HomeMy WebLinkAbout153-97 - Res. Overall Economic Development Plan Committee Designation sue,
RESOLUTION NO. 6-3
WHEREAS, members of the Board of Directors of the Economic
Development Council have been designated by the Mason County Board
of Commissioners as the Overall Economic Development Plan (OEDP)
Committee for Mason County, Washington; and
WHEREAS, the OEDP Committee has assisted Mason County in
prioritizing possible infrastructure improvements to enhance
economic sustainability throughout Mason County; and
WHEREAS, President Clinton' s Economic Adjustment Initiative
for the Pacific Northwest and Northern California is soliciting
eligible projects for funding; and
WHEREAS, eligibility for funding must be demonstrated by a
prioritization of projects; and
WHEREAS, the OEDP Committee has recommended a list of projects
which updates the list reflected by Resolution 98-97 and reflects
current infrastructure needs and includes :
First Prioritv: Complete Belfair/Hood Canal Sewer Plan
($ 40 , 000) . Large portion of proposed service area is located
in an Urban Growth Area as designated in the recently adopted
Mason County Comprehensive Plan.
Second Priority: Correct Finch Creek (Hoodsport Area) septic
tank problems ($500, 000) .
Third Priority: Preliminary engineering of Hwy 101 connector
(2 . 5 Million) .
Fourth Prioritv: Restoration of the Skokomish River (1
Million) .
Fifth Prioritv: Paving for forest products industry
infrastructure for stormwater control and value-added
manufacturing ($389, 000) at Port of Shelton.
Sixth Priority: Remove Goldsborough Creek Dam ($3 Million) .
Seventh Priority: Russelwood Sewer Improvements ($304 , 000) .
Eighth Priority: Correct City of Shelton I & I sewer problems
($5 Million) .
Ninth Priority: Renovation of Baja Building at the Port of
Shelton ($360, 000) .
Tenth Prioritv: Design and Construct Belfair Water System
400, 000 gal . storage tank ($130, 000) .
Eleventh Priority: Construct Belfair Park and Ride
($250, 000) .
Twelfth Priority: Complete Port of Shelton Comprehensive Plan
($81, 000) .
Thirteenth Priority: Expand City of Shelton Emergency Services
($500, 000) .
Fourteenth Priority: Fire District #5 Central Admin. , Repair
and Training Facility ($1, 460, 000) .
Fifteenth Priority: Renovation of Building 1 at the Port of
Shelton ($1 . 6 Million) .
Sixteenth Priority: Brown Fields restoration of Goose Lake
area ($250 , 000) .
Seventeenth Priority: Improve rail loading and off loading
facility at John' s Prairie ($350 , 000) .
Eighteenth Priority: Widen Wallace Kneeland Interchange ($1 . 5
Million) .
Nineteenth Priority: Electrical Utility Transmission and
Infrastructure (11 Million) .
Twentieth Priority: Lilliwaup Bay/Hood Canal Septic Systems
Upgrade ($100, 000 . 00) .
NOW, THEREFORE BE IT HEREBY RESOLVED, that the Board of Mason
County Commissioners accepts the OEDP Committee' s recommendations
and amend the OEDP for Mason County to include these priorities and
request that the amended document be forwarded to the Region 10
office of the Economic Development Administration, U. S . Department
of Commerce, the Governor' s Interagency Timber Taskforce and the
Office of Forestry and Economic Development in Portland, Oregon.
PASSED by the Board of Mason County Commissioners this
day of December, 1997 .
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
Ma y Jc -,a airpe son
Jo Bo n er, Co l ts �
ver
Ci-nd lsen, Commissioner