,2017 None DONE G;V1iV1 1,31;2017 GMM CALLED AND TALKED WITH BOB,PERMIT IS READY FOR PICKUP,ALSO GAVE HIM THE REMAINING AMOUNT DUE. COMA500 Issue Commercial Permit 2/2/2017 None DONE GMM 2/2/2017 GMM COMA540 Print Inspection Card 2/2/2017 None DONE GMM 2/2/2017 GMM COMC100 Inspection 2/3/2017 2/3/2017 None DONE SLC 2/6/2017 JAK POINT AND SHOOT-WENT OVER DOCS AND PLANS.-THERE MAY BE REVISIONS ON USE.TOLD THEM TO CONTACT TRISH IF THEY DECIDE TO REVISE COMC 157 Final Inspection-Failed 8/4/2017 None FAIL DEK 8/7/2017 JAK OWNER ADVISED TO AMEND SCOPE OF PROJECT TO GAR./STORAGE AS RETAIL/COMMERCIAL FACILITIES NOT REQ FOR PROPOSED USE.SHOULD BE"U"OCCUPANCY Page 2 of 2 CaseActivity..rpt MASON COUNTY PERMIT NO.Corm 2.01 00139,, y DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 Mason County Bldg. 111,426 West Cedar Street (360)275-4467 Belfair ext.352 Shelton,WA 98584 (360)482-5a Cff exxt�� NG BUILDING PERMIT APPLICATION OWNER INFORMATION: CONTRACTOR INFORMATION: NAME:A� Z27 �. 9�Kfz.Cl�✓fL NAME: Sc L� MAILING ADDRESS 7 J// MAILING ADDRESS: CITY;1 ?k,o&ik/Zio,y STATE:4bq ZIP:9,99/Z CITY: STATE: ZIP: PHONE: CELL: S/g -ZZ/-BLS-1 PHONE: CELL: EMAIL: 1"rn 4 e-x e—n a e. I I ?S-@ .F. cry, EMAIL : L&I REG# EXP. PARCEL INFORMATION: p PARCEL NUMBER(12 DIGIT NUMBER) Z 23 v Z l d v Z S FIRE DISTRICT Q/(LEGAL DESCRIPTION(ABBREVIATED): 2S/ ,(14 Z4&tr- ITEADDRESSCDMB tpiS S I-4-11117 Z -Z CITY .��.�gi2 �JA. 4RSZ8 DIRECTIONS TO SITE ADDRES 1 Mi (e/ �l o,4 E4F�ii2 4fw'f T'a /Rvn� I-Aler C�Al Z211-1), Au ,17-A1, l S T 'Riv«Ay '0AJ 'L4E/-'; IS PROPERTY WITHIN 200 FT: SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES[] NOg TYPE OF JOB: NEW ❑ ADDITION ❑ ALTERATIONO REPAIR❑ OTHER ❑ USE OF STRUCTURE(RESIDENCE,GARAGE ETC.) IS USE: PRIMARY SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF BATHROOMS O DESCRIBE WORK—/�Njf SQUARE FOOTAGE: I ST FLOOR sq.ft. 2ND FLOOR sq.ft. 3RD FLOOR sq.ft. BASEMENT sq.ft. DECK sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.ft. GARAGD sq.ft. ATTACHED ❑ DETACID DX CARPORT sq.ft. ATTACHED ❑ DETACHED ❑ MANUFACTURED HOME INFORMATION:�/� *4 COPIES OF THE FLOOR PLAN MAKE MODEL YEAR LENGTH WIDTH BEDROOMS BATHS SERIAL NUMBER OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPEC ION. INACTIVI O'f THIS PERMIT APPLICATION OF 180 DAY WILL INVA DATE THE APPLICATION. xL� 7sigp4ture of A cant Date x � � �- �s��,� �-ice OWNER/ REPRESENTATIVE/CONTRACTOR Print Name (CIRCLE TO INDICATE) DEPARTMENTAL REVIEW VED DATE DENIED DATE T O NS BUILDING DEPARTME PLANNING DEPARTMENT FIRE MARSHAL 426 - t�PSON COp�r� MASON COUNTY PERMIT NO.,'� o 2o1�•G6i 32 DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING•PLANNING• FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 _ Mason County Bldg. III,426 West Cedar Street (360)275-4467 Belfair ext. 352 J sd PO Box 279, Shelton,WA 98584 (360)482-5269 Elma ext. 352 PLUMBING & MECHANICAL PERMIT APPLICAY&DING OWNER INFORMATION: CONTRACTOR INFORMATION: NAME: T J. /L/ c z� NAME: MAILING ADDRESS: .��y/ �/ R/,✓;� l�_ MAILING ADDRESS: CITY: STATE: &-le ZIP: i , 2, CITY: STATE: ZIP: PHONE: CELL: S/6 ZZ/-L'8S'/ PHONE: CELL: EMAIL: EMAIL : L&I REG# EXP. PARCEL INFORMATION: PARCEL NUMBER(I2 DIGIT NUMBER): Z Z LEGAL DESCRIPTION(ABBREVIATED): Z-OM i3 L OT-S X S //l 7 SZ TZ3,t1 i?Z SITEADDRESS: 64S1 J-JE E44ee e/Zk�l ��•/g?� /2s�. CITY: E,LLsZi DIRECTIONS TO SITE ADDRESS: �1�-1,' Zk9— AT TR LJI A-,4J w -rx'/ ZSi L) Z o ,v TYPE OF JOB �,��� T NEW ADD ALT REPAIR OTHER USE OF BUILDING �'�9�.�'A FZoM 4 O LOCATION OF FIXTURES/UNITS— 1 ST FLOOR 2ND FLOOR BASEMENT GARAGE OTHER 7I,Zo)ue PLUMBING FIXTURES(SHOW NUMBER OF EACH) MECHANICAL UNITS Type of Fixture No. of Fixtures Fees Fuel Type:Electric LPG Natural Gas Ductless_ Toilets Type of Unit No. of Units Fees Bathroom Sink Furnace Bath Tubs Heat Pump 1 Showers Spot Vent Fan 2 Water Heater Propane Tank Clothes Washer Gas Outlets Kitchen Sinks Wood/Gas/Pellet Stove Dishwasher Kitchen Exhaust Hood Hose bibs Dryer Vent Other Solar Panel Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner. owners legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180/DAS WILL INVALIDATE THE APPLICATION. Signat a of pplica Date X 3 V. �fG�/�f� �/� Owner/Owners Representative/Contractor Print Name (indicate which DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS BUILDING DEPARTMENT SEP 2 PLANNING DEPARTMENT ST. FIRE MARSHAL yTATF C� �F O �yy n 18 89 acY Washington State Building Code Council Improving the built environment by promoting health, safety and welfare 1500 Jefferson Street SE • P.O.Box 41449 • Olympia, Washington 98504 (360)407-9280 • fax(360)586-5366 • e-mail sbcc@ga.wa.gov • www.ga.wa.gov/sbcc STATE BUILDING CODE INTERPRETATION NO. 15-04 CODE: 2012 International Building Code SECTION: QUESTION: The first paragraph of WAC 51-50-007 states: The provisions of this code do not apply to temporary growing structures used solely for the commercial production of horticultural plants including ornamental plants,flowers, vegetables, and fruits. "Temporary growing structure"means a structure that has the sides and roof covered with polyethylene,polyvinyl, or similar flexible synthetic material and is used to provide plants with either frost protection or increased heat retention.A temporary growing structure is not considered a building for purposes of this code. Does this exception apply to large scale greenhouses built from polycarbonate panels?These greenhouses in question will be used for the year round production of marijuana.These structures will be equipped with mechanical ventilation, grow lights,and a supplemental heat source for winter growing. ANSWER: No.The exception applies only to temporary structures,with a flexible temporary covering used for passive retention of heat and protection of plants from frost. For structures used year round and provided with other services and structural elements other than those addressed in WAC 51-50- 007,this exception would not apply. In addition,RCW 82.04.213 states that marijuana is not considered an agricultural product which would not classify it as an ornamental plant,flower,vegetable,or fruit. SUPERSEDES: None REQUESTED BY: City of Moses Lake 1 WASHINGTON STATE AMENDMENTS CHAPTER 51-50 WAC STATE BUILDING CODE ADOPTION AND AMENDMENT OF THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE WAC 51-50-001 AUTHORITY The provisions of this code do not apply to the These rules are adopted under the authority of Chapter construction,alteration,or repair of temporary worker 19.27 RCW. housing except as provided by rule adopted under chapter 70.114A RCW or chapter 37,Laws of 1998(SB 6168). WAC 51-50-002 PURPOSE "Temporary worker housing"means a place,area,or piece The purpose of these rules is to implement the provisions of land where sleeping places or housing sites are provided of Chapter 19.27 RCW,which provides that the State by an employer for his or her employees or by another Building Code Council shall maintain the State Building person,including a temporary worker housing operator, Code in a status which is consistent with the purpose as set who is providing such accommodations for employees,for forth in RCW 19.27.020.In maintaining the codes the temporary,seasonal occupancy,and includes"labor camps" Council shall regularly review updated versions of the under RCW 70.54.110. codes adopted under the act,and other pertinent Codes referenced which are not adopted through RCW information,and shall amend the codes as deemed 19.27.031 or RCW 19.27A shall not apply unless appropriate by the Council. specifically adopted by the authority having jurisdiction. The 2015 International Existing Buildings Code is included WAC 51-50-003 INTERNATIONAL BUILDING in the adoption of this code in Section 101.4.7 and amended CODE in WAC 51-50-480000. IThe 2015 edition of the International Building Code, including Appendix E,published by the International Code WAC 51-50-008 IMPLEMENTATION Council is hereby adopted by reference with the exceptions The International Building Code adopted under Chapter noted in this chapter of the Washington Administrative 51-50 WAC shall become effective in all counties and cities Code. of this state on July 1,2016. WAC 51-50-005 INTERNATIONAL BUILDING WAC 51-50-009 RECYCLABLE MATERIALS, CODE REQUIREMENTS FOR BARRIER-FREE COMPOST,AND SOLID WASTE STORAGE ACCESSIBILITY For the purposes of this section,the following definition Chapter 11 and other International Building Code shall apply: requirements for barrier-free access,including ICC A117.1- COMPOST means biodegradable solid wastes that are 2009 and Appendix E,are adopted pursuant to Chapters separated for composting such as food waste,food soiled 70.92 and 19.27 RCW. paper and yard waste. Pursuant to RCW 19.27.040,Chapter 11 and RECYCLED MATERIALS means those solid wastes that are requirements affecting barrier-free access shall not be separated for recycling or reuse,such as papers,metals amended by local governments. and glass. mmwwm All local jurisdictions shall require that space be provided The exceptions and amendments to the International for the storage of recycled materials,compost,and solid Building Code contained in the provisions of Chapter 19.27 Waste for all new buildings RCW shall apply in case of conflict with any of the Exceptions:Group R-3 and Group U occupancies. provisions of these rules. The storage area shall be designed to meet the needs of The provisions of this code do not apply to temporary the occupancy,efficiency of pickup,and shall be available growing structures used solely for the commercial to occupants and haulers. production of horticultural plants including ornamental plants,flowers,vegetables,and fruits."Temporary growing structure"means a structure that has the sides and roof covered with polyethylene,polyvinyl,or similar flexible synthetic material and is used to provide plants with either frost protection or increased heat retention.A temporary growing structure is not considered a building for purposes of this code. A Effective July 1, 2016 2015 INTERNATIONAL BUILDING CODE 306.2 Moderate-hazard factory industrial;:Grouper Factory industrial uses that are not classified as factory industrial F-2 low hazard shall be classified as F-1 moderate hazard and shall include,but not be limited to,the following: Aircraft(manufacturing,not to include repair) Appliances Athletic equipment Automobiles and other motor vehicles Bakeries Beverages:Over 16 percent alcohol content Bicycles Boats Brooms or brushes Business machines Cameras and photo equipment Canvas or similar fabric Carpets and rugs(includes cleaning) Clothing Construction and agricultural machinery Disinfectants Dry cleaning and dyeing Electric generation plants Electronics Engines(including rebuilding) Food processing establishments and commercial kitchens not associated with restaurants,cafeterias and similar dining facilities more than 2,500 square feet(232m2)in area Furniture Hemp products Jute products Laundries Leather products Machinery lad a ruc Meta"s Millwork(sash and door) Motion pictures and television filming(without spectators) Musical instruments Optical goods Paper mills or products Photographic film Plastic products Printing or publishing Recreational vehicles Refuse incineration Shoes Soaps and detergents Textiles Tobacco Trailers Upholstering Wood;distillation Woodworking(cabinet) (Insert Facing Page 43) Effective July 1, 2016 P p ppppp- 2015 INTERNATIONAL BUILDING CODE 312.1 General.Buildings and structures of an accessory character and miscellaneous structures not classified in any specific occupancy shall be constructed,equipped and maintained to conform to the requirements of this code commensurA&&aLklie fire and life hazard incidental to their occupancyy shall include,but not be limited to,the following: Agricultural buildings Aircraft hangers,accessory to a one-or two-family residence(see Section 412.5) Barris Carports Fences more than 6 feet(1829 mm)in height -Qmin silos,access and ory.to a,r5go ?jal occupancy I other structures used for cultivation, prmecnurro-r maintenance of'plants= Livestock shelters Private garages Retaining walls Sheds Stables Tanks Towers (Insert Facing Page 51) Effective July 1, 2016