HomeMy WebLinkAboutBLD2018-00240 SFR - BLD Inspections - 6/21/2022 INSPECTION CARD
Mason County
v 615 W. Alder St. Bldg. 8, Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
PERMIT# BLD2018-00240 PROJECT ADDRESS 2080 E STATE ROUTE 3 SHELTON, WA 98584
PARCEL# 320165100049 PROJECT DESCRIPTION NEW SFR
OWNER ADDRESS PHONE
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Footing Inspection Framing/Plumbing/Mechanical
Foundation Wall Inspection Framing/Plumbing/Mechanical
Underground Plumbing Plumbing Inspection
Below Grade Insulation Insulation Inspection
Shear Wall Nailing BLD-Final Inspection .Z
Shear Wall Nailing Progress Inspection
Shear Wall Nailing
Mason Count Community...
MASON COUNTY 15 W Alder WA St,Bldg.B
Shelton, 98584
COMMUNITY SERVICES 360-427 9672 extt 352
—nikyfl kh PRJdmjg PP—,g,Fn�n......uiFla�deF�La� www.co.mason.wa.us
BLD2018-00240 NEW SINGLE FAMILY RESIDENCE
Project
Description: Issued:
Site Address: Expires:
Approved per dimensions and setbacks on submitted
site plan.Setbacks are measured from the furthest
� SITE PLAN
projection of the structure.
X
Temporary erosion control measures must be
implemented to prevent water quality degradation of
adjacent waters or wetlands. Silt fencing must be TEMPORARY
2 EROSION
installed and maintained until upland vegetation has CONTROL
become established.
X
The proposed project must be consistent with all
applicable policies and other provisions of the Shoreline
Management Act, its rules, and the Mason County SHORELINE
3 MANAGEMENT
Shoreline Master Program. Property is located within a ACT
Residential Shoreline Environment.
X
By definition, propane tanks and heatpumps are
structures,which must meet setback conditions. Please
4 check your"Approved Site Plan"to ensure these
Custom
structures meet the setback conditions listed.
X
Landings and stairs must meet the same setback
conditions as any permitted structure; and,must be
shown on your site plan. Please check your"Approved
6 Custom
Site Plan"to ensure these structures are shown and
meet the setback conditions listed.
X
ALL SURFACE WATER AND POTENTIAL RUNOFF
WILL BE CONTROLLED ON SITE AND SHALL NOT
ADVERSLY AFFECT ANY ADJACENT PROPERTIES
6 NOR INCREASE THE VELOCITY FLOW ENTERING Custom
OR ABUTTING TO ANY STATE OR COUNTY
CULVERTING/DITCHING SYSTEM OR ROAD WAY.
X
1
The area within 20'of the bulkhead is considered to be a
shoreline buffer.The existing native trees and shrub
vegetation is to be retained and enhanced with native
7 vegetation.The invasive species may be removed.The custom
existing concrete bulkhead should be backfilled with
appropriate drainage rock and planted with native
begetation. X
A Road Access Permit or Approval must be granted by
the Washington State Department of Transportation. STATE ROAD
a For more information contact Paula Hammond, ACCESS
Transportation Planning Engineer,at(206)357-2620, PERMIT
ext.630.X
Contractor registration laws are governed under RCW
18.27 and enforced by the WA State Dept of Labor and
Industries,Contractor Compliance Division.There are
potential risks and monetary liabilities to the homeowner
9 for using an unregistered contractor. Further information custom
can be obtained at 1-800-647-0982.The person signing
this condition is either the homeowner,agent for the
owner or a registered contractor according to WA state
law. X
All approved plans are required to be on-site for
inspection purposes. If an inspection is called for and
plans are not available on site,then approval will not be
granted. In addition, a re-inspection fee(refer to current APPROVED
10 fee schedule,minimum 1 hour will be charged d PLANS
) g an REQUIRED ON
must be collected by the Building Department prior to SITE
any further inspections being performed or approvals
granted.
X
Owner/Agent is responsible to post the assigned
address and/or purchase and post private road signs in ADDRESS/
accordance with Mason County Title 14.28. ROAD SIGNING
X
The plan review check list and corrections are part of
the approved plans and must remain thereto. It is the
responsibility of the applicant to make the corrections
indicated on the plans. Once the plans are marked
"APPROVED",they shall not be changed or altered
12 without authorization from the Building Official. The custom
permit holder is responsible to retain the complete
approved set of plans on site for the duration of the
project. Failure to comply and/or removal of approved
documents will result in failure of required building
inspections.
X
THE FOUNDATION SYSTEM SHALL BE PLACED ON
13 UNDISTURBED, FIRM-NATIVE SOIL. Custom
X
2
The"approved"site plan is required to be on-site for
inspection purposes. If an inspection is requested and
the"approved"site plan is not on site,then approval will
not be granted. In addition,a re-inspection fee(refer to
14 current fee schedule,minimum 1 hour)will be charged Custom
and shall be collected by the Building Department prior
to any further inspections being performed or approvals
granted.
X
Adopted IECCMashington State Energy Code
Compliance has been approved as follows:
Heat Type: Electric or other than electric,Compliance
Method: Prescriptive option Marine-4C,Window(Max
U-Factor):0.30,Skylight(Max U-Factor):0.50,Doors
(Type/Max U-Factor):0.30 or less,Wall insulation R-21,
Floor insulation R-30,Ceiling Insulation min.R-49,
Vault Insulation R-38,and Slab Insulation R-10.
In addition the following credits from WSEC table
R406.2 shall be completed as follows:
3b-HIGH EFFICIENCY HVAC EQUIPMENT 3b:
Air-source heat pump with minimum HSPF of 9.0
4-HIGH EFFICIENCY HVAC DISTRIBUTION
SYSTEM:
All heating and cooling system components installed
inside the conditioned space.This includes all
equipment and distribution system components such as
forced air ducts, hydronic piping, hydronic floor heating
loop,convectors and radiators.All combustion
equipment shall be direct vent or sealed combustion.
For forced air ducts:A maximum of 10 linear feet of
return ducts and 5 linear feet of supply ducts may be
located outside the conditioned space.All metallic ducts
located outside the conditioned space must have both
transverse and longitudinal joints sealed with mastic. If
15 flex ducts are used,they cannot contain splices. Flex
Custom
duct connections must be made with nylon straps and
installed using a plastic strapping tensioning tool. Ducts
located outside the conditioned space must be insulated
to a minimum of R-8.
Locating system components in conditioned crawl
spaces is not permitted under this option.
Electric resistance heat and ductless heat pumps are
not permitted under this option.Direct combustion
heating equipment with AFUE less than 80%is not
permitted under this option.
5c-EFFICIENT WATER HEATING 5c:
Water heating system shall include one of the following:
3
Gas, propane or oil water heater with a minimum EF of
0.91
or
Solar water heating supplementing a minimum standard
water heater.Solar water
heating will provide a rated minimum savings of 85
therms or 2000 kWh based on the Solar Rating and
Certification Corporation(SRCC)Annual Performance
of OG-300
Certified Solar Water Heating Systems
or
Electric heat pump water heater with a minimum EF of
2.0 and meeting the standards of NEEA's Northern
Climate Specifications for Heat Pump Water Heaters
X
A permanent certificate,completed by the owner,builder
or registered design professional,shall be posted within
three feet of the electrical distribution panel.The
certificate shall list the predominant R-values of
insulation installed in or on ceiling/roof,walls,foundation
(slab,basement wall,crawlspace wall and/or floor),and
ducts outside the conditioned spaces; U-factors for
fenestration;and the solar heat gain coefficient(SHGC)
of fenestration.Where there is more than one value for
each component,the certificate shall list the value
covering the largest area.The certificate shall list the
type and efficiency of heating,cooling,and service
water heating equipment,duct leakage rates including
test conditions as specified in WSEC Section 105.4,and
air leakage results if a blower door test was conducted.
Building envelope air leakage control shall be
16 Custom
considered acceptable when tested to have an air
leakage less than 5 air changes per hour when tested
with a blower door in accordanve with IECC/.WSEC
Section R402.4.
The blower door test results shall be recorded on the
permanent certificate required located near the electrical
distribution panel. Air leakage testing is not required for
additions less than 750 square feet. Reference
IECC/WSEC R401.3.
Compliance certificates are available online at the WSU
Energy program website titled,"WSEC 2015 Certificate"
and are available in'/.or'/:sheets. The Mason County
Permit Center will also have some available.
X
4
A minimum of 75 percent of all permanently installed
lamps in lighting fixtures shall be high efficacy lamps in
n accordance with IECC/WSEC Section R404.1. Custom
X
A Mason County Stormwater Management Worksheet
was completed and signed as part of this building permit
application. Design,sizing, placement, inspection and
maintenance of stormwater management systems shall
be the responsibility of the owner/agent of the
developed parcel. It is the owner/agent/contractor's
responsibility to ensure that Mason County Department
of Public Works has approved the stormwater site plan
for this parcel prior to the commencement of any
development activities.*NOTE if Stormwater
Management option"A"was selected on the Small
Parcel Stormwater Management Application/Worksheet
the document entitled"Managing Storm Drainage on
a Small Lots,The Small Parcel Stormwater Site Plan" Custom
constitutes an approved plan based on the criteria listed
on the application/worksheet. If the development has,
or will have, a septic/d ra infield system you are
responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater
system will not adversely affect the septic system of this,
or any other, parcel. You may also wish to consult with
the septic design professional involved with the project.
By calling for a final inspection of the building permit the
owner/agent/contractor is acknowledging that all
components of the stormwater management system
have been installed as approved on the stormwater site
plan.X
A concrete encased grounding electrode must be
installed and used at each new building or structure that
is built upon a permanent concrete foundation. In
Mason County the electrical code is regulated by
Washington State Department of Labor&Industries
(L&I).
19 Custom
For more information contact L&I for additional
information. In Olympia call(360)902-6350 and in
Bremerton call(360)415-4000.
X
A separate inspection in addition to the inspections
required in the IBC, Section 110 shall be required in
accordance with the 2015 IBC, Section 1705.12.2 and
Section 1707.1. The additional inspection is required
when shear wall fastener spacing is required to be 4
inches or less. The shear wall schedule shown on sheet
5
L-11-2 designate wall(s)type P1-2, P1-3,and P1-4 with
fastener spacing 4 inches or less.
The required inspection may be performed by the
Mason County Building Department,a WABO certified
inspector,certified to inspect lateral connections,the
Engineer of record(EOR),or an authorized
representative of the(EOR). The special inspectors
duties and responsibilities shall be as specified in
Zo custom
Chapter 17. When a third party inspector is used to
perform the inspection,special inspection reports shall
be submitted to the Mason County Building Department,
615 W Alder St,Shelton,WA 98584 and also available
on site for review by the Building Official. Inspection
reports shall be completed and submitted to the Mason
County Building Department in a timely manner and
shall be submitted prior to the framing inspection of said
project.X
Carbon monoxide alarms, listed as complying with UL
2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section
R315.
Alarms shall be installed outside of each separate
sleeping area in the immediate vicinity of the bedrooms
21 and on each level of the dwelling. custom
EXISTING DWELLINGS shall be equipped with carbon
monoxide alarms when alterations(including addition or
alteration of fuel burning appliances), repairs,or
additions requiring a permit occur,or when one or more
sleeping rooms are added or created.
X
The international code requires a fire apparatus access
road for every facility,building,or portion of a building
that is more than 150'from an approved access road.
Roads are required to meet the minimum Mason County
22 Fire Marshal standards for Fire Apparatus Access custom
Roads up to the point where such roads connect with a
county maintained public road or to another fire
apparatus access road which connects to a county
maintained public road.
X
6
Any changes in proposed construction shall be reviewed
by the engineer or architect of record and submitted in
writing to the Mason County Building Department prior
to construction. All engineering and/or architectural
documents are a part of the approved set of plans and
23 shall remain attached thereto. If documents are Custom
removed, approval will not be granted. In addition, a re-
inspection fee(refer to current fee schedule, minimum 1
hour)will be charged and shall be collected by the
Building Department prior to any further inspections
being performed or approvals granted.
X
All construction must meet or exceed all local
ordinances and the international codes requirements as
adopted and amended by Mason County and the State ALL
24 of Washington. Occupancy is limited to the approved CONSTRUCTIO
and permitted classification. Any non-approved change N
of use or occupancy would result in permit revocation.
X
Installation of heating equipment in a single-family
residence shall meet the requirements of the current
IECC/WSEC R403, applicable sections of the IRC,and
IMC.
Heating equipment shall be sized in accordance to
ICC/WSEC, Section R403.6. Heating and design load
calculations for the purpose of sizing HVAC systems are
required and shall be calculated in accordance with
accepted practice, including infiltration and ventilation.
Design calculations shall be available for inspection
during inspection.
Referencing IRC M1601.4,all ducts, air handlers,filter
boxes,and building cavities shall be sealed. All joints of
duct systems and seams shall be made substantially air
tight by means of tapes, mastics, liquid sealants,
gasketing or other approved closure systems.Closure
systems used with rigid fibrous glass ducts shall comply
with UL181A and shall be marked 181A-P for pressure-
sensitive tape, 181A-M for mastic or 181 A-H for heat-
sensitive tape. Closure systems used with flexible air
ducts and flexible air connectors shall comply with
UL181 B and shall be marked 181 B-FX for pressure-
sensitive tape or 181 B-M for mastic. Duct connections to
flanges of air distribution system equipment or sheet
25 metal fittings shall be mechanically fastened.
Custom
Mechanical fasteners for use with flexible nonmetallic air
ducts shall comply with UL 181 B and shall be marked
181 B-C. Crimp joints for round metal ducts shall have a
contact lap of at least 1-1/2 inches(38 mm)and shall be
mechanically fastened by means of at least three sheet-
7
metal screws or rivets equally spaced around the joint.
Closure systems used to seal metal ductwork shall be
installed in accordance with the manufacturer's
installation instructions.
Duct tape is NOT permitted as a sealant on any ducts.
When ducts are located in unheated spaces the ducts
hall be insulated to R-8
DUCT TIGHTNESS TESTING shall be conducted by
person(s)trained to perform such testing. A signed
affidavit documenting test results in accordance to
IECCIWSEC Section R403.3.3 shall be provided to the
Mason County Building Department prior to the final
occupancy inspection. Affidavit forms are available on
at the WSU-Energy Program website titles,"Duct
Leakage Affidavit"or"Duct Leakage Testing Results
(Existing Construction)."Duct tightness testing is not
required if the air handler and all ducts are located
within the heated space.
X
All changes to"approved"building plans that effect
compliance with the international codes as amended
and adopted,or any other Mason County ordinance or
zs custom
regulation, must be reviewed and approved by Mason
County prior to construction.
X
CONSTRUCTION PROCESS TO BE FIELD
CORRECTED AS REQUIRED PER MASON COUNTY
BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to
27 inspections by the Mason County Building Department. Custom
All construction must be in conformance with the
international codes as amended and adopted by Mason
County. Any corrections,changes or alterations
required by a Mason County Building Inspector shall be
made prior to requesting additional inspections.
X
All property lines shall be clearly identified at the time of
PROPERTY
2e foundation inspection. UNEs
X
B
All building permits shall have a final inspection
performed and approved by the Mason County Building
Department prior to permit expiration.The failure to
request a final inspection or to obtain approval will be
29 custom
documented in the legal property records on file with
Mason County as being non-compliant with Mason
County ordinances and building regulations.
X
All permits expire 180 days after permit issuance, or 180
days after the last inspection activity is performed. The
Building Official may extend the time for action for a
period not exceeding 180 days, upon the receipt of a
30 written extension request indicating that circumstances custom
beyond the control of the permit holder have prevented
action from being taken. No more than one extension
may be granted.
X
Pressure treated wood manufactured after January 1,
2004 may contain high concentrations of copper which
31 could quickly corrode metal fasteners, connectors, and
Custom
flashing. Install metal connectors approved for contact
with the new types of pressure treated material.
X
Owner/builder assumes all responsibility if
drainfield/reserve area is encumbered.
A. Drainfield/Reserve requires a 1Oft setback from all
footing/foundations.
32 B. Septic tank requires5ft setback f all OWNER
p (s) ac from RESPONSIBLE
footing/foundations.
C. No foundation drains within 30ft,down gradient of
drainfield/reserve area.
X
Application acknowledges that the structure is only
permitted for a use consistent with the current zoning of
33 the parcel.Zoning is Rural Residential 5. Height of custom
structure cannot exceed 35'.
X
There needs to be an installation of a 300-gallons
34 storage resevoir and booster pump on both parties well custom
connection.
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or
permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owner's
legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work
as proposed. I have obtained permission from all the necessary parties, including any easement holders or
parties of interest regarding this project.The owner or authorized agent represents that the information
provided is accurate and grants employees of Mason County access to the above described property and
structure(s)for review and inspection.This permit/application becomes null and void if work or authorized
construction is not commenced within 180 days or if construction work is suspended for a period of 180 days.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
9
Signature Date
OWNER - REPRESENTATIVE -
CONTRACTOR
Print Name (Circle one to indicate)
10
MASON COUNTY 360-427-9670 Shelton ext. 352
360-275-4467 Belfair ext.352
(1) COMMUNITY SERVICES 360-482-5269 Elma ext. 352
Building, Planning, Environmental Health,Community Health
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: �%t1�Lg0
ADDRESS/LOCATION: I-WPe, 3
FINDINGS• t
Items listed above must be corrected to gain compliance.
THIS IS NOT A COMPLETE INSPECTION
This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
Call for re-inspection when corrections are made before proceeding with any further work.
Make corrections, items will be checked on the next inspection.
OK to
Date: — ❑ Please contact our office regarding possible
Department: UZ)(n structural damage incurred by recent
natural/man made"disasters.This is NOT a
Inspector: ��.� CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC 14.12
INSPECTION HISTORY Pagel oft
i Report run on: 04/26/2022
Application#: BLD2018-00240 Parcel# : 320165100049
Property Address: 2080 E STATE ROUTE 3 SHELTON
Project: PRJ2018-00098
Inspection Type Description Inspector Date Status Comments
FOOTING INSPECTION Footing Inspection Drew Carlson 18-Jul-18 PASS
FOUNDATION WALL Foundation Wall Inspection Josh Luck 27-Jul-18 DONE HOLD DOWN IN PLACE THIS DATE
INSPECTION
UNDERGROUND PLUMBING Underground Plumbing Drew Carlson 27-Aug-18 DONE
BELOW GRADE Below Grade Insulation Drew Carlson 29-Aug-18 DONE
INSULATION
SHEAR WALL NAILING Shear Wall Nailing Dave Kuzawa 28-Nov-18 APPROVED NOT READY
SHEAR WALL NAILING Shear Wall Nailing Josh Luck 07-Dec-18 APPROVED 1)SHEAR WALL TYPE P1-3 REQ'S A 3"
NAILING AT PANEL EDGES,AREAS
WHERE THIS IS NOT ACHIEVED.
AREA THAT NEEDS ADDRESSED IS
NOTED ON PLAN SHEET L1. 2)
SHEAR WALL TYPE P1-2 REQ'S 2"
NAILING AT PANEL EDGES,AREAS
WHERE THIS IS NOT ACHIEVED.
AREA MARKED/NOTED ON PLAN
SHEET L1. 3)SHEAR WALL P1-6
REQ'S 6" NAILING AT PANEL EDGES.
PLEASE NOTE THIS IS MOST WALL
SECTION. (UNLESS OTHERWISE
NOTED). ENSURE THIS REQ IS MET.
4)NOTE 5 OF SHEAR WALL
SCHEDULE ON SHEET L1, STATES 3"
MEMBERS REQ'D AT PANEL EDGES.
THIS INCLUDES BLOCKING, PLEASE
ADDRESS.
a
INSPECTION HISTORY Page 2of2
x Report run on: 04/26/2022
e,, a
Application#: BLD2018-00240 Parcel # : 320165100049
Property Address: 2080 E STATE ROUTE 3 SHELTON
Project: PRJ2018-00098
Inspection Type Description Inspector Date Status Comments
SHEAR WALL NAILING Shear Wall Nailing Drew Carlson 14-Dec-18 APPROVED CONTRACTOR STATES3x FRAMING
ON NOTE 5 PG L1 IS FOR
SHEARWALLS P1-2 AND P1-3 ONY
PER ENGINEER OF RECORD.
PROVIDE LETTER FROM ENGINEER
STATING THAT IS CORRECT.
ALL OTHER SHEAR WALLS WOULD
PASS WITHOUT3x FRAMING.
**PROVIDE LETTER THEN WRAP
HOUSE*
FRAMING/PLUMBING/MECH Framing/Plumbing/Mechanical Joshua Luck 27-Aug-19 CANCELLED BIG SQ FT
ANICAL 8/27/19: PLUMBING ONLY THIS DATE-
APPROVED PLANS NOT ON SITE
FRAMING/PLUMBING/MECH Framing/Plumbing/Mechanical David Kuzawa 30-Aug-19 PASSED BIG SQ FT
ANICAL 8/27/19: PLUMBING ONLY THIS DATE-
APPROVED PLANS NOT ON SITE
PLUMBING INSPECTION Plumbing Inspection Joshua Luck 27-Aug-19 PASSED plumbing only this date-no plans on site
INSULATION INSPECTION Insulation Inspection Joshua Luck 23-Sep-19 PASS 206-305-0362
BLD-FINAL INSPECTION BLD-Final Inspection PENDING
PROGRESS INSPECTION Progress Inspection Corey Bennett 27-Apr-21 DONE
r
Mason County
� Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
B DD2018-00240 NEW SINGLE FAMILY RESIDENCE
PROJECT DESCRIPTION: NEW SFR ISSUED: 0 611 1/201 8
SITE ADDRESS: 2080 E STATE ROUTE 3 SHELTON
EXPIRES: 10/24/2021
PARCEL: 320165100049
APPLICANT: HOANG NGUYEN OWNER:
123 XXX
XX, XX 00000
FEES: Paid Due
Building Permit Fee $3,071.35 $0.00
Building Permit Fee $3,071.35 $0.00
Building Permit Fee $3,071.35 $0.00
Planning Review Fee $240.00 $0.00
Planning Review Fee $240.00 $0.00
Planning Review Fee $240.00 $0.00
Plumbing Base Fee $24.70 $0.00
Mechanical Permit Fee $176.70 $0.00
Building State Fee $4.50 $0.00
EH Plan Review $215.00 $0.00
Plumbing Permit Fee $154.10 $0.00
Plan Check Fee $1,996.38 $0.00
Plan Check Fee $1,996.38 $0.00
Mechanical Base Fee $28.50 $0.00
Totals : $14,530.31 $0.00
FIXTURES
City Mechanical Fixtures Qty Plumbing Fixtures
1.0000 Dryer Vent(s) 1.0000 Number of Bath Tubs
1.0000 Furnace(s) 1.0000 Number of Clothes Washers
Printed by:Corey Bennett on:04/27/2021 09:34 AM
Page 1 of 2
a Mason County
Mason County - Division of Community Development
615 W. Alder St. Bldg. 8
Shelton, WA 98584
360-427-9670 ext 352
www.co.mason.wa.us
NEW SINGLE FAMILY RESIDENCE BLD2018-00240
(Q,t_y Mechanical Fixtures Qtty Plumbing Fixtures
1.0000 Heat Pump(s) 1.0000 Number of Kitchen Sinks
1.0000 Kitchen Exhaust Hood(s) 3.0000 Number of Hose Bibs
1.0000 Wood/Gas/Pellet Stove(s) 3.0000 Number of Showers
5.0000 Spot Vent Fan(s) 5.0000 Number of Toilets
REQUIRED INSPECTIONS
Footing Inspection Framing/Plumbing/Mechanical
Foundation Wall Inspection Framing/Plumbing/Mechanical
Underground Plumbing Plumbing Inspection
Below Grade Insulation Insulation Inspection
Shear Wall Nailing BLD-Final Inspection
Shear Wall Nailing Progress Inspection
Shear Wall Nailing
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Corey Bennett on:04/27/2021 09:34 AM
Page 2 of 2
MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584
COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352
BELFAIR:360-275-4467,EXT 352
Building.Planning,Environmental Health,Community Health ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY"
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2018-00240 Date Issued 06/11/2018 Issued By
Project NEW SFR
Site Address 2080 E STATE ROUTE 3 r
Applicant HOANG NGUYEN
Contractor
Contractor Phone
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks Slab
Footing Perimeter C�.\�•\^-4 i, Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls ther
Rough-In Groundwork Plumbing \It 'pC(_ Framing 06
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing OTC,
Underfloor
Other
Insulation Slab Y-)&Cw Coo& C)%•I,C� p)FC Ceiling Oak-23.\cl Ott.
Floor Vaulted Ceiling
Walls C;q.23.\q R Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other