Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWG2023-00227 - SWG Application / Design - 6/7/2023
MASON COUNTY 415 N 6TH STREET, SHELTON,WA 98584 SHELTON:360-427-9670,EXT 400 +- BELFAIR:360-275-4467,EXT 400 r Public Health & Human Services ELMA:360 482-5269,EXT 400 FAX:360-427-7787 On-Site Sewage System Permit: SWG2023-00227 APPLICANT STOKES CO-TRUSTESS BRUCE R & Phone: ELIZABETH S Address: STOKES FAMILY TRUST SANTA CLARA, CA 91321 OWNER STOKES CO-TRUSTESS BRUCE R & Phone: ELIZABETH S Address: STOKES FAMILY TRUST SANTA CLARA, CA 91321 SEPTIC DESIGNER PAULA JOHNSON -Arrow Septic Phone: 360-898-2255 Designs Inc. Address: 171 E VUECREST DRIVE UNION, WA 98592 Site Address: 11181 E State Route 106 Primary Parcel Number: 222302300120 Permit Description: 2-bedroom BNR 500 pressure system repair Permit Submitted Date: 06/07/2023 Permit Issued Date: 06/23/2023 Issued By: David Anderson Current Permit Fees Paid: $780.00 (additional fees may be required upon installation of system). Permit Expiration Date: 06/16/2024 (based on date of inspection) Permit Conditions: 1 Proposed development subject to zoning requirements and approval by the planning department staff per Mason County Title 17. 2 Permit must be installed by a Mason County Certified Installer unless prior written authorization from Mason County is obtained. 3 Drain field installation not to exceed designed upslope and downslope depth specified on design form. 4 Installer is responsible for obtaining Mason County installation approval prior to backfill of system components. 5 Installer is responsible for obtaining Septic Designer/Engineer installation approval prior to backfill of system components. 6 Mason County Asbuilt Form, Record Drawing, and Installation fee must be submitted for final installation approval. THIS PERMIT MUST BE ONSITE DURING INSTALLATION OF OSS. PROPERTY OWNERS ARE RESPONSIBLE FOR DETERMINING AND MARKING ALL PROPERTY LINE AND EASEMENT LOCATIONS. THIS PERMIT MAY BE REVOKED IF THE SITE CONDITIONS HAVE CHANGED SINCE THE SITE WAS INSPECTED AND DESIGN APPROVED. FINAL INSTALLATION APPROVAL IS REQUIRED PRIOR TO TEMPORARY OR FINAL OCCUPANCY OF ANY RELATED STRUCTURES. For Final Inspection visit: masoncountywa.gov/health/environmental/onsiteloss-inspection-request.php or call: 360-427-9670, extension 400. 41( DAIS RECEIVED OFFICIAL USE ONLY MASON COUNTY 4 .7 • 1.3> ci) n ' ' COMMUNITY SERVICES la RECENE CO (1) Public Health(Community Health/Environmental Health) C (n t9e70.No.apelt 54467,ext.<(G 41S N.6th Start ••Shelton.WA 92586 IA nG �� — T Z 6 ON-SITE SEWAGE SYSTEM APPLICATION D M n m m APPLICANT PHONE r Bruce Stokes (661)714-2676 z MAILING ADDRESS-STREET.CITY.STATE ZIP CODE g 25008 Green Mill Ave Santa Clara CA 91321 03 SITE ADDRESS-STREET,CITY,ZIP CODE 11181 E State Route 106 Union WA 98592 I ") NAME OF DESIGNER PHONE I ry Arrow Septic Designs (360)898- 2255 NAME OF INSTALLER Pr-CN:E0 1 N Maples Excavating (360)463-8474 < co PERMIT TYPE(select one) DRINKING WATER SOURCE O g RESIDENTIAL OSS r �-COMMUNITY OSS 1 (:COMMERCIAL OSS 67 PRIVATE INDIVIDUAL WELL L.1�PRIVATE TWO-PARTY WELL Z TYPE OF WORK(select one) l PUBLIC WATER SYSTEM E,J NEW CONSTRUCTION!JPGRADES gf REPAIR/REPLACEMENT OTHER DETAILS(select all that apply) 0 TABLE IX REPAIR I N) SUBMITTALS � 0 SURFACING SEWAGE gi EXISTING FAILURE 0 SHORELINE 03 LKl DESIGN FORM(REQUIRED) SEPTIC DESIGN(REQUIRED) BEDROOMS LOT SIZE W bWAIVER(S)(IF APPLICABLE) 2 2.05 T I x O DIRECTIONS TO SITE AND SITE CONDITIONS.(en IorIed gate) Go up Northcliff Rd. Turn right onto N 13th St. Continue straight onto E Brockdale then onto I O E McReavy Rd. Turn right onto E Dalby Rd. Turn right onto E Hwy 106. House will be on r the left with a black chain link fence and "11181" on mailbox. Park to the right across the o highway. Iry w SITE MUST BE FLAGGED FROM MAIN ROAD AND TEST HOLES MUST BE FLAGGED WITH TEST HOLE NUMBERS. O OFFICIAL USE ONLY BELOW THIS LINE UPGRADE I FAILURE SOURCE(for reporting purposes] ❑VOLUNTARY 0 MAINTENANCE/PUMPING ❑BUILDING PERMIT ❑HOME SALE ❑COMPLAINT POTHER: INSPECTOR SOIL LOGS COMMENTS I CONDITIONS 1 PLC.{-• NO TH i: J/q THY (7- 67 C 5 wt Nft\ I a u ' i "t& , l ►t� Dole, ,T ; TId \ 7 H i(, (�-�(Z C7 /5 / d 3,J N p 7 2023 t, RECORD DRAW( GANDINSTI -REPORT _. SOIL CODES: - --- V=VERY G=GRAVELLY S=SAND L=LOAM Si=SILT C=CLAY E=EXTREMELY R=ROOTS REQUIRED FOR NALAP --'-`-- INSPECTOR SIGNATURE DATE APPLICATION EXPIRATION DATE APPLICATION APPROVED/ISSUED BY CATE 4.."1/// 6/6 V , 6//6/ZC z(-j THIS FORM MAY BE SCANNED AND AVAILABLE FOR PUBLIC VIEW ON THE MASON COUNTY WEBSITE REVISED 12/7/2015 4 DESIGN FORM—PAGE ONE Assessor's Parcel Number: 2 2 2 3 0 — 2 3 — 0 0 1 2 0 A design will be reviewed when 3 conies of each of the following are submitted: ''Completed design form that has been signed and dated. '' Scaled layout sketch,including all applicable items on checklist "Scaled plot plan,including all applicable items on checklist. " Cross-section sketch,including all applicable items on checklist. This form may be scanned and available for public view on the Mason County Web site.Maximum paper size: 11"X 17" • PARCEL IDENTIFICATION . Permit Number: SWG Designer's Name: Arrow Septic Designs Applicant's Name: Bruce Stokes Designer's Phone Number: (360)898-2255 Mailing Address: 25008 Green Mill Ave Designer's Address: 171 E Vuecrest Dr Santa Clara CA 91321 Union WA 98592 City State Zip City State Zip DESIGN PARAMETERS Treatment Device 0 Glendon Biofilter 0 Sand Filter 0 Mound 0 Sand Lined Drainfield ❑ Recirculating Filter,Type: 'Aerobic Unit Make/Model NuWater BNR-500 0 Disinfection Unit Make/Model Other: Drainfield Type 0 Gravity Ef Pressure 0 Trench l 'Bed 0 Sub Surface Drip Septic Tank/Drainfield Specifications Laterals Number of Bedrooms 2 c. Schedule/Class 40 Daily Flow: Operating Capacity 180 gPd Length (2)60' average ft Daily Flow:Design Flow 240 gpd✓ Diameter 1.25 in Septic Tank Capacity(working) 500 gal 7 Number 2 Receiving Soil Type(1-6) 3 - Separation 2.5 ft Receiving Soil Appl. Rate 0.8 gpd/fT Orifices Required Primary Area 300 ft2 -, Total Number of Orifices 61 Designed Primary Area 300 ft' / Diameter 3/16 in Designed Reserve Area - Spacing 24 in- ft2 Trench/Bed Width 5 ft Manifold Trench/Bed Length 60 ft Schedule/Class 40 Elevation Measurements Length 2.5 ft Original Drainfield Area Slope 0 % Diameter 1.25 in New Slope,If Altered 0 % Preferred manifold configuration used? lifYes 0 No Depth of Excavation Up-slope 18 in Transport Pipe from Original Grade Down-slope 18 in Schedule/Class 40 Designed Vertical Separation 24 in Length 30 ft Gravelless Chambers Required? 0 Yes 0 No 0 Optional Diameter 2 in Pump Required? 0 Yes 0 No Dosing and Pump Chamber Pump/Siphon Specifications Number of doses/day 4 Diff. in Elevation Between Pump& Uppermost Orifice 6 ft Dose quantity 60 gal Drainfield Squirt Height/Selected Residual(head) 2 ft Chamber Capacity(flood) 1,000 gales Uppermost Orifice El Higher El Lower than Pump Shutoff Pump controls:Please check those required. Capacity @ Total Pressure Head 35.99 gpm 'Timer 'Elapse Meter [i'Event Counter Calculated Total Pressure Head 14.29 ft If Timer: Pump on 2 minutes ,Pump off 6 hours Comments A P P R O V E D IA 2 3 'fl7 DESIGN FORM—PAGE TWO Assessor's Parcel Number:2 2 2 3 0 — 2 3 -- 0 0 1 2 0 , Permit Number: SWG DESIGN CHECKLISTS Scaled Plot Plan Scaled Layout Sketch Cross-Section Sketch lid Test hole locations 0 Drainfield orientation and layout Reference depth from original grade: Fii Soil logs 0 Trench/bed dimensions and l ' Septic tank Property lines critical distances within layout Drainfield cover ❑ Existing and proposed wells lid D-Box/Valve box locations Reference depth from original grade within 100 ft of property 0 Septic tank/pump chamber and restrictive strata: 0 Measurements to cuts,banks,and locations Z. Laterals,trench/bed,top and surface water and critical areas 0 Observation port location bottom ❑ Location and orientation of 0 Clean-out location 0 Curtain drain collector curtain drain and all absorption 0 Manifold placement 0 Sand augmentation components 0 Orifice placement Other cross-section detail: 0 Location and dimension of Lateral placement with distance 0Observation ports/clean-outs li primary system and reserve area to edge of bed Other Information 0 Buildings 0 Audible/visual referenced Yes No 0 Direction of slope indicator ►� EZi Scale of dra „i:s wn on scale El 0 Design staked out ❑ Waterlines bar r''i ❑ 0 Recorded Notices attached 0 Roads,easements,driveways .6 0 El Waiver(s)attached parking et. � 'tip et ."1�,� 0 ❑ Pump curve attached 1• 0 0 Evaluation of failure g North arrow and scale drawing 3 / .u,� 41 shown on scale bar %-• 51 349 '`r�Sj�; Non-residential justification ic:t-.-.� PAULA JOY JOHNSON.M. 0 El Waste strength iCE7JS>_ IMIGN 1n h 0 gFlow DESIGN APPROVAL The undersigned designer must ben •' ed by install at time of installation g Yes 0 No (o-,-Zs Signature o esigner Date The undersigned has reviewed this design on behalf of Mason County Public Health aAilaI?rrIi Q' r D compliance with state and local on-si i_ula 'ons: 6/2//zo V JUN 2 3 2023 Environmental Health Specialist Al COUNTY ENVIRONMENTAL HEALTH CAUTION: DESIGN APPROVAL IS VALID ONLY UNDER THE FOLLOWING CON1 'fON: ✓ The design is stamped"Approved"by Mason County Public Health. ✓ The Onsite Sewage Permit has not expired,the Permit Expiration Date is: ✓ Drainfield site conditions have not been altered to adversely affect conditions of design approval. Please Note: The system must be installed by a certified installer, unless prior authorization is obtained from Mason County Public Health. An Installation Fee is required. This form may be scanned and available for public view on the Mason County Web site. Updated Date: 12/7/2015 Arrow Septic Designs 171 E. Vuecrest Dr. Union, WA 98592 June 7,2023 Mason County Department of Health Services 415N6thSt Shelton,WA 98584 RE: Bruce Stokes Property(Parcel#22230-23-00120)Septic Replacement/Upgrade Dear Inspector: Attached is a replacement/upgrade septic design for a property located at 11181 E State Route 106,Union,WA 98592. The 2-bedroom home was built in 1963 and there is an existing gravity trench septic system assumed to be of the same era. The tanks is a 750-gallon single compartment and the exact size and location of the drainfield is unknown. The septic has been having issues for many years and recent pumpers reports show a high effluent level in the tank and indicate the drainfield is no longer taking water. This is a very limited use property but the owner would like to get the septic upgraded to a modern system so it can be used more often. The existing tank is to be removed and the old drainfield is to be abandoned. The proposed 2-bedroom replacement system will include a new NuWater BNR-500 aerobic treatment unit tank,followed by a 1,000- gallon pump chamber. The proposed replacement drainfield is 300 s.f. of shallow pressure bed. We are also proposing a new control panel with a timer,elapse meter and event counter to extend the life of the system and to facilitate future operation and maintenance. A Notice of Operation and Maintenance of On-Site Sewage System has previously been filed on the property deed. This system meets Table IX repair standards with the new proposed drainfield being less than 25' to the bulkhead,treatment level B without disinfection,and 24"+vertical separation. The property water source is from a spring on the opposite side of the highway and there are no known wells nearby. The property owner's contact information is as follows: Bruce Stokes 25008 Green Mill Ave Santa Clara,CA 91321 (661)714-2676 If you need further information,please contact my office at(360) 898-2255. Sincerely, APPROVED "; JUN232023 p5 .o, k MASON COUNTY ENVIROMMEN T f l HEALTH 14. � D J A ,✓ 5100349 � # PAULA JOY JOHNSON•y 3►�\\ �[ F- ' 'astewater Treatment System Designer \-'(_-_ On BAN L `ft_ J 4--\ GO' ZK -. GoNc9..F-TCo�tD,,,y, \r� e ' • 8' o EX►s 1 k-In -" Ste,` 35 \1%;,`1 'i..B CAB\ a 0 O a --e- s a / t- 0 (-- \ c.--ece...A.-w•-__ . / mil .%' t PDVA—i�, SPACE/ Li: . CD �► 5x(Do` P1ZESsuR.- 8E. #3 07. SLOPE (1)0' 2.E;1,'AtNkNC& WALL 1014' PZOP "C\f Lt NE_ STftIRS �TQ.SE TRCE 3 . t G I Key: AL.✓• 1'�: \OF `-. I Audio-visual 1 1 t 'I�H wA b o(p — O Alarm p0Cleanout PLoT �� 3 NuWater 13NR-500 ATti Tani fAR,Gt.4er2.21.50-23-00120 O 1,000 Gallon Pump Chambe ltlBG E SW RO'AT toy ii:----Te.57\- oLE -421. ---‘6.. 4,,.."--14 p''.5 . �i ep .cGLS (-A-` \--&) r,;`'s�, "'H i. -,, _Y °GLs ti.,` a'ca. IF, kk20CJ34- (pvoka1 RIllt V't:Y: 1 *..��� 4. 3 (_S trri 'Eb43 Oa 1 PAUL• JUY J3HNSON `/ APP a. 4.1e-4 A- 0 --Lt2- `1 Gas REs 4/-1Ii2 '-'5" JUN 2 3 2023 MASON COUNTY ENVIRONMENTAL HEALTH 0.0 DJA pRkiNFI )0E.ThILED I-Poiov,7 14-5'4I AN 0" SCALE: \" t0' 1 t I t p.�i� o 0 5 to 15 1.0 CVr�xeulic ---VNtp1'c_•1 • • • p 1oSevJ:iev, l?a✓t . • • • • • • 3l ` . -5(0 ' • • • • Note: (Typical Bed Layout) • 0=Observation Port—to be 4"perforated • • PVC pipe from bottom of bed to finished • ,_ �, w grade. A removable cap shall be installed on 2t T 't;a� observation`�{� port pipe. Glue"T"on bottom If is • 2 4 1 ~� Or;�,,,¢ so pipe can't be removed. • 'Minimum of 3 in system,one in each corner. 0 ci I. • • 1 • • tQ�•t . 4'% Laterals are to be centered in trenches. 30'( '} 4- •• • • • 1f_..• . t0t3 i°`{e-1 • • •2. TRANSPORT 15" 21 LINE ..-1). c `7ypc,a1 r1,7.A.4......1fit.. ______,•Z...5 L g—,.,-n, �eo,„_,Yq�;on ?c' ': rr\c.J yracUi f " Cow2-r I LI Tr, ,.. e.,40, ,,,,,,,p.,, l g '� J4 ��� T 15 f- ri .5G4¢15 -1y R �"„ X r 5iooi4 33 ft �1� y'r PAULA JOY JOHNSON •? . 1G Still k J' t EXRSEr � i ll 24 DP 1NF\ELP f);E_D E\19 V1Ew 1J ,T. -S. r eS Y leCk V e Screw-On Cep . LOW e Y 45 Dewee Ebow APPR® V�� Lc veal • End of Ditch Deter - C7ean Out JUN 2 3 2023 MASON COUNTY ENVIRONMENTAL HEALTH. Note. cam'°`' to be `'r°"' D to 6 ixxs aebw = DJA Grade. shed Mork ends with R m a Regan. Ctert Reefred et the End cf Each LeteraL Arrow Septic Designs 4-0-€ 9 (360) 898-2255 • Length Length Orifice # Distance from Distance from Lateral# (In.) (Ft.) Spacing Orifices Feeder Line (In.) Cleanout(In.) 1 684 57 24 29 6 6 2 756 63 24 32 6 6 Total Lateral Length 120 Total#Orifices 61 GPM = 35.99 Dynamic Head Calculations Selected residual pressure: 2 ft. Length (Ft.) #Orifices Transport Pipe 30 61 0.55 ft. Feeder Total Lateral Line Length Lateral#1 57 2 59 29 2.32 ft. Lateral#2 63 70 32 3.31 ft. At Total Elevation LiftIgi iyA).1q,,,,, 6.00 ft. Total Dynamic Head lA '4aN, . A P P ROVE ft. y - 'A' JUN 2 3 2023 PAULA JOY JOHNSON L'IC ISMtez pi.iGivit" .LIS ; � MASON COUNTY ENVIRONMENTAL HEALTH t D J A SECURED UD WITH GAS TIGHT SEAL THREADED UNION • 24-DIAMETER ACCESS RISER SERVICE VALVE` FINISH GRADE I—_- .Ai I� 7:- - it s t �T ,i_-9 - I ' . r_:=_.TO ORA .D SEPTIC -� J ANSEPTIC �-'7 T�• N.-----"- •• EMERGENCY STORAGE• IPHON HIGH MATIR ALARM LEVEL > t WORKING VOLUME _ FLOJIT NORMAL TIMER OFF LEVEL • 1 _ FOR PLDAT . MOUNTING ENCLOSED PUMP , — CHECK VALVE' SEDIMENT SHROUDROUftOt7D I8"f..._f ' SEDIMENTS t• ''iJ't 1.1 I - SUBMERSIBLE PUMP PUMP_CHAMBER 'AS NEEDED Septic Tanks must meet standards required by WAC chapter 4 sewage Ztanks and FIGURE 2:. manufacturer must be on Dept of Health list of register • .... .,..-T.....:Y.:...all-f_nr7 P8Qt 35 of 65 137, 139, 14a, /, 151k. 1 ..a Flow-Mate Dose- - eoretuiN1 In high head dewatering or effluent This is our fastest growing line of effluent applications where pumping pumps.The 150 series is truly a workhorse - -. performance is critical, this robust designed for reliability under extreme family of pumps is known for reliability, conditions in an effluent environment.150 durability and performance. These series pump curves cover a wide range pumps are especially suited for harsh ," , of applications. They are well suited to environments.Zoeller's cool run design • -•�•- applications with low pressure pipe (LPP) 4 and corrosion-resistant,powder coated and enhanced flow STEP systems.Zoeller's epoxy finish add up to a long-lasting, cool run design and corrosion-resistant, trouble-free product • powder coated epoxy finish,in addition to I— the hermeticallysealed,oil-filled motorand Z = non-clogging vortex impeller add up to a a Jam' long-lasting,trouble-free product. �e� J Q MADE IN INT 1101 t Q Lt. — MADE I NTHE USA �? 0- APPLICATIONS: APPLICATIONS: �� 2 • STEP or onsite applications • STEP or onsite applications R 0 NWater transfer • Light commercial dewatering ��• 000 ED • Light commercial dewatering 66 SPECIFICATIONS: ��� 3 2023 SPECIFICATIONS: • i-1/2"NPT dischar e • 1-1/2"NPT discharge • 3/10 HP through 1 Z HP MASON COUNTY ENVIR • 1/2 HP through 1 HP �N��FNTAL HEALTH • Available in nonautomatic or with a variable levelD,JA • Available in automatic or nonautomatic piggyback mechanical switch • Model 137,139,140:1/2"(12 mm)spherical solids • 1/2"(12 mm)spherical solids capacity with vortex capacity with vortex impeller thermoplastic impeller • Model 145:3/4"(19 mm)spherical solids capacity with For more information,see Technical Data Sheet FM2784. vortex impeller • Bronze construction available(139 series) • High head version available(145 series) • Double shaft seal versions available for added protection on models 140/145. For more information,see Technical Data Sheets FM2782,FM2783. iz I LL PUMP PERFORM•••. CURVE l i PUMP PERFORMANCE CLR 5 MODEL 15 up 3 6100EL•37h40145 50'. n y .■■■..■■■■ 14— 45 153 s GS ,......... �. .,........ 12- 43 •, .'........ 0 35 ' ..,,....... 'i 10- 152 ,"....... 1 30 1,, ,, 8— 25 151 t} .����...... ■■.11\■.... • a ....",.... 15 �S'�■.,... 4 10 111...\���E.. 2— ., ■....,1,`.. 5 ...■■BI.\O. 0 ■••11•®•.®. GALLONS 10 20 30 40 50 60 70 80 90 100 LITERS 0 40 80 120 160 200 240 280 320 360 'a'c c m 'm ;< m za,xa•..,,T '5269.1 FLOW PER MINUTE C•4SC8 8 ©All rights reserved. ZOELLER PUMP CO. 1502-778-2731 1800-928-7867 I zoellerpumps.com / 9'2" k WATERTIGHT --\ LID VENT(typ) DUAL PORT AERATOR-. RISERS MR) �r--, I II j r-1 I 1 T 1. 1 36-MAX. 1'PVC(TYP) - / , 0 _ - o 1/2'PVC' \ \ 1, t, �I u / RUNEC d 4" 1 2'COUPLING I -14 &REDUCER 6' , 'fr-- ----'. g_l___,_3 Y TEE 12, 1•PVC SLUDGE RETURN LINE • 2'PVC J TRASH CHAMBER DIGESTER CHAMBER CLARIFIER j I OPERATING CAPACrTY:417 GALLONS OPERATING CAPACITY:421 GALLONS CHAMBER i FLOOD CAPACITY:490 GALLONS FLOOD CAPACITY:494 GALLONS 160 GALLONS j srI FLOOD:191 GAL. 58- 54- I 50' 1 53' °° °° ° o i"X1/L' °I ° ° TEE ^ 1 'O DIFFUSER BARS(2) \ I , • _ PARALEL TO TANK WALL /APPROVED SLUDGE 4. -�k SLUDGE RETURN JUN 2 3 2023 SIDE 4IEW � �i 1•sTA�ER k STONE-FREE NATIVE SOIL Twit c `1'A1 HEALTFI OR COMPACTED SAND OVER STONY SOIL 1)Excavate tank hole with vertical WA to 1 foot larger than tank on all sides. 2)If bottom of hole is stony,install 3"of compact sand&level ' g-Y y out with screed. 3)Install tank in center of hole,keeping 1 ft void space on ——I — r -- all sides. — - 4)As tank is filling with water,fill in void space with compact24'RISERS'I rP) 24'acowArS ranularI SING CAS g (sandy)soil free of large dumps of day- r N roa of cr I 5)Install rest of system,&affix risers to adapters withI I waterproof adhesive- C i' 1 6)Perform watertightness test in field as required by local I / I I 1 I 4'B' juhsditxion. I // (I 7)Upon approval to backfill,carefully backfill with native I I I 12'RISER I i 1 soils over top of tank. ' TRASH CHAMBER I I DIGESTER I Isdet s1 8)Final grade the surface to avoid chanelling surface L water toward tank. _I —— TOP VIEW r--28It AEROBIC TREATMENT TANK DETAIL FOR , NuWA TER BNR-500 TREATMENT UNIT I,,' + ENVIRO-FLO, INC. REVISED Wastewater Treatment Technologies 3/01/12 P.O.BOX 321161, Flowood,MS 39232 (877)836-8476 (601)845-4716 fax scACE_ 1 n — 1.4 /C. www.enviro-fio-net — �C Illalit J « vo ¢d m Actnc Trccstont Systc;rns BY Enviro nc-Flo,i I I !" lI APPROVED \ lUN 2 3 2023 \ c MSON COUNTY ENV RI OhF�dENTAL HEALTH e_A I Z-C° DJA ''' ,- I 11!) is14.111'.. �� �� L© L 0 • <<+ rtr Eli �. c © fi I: 4:.".,,, i® 1/--e 0?°. alb 0 r e 1111* �" di 0 / 14 % �.1 I 3 ,. \--e 11% r* {:} . PARTS LIST NuWater N u a NR Assembly Diagram V I A.DUAL PORT AERATOR M.POLY DIFFUSER BAR(2: H' 47 B.3/8"RUBBER 90°WI CLAMPS(2) N.1"PVC(2 1/2"SECTION) C.3/8"BARBED ADAPTOR X 1=2"NPT(Z O.1"SLIP CAP • �n D.1/2"SUP X 1/2"NPT ADAPTOR P. 1/8"CLEAR PVC HOSE(OPTIONAL 5 A E.1"STREET X 112"NPT BUSHING(3) Q.1/2"PVC PIPE(BY INSTALLER) F 1/2'90°ELBOW(3) R.1"PVC PIPE(BY INSTALLER) It G.1"X 1'X 1/2'TEE S.2"PVC PIPE(BY INSTALLER) ,,.: , H.1'90°ELBON!(3) T.1;8'BARBED ADAPTOR TO 1/4"NPT(2) 2"X 1"BUSHING U.1/2"STREET X 1/4"NPT BUSHING(2) C J 2"SANITARY TEE V 1/2"PVC COUPLER(2) K.1"PVC CROSS W 2"COUPLER(BY INSTALLER; L.t"COUPLER(BY INSTALLER) , CI Revised 2/25/12 5 l A Cbritzcu Septic De/sign/3 o� 3y)-akiik 1. NuWater BNR Pretreatment • LNSTALLATION & MAINTENANCE . •.V� Pressure Distribution Systems 51(.0349 j� ✓ PAULA JOY JOHNSON 'LJ� L f s 1. Install Laterals with contour of the ground. 1r 2. Install trench bottoms level. 3. Install locator tape or rebar at each end of all drainfield laterals. 4. Install observation ports as indicated on the plot plan. One required at distal end of each lateral in drainfield with bottom extending to the drainrock/native soil interface. Glue "T" to bottom so Observation Port cannot be easily removed from ground. Install removable cap on top of port at final grade level. 5. Install drainfield during dry weather and soil conditions; any soil smearing must be eliminated by hand raking. 6. Install threaded clean-outs at the end of all laterals (cap must extend to within six inches of finished grade and be marked with locator tape or rebar). 7. Install audio/visual high water level alarm. Redundant off switch not required. 8. Install check valve in pump outlet line to prevent system from draining back into the pump chamber. 9. Tee to Tee construction between laterals and manifold with orifices oriented at 6 o'clock. Install laterals to the manifold with the orifices at 12 o'clock, (do not glue), after pressure test and Environmental Health Dept. approval, turn orifices down (6 o'clock) and glue laterals to manifold. Orifice shields may be used with orifices in the 12 o'clock position in lieu of turning the orifices down to the 6 o'clock position. 10. Filter fabric required over drain rock prior to back filling. If the drain rock extends above natural grade, run the filter fabric at least 2 inches down the trench wall. 11. Encase all water lines within 10' of drainfield and under any driveway/parking areas. 12. Divert all storm water runoff away from on-site sewage system. 13. No curtain drains allowed within 10' of the up-slope edge or 30' of the down-slope edge of the drainfield and reserve area. 14. No vehicular traffic over drainfield area. 15. Inspect floats, clean filters, and test high water level alarm every 6-12 months as needed. 16. All materials and workmanship must meet County and State regulations. 17. Deviation from this design without prior approval from the Designer and Mason County Environmental Health Department will make this design null and void. 18. All manhole lids and access, sampling or inspection ports must have locking covers and be located at ground level. 19. All pressure systems with a pump chamber outlet higher than the drainfield must have a 1/8"hole drilled in the discharge pipe above the pump to prevent siphoning. 20. All transport lines under driveways or parking areas must be encased to prevent crushing. 21. Homeowner is responsible for all property lines. 22. Please Note: When you begin using your septic system, contact your septic installer to discuss setting up a h e for your required Operation& Maintenance on your NuWater pretreatmA O JUN 2 3 2023 MASON COUNTY ENVIRONMENTAL HEALTH C ce DJA