Loading...
HomeMy WebLinkAbout2023-028 - Res. County Road Project No. 2050 Bear Creek Dewatto Road MASON COUNTY COMMISSIONERS RESOLUTION NO: COUNTY ROAD PROJECT NO. 2050 WHEREAS,on Mason County Road No.79800,known locally as the Bear Creek Dewatto Road and more specifically located in Sec.5,T.23N.R 1W,WM at approximately mile post 1.53 to mile post 1.96;work defined as"construction" in the BARS Manual,Page II-63,et seq,is determined to be necessary and proper; and, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Realign roadway to improve the horizontal curves with wider lanes and shoulders that mvill he na%ed with Hot Mix Asphalt(HMA). SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County (RCW 36.77.020 and/or RCW 36.77.065 and WAC 136-18). BE IT FURTHER RESOLVED that the described County Road Project is necessary and proper,and the estimated costs of said project are herewith set out as follows: Engineering: $ 20,000 Right of Way $ 20,000 Construction S 1,035.000 The County Road project herein described in HEREBY DECLARED to be a public necessity,and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in accordance with RCW 36.75.050,36.80.080 and 36.80.070. ADOPTED this C& day of-ftAU2023. o BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON /-Z Sharon Trask,Chair ATTEST: 1 t 1uJt 2Q( ,9 _A ' R dy Neathe ,Vice Chair McKenzie Sm h,C erk of the Board , 6- Kevin Shutty, mmissioner APPROVED AS TO FORM: rtim e ead,Ch. DPA cc: Co.Commissioners Engineer JOURNAL: Publ. It: 05/18/2023