HomeMy WebLinkAboutBLD2022-00445 Final MFG Home - BLD Permit / Conditions - 7/20/2022 Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
B DD2022-00445 MANUFACTURED HOME
PROJECT DESCRIPTION: INSTALLATION OF NEW MANUFACTURED ISSUED: 07/20/2022
HOME
SITE ADDRESS: 470 E HARDINGS HILL RD ALLYN EXPIRES: 01/16/2023
PARCEL: 122322390020
APPLICANT: OOSTERVELD JAN &THERESA OWNER: OOSTERVE LID JAN&THERESA
aka THERESA DEMELLO aka THERE 3A DEMELLO
PORT ORCHARD,WA 98366 PORT ORCHARD, WA98366
CONTRACTOR: PENINSULA LAND&HOME LLC OWNER'S REP: Candace Vickery
3216 SE PARAKEET LN P.O. Box4 9
PORT ORCHARD,WA 98367 Keyport,W 98345
206.954.4082 360440547
GENERAL CONTRACTOR'S LICENSE: PENINSULA LAND&HOME LLC License: PENINLH80208
3216 SE PARAKEET LN Expires: 09/29/2022
PORT ORCHARD,WA98367
206.954.4082
FEES: Paid Due
Modular/Manufactured Home $275.00 $0.00
Fee- 1 st half collected at
submittal
Building Plan Review/Change of $125.00 $0.00
Use-Onsite Sewage
Modular/Manufactured Home $275.00 $0.00
Fee-2nd half collected at ready
to issue
Planning Review Fee $240.00 $0.00
Technology Surcharge $11.00 $0.00
State Fee-Residential $6.50 $0.00
Wetland Delineation Review $160.00 $0.00
Tota s : $1,092.50 $0.00
REQUIRED INSPECTIONS
Printed by:Genie Mcfarland on:07/20/2022 10:23 AM
Page 1 of 5
I
i
Mason County
Mason County - Division of,Community Development
—" 615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2022-00445
Setback Inspection Connection has been verified by Health or Utilities
Footing Inspection BLD-Final Inspection
Set-Up Inspection
CONDITIONS
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured froin the furthest projection of the
structure.
When parcel development requires direct access to county road(s), a Road Access Permit r Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at(360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection ee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Departmen prior to any further inspections
being performed or approvals granted.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, teps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a mini um compressive strength of
3000 psi (IRC Table R402.2).
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* The foundation/footing must be placed on undisturbed, firm-native soil.
* Owner/Agent is responsible to post the assigned address and/or purchase and post priva e road signs in accordance
with Mason County Title 14.28 and 14.17.
* This permit is for the placement and installation of the manufactured home only and does n A imply approval or review for
any other items indicated on the plot plan.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances anO building regulations.
i
Printed by:Genie Mcfarland on:07/20/2022 10:23 AM
Page 2 of 5
i
I
' I
Mason County
Mason County - Division ofjCommunity Development
615 W. Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
I
MANUFACTURED DOME BLD2022-00445
i
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater managem nt systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's rE sponsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this pai cel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A"was selected on he Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the applica ion/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the pr ject. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new constructic n or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to coristruction at Ext 450. For any
construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
* The installation permit shall be displayed in clear view of the site access road. The approv d site plan and other
applicable instructions, including installation instructions, shall be available in this location O placed in the location
specified by WAC 296-150M-655. Support configuration shall be clearly marked in the install tion instructions.
* REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the schediuling of my required
inspections. If the required inspections are not requested, inspected and signed off(approve )by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be
granted for the residence.
OWNER/CONTRACTOR(indicate which)
* Any retailer, manufacturer or contractor who installs a manufactured home warrants that th manufactured home is
installed in accordance with the State Installation code, chapter 296-150M WAC. All installer hired to do installation work
shall be certified manufactured home installers and shall be present to supervise the installati n of all on-site work. An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for each
major part of the installation. RCW43-63B.090
An approved Installer cerification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. , here shall be one certification
tag for each certified installer accounting for the work that each installer performed or installe� Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365- 10
i
Printed by:Genie Mcfarland on:07/20/2022 10:23 AM Page 3 of 5
I
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
I
I
MANUFACTURED OME BLD2022-00445
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permi application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACT VITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
* All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* All property lines shall be clearly identified at the time of foundation inspection.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON OOUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Buildi g Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocati n.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee'(refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* If you are installing a manufacturing home and no longer have the installation manual for th home, you must use the
instructions of the American National Standards Institute (NCSBCS/ANSI A225.1).
* Retaining walls needed to support a surcharge such as structures, roads, or to support slor es, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for con act with the new types of
pressure treated material.
* All surface water and potential runoff must be controlled on site and shall not adversely aff ct any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching syste or road way.
* On-site Septic System final installation approval required prior to temporary/final occupanc of the residence.
* Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.)Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft, down gradient of Drain ield/ Reserve area.
Printed by:Genie Mcfarland on:07/20/2022 10:23 AM
Page 4 of 5
..__.._.. ..
. b
Mason County
Mason County - Division of Community Development
615 W.Alder St. Bldg.8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
MANUFACTURED HOME BLD2022-00445
" The destruction or alteration of wetlands and wetland buffer through clearing, harvesting, st ading, intentional burning, or
planting of vegetation that would alter the character of a designated wetland or buffer is not permitted.
* Comply with Wetland Delineation report dated April 16, 2021
" Application acknowledges that the structure is only permitted for a use consistent with the c�rrent zoning of the parcel.
I hereby certify that I have read and examined this application and know the s�me to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be co plied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: �¢,ru.� �'✓�. �
Contractor or Authorized Agent: Date: -7 Zv —2-2-t by:Genie Mcfarland on:07/20/2022 10:23 AM Page 5 of 5
SMALL PARCEL STORMWATER SITE PLAN
WRITTEN DESCRIPTION
The site is located between St Hwy 3 and E. Grapeview Loop Road, on the south side of
Hardings Hill Road on a 2.5 acre lot. The lot is forested, with wetlands near the northwest
corner and near the southeast corner. The site slopes downhill, generally from the southwest to
the northeast. Site slopes average about 14%, with steeper slopes in areas approaching the
wetlands.
Clearing will be limited to the area needed for installation of the manufactured home,typical
residential landscaping,the septic system, and construction of the driveway, and comprise an
area of approximately 8,800 square feet. The rest of the site will remain forested. The wetlands
and their buffers and setbacks will remain undisturbed.
The proposed impervious surfaces are: Manufactured home rooftop— 1,680 sf; and
Driveway/parking—825 sf, for total impervious surface area of 2,505 square feet, which falls
within the limits for Small Parcel Drainage Review.
All stormwater flows will be dispersed through vegetation: for rooftop surface, via
down spout/splash blocks; and for driveway/parking surface, via sheetflow, both directed
toward vegetated flowpaths.
In order to prevent erosion and contain sediments onsite,the following Best Management
Practices (BMPs) will be used, as shown on the Erosion and Sediment Control Plan:
• Clearing limits marked on the ground
• The driveway will be constructed and graveled; areas accepting sheet flow from the
driveway and parking area (that are not being left in native vegetation)will be seeded
and mulched.
• Silt fencing will be placed at the low side(s) of the clearing area.
• A construction entrance will be at the end of the driveway.
• Cleared areas of the site not being actively worked will be covered with mulch,
consisting of straw and/or chipped site vegetation.