Loading...
HomeMy WebLinkAboutBLD2018-00240 SFR - BLD Inspections - 6/21/2022 INSPECTION CARD Mason County v 615 W. Alder St. Bldg. 8, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us PERMIT# BLD2018-00240 PROJECT ADDRESS 2080 E STATE ROUTE 3 SHELTON, WA 98584 PARCEL# 320165100049 PROJECT DESCRIPTION NEW SFR OWNER ADDRESS PHONE CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Footing Inspection Framing/Plumbing/Mechanical Foundation Wall Inspection Framing/Plumbing/Mechanical Underground Plumbing Plumbing Inspection Below Grade Insulation Insulation Inspection Shear Wall Nailing BLD-Final Inspection .Z Shear Wall Nailing Progress Inspection Shear Wall Nailing Mason Count Community... MASON COUNTY 15 W Alder WA St,Bldg.B Shelton, 98584 COMMUNITY SERVICES 360-427 9672 extt 352 —nikyfl kh PRJdmjg PP—,g,Fn�n......uiFla�deF�La� www.co.mason.wa.us BLD2018-00240 NEW SINGLE FAMILY RESIDENCE Project Description: Issued: Site Address: Expires: Approved per dimensions and setbacks on submitted site plan.Setbacks are measured from the furthest � SITE PLAN projection of the structure. X Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be TEMPORARY 2 EROSION installed and maintained until upland vegetation has CONTROL become established. X The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County SHORELINE 3 MANAGEMENT Shoreline Master Program. Property is located within a ACT Residential Shoreline Environment. X By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please 4 check your"Approved Site Plan"to ensure these Custom structures meet the setback conditions listed. X Landings and stairs must meet the same setback conditions as any permitted structure; and,must be shown on your site plan. Please check your"Approved 6 Custom Site Plan"to ensure these structures are shown and meet the setback conditions listed. X ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOT ADVERSLY AFFECT ANY ADJACENT PROPERTIES 6 NOR INCREASE THE VELOCITY FLOW ENTERING Custom OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM OR ROAD WAY. X 1 The area within 20'of the bulkhead is considered to be a shoreline buffer.The existing native trees and shrub vegetation is to be retained and enhanced with native 7 vegetation.The invasive species may be removed.The custom existing concrete bulkhead should be backfilled with appropriate drainage rock and planted with native begetation. X A Road Access Permit or Approval must be granted by the Washington State Department of Transportation. STATE ROAD a For more information contact Paula Hammond, ACCESS Transportation Planning Engineer,at(206)357-2620, PERMIT ext.630.X Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner 9 for using an unregistered contractor. Further information custom can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner,agent for the owner or a registered contractor according to WA state law. X All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee(refer to current APPROVED 10 fee schedule,minimum 1 hour will be charged d PLANS ) g an REQUIRED ON must be collected by the Building Department prior to SITE any further inspections being performed or approvals granted. X Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in ADDRESS/ accordance with Mason County Title 14.28. ROAD SIGNING X The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered 12 without authorization from the Building Official. The custom permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. X THE FOUNDATION SYSTEM SHALL BE PLACED ON 13 UNDISTURBED, FIRM-NATIVE SOIL. Custom X 2 The"approved"site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved"site plan is not on site,then approval will not be granted. In addition,a re-inspection fee(refer to 14 current fee schedule,minimum 1 hour)will be charged Custom and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X Adopted IECCMashington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric,Compliance Method: Prescriptive option Marine-4C,Window(Max U-Factor):0.30,Skylight(Max U-Factor):0.50,Doors (Type/Max U-Factor):0.30 or less,Wall insulation R-21, Floor insulation R-30,Ceiling Insulation min.R-49, Vault Insulation R-38,and Slab Insulation R-10. In addition the following credits from WSEC table R406.2 shall be completed as follows: 3b-HIGH EFFICIENCY HVAC EQUIPMENT 3b: Air-source heat pump with minimum HSPF of 9.0 4-HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM: All heating and cooling system components installed inside the conditioned space.This includes all equipment and distribution system components such as forced air ducts, hydronic piping, hydronic floor heating loop,convectors and radiators.All combustion equipment shall be direct vent or sealed combustion. For forced air ducts:A maximum of 10 linear feet of return ducts and 5 linear feet of supply ducts may be located outside the conditioned space.All metallic ducts located outside the conditioned space must have both transverse and longitudinal joints sealed with mastic. If 15 flex ducts are used,they cannot contain splices. Flex Custom duct connections must be made with nylon straps and installed using a plastic strapping tensioning tool. Ducts located outside the conditioned space must be insulated to a minimum of R-8. Locating system components in conditioned crawl spaces is not permitted under this option. Electric resistance heat and ductless heat pumps are not permitted under this option.Direct combustion heating equipment with AFUE less than 80%is not permitted under this option. 5c-EFFICIENT WATER HEATING 5c: Water heating system shall include one of the following: 3 Gas, propane or oil water heater with a minimum EF of 0.91 or Solar water heating supplementing a minimum standard water heater.Solar water heating will provide a rated minimum savings of 85 therms or 2000 kWh based on the Solar Rating and Certification Corporation(SRCC)Annual Performance of OG-300 Certified Solar Water Heating Systems or Electric heat pump water heater with a minimum EF of 2.0 and meeting the standards of NEEA's Northern Climate Specifications for Heat Pump Water Heaters X A permanent certificate,completed by the owner,builder or registered design professional,shall be posted within three feet of the electrical distribution panel.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof,walls,foundation (slab,basement wall,crawlspace wall and/or floor),and ducts outside the conditioned spaces; U-factors for fenestration;and the solar heat gain coefficient(SHGC) of fenestration.Where there is more than one value for each component,the certificate shall list the value covering the largest area.The certificate shall list the type and efficiency of heating,cooling,and service water heating equipment,duct leakage rates including test conditions as specified in WSEC Section 105.4,and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be 16 Custom considered acceptable when tested to have an air leakage less than 5 air changes per hour when tested with a blower door in accordanve with IECC/.WSEC Section R402.4. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 750 square feet. Reference IECC/WSEC R401.3. Compliance certificates are available online at the WSU Energy program website titled,"WSEC 2015 Certificate" and are available in'/.or'/:sheets. The Mason County Permit Center will also have some available. X 4 A minimum of 75 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in n accordance with IECC/WSEC Section R404.1. Custom X A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design,sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities.*NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on a Small Lots,The Small Parcel Stormwater Site Plan" Custom constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/d ra infield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan.X A concrete encased grounding electrode must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor&Industries (L&I). 19 Custom For more information contact L&I for additional information. In Olympia call(360)902-6350 and in Bremerton call(360)415-4000. X A separate inspection in addition to the inspections required in the IBC, Section 110 shall be required in accordance with the 2015 IBC, Section 1705.12.2 and Section 1707.1. The additional inspection is required when shear wall fastener spacing is required to be 4 inches or less. The shear wall schedule shown on sheet 5 L-11-2 designate wall(s)type P1-2, P1-3,and P1-4 with fastener spacing 4 inches or less. The required inspection may be performed by the Mason County Building Department,a WABO certified inspector,certified to inspect lateral connections,the Engineer of record(EOR),or an authorized representative of the(EOR). The special inspectors duties and responsibilities shall be as specified in Zo custom Chapter 17. When a third party inspector is used to perform the inspection,special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St,Shelton,WA 98584 and also available on site for review by the Building Official. Inspection reports shall be completed and submitted to the Mason County Building Department in a timely manner and shall be submitted prior to the framing inspection of said project.X Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms 21 and on each level of the dwelling. custom EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations(including addition or alteration of fuel burning appliances), repairs,or additions requiring a permit occur,or when one or more sleeping rooms are added or created. X The international code requires a fire apparatus access road for every facility,building,or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County 22 Fire Marshal standards for Fire Apparatus Access custom Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 6 Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and 23 shall remain attached thereto. If documents are Custom removed, approval will not be granted. In addition, a re- inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State ALL 24 of Washington. Occupancy is limited to the approved CONSTRUCTIO and permitted classification. Any non-approved change N of use or occupancy would result in permit revocation. X Installation of heating equipment in a single-family residence shall meet the requirements of the current IECC/WSEC R403, applicable sections of the IRC,and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.6. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4,all ducts, air handlers,filter boxes,and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems.Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure- sensitive tape, 181A-M for mastic or 181 A-H for heat- sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet 25 metal fittings shall be mechanically fastened. Custom Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches(38 mm)and shall be mechanically fastened by means of at least three sheet- 7 metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to IECCIWSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles,"Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing Construction)."Duct tightness testing is not required if the air handler and all ducts are located within the heated space. X All changes to"approved"building plans that effect compliance with the international codes as amended and adopted,or any other Mason County ordinance or zs custom regulation, must be reviewed and approved by Mason County prior to construction. X CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to 27 inspections by the Mason County Building Department. Custom All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections,changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. X All property lines shall be clearly identified at the time of PROPERTY 2e foundation inspection. UNEs X B All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be 29 custom documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a 30 written extension request indicating that circumstances custom beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which 31 could quickly corrode metal fasteners, connectors, and Custom flashing. Install metal connectors approved for contact with the new types of pressure treated material. X Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/Reserve requires a 1Oft setback from all footing/foundations. 32 B. Septic tank requires5ft setback f all OWNER p (s) ac from RESPONSIBLE footing/foundations. C. No foundation drains within 30ft,down gradient of drainfield/reserve area. X Application acknowledges that the structure is only permitted for a use consistent with the current zoning of 33 the parcel.Zoning is Rural Residential 5. Height of custom structure cannot exceed 35'. X There needs to be an installation of a 300-gallons 34 storage resevoir and booster pump on both parties well custom connection. OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owner's legal representative,or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holders or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This permit/application becomes null and void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. 9 Signature Date OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 10 MASON COUNTY 360-427-9670 Shelton ext. 352 360-275-4467 Belfair ext.352 (1) COMMUNITY SERVICES 360-482-5269 Elma ext. 352 Building, Planning, Environmental Health,Community Health 615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us CORRECTION/INSPECTION REPORT PERMIT/CASE NUMBER: �%t1�Lg0 ADDRESS/LOCATION: I-WPe, 3 FINDINGS• t Items listed above must be corrected to gain compliance. THIS IS NOT A COMPLETE INSPECTION This structure has been inspected by Mason County Building Department and the items listed above are in VIOLATION of Mason County laws and/or ordinances. Call for re-inspection when corrections are made before proceeding with any further work. Make corrections, items will be checked on the next inspection. OK to Date: — ❑ Please contact our office regarding possible Department: UZ)(n structural damage incurred by recent natural/man made"disasters.This is NOT a Inspector: ��.� CORRECTION NOTICE. DO NOT REMOVE THIS TAG MCC 14.12 INSPECTION HISTORY Pagel oft i Report run on: 04/26/2022 Application#: BLD2018-00240 Parcel# : 320165100049 Property Address: 2080 E STATE ROUTE 3 SHELTON Project: PRJ2018-00098 Inspection Type Description Inspector Date Status Comments FOOTING INSPECTION Footing Inspection Drew Carlson 18-Jul-18 PASS FOUNDATION WALL Foundation Wall Inspection Josh Luck 27-Jul-18 DONE HOLD DOWN IN PLACE THIS DATE INSPECTION UNDERGROUND PLUMBING Underground Plumbing Drew Carlson 27-Aug-18 DONE BELOW GRADE Below Grade Insulation Drew Carlson 29-Aug-18 DONE INSULATION SHEAR WALL NAILING Shear Wall Nailing Dave Kuzawa 28-Nov-18 APPROVED NOT READY SHEAR WALL NAILING Shear Wall Nailing Josh Luck 07-Dec-18 APPROVED 1)SHEAR WALL TYPE P1-3 REQ'S A 3" NAILING AT PANEL EDGES,AREAS WHERE THIS IS NOT ACHIEVED. AREA THAT NEEDS ADDRESSED IS NOTED ON PLAN SHEET L1. 2) SHEAR WALL TYPE P1-2 REQ'S 2" NAILING AT PANEL EDGES,AREAS WHERE THIS IS NOT ACHIEVED. AREA MARKED/NOTED ON PLAN SHEET L1. 3)SHEAR WALL P1-6 REQ'S 6" NAILING AT PANEL EDGES. PLEASE NOTE THIS IS MOST WALL SECTION. (UNLESS OTHERWISE NOTED). ENSURE THIS REQ IS MET. 4)NOTE 5 OF SHEAR WALL SCHEDULE ON SHEET L1, STATES 3" MEMBERS REQ'D AT PANEL EDGES. THIS INCLUDES BLOCKING, PLEASE ADDRESS. a INSPECTION HISTORY Page 2of2 x Report run on: 04/26/2022 e,, a Application#: BLD2018-00240 Parcel # : 320165100049 Property Address: 2080 E STATE ROUTE 3 SHELTON Project: PRJ2018-00098 Inspection Type Description Inspector Date Status Comments SHEAR WALL NAILING Shear Wall Nailing Drew Carlson 14-Dec-18 APPROVED CONTRACTOR STATES3x FRAMING ON NOTE 5 PG L1 IS FOR SHEARWALLS P1-2 AND P1-3 ONY PER ENGINEER OF RECORD. PROVIDE LETTER FROM ENGINEER STATING THAT IS CORRECT. ALL OTHER SHEAR WALLS WOULD PASS WITHOUT3x FRAMING. **PROVIDE LETTER THEN WRAP HOUSE* FRAMING/PLUMBING/MECH Framing/Plumbing/Mechanical Joshua Luck 27-Aug-19 CANCELLED BIG SQ FT ANICAL 8/27/19: PLUMBING ONLY THIS DATE- APPROVED PLANS NOT ON SITE FRAMING/PLUMBING/MECH Framing/Plumbing/Mechanical David Kuzawa 30-Aug-19 PASSED BIG SQ FT ANICAL 8/27/19: PLUMBING ONLY THIS DATE- APPROVED PLANS NOT ON SITE PLUMBING INSPECTION Plumbing Inspection Joshua Luck 27-Aug-19 PASSED plumbing only this date-no plans on site INSULATION INSPECTION Insulation Inspection Joshua Luck 23-Sep-19 PASS 206-305-0362 BLD-FINAL INSPECTION BLD-Final Inspection PENDING PROGRESS INSPECTION Progress Inspection Corey Bennett 27-Apr-21 DONE r Mason County � Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2018-00240 NEW SINGLE FAMILY RESIDENCE PROJECT DESCRIPTION: NEW SFR ISSUED: 0 611 1/201 8 SITE ADDRESS: 2080 E STATE ROUTE 3 SHELTON EXPIRES: 10/24/2021 PARCEL: 320165100049 APPLICANT: HOANG NGUYEN OWNER: 123 XXX XX, XX 00000 FEES: Paid Due Building Permit Fee $3,071.35 $0.00 Building Permit Fee $3,071.35 $0.00 Building Permit Fee $3,071.35 $0.00 Planning Review Fee $240.00 $0.00 Planning Review Fee $240.00 $0.00 Planning Review Fee $240.00 $0.00 Plumbing Base Fee $24.70 $0.00 Mechanical Permit Fee $176.70 $0.00 Building State Fee $4.50 $0.00 EH Plan Review $215.00 $0.00 Plumbing Permit Fee $154.10 $0.00 Plan Check Fee $1,996.38 $0.00 Plan Check Fee $1,996.38 $0.00 Mechanical Base Fee $28.50 $0.00 Totals : $14,530.31 $0.00 FIXTURES City Mechanical Fixtures Qty Plumbing Fixtures 1.0000 Dryer Vent(s) 1.0000 Number of Bath Tubs 1.0000 Furnace(s) 1.0000 Number of Clothes Washers Printed by:Corey Bennett on:04/27/2021 09:34 AM Page 1 of 2 a Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us NEW SINGLE FAMILY RESIDENCE BLD2018-00240 (Q,t_y Mechanical Fixtures Qtty Plumbing Fixtures 1.0000 Heat Pump(s) 1.0000 Number of Kitchen Sinks 1.0000 Kitchen Exhaust Hood(s) 3.0000 Number of Hose Bibs 1.0000 Wood/Gas/Pellet Stove(s) 3.0000 Number of Showers 5.0000 Spot Vent Fan(s) 5.0000 Number of Toilets REQUIRED INSPECTIONS Footing Inspection Framing/Plumbing/Mechanical Foundation Wall Inspection Framing/Plumbing/Mechanical Underground Plumbing Plumbing Inspection Below Grade Insulation Insulation Inspection Shear Wall Nailing BLD-Final Inspection Shear Wall Nailing Progress Inspection Shear Wall Nailing I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Corey Bennett on:04/27/2021 09:34 AM Page 2 of 2 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 BELFAIR:360-275-4467,EXT 352 Building.Planning,Environmental Health,Community Health ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2018-00240 Date Issued 06/11/2018 Issued By Project NEW SFR Site Address 2080 E STATE ROUTE 3 r Applicant HOANG NGUYEN Contractor Contractor Phone Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Department Building Official: Community Services Designee Concrete Setbacks Slab Footing Perimeter C�.\�•\^-4 i, Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls ther Rough-In Groundwork Plumbing \It 'pC(_ Framing 06 Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing OTC, Underfloor Other Insulation Slab Y-)&Cw Coo& C)%•I,C� p)FC Ceiling Oak-23.\cl Ott. Floor Vaulted Ceiling Walls C;q.23.\q R Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other