Loading...
HomeMy WebLinkAboutSHX2016-00081 MEP2016-00050 - SHX Permit / Conditions - 12/12/2016 srgTFO MASON COUNTY �P C Der artment of Community Services o A yN Planning Division p T 2 615 W Alder St, Shelton, WA 98584 N Y ti (360)427-9670 OJ a0 1864 Exemption from Shoreline Management Act Case No.: SHX2016-00081 Substantial Development Permit Requirement The Proposal By: DIREK HODGES 12784 ROAD # 35 MADERA, CA 93636 Parcel Number: 423075000039 Site Address: 111 N POTLATCH DR NORTH HOODSPORT To undertake the following development: HODGES PIER, FLOAT and STAIRS AFTER THE FACT PERMITTING PROJECT Within LAKE CUSHMAN and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2) as being category: A-does not exceed dollar threshold Please contact Kell McAboy at ext 365 if you have any questions. Issued:12/12/2016 Authorized Local Govern�ent Official SHX2016-00081 December 12, 201E v Pd^� -�YV-A- l f hLi lu fLP ---------------------------------------- AGENCY USE ONLY Date received: O US Army corps � �G• � � WASHINGTON STATE of Engineers• Seattle District Joint Aquatic Resources PermitAgency reference #: SNXZo(tQ- t Application (DARPA) Form ; Tax Parcel#(S): �23n7' 1-0003`� USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. i 7 � 1 L--------------------------------------+ Part 1—Project Identification 1 Project Name (A name for your project that you create. Example Smith's Dock or Seabrook Lane Development) [help] Hodges Pier and Float After the Fact Permitting & Float Repair Projects Part 2—Applicant The person and/or organization responsible for the project. net ] 2a. Name (Last, First, Middle) Hodges, Direk 21b. Organization(If applicable) 2c. Mailing Address (Street or PO Box) 12784 Road #35 2d. City, State, Zip Madera, Ca, 93636 2e. Phone(i) A Phone`(2) 2 .` Fax 21h E-mail (559) 474-1486 Additional forms maybe required for the following permits: • If your project may qualify for Department of the Army authorization throug a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Adt,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at httl)://www nws usace army mii/Missions/CivilWorks/Regulatory/PermitGui4pbook/EndancieredSpecies.as1)x. • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to htti)://www.epermitting.wa.gov/site/alias resourcecenter/iarpa iarpa form/99844arpa form aspx. For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or helpe__ora.wa.gov. JARPA Revision 2012.1 Page 1 of 14 Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) [hel 3a. Name (Last, First, Middle) Schaumburg, Kimberly 3b. Organization (if applicable) BioResources, LLC. 3c. Mailing Address (Street or Po Box) 10112 Bayview Rd KPN 3d. City, State, Zip Vaughn, WA 09394 3e. Phone(1) 3f. Phone(2) 3 `. Fax 3h. E-mail (253) 884-5776 (253) 225-2973 Kimberly035@centurytel.net Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies)where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help] ❑ Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at(360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First,Middle) 4b. Organization(if applicable) Tacoma Power 4c. Mailing Address (Street or Po Box) P.O. Box 11007 4d. City, State, Zip Tacoma, WA 98411-0007 4e. Phone(1) 4f. Phone(2) 4 . Fax 4h.. E-mail JARPA Revision 2012.1 Page 2 of 14 Part 5—Project Location(s) Identifying information about the property or properties whe e the project will occur. [help] ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check a that apply.) [help] X ❑ Private ❑ Federal ❑ Publicly owned (state,county, city,special districts like schools, ports, etc.) ❑ Tribal ❑ Department of Natural Resources (DNR) —managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel 111 N Potlatch Dr 5c. City, State, Zip(If the project is not in a city or town, provide th name of the nearest city or town.) [help] Hoodsport, WA 98548 5d. County hl eIp] Mason 5e. Provide the section, township, and range for the project location. [hem] 1/4 Section Section Towns'llip Range 07 23N 4W 5f. Provide the latitude and longitude of the project location. [help] • Example:47.03922 N lat./-122,89142 W long. (Use decimal degrees NAD 83) 47.49316 N -123.24718 W 5g. List the tax parcel number(s) for the project location. [help] • The local county assessor's office can provide this information. 42307-50-00039 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) [hef Name Mailing Address Tax Parcel#(if known) Nesbitt, Douglas M. & Elizabeth 131 N Potlatch Dr, Hoodsport Wa, 98548 42307-50-00038 ......................................................................................................................................................................................................................... 101 N Potlatch Dr, Hoodsport Wa, 98548 42307-50-00040 Delbert, William G. &Sharon D. ..................................................................................................... ..................I............................................................................................... JARPA Revision 2012.1 Page 3 of 14 5i. List all wetlands on or adjacent to the project location. [he-is] No wetlands on or adjacent to the project location. 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. het Lake Cushman. 5k. Is any part of the project area within a 100-year floodplain? [hei X❑ Yes ❑ No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. [ham] Site has a moderate cover of native vegetation. 5m. Describe how the property is currently used. h[ eip] Recreational and residential. 5n. Describe how the adjacent properties are currently used. [help] Recreational and residential. 5o. Describe the structures (above and below ground)on the property, including their purpose(s) and current condition. '[help] There is a single-family residence (SFR), a fire pit, shoreline access (concrete stepping stone) steps, a wood retaining wall, a pier and attached beach access stairs, a float, and a rock bulkhead (the latter is permitted). 5p. Provide driving directions from the closest highway to the project location, and attach a map. [hem] From SR 119 heading North, turn right onto N Mount Church Dr, then keep left as N Mount Church Dr turns into N Potlatch Drive. At the bottom of the hill, turn right at the stop sign and follow addresses to the site. The property is on the left. Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. [help] JARPA Revision 2012.1 Page 4 of 14 Existing shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot (4' x 15') set of shoreline access (concrete stepping stone) steps, a rock fire pit on top of the bank (above the bulkhead), an approx. twenty-two-foot (21' 8")wood retaining wall with electrical outlets along the base of the bank that is between the bul head and an approx. four-foot (4') walking path, an approx. fifty-eight by five-foot (58' x 5') r k bulkhead (installed in 1995), an approx. six by fifteen-foot (5' 10" x 15' 6") pier, an approx. tw my-seven by fifty-inch (27" x 8') set of wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot (8' x 7' 4") float. The pier is supported by the bank and four(4) metal pilings, two which are shared with the float. The float utilizes four float positioning steel pilings (6"). A vertical wood ladder on the pier accesses the float. The total overwater coverage at the site (lakebed access stairs, pier, and float is 155 square feet). In addition, one new project is proposed: the existing float will be fitted with polyethylene encapsulated Styrofoam®floats when the lake's waters are lowered. 6b. Describe the purpose of the project and why you wan or need to perform it. h[ eip] The existing shoreline appurtenances are common to shoreline properties on Lake Cushman; however, they were installed without the proper permits from Mason County. The applicants were unaware that permits were mandatory and want to bring their property into compliance by obtaining all the required regulatory permits. Tacoma Power requires that the existing float be fitted with polyethylene encapsulated Styrofoam®.floats as the existing float currently utilizes un-encapsulated float material. 6c. Indicate the project category. (check all that apply) hf eLm ❑ Commercial x❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all that apply) [help] ❑ Aquaculture ❑ Culvert X❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam/Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift X❑ Dock/ Pier Marina/ Moorage X❑ Stairs ❑ Bridge ❑ Dredging Mining ❑ Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: JARPA Revision 2012.1 Page 5 of 14 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. ,[help] • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. The existing float will be fitted with new, polyethylene encapsulated Styrofoam®floats, as per Tacoma Power rules. Four(4) twenty-four by forty-eight by twelve-inch (24" x 48" x 12") polyethylene encapsulated Styrofoam®floats will be installed on the existing float, as per the manufacturers installation instructions. Also, to ensure that the float is resting a minimum of one foot above the lakebed during the low water season, the float positioning steel pilings will be fitted with two by eight-foot (2' x 8') landing planks, utilizing galvanized carriage bolts and other hardware. 6f. What are the anticipated start and end dates for project construction? (Month/Year) [help] • If the project will be constructed in phases or stages, use DARPA Attachment D to list the start and end dates of each phase or stage. Start date: _ASAP, after receiving all required permits._ End date: Project is expected to take one day. ❑ See JARPA Attachment D 6g., Fair market value of the project, including materials, labor, machine rentals, etc. [heipi Unknown. 6h. Will any portion of the project receive federal funding? [Leipi • If yes, list each agency providing funds. ❑ Yes x❑ No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.)[heipi 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [help] X❑ Not applicable 7b. Will the project impact wetlands? [help] ❑ Yes ❑ No ❑ Don't know JARPA Revision 2012.1 Page 6 of 14 7c. Will the project impact wetland buffers? [help] ❑ Yes ❑ No ❑ Don't know 7d. Has a wetland delineation report been prepared? [help] • If Yes,submit the report, including data sheets,with the JARPA package. ❑ Yes ❑ No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? [heipj • If Yes, submit the wetland rating forms and figures with the JARPA package. ❑ Yes ❑ No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [help] • If Yes, submit the plan with the JARPA package and answer 7g. • If No,or Not applicable, explain below why a mitigation plan should not be required. ❑ Yes ❑ No ❑ Not applicable 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. [help] 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. [help] Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type' (sq. ft. or category' Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents, such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Walshington Wetland Rating System. Provide the wetland rating forms with the JARPA package. 3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent'if applicable. °Creation(C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B) Page number(s) for similar information in the mitigation plan, if available: JARPA Revision 2012.1 Page 7 of 14 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. [help] 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. n[ elp] Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [hgjpi x❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. NAI ❑ Not applicable The ATF project located on the shoreline of Lake Cushman has had/will have minimal negative impacts on aquatic habitat or any other uses of the lake. BMPs and HPA stipulations will be followed during the installation of the encapsulated floats. 8b. Will your project impact a waterbody or the area around a waterbody? [hLld x❑ Yes ❑ No 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies?[help] JARPA Revision 2012.1 Page 8 of 14 • If Yes,submit the plan with the JARPA package and answer' . • If No,or Not applicable,explain below why a mitigation plan s ould not be required. X❑ Yes x❑ No ❑ Not applicable Mitigation for the ATF development is previously installed native plantings (trees) on the shoreline. The trees are primarily conifers and are approx. two to three feet in height. 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your an wer here. [help] An existing planting plan will improve habitat at the site. 8e. Summarize impact(s) to each waterbody in the table b low. hf elpl Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft.or dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbody Install Lake shoreline Les than none Approx. 57 sf polyethylene Cushman 7 da s encapsulated Styrofoam® floats on an existing float If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3Indicate the days,months or years the waterbody will be measurably impacted b the work. Enter"permanent"if applicable. 8f. For all activities identified in`8e, describe the source a nature of the fill material, amount(in cubic yards) you will use, and how and where it will be placed into t waterbody. [help] JARPA Revision 2012.1 Page 9 of 14 N/A. 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. help] N/A. Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. [help] Agency Name Contact Name Phone Most Recent Date of Contact 91b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? [help] • If Yes,list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: httl2://www.ecy.wa.gov/programs/wq/303d/. ❑ Yes X❑ No 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help] • Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC. 17110018 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? [help] JARPA Revision 2012.1 Page 10 of 14 • Go to http//www ecy.wa. ov/services/qis/maps/wria/wria.htm t find the WRIA#. WRIA 16 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? [help] • Go to http://www.ecy.wa.aov/r)rocirams/wq/swqs/criteria.html for the standards. x❑ Yes ❑ No [I Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? Lneip] • If you don't know, contact the local planning department. • For more information, go to: http//www.ecy_wa. ov/ ro rams/:_ea/sma/laws rules/173-26/211 designations.html. ❑ Rural X❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? [help] • Go to http://www.dnr.wa.gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertypinq.aspx for the Forest Practices Water Typing System. X❑ Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? [help] • If No, provide the name of the manual your project is designed to meet. X❑ Yes ❑ No Name of manual: Stormwater Management Manual for Western Washington. 9i. Does the project site have known contaminated sediment? [help] • If Yes, please describe below. ❑ Yes X ❑ No 9j. If you know what the property was used for in the past, describe below. [help] Prior to the early 1900's it was a forest. I 9k. Has a cultural resource (archaeological) survey been performed on the project area? [help] • If Yes, attach it to your JARPA package. X❑ Yes ❑ No i JARPA Revision 2012.1 Page 11 of 14 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. [hep] The Chinook salmon, the bull trout, the Puget Sound steelhead, the marbled murrelet, streaked horned lark, yellow-billed cuckoo, and the spotted owl are the ESA listed threatened or endangered species in the area. 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. [ham] See above, plus cutthroat trout, Kokanee, and fisher. Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office of Regulatory Assistance at(800) 917-0043 or help@ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) [help] For more information about SEPA,go to www.egy.wa.gov/Droaramsisea/sepa/e-review.htmt. ❑ A copy of the SEPA determination or letter of exemption is included with this application. X❑ A SEPA determination is pending with_Mason County_(lead agency). The expected decision date is ❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 ob.)[help] ❑ This project is exempt(choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: 10b. Indicate the permits you are applying for. (Check all that apply.) [hely] LOCAL GOVERNMENT Local Government Shoreline permits: X❑ Substantial Development ❑ Conditional Use ❑ Variance ❑ Shoreline Exemption Type (explain): Other city/county permits: ❑ Floodplain Development Permit X❑ Critical Areas Ordinance STATE GOVERNMENT JARPA Revision 2012.1 Page 12 of 14 Washington Department of Fish and Wildlife: X ❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: X❑ $150 check enclosed. (Check# ) Attach check made payable to Washington Department of Fish and Wildlife. ❑Charge to billing account under agreement with WDFW. (Agreement# ) ❑ My project is exempt from the application fee. (Check appropriate exemption) ❑ HPA processing is conducted by applicant-funded WDFW staff. (Agreement # ) ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded ovith the county auditor, or other proof of current land use.) ❑ Project is a modification of an existing HPA oric inally applied for, prior to July 10, 2012. (HPA# ) Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 p ayable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) ❑ SEPA is pre-empted by federal law. JARPA Revision 2012.1 Page 13 of 14 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. [help] 11a. Applicant Signature (required) Lhgjpj I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. (initial) Applicant Printed Name Applicant Signature Date 11 b. Authorized Agent Signature [help] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. Authorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant). [help] Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341. ORA publication number: ENV-019-09 rev. 06-12 JARPA Revision 2012.1 Page 14 of 14 I oN.srgTF MASON COUNTY �Py M� Department of Community Services 0 s"° '= Planning Division i o T �? 615 W Alder St, Shelton, WA 98584 �oJ Y C,o~ (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2016-00119 Description of Proposal: HODGES PIER, FLOAT and STAIRS AFTER THE FACT PERMITTING PROJECT, POSSIBLE NEW WORK TO REMOVE CONCRETE FROM LAKEBED. Proponent: DIREK HODGES Location of Proposal: 111 N POTLATCH DR NORTH HOODSPOF Parcel Number: 423075000039 Legal Description: LAKE CUSHMAN #2 TR 39 Directions to Site: US HIGHWAY 101 NORTH, L ON LAKE CUSHMAN RD, R ONTO MOUNT CHURCH DR, FOLLOW TO POTLATCH DR NORTH TO SITE ADDRESS Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Kell McAboy at ext. 365 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by 12/27/2016. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. �LQ Authorized Local Gov ment Official Date °N-STATE MA$ON COUNTY �P5 C 4-, DEPARTMENT OF COMMUNITY DEVELOPMENT 4 MO r o N Planning Division N Y y 615 W Alder St, Shelton, WA 98584 (360)427-9670 rasa MASON COUNTY ENVIRONMENTAL PERMIT March 06, 2017 DIREK HODGES 12784 ROAD # 35 MADERA CA 93636 Parcel Number(s): 423075000039 Expiration Date: 3/6/2019 12:00:OOAN Date Issued: 3/6/2017 Case Number: MEP2016-00050 Project Description: ATF PERMITTING FOR CONCRETE STEPPING STONES, RETAINING WALL, PIER WITH BEACH ACCESS STAIRS AND FLOAT The following critical areas are present on this property: Long-Term Commercial Forest xx FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Ma on County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant frpm compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this prOjE ct. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comp) with the standards of this ordinance. Authorized L6qaDGovemment Official Date Conditions: 3/6/2017 Pagel 0 2 MEP2016-00050 MASON COUNTY ENVIRONMENTAL PERMIT 3/6/2017 Case No.: MEP2016-00050 No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showin go cl cause, may extend the initial two year period by one year. No permit shall be extended unless the appli s requested such review and extension prior to the exporation date. 444 Signature Date ( O NE - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 3/6/2017 Page 2 of 2 MEP2016-00050 T&Q-Trtd 261 co -61 A MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use: Ll CONDITIONAL USE($1520) MEP - .X1 HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd MASON COUNTY ��- DEPARTMENT OF COMMUNITY DEVELOPMENT `S 1 Alder Street Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PE IT APPLICATION The purpose of the Resource Ordinance is to protect Mason C ounty's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A,39.34, 58.1 , 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1.PROPERTY OWNER Name: Hodges,Direk Mailing Address: 12784 Road#35, Madera,Ca 93636 Work Phone: Email Address: Home/Cell Phone: Fax#: If an agent is actin or theproperty owner during the permitprocess,_ om lete#2. 2. AUTHORIZED AGENT Name: Kimberly Lee Schaumburg Mailing Address: 10112 Bayview Rd KPN,Vaughn,Wa 90394 Work Phone: (253)884-5776 Email Address:Kimberly035@centuryel.net Home/Cell Phone: (253)225-2973 Fax# 3.PROJECT SITE Site Address: 111 N Potlatch Dr N,Hoodsport Wa,98548 Parcel#: 42307-50-00039 Legal Description: Lake Cushman#2 TR 39 Directions to Site: From Wa-119 Going North,turn right onto N Mount Church Dr,then keep left when N Mount Church Dr turns into N Potlatch Dr.The property is on the right. Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale.Also draw a separate topography diagram. Re-,i4xd Mlle IaCommunat Devepop�.ne��ORAC'� R-P Pau I oft 201fp 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑' Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.1041 Fish & Wildlife Habitat Conservation Areas, ❑ In-Holding Lands,Chapter 17.01.062 Chapter 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: There is a single-family residence with a bulkhead,pieir,float,shoreline and beach access steps/stairs, a retaining wall,and fire pit. 6. Identify and describe the proposed project, including the type of materials to be used, construction methods, principle dimensions, and other pertinent information(attach additional sheets, if needed): The float will be upgraded with the addition of polyethylene encapsulated Styro oam. As per acoma ower s regu ations,a small ece o concre a on e akefied will need to be removed if it is determined to be unattached to the stair tin? . Unconnected to the existing stairway. 7. Describe why the action requiring this permit cannot be a oided. ATF permitting is required by MC. 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes XNo 9. Identify any surface water on or adjacent to property(circle one): Saltwater XLake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records. XConnected to Septic Connected to Community Septic 11. Identify existing water supply(circle one): Public Water Supply $Well 11. Type of Job(circle one): X New Add XAlteration Repair Demptition Other: ATF J ' Print'Name Signatuie Date P q, SGP2D(La —001t 1 1,D2Oue — Ott ' Z MASON COUNTY ENVIRONMENTAL CHECKLIST 1 MASON CO. ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Hodges After-the Fact Permitting Project. 2. Name of applicant: Direk Hodges. 3. Address and phone number of applicant and contact person: 312 Canyon Valley Drive, Richardson, TX 75080-1934, (972) 755-1505. 4. Date checklist prepared: 7-27-16, revised 2-27-16. 5. Agency requesting checklist: Mason County 6. Proposed timing or schedule (including phasing, if applicable): Repair of an existing float will occur in 2017, when the lake's waters are lowered. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: if yes,�explain. No. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. HMP & MEP. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No. 10. List any government approvals or permits that will be needed for your proposal, if known. A Mason County shoreline substantial permit, an HPA from the WDFW, and permits from Tacoma Power, the USACE, and the Lake Cushman Management Company. 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead MASON COUNTY ENVIRONMENTAL CHECKLIST 2 agencies may modify this form to include additional specific information on project description). Existing shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot (4' x 15') set of shoreline access (concrete stepping stone) steps, a rock fire pit on top of the bank (above the bulkhead), an approx. twenty-two-foot (21' 8") wood retaining wall with electrical outlets along the base of the bank that is between the bulkhead and an approx. four-foot (4') walking path, an approx. fifty-eight by five- foot (58' x 5') rock bulkhead (installed in 1995), an approx. six by fifteen-foot (5' 10" x 15' 6") pier, an approx. twenty-seven by fifty- inch (27" x 8') set of wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot (8' x 7' 4") float. The pier is supported by the bank and four(4) metal pilings, two which are shared with the float. The float utilizes four float positioning steel pilings (6"). A vertical wood ladder on the pier accesses the float. The total overwater coverage at the site (lakebed access stairs, pier, and float is 155 square feet). The existing float will be fitted with new, polyethylene encapsulated Styrofoam®floats, as per Tacoma Power rules. Four(4) twenty-four by forty-eight by twelve-inch (24" x 48" x 12") polyethylene encapsulated Styrofoam®floats will be installed on the existing float, as per the manufacturers installation instructions. Also, to ensure that the float is resting a minimum of one foot above the lakebed during the low water season, the float positioning steel pilings will be fitted with two by eight-foot (2' x 8') landing planks, utilizing galvanized carriage bolts and other hardware. 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist The site is located on Lake Cushman at 111 N Potlatch Dr, Hoodsport. Section 07, Township 23N, Range 04W. Parcel number 42307-50-00039. The legal description is: Lake Cushman #2 TR 39. MASON COUNTY ENVIRONMENTAL CHECKLIST 3 B. ENVIRONMENTAL ELEMENTS: 1. EARTH: I a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other. Moderately steep slope to the shoreline. b. What is the steepest slope on the site (approx. percent slope)? Approx. 60%. C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know classification of agricultural soils, specify them and note any prime farmland. Sand, gravel, and clay. Cl. Are there surface indications of history of unstable soils in the immediate vicinity: If so, describe. No. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. No filling or grading proposed. f. Could erosion occur as a result of clE aring, construction, or use: If so, generally describe. No. g. About what percentage of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? The ATF project created an extremely small amount of impervious surface area. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. BMPs will be implemented during construction. 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. duct, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known N/�► b. Are there any off-site sources of emissions or odors that may affect your proposal? If so, generally describe. N/A MASON COUNTY ENVIRONMENTAL CHECKLIST 4 C. Proposed measures to reduce or control emissions or other impacts to air, if any: N/A 3. WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Lake Cushman. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes, see HMP entitled Hodges ATF Permitting Project 7-18-16. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Yes, the ATF site is located on the shoreline of Lake Cushman. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. N/A. MASON COUNTY ENVIRONMENTAL CHECKLIST 5 2) Describe waste material that will )e discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage, industrial, containing the following chemicals...,agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. N/A. C. Water runoff(including storm water): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. N/A. 2) Could waste materials enter ground or surface waters: if so, generally describe. N/A. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: /A. 4. PLANTS: a. Check or circle types of vegetation f and on the site: X_deciduous tree: alder, maple, aspen, other x_evergreen tree: fir, cedar, pine, other x_shrubs x_ grass pasture crop or grain wet soil plants: cattail, buttercup, bul' ush, skunk cabbage, other _water plants: water lily, eelgrass, mil oil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? None. C. List threatened or endangered species known to be on or near the site. Unknown. MASON COUNTY ENVIRONMENTAL CHECKLIST 6 d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: None proposed. See HMP mitigation, please. 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other Mammals: deer, bear, elk, beaver, other Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. The Chinook salmon, the bull trout, the Puget Sound steelhead, the northern spotted owl, the Hood Canal summer-run chum, the streaked horned lark, and the yellow-billed cuckoo. C. Is the site part of a migration route? If so, explain. No, Lake Cushman is land-locked due to two dams. d. Proposed measures to preserve or enhance wildlife, if any: See above (4d)• 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. N/A. b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. N/A. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy MASON COUNTY ENVIRONMENTAL CHECKLIST 7 impacts, if any: N/A. 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, which could occur as a result of this proposal? If so, describe. N/A. 1) Describe special emergency services that might be required. An ambulance in the event of a construction accident. 2) Proposed measures to reduce or control environmental health hazards, if any: N/A. b. Noise: 1) What types of noise exist in t area which may affect your project (for example: traffic, equipment, operation, other)? N/A. 2) What types and levels of noi4 would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. N/A 3) Proposed measures to reduce or control noise impacts, if any" N/A 8) LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Recreational. b. Has the site been used for agriculture? If so, describe. No. MASON COUNTY ENVIRONMENTAL CHECKLIST g C. Describe any structures on the site. There is a single-family residence (SFR), a fire pit, shoreline access (concrete stepping stone) steps, a wood retaining wall, a pier and attached beach access stairs, a float, and a rock bulkhead (the latter is permitted). Cl. Will any structures be demolished? If so, what? No. The float will be repaired to accommodate encapsulated float material. e. What is the current zoning classification of the site? Unknown. f. What is the current comprehensive plan designation of the site? Unknown. g. If applicable, what is the current Shoreline Master Program designation of the site? Urban residential. h. Has any part of the site been classified as an "Environmentally sensitive" area? If so, specify. Lake Cushman is a "lake of statewide significance." i. Approximately how many people would reside or work in the completed project? N/A. j. Approximately how may people would the completed project displace? N/A. k. Proposed measures to avoid or reduce displacement impacts, if any: N/A. i. Proposed measure to ensure the proposal is compatible with existing and projected land uses and plans, if any: N/A. 9. HOUSING: MASON COUNTY ENVIRONMENTAL CHECKLIST 9 a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. N/A. b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income housing. N/A. C. Proposed measures to reduce or co trot housing impacts, if any: N/A. 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The ATF bulkhead is approx. 5 feet in height. b. What views in the immediate vicinity would be altered or obstructed? The project does not obstruct anylviews. C. Proposed measure to reduce or control aesthetic impacts, if any: N/A. 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. The project does not produce any light or glare. b.Could light or glare from the finished project be a safety hazard or interfere with views? N/A. C. What existing off-site sources of light or glare may affect your proposal: N/A. d. Proposed measures to reduce or control light and glare impacts, if any: N/A. MASON COUNTY ENVIRONMENTAL CHECKLIST 10 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Boating, fishing, hiking, etc. b. Would the proposed project displace any existing recreational uses? If so, describe. The project enhances recreational opportunities. C. Proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the project or applicant, if any: N/A. 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. Not that the applicants know of. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None. C. Proposed measures to reduce or control impacts, if any: N/A. 14. TRANSPORTATION a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. N/A. MASON COUNTY ENVIRONMENTAL CHECKLIST 11 b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. Unknown. C. How many parking spaces would the completed project have? How many would the project eliminate? N/A. N d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or F rivate). No. N e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project. If known, indicated when peak volumes would occur. N/A. g. Proposed measures to reduce or cor trol transportation impacts, if any: N/A. 15. PUBLIC SERVICES a. Would the project result in an increased need for public service (for example: fire protection, police prot ction, health care, schools, other)? If so, generally describe: No. b. Proposed measures to reduce or control direct impacts on public services, if any: N/A. 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, E anitary sewer, septic system, other: MASON COUNTY ENVIRONMENTAL CHECKLIST 12 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. N/A. Signature: The above answers are true and complete to the best of my knowledge. understand that the lead agency is relying on them to make its decision. Signature: I sign Date submitted: revised 2-27-17 MASON COUNTY ENVIRONMENTAL CHECKLIST 12 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. N/A. Signature: The above answers are true and complete the best of my knowledge. understand that the lead agency is relying o them to make its decision. Signature: Date submitted: 10-07-16 v •--------------------------------------, AGENCY USE ONLY Date received: WASHINGTON STATE US Army Corps t of Engineers Seattle District Agency reference# � Joint Aquatic Resources Permit Parcel#(s): Application (JARPA) Form Tax � � USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. " t � t i L--------------------------------------' N Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) h( elp] Hodges Pier and Float After the Fact Permitting & Float Repair Projects Part 2—Applicant I The person and/or organization responsible for the project. [help] 2a. Name (Last, First, Middle) Hodges, Direk 2b. Organization(If applicable) 2c. Mailing Address (Street or Po Box) 12784 Road #35 2d. City, State, Zip Madera, Ca, 93636 2e. Phone(1) 2f. Phone(2) 2g. fax 2h. E-mail (559) 474-1486 Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization througli a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at http://www nws usace army mil/Missions/CivilWorks/Regulatory/PermitGuioebook/Endan-qeredSpecies aspx. • Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to httr)://www.epermitting.wa.gov/site/alias resourcecenter/iarpa marpa form/9984�rpa form aspx. For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help(Wora.wa.gov. JARPA Revision 2012.1 Page 1 of 14 v Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) hf elp] 3a. Name (Last, First, Middle) Schaumburg, Kimberly 3b. Organization(if applicable) BioResources, LLC. 3c. Mailing Address (Street or PO Box)' 10112 Bayview Rd KPN 3d. City, State, Zip Vaughn, WA 09394 3e. Phone(1) 3f. Phone(2) 3 . Fax 3h. E-mail (253) 884-5776 (253) 225-2973 Kimberly035@centurytel.net Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies)where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [Help) ❑ Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization cif applicable) Tacoma Power 4c. Mailing Address (street or PO Box) P.O. Box 11007 4d. City, State, Zip Tacoma, WA 98411-0007 4e. Phone(1) 4f. Phone(2) 4 . Fax 4h. E-mail JARPA Revision 2012.1 Page 2 of 14 Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. [help] ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) h[�el ] X❑ Private ❑ Federal ❑ Publicly owned (state,county, city,special districts like schools, ports, etc.) ❑ Tribal ❑ Department of Natural Resources (DNR)—managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box.if there is no address,provide other location information in 5p.) h[ elp] 111 N Potlatch Dr 5c. City,, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) [help] Hoodsport, WA 98548 5d. County h[ipj Mason 5e. Provide the section, township, and range for the proje location. [hy] '/4 Section Section Township Range 07 23N 4W 5f. Provide the latitude and longitude of the project locatio [but ] • Example:47.03922 N lat./-122,89142 W long. (Use decimal grees-NAD 83) 47.49316 N -123.24718 W 5g. List the tax parcel number(s)for the project location. e ] • The local county assessor's office can provide this information. 42307-50-00039 5h. Contact information for all adjoining'property owners. l If you need more space, use JARPA Attachment C.)°�[help] Name Mailing Address Tax Parcel#(if known) Nesbitt, Douglas M. & Elizabeth 131 N Potlatch Dr, Ho dsport Wa, 98548 42307-50-00038 101 N Potlatch Dr, Hoodsport Wa, 98548 42307-50-00040 ...................................._...................................... ..._..............._................_.................._............................................... Deibert, William G. &Sharon D. ........... JARPA Revision 2012.1 Page 3 of 14 r 5i. List all wetlands on or adjacent to the project location. [heipj No wetlands on or adjacent to the project location. 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hel Lake Cushman. 5k. Is any part of the project area within'a 100-year floodplain? hei j X❑ Yes ❑ No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. [help] Site has a moderate cover of native vegetation. 5m. Describe how the property is currently used. hf M Recreational and residential. 5n. Describe how the adjacent properties are currently used. h[ eipj Recreational and residential. 5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. h�j There is a single-family residence (SFR), a fire pit, shoreline access (concrete stepping stone) steps, a wood retaining wall, a pier and attached beach access stairs, a float, and a rock bulkhead (the latter is permitted). 5p. Provide driving directions from the closest highway to the project location, and attach a map. [help] From SR 119 heading North, turn right onto N Mount Church Dr, then keep left as N Mount Church Dr turns into N Potlatch Drive. At the bottom of the hill, turn right at the stop sign and follow addresses to the site. The property is on the left. Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. [heip JARPA Revision 2012.1 Page 4 of 14 Existing shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot (4' x 15') set of shoreline access (concrete stepping stone) steps, a rock fire pit on top of the bank (above the bulkhead), an approx. twenty-two-foot (21' 8")wood retaining wall with electrical outlets along the base of the bank that is between the bulkhead and an approx. four-foot (4') walking path, an approx. fifty-eight by five-foot(58' x 5') rock bulkhead (installed in 1995), an approx. six by fifteen-foot (5' 10" x 15' 6") pier, an approx. twenty-seven by fifty-inch (27" x 8') set of wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot (8' x 7' 4") float. The pier is supported by the bank and four(4) metal pilings, two which are shared with the float. The float utilizes four float positioning steel pilings (6"). A vertical wood ladder on the pier accesses the float. The total overwater coverage at the site (lakebed access stairs, pier, and float is 155 square feet). In addition, one new project is proposed: the existing float will be fitted with polyethylene encapsulated Styrofoam®floats when the lake's waters are lowered. 6b. Describe the purpose of the project and why you want r need to perform it. tr[he ] The existing shoreline appurtenances are common to shoreline properties on Lake Cushman; however, they were installed without the proper permits from Mason County. The applicants were unaware that permits were mandatory and want to bring their property into compliance by obtaining all the required regulatory permits. Tacoma Power requires that the existing float be fitted with polyethylene encapsulated Styrofoam®floats as the existing float currently utilizes un-encapsulated float material. 6c. Indicate the project category. (check all that apply), hr eM ❑ Commercial x❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all t at apply) [help] ❑Aquaculture ❑ Culvert X❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam/Weir Floating Home (upland) ❑ Boat House ❑ Dike/ Levee/Jetty Geotechnical Survey ❑ Road ❑❑ Boat Launch ❑ Ditch Land Clearing Scientific Device ❑ Boat Lift X❑ Dock/ Pier Marina/ Moorage X❑ Stairs ❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility ❑ Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: JARPA Revision 2012.1 Page 5 of 14 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. [help] • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. The existing float will be fitted with new, polyethylene encapsulated Styrofoam®floats, as per Tacoma Power rules. Four(4) twenty-four by forty-eight by twelve-inch (24" x 48" x 12") polyethylene encapsulated Styrofoam®floats will be installed on the existing float, as per the manufacturers installation instructions. Also, to ensure that the float is resting a minimum of one foot above the lakebed during the low water season, the float positioning steel pilings will be fitted with two by eight-foot (2' x 8') landing planks, utilizing galvanized carriage bolts and other hardware. 6f. What are the anticipated start and end dates for project construction? (Month/Year) h[�el ] • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start date: _ASAP, after receiving all required permits._ End date: Project is expected to take one day. ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. [help) Unknown. 6h. Will any portion of the project receive federal funding? h[h2] • If yes, list each agency providing funds. ❑ Yes x❑ No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) [help] 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [help] X❑ Not applicable 7b. Will the project impact wetlands? [help] ❑ Yes ❑ No ❑ Don't know JARPA Revision 2012.1 Page 6 of 14 7c. Will the project impact wetland buffers? [L ] ❑ Yes ❑ No ❑ Don't know 7d. Has a wetland delineation report been prepared?, [held) • If Yes,submit the report, including data sheets,with the JARPA package. ❑ Yes ❑ No 7e. Have the wetlands been rated using the Western Was ngton or Eastern Washington Wetland Rating System? [ham] • If Yes,submit the wetland rating forms and figures with the JAR A package. ❑ Yes ❑ No ❑ Don't know 7f. Have you prepared amitigation plan to compensate fo' any adverse impacts to wetlands?'[help] • If Yes,submit the plan with the JARPA package and answer 7g • If No,or Not applicable,explain below why a mitigation plans ould not be required. ❑ Yes ❑ No ❑ Not applicable 7g. Summarize what the mitigation plan is meant to acco plish, and describe how a watershed approach was used to design the plan. [help] 7h. Use the table below to list the type and rating of each etland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below)where we can find his information,in the plan. [help] Activity (fill, Wetland Wetland Irr>ipact Duration Proposed Wetland drain, excavate, Name type and area (sq. of impact3 mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category' Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms with the JARPA package. 3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable. "Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B) Page number(s) for similar information in the mitigation plan, if available: JARPA Revision 2012.1 Page 7 of 14 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic __yards that will be used,and how and where it will be placed into the wetland. [Leis] 7j. For all excavating activities identified in 7h, describe the excavation'method, type and amount of material in cubic yards you will remove, and where the material will be disposed. h(�l Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hei i x❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hL e�] ❑ Not applicable The ATF project located on the shoreline of Lake Cushman has had/will have minimal negative impacts on aquatic habitat or any other uses of the lake. BMPs and HPA stipulations will be followed during the installation of the encapsulated floats. 8b. Will your project impact a waterbody or the area around a waterbody? [help] x❑ Yes ❑ No 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? [help JARPA Revision 2012.1 Page 8 of 14 • If Yes,submit the plan with the JARPA package and answer 8d • If No,or Not applicable,explain below why a mitigation plans uld not be required. X❑ Yes x❑ No ❑ Not applicable Mitigation for the ATF development is previously installed native plantings (trees) on the shoreline. The trees are primarily conifers and are approx. two to three feet in height. 8d. Summarize what the mitigation plan is meant to acco plish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. [he]p] An existing planting plan will improve habitat at the site. 8e. Summarize impact(s) to each waterbody in the table b low. [help] Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 (cubic yards) to be linear.ft.) of drive, etc.) placed in or waterbody removed from directly affected waterbody Install Lake shoreline Less than none Approx. 57 sf polyethylene Cushman 7 days encapsulated Styrofoam® floats on an existina float If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3 Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. [help] i JARPA Revision 2012.1 Page 9 of 14 N/A. 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. hel N/A. Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project,list them below. [help] Agency Name Contact Name Phone Most Recent Date of Contact 91b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? h[ eipi • If Yes,list the parameter(s)below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: http://www.ecy.wa.-gov/programs/wci/303d/. ❑ Yes X❑ No 9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help] • Go to http://cfpub.ega.gov/surf/locate/index.cfm to help identify the HUG 17110018 9d. What Water Resource Inventory Area Number(WRIA#)'is the project in? h[ eipt JARPA Revision 2012.1 Page 10 of 14 • "Go to http7/lwww.ecy.wa.gov/ g� to find the WRIA#. WRIA 16 9e. Will the in-water construction work comply with the Sta e of Washington water quality standards for turbidity? L�elpj • Go to http://www.ecy.wa.gov/programs/Wq/sMs/criteria.html for the standards. x❑ Yes ❑ No ❑ Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? rhelp] • If you don't know, contact the local planning department. • for more information,go to: http://www.ecy.wa.gov/programs/§ea/sma/laws rules/173-26/211—designations.html. ❑ Rural X❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other 9g. What is the Washington Department of Natural Resources Water Type? [help] • Go to http://www dnr wa gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertypina aspx for the Forest Practices Water Typing System. X❑ Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington [department of Ecology's most current stormwater manual? [ham] i • If No, provide the name of the manual your project is designed o meet. X❑ Yes ❑ No Name of manual: Stormwater Management Manual for Western Washington. 9i. Does the project site have known contaminated sediment? [he1pI • If Yes, please describe below. ❑ Yes X ❑ No 9j. If you know what the property was used for in the past,describe below. h[ ela] Prior to the early 1900's it was a forest. 9k. Has a cultural resource (archaeological) survey been performed on the project area? [help) • If Yes, attach it to your JARPA package: X❑ Yes ❑ No i JARPA Revision 2012.1 Page 11 of 14 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. h[ elpl The Chinook salmon, the bull trout, the Puget Sound steelhead, the marbled murrelet, streaked horned lark, yellow-billed cuckoo, and the spotted owl are the ESA listed threatened or endangered species in the area. 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. [km See above, plus cutthroat trout, Kokanee, and fisher. Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at httl):Hapr)s.ecy.wa.gov/ol)as/. • Governor's Office of Regulatory Assistance at (800) 917-0043 or heIP(c-ora.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 1 Oa. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hl elpl • for more information about SEPA,go to www.ecy.wa.ciov/programs/sea/sepa/e-review.html. ❑ A copy of the SEPA determination or letter of exemption is included with this application. X❑ A SEPA determination is pending with_Mason County_(lead agency). The expected decision date is ❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 100[help] ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: 1 Ob. Indicate the permits you are applying for. (Check all that apply.) he[ el l LOCAL GOVERNMENT Local Government Shoreline permits: X❑ Substantial Development ❑ Conditional Use ❑ Variance ❑ Shoreline Exemption Type (explain): Other city/county permits: ❑ Floodplain Development Permit X❑ Critical Areas Ordinance STATE GOVERNMENT JARPA Revision 2012.1 Page 12 of 14 Washington Department of Fish and Wildlife: X ❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes: X❑ $150 check enclosed. (Check# ) Attach check made payable to Washington Department of Fish and Wildlife. ❑Charge to billing account under agreement with WDFW. (Agreement# ❑ My project is exempt from the application fee. (Check appropriate exemption) ❑ HPA processing is conducted by applicant-funded WDFW staff. (Agreement # ) ❑ Mineral prospecting and mining. ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded ith the county auditor, or other proof of current land use.) ❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012. (HPA# Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification FEDERAL GOV RNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) ❑ SEPA is pre-empted by federal law. JARPA Revision 2012.1 Page 13 of 14 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. help] 11a. Applicant Signature (required) h[�el j I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. (initial) Applicant Printed Name Applicant Signature Date 11 b. Authorized Agent Signature [help] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. Authorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant). [help] Not required if project is on existing rights-of-way or easements. I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick, scheme, or device a material fact or makes any false, fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format, contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341. ORA publication number: ENV-019-09 rev. 06-12 JARPA Revision 2012.1 Page 14 of 14 Habitat Management Plan Hodges Pier and Float After-the-Fact Permitting Project Lake Cushman, Hoodsport WA. For: Direk Hodges 12784 Roa1 #35 Madera, CA 93636 Prepared by: BioResourc ,LLC Kim Schaumburg Fisheries biologist,Universi of Washington, 1981 10112 Bay Viev Rd. KPN Vaughn,W ,98394 (253) 884-5776 225-2973 Email: kimberly035 centurytel.net August 5,2016 Revised February 22, 2017 Table of Contents 1.0 Proposed Action.............................................................................. 3 1.1 Background&ATF Development........................................................ 3-4 1.2 ATF Development Need&Objectives.................................................... 4 2.0 Project Description&Activities............................................................. 3 2.1 Mitigation....................................................................................... 4-5 2.2 Timing....................................................................................... ... 5 2.3 Best Management Practices.................................................................. 5 2.4 Conservation Measures....................................................................... 6 3.0 ESA Species and Habitat Information..................................................... . 6 3.1 ESA Listed Species........................................................................... 7-9 4.0 Environmental Baseline Conditions........................................................ 9 4.1 ATF Project Vicinity......................................................................... 9-10 4.2 ATF Project Site.............................................................................. 10 5.0 Effects of the Action.......................................................................... 10 5.1 Direct Effects.................................................................................. 10-13 5.2 Indirect Effects................................................................................. 13 5.3 Cumulative Effects............................................................................ 13 6.0 Conclusion......................................................................................14 6.1 Take Analysis.................................................................................. 14 6.2 Determination of Effect...................................................................... 14-15 7.0 References......................................................................................16-18 Attachments 1. Project location...................................................................................19 2. Site plan....................................................................................... ...20 3. Site plan........................................................................................... 21 4. Float details........................................................................................22 5. Cross section..................................................................................... 23 6. Site Photographs.................................................................................. 24 7. Site Photographs.................................................................................. 25 8. Site Photographs.................................................................................. 26 9. Site Photographs.................................................................................. 27 10. Site Photographs.................................................................................. 28 Hodges Habitat Management Plan 2 1.0 Proposed Action This Habitat Management Plan has been submi d on behalf of Direk Hodges at the request of Mason County to comply with the Cc anty's regulations and procure after-the- fact(ATF)permits for existing shoreline develo ment on his Lake Cushman property. The ATF development includes the following: a fire pit, shoreline access(concrete stepping stone) steps, a wood retaining wall, a p er and attached beach access stairs, and a float.An existing rock bulkhead is permitted. In addition, a new project is also being proposed as Tacoma Power requires that the exi iting float be fitted with polyethylene encapsulated Styrofoam® floats;the existing fl t currently utilizes un-encapsulated float material. Mitigation for ATF development is pr viously installed native plantings(trees) on the shoreline. 1.1 Background & ATF Develop ent The proposed project site is located in Mason C unty at 11I North Potlatch Drive North, Hoodsport Washington(Attachment 1). The M on County tax parcel number is 42307- 50-00039.The property is located in Section 07 Township 23N,Range 04 of the Western Meridian. The latitude is 47.49316 no , and the longitude is-123.24718 west. The proposed project site is located on Lake Cu hman in the Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16) on shoreline designated Urban Residential by the Shoreline Master Program of Mason Coll o ty. Lake Cushman is regulated under the Mason County Shoreline Master Program and t e Mason County Resource Ordinance as a Fish and Wildlife Habitat Conservation Area. rhe Shoreline Management Act of 1971 designated Lake Cushman as a Shoreline of Sta ewide Significance. In addition,Lake Cushman is regulated by Tacoma Public Utiliti (aka Tacoma Power),which has designated Shoreline Management Classificati (SMC)zones. The proposed project site is located in an SMC zone classified as "A."Ta -,oma Power defines the"A"management classification as shoreline areas with no known ignificant environmental/cultural resources or associated resource management g als precluding existing or future shoreline uses;this classification acknowledges existing private uses and anticipates potential future private and light commercials reline uses (Kleinschmidt 2012). The proposed project site is located in a rural n ighborhood on a shoreline lot with approximately(approx.) 70 feet of frontage,w ch supports a single-family residence located approximately twenty feet vertically an sixty-five feet horizontally from the shoreline of Lake Cushman. The site features a oderate cover of mature native conifers. Additionally,native trees have been recently p nted along the shoreline, on a bank directly landward of the bulkhead area. Existin shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot(4' x 1 ') set of shoreline access(concrete stepping stone) steps, a rock fire pit on top of tl e bank(above the bulkhead), an approx. twenty-two-foot(21' 8")wood retaining wall v ith electrical outlets along the base of the bank that is between the bulkhead and an apprc x. four-foot(4')walking path, an approx. fifty-eight by five-foot(58' x 5')rock bulkhea (installed in 1995), an approx. six by Hodges Habitat Management Plan 3 fifteen-foot(5' 10"x 15' 6")pier, an approx.twenty-seven by fifty-inch (27"x 8') set of wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot(8' x 7' 4") float. The pier is supported by the bank and four(4)metal pilings,two which are shared with the float. The float utilizes four float positioning steel pilings (6"). A vertical wood ladder on the pier accesses the float. The total overwater coverage at the site (lakebed access stairs,pier, and float is 155 square feet). 1.2 ATF Development Need and Objectives The existing shoreline appurtenances are common to shoreline properties on Lake Cushman; however,with the exception of the bulkhead,they were installed without the proper permits from Mason County. It is probable that the former owners were unaware that permits were mandatory.Now,the applicant(and new owner)wants to bring his property into compliance by obtaining all the required regulatory permits. To this end, permits will be procured from the following agencies: Mason County, the Washington Department of Fish& Wildlife(WDFW), Tacoma Power,the Lake Cushman Management Company, and the United States Army Corps of Engineers(USACE). Additionally, as per Tacoma Power rules, the float will be fitted with new, polyethylene encapsulated Styrofoam® floats. The WDFW does not issue after-the-fact permits,but an HPA(hydraulic permit application)will be required for the latter action. 2.0 Project Description & Activities As previously noted,the existing float will be fitted with new, polyethylene encapsulated Styrofoam® floats, as per Tacoma Power rules. Four(4)twenty-four by forty-eight by twelve-inch(24"x 48"x 12")polyethylene encapsulated Styrofoam®floats will be installed on the existing float, as per the manufacturers installation instructions.Also,to ensure that the float is resting a minimum of one foot above the lakebed during the low water season, the float positioning steel pilings will be fitted with two by eight-foot(2' x 8') landing planks, utilizing galvanized carriage bolts and other hardware. 2.1 Mitigation Mitigation for the ATF development is previously installed native plantings (trees)on the shoreline (Attachments 9 & 10).The trees are primarily conifers and are approx. one to three feet in height. They appear to have been planted within the last two years. The following species and quantities were observed: Hodges Habitat Management Plan 4 Approximately twenty-five(25)Douglas fir and twenty(20)Western red cedar. Seven red huckleberry also appear to have been plant& . It is recommended that existing ivy be removed. Additionally,the replacement of the float materi d with encapsulated floats is self- mitigating as the removal of the existing un-enc psulated float material is expected to have a beneficial impact to the lake's water qual ty(see 5.1 Direct Effects). 2.2 Timing Work on the float will be completed over an ap ox. seven(7) day period during daylight working hours normal to a rural residential neig borhood. Work will only take place when the water level of Lake Cushman is low, which is generally between October and April. 2.3 Best Management Practices In order to maintain the present water quality of Lake Cushman during project construction,Best Management Practices (B )will be implemented. BMPs are defined as physical, structural, and/or manageri 1 practices that prevent or reduce the pollution of water(WDOE). The following additional BMP shall be used to insure that water quality is not degraded during construction: 1. Equipment shall be cleaned and check& for leaks, offsite and daily, before commencing work. In addition,the following Spill Prevention Con of measures shall also be followed: 1) The applicant will supply the site with a portab bathroom or allow workers access to the onsite bathroom so that solid or liquid waste wi l not become a source of stormwater pollution. 2)The applicant will be responsible or alerting the appropriate authorities in the event of a hazardous spill. 3)The applicant will have a spill kit and be able to perform basic control, containment, and/or con nement operations within the capabilities of the resources and personnel protective equip nent available. In other words, small spills, such as paint or oil, shall be promptly an I fully collected and disposed of at a suitable disposal site. In the event of a signific t spill, a fish kill, and/or if fish are observed in distress the Washington State Dep ment of Ecology(800.258.5990)and the Washington State Department of Fish and Wil ife's Area Habitat Biologist, Joshua Benton(360.602.0364), will be notified imme ately. Hodges Habitat Management Plan 5 2.4 Conservation Measures 1. No construction to occur unless Lake Cushman's waters are low. 2. An existing float will be refitted with polyethylene encapsulated Styrofoam®. 3. Construction to take place as per the HPA provisions from the Washington Department of Fish and Wildlife. 4. Previously discussed BMPs to be strictly adhered to. 5. Existing small native trees planted on the shoreline to be maintained with weeding and watering as necessary. 6. Electrical outlets,located on a wood retaining wall along the base of the bank that is between the bulkhead and a walking path,to be removed,as per Tacoma Power's regulations. 3.0 ESA Species and Habitat Information In the ATF project area,there are six species listed under the Endangered Species Act by the U.S. Fish and Wildlife Service (USFWS) as either threatened, endangered, or candidate species. The bull trout(Salvelinus confluentus), marbled murrelet (Brachyramphus marmoratus),northern spotted owl (Stridex occidentalis), and streaked horned lark(Eremophila alpestris strigata) are listed as threatened and critical habitat has been designated for these species. The ATF project site is in the bull trout's critical habitat.The yellow-billed cuckoo(Coccyzus americanus) and the fisher(Mantes pennanti) are listed as proposed threatened and candidate species, respectively. In the proposed project area,there is one species listed under the Endangered Species Act by the National Marine Fisheries Service(NMFS) as either threatened, endangered, or candidate species. The Puget Sound Chinook salmon(Oncorhynchus tshawytscha) is listed as threatened and critical habitat has been designated. Lake Cushman is a historical watershed of the Chinook that has been anthropogenically blocked; however, it has been designated critical habitat. The Washington Department of Fish and Wildlife(WDFW) GIS maps reveal the documented presence of two other species of salmonids on the State's PHS list within the action area: Kokanee(Oncorhynchus nerka) and the Puget Sound/Coastal cutthroat trout (Oncorhynchus clarki clarki). The presence of these two species has been documented in Lake Cushman. WDFW data reveals that Lake Cushman was stocked with 23,896 cutthroat trout in 2005 and 205,800 Kokanee(landlocked sockeye salmon) in 2004. A WDFW biologist reported that other species that inhabit the lake include rainbow trout (Oncorhynchus mykiss) and non-native largemouth bass (Micropterus salmoides). Hodges Habitat Management Plan 6 i Additionally,Tacoma Power is presently worki g in association with the Skokomish Tribe and the WDFW to re-establish migrating lmonid runs in the North fork of the Skokomish River. The North Fork Skokomish Pov erhouse and Fish Facility has recently been completed.This facility collects adult fish at the )ase of Cushman Dam No. 2 and transports them to the top of the dam for sorting It also provides sorting facilities for juvenile fish and transports them to the base of t ie dam for release into the river. The fry will be released in Lake Cushman, and smolts m ill be collected and released into the lower North Fork Skokomish River.Returning ult sockeye will eventually be collected at the base of Cushman Dam No. 2. Two new h tcheries are also under construction, one on the Hood Canal at Potlatch for sockeye,the her on Lake Kokanee for Chinook, coho, and steelhead.Hatchery construction is pl nned to be complete in 2015 (Tacoma Public Utilities 2015). 3.1 ESA Listed Species BULL TROUT Bull trout are members of the char subgroup of he salmon family and are native to the Pacific Northwest and western Canada. Water t mperature above 15 degrees Celsius is believed to limit bull trout distribution, as eggs nd juveniles require extremely cold water for survival. Bull trout are also vulnerabl to degraded stream habitat, poor water quality, dams and other stream blocking structu s, and predation by non-native fish. Critical habitat includes the upper North Fork o the Skokomish River(70 FR 56304). Critical Habitat in the North Fork of the Skokor kish River includes spawning and rearing habitat. Lake Cushman provides rearing, foraging, and migration habitat, so it is expected that bull trout may be found in the vicinity of th ATF project site. MARBLED MURRELET A small, diving seabird in the family Alcidae,tl e marbled murrelet forages for small fish and invertebrates almost exclusively in nearsho e marine waters, while nesting inland in old-growth or mature conifer forests. Threats i lude loss of habitat, predation, gill-net fishing operations, oil spills, marine pollution, z rid disease. The USFWS assembled a team of scientists in October 2011 to investigat causes for the continued decline in murrelet populations. The outcome of these dis ssions listed many factors, chiefly loss of potential nesting habitat as the main reason r hindrance of population recovery goals (WDFW 2012). Potential nest trees are coniferous trees within f 5 mi(88.5 km)of marine waters that support at least one 4-inch(10.2-cm) diameter I latform located at least 33 feet(10 meters)above the ground,with horizontal and rtical cover(USFWS 2012). If a tree or forested area does not support these habitat feat res, it is"extremely unlikely"to support a murrelet nest(USFWS 2012).Nest success is influenced by forest structure,the spatial Hodges Habitat Management Plan 7 mix of habitat and non-habitat, human disturbance, prey availability, and marine foraging conditions. Human disturbance can lead to higher predation levels by Steller's and gray jays, crows, ravens, and other species that seek human-related foods and refuse at high- use recreational areas (Peery et al. 2004,Marzluff and Neatherlin 2006). Critical habitat for the marbled murrelet, which was designated in May of 1996 and revised in October of 2011, is located to the northwest of the ATF project site; therefore, it must be assumed that marbled murrelets may be found nesting in the vicinity. NORTHERN SPOTTED OWL The Northern Spotted Owl is one of the largest owls in North America, and the average adult female is approximately 18 inches tall with a 48-inch wingspan.Northern spotted owls are strictly nocturnal, and require old-growth forests with multi-layered canopies of trees, including large trees with broken tops, deformed limbs, and large holes and cavities to nest in. The Northern spotted owl is very territorial and intolerant of habitat disturbance, and a pair requires a large amount of forest for hunting and nesting. Habitat loss has occurred as a result of forest conversion, timber harvest, fire,windthrow, insect outbreak and disease (WDFW 2012). The USFWS designated revised critical habitat for the northern spotted owl under the Endangered Species Act. In total, approximately 9,577,969 acres (ac) (3,876,064hectares (ha)) in 11 units and 60 subunits in California, Oregon, and Washington fall within the boundaries of the 2 critical habitat designation. Critical habitat for the Northern spotted owl is located in the vicinity of Lake Cushman. However, due to the close proximity of human habitation, it is unlikely that any Northern spotted owls may be found in the neighborhood of the ATF project site. STREAKED HORNED LARK Horned larks are birds that utilize wide open spaces with no trees and few or no shrubs. The streaked horned lark nests on the ground in sparsely vegetated sites dominated by grasses and shrubs. Historically this type of habitat was found in prairies in western Oregon and Washington, in dune habitats along the coast of Washington, on the sandy beaches and spits along the Columbia and Willamette Rivers, and in grasslands, estuaries, and sandy beaches in British Columbia(WDFW 2012).Today the streaked horned lark nests in a broad range of habitats, including native prairies, coastal dunes, fallow and active agricultural fields, wetland mudflats, sparsely-vegetated edges of grass fields, recently planted Christmas tree farms with extensive bare ground, moderately-to heavily- grazed pastures, gravel roads or gravel shoulders of lightly-traveled roads, airports, and dredge deposition sites in the lower Columbia River(WDFW 2012). It is expected that the ATF project site contains unsuitable habitat for the streaked horned lark. Hodges Habitat Management Plan 8 CHINOOK SALMON Chinook salmon in Lake Cushman are a land-1 ked population that originated from anadromous fish, although loss of genetic varial on makes it difficult to determine whether they are descended from historical Hoc I Canal populations or introduced hatchery fish(NOAA 2006). Lake Cushman C nook are genetically different, smaller in size (and presumably less fecund)than their anz romous counterparts (Myers et al. 1998). On Jan. 12,2009,Tacoma Power,the Skokc nish Tribal Nation and state and federal agencies signed a settlement agreement that res ved a$5.8 billion damages claim and long-standing disputes over the terms of a long erm license for Cushman Hydroelectric Project.Tacoma Power has proposed to introdu e sockeye and spring Chinook and enhance the existing winter steelhead and coho opulations in the North Fork in cooperation with the WDFW and the Skokomis i Tribe(Tacoma Public Utilities 2014). In addition, Tacoma Power will annually release u to 100,000 rainbow trout for sport harvest(TPU 2014). Lake Cushman has been designated Critical ha at, and the ATF project site provides rearing, foraging, and migration habitat, so it is xpected that adult and/or juvenile Chinook salmon may be found in the vicinity ol the site. 4.0 Environmental Baseline Cond[tions 4.1 ATF Project Vicinity The environmental baseline represents the exist g set of conditions,to which the effects of the proposed action are then added. The envi onmental baseline is defined as"the past and present impacts of all Federal, state, and pri vate actions and other human activities in the action area,the anticipated impacts of all pri 1posed Federal projects in the action area that have already undergone formal or informal ection 7 consultation, and the impact of state or private actions which are contemporan us with the consultation process"(50 CFR 402.02).The proposed project site is in S komish/Dosewallips WRIA 16 (Water Resource Inventory Area), on Lake Cushman ir Mason County.The majority of the fresh and marine waterbodies in WRIA 16 suffer fro water quality issues;however Lake Cushman is not listed on the state's 2012 Watei Quality 303(d) list of impaired waterbodies for any parameters. Two waterbod s in the Skokomish watershed,the South Fork of the Skokomish River and Lebar Creek Are listed for the parameter of temperature (high). The proposed project site is located in a rural n ighborhood on a lot with approximately 70 feet of frontage on Lake Cushman, in an area classified as an Urban Residential shoreline environment by the Shoreline Master rogram of Mason County. Neighboring parcels support single-family residences (or rec eational cabins), bulkheads,piers, floats, and other appurtenances common to waterfront properties.Forested land in the vicinity of Hodges Habitat Management Plan 9 Lake Cushman has been logged heavily. Erosion impacts from surface flows have been particularly damaging in the logged areas above the lake's west shore. Before the completion of two dams in 1926 and 1930, Lake Cushman was a natural oligotrophic lake with a mean depth of 200 feet.Now Lake Cushman is 4,010-acre water body in the Olympic National Forest, having been altered in size to accommodate the hydroelectric dams. Because of the dams,water levels in Lake Cushman can fluctuate up to 21 meters (69 feet), with peak levels occurring during summer and minimum levels during winter.The magnitude of these fluctuations results in periodic inundation of 12 hectares (30 acres) of land surrounding the inlet to the reservoir, resulting in high water temperatures in the shallow waters of the inlet during the summer months (Brenkman 1998). Currently,the reservoir inundates 17.2 kilometers(10.7 miles) of river, including areas of the original Lake Cushman(Brenkman 1998). 4.2 ATF Project Site A field investigation was conducted on June 19, 2016, at approximately one in the afternoon. The project area was surveyed visually on foot. The elevation of the lake's water level was approx. 736 feet,two feet below full pool or the current ordinary high water mark of 738 feet. The site supports a single-family residence and the previously described shoreline appurtenances.Native vegetation coverage at the site is substantial, and there are numerous large trees.As previously noted,native trees that are approx. two to three feet in height have been planted on the bank, landward of the bulkhead. They appear to have been planted within the last two years. The shoreline at the site is located in a small cove. A perennial stream on the second adjacent property to the north discharges into the lake via an 18 inch culvert that collects stormwater throughout the north end of the neighborhood.The cove accumulates large quantities of woody debris, as it is blown in by prevailing winds.Adjacent properties support bulkheads,piers, and/or piers and floats. 5.0 Effects of the Action 5.1 Direct Effects Direct effects to the shoreline include: 1) The loss of benthic habitat from the installation of the beach access stairs' concrete landing and posts and the pier/float pilings. 2) Creation of shade to the shoreline from the stairs,pier, and float. 3)Contamination to Lake Cushman from the leaching of wood preservatives. 4)The prevention of Styrofoam®pollution. Hodges Habitat Management Plan 10 1)The footprint of the landing, posts, and pilin utilized in this project are located waterward of the lake's high water mark of 738 feet.All of the posts and pilings occupy less than eight square feet(sf) of benthic habitat Due to the seasonal fluctuations of the lake's water level, it is probable that benthic sp(cies do not thrive in the nearshore areas of the lake that lack permanent water.No empi cal evidence was found to document if both terrestrial and aquatic species utilize the ul per shoreline habitat, or if it has been too altered to support normal concentrations of eith r species. 2)Another direct effect is the creation of ove iter shade from the beach access stairs, pier, and float. The stair, pier, and float produce a reduction in light to the underlying aquatic environment by creating a light/dark bo indary that may give piscivorous species an advantage over their prey. The use of over-A iter structures in western Washington waters by bass, a common, non-native predator f juvenile salmonids, has been documented by several authors.Largemouth ba s in Lake Washington prefer areas of heavy log and brush cover over other habitat t es; however,they are commonly found under docks in early spring and are thought to b present until late summer(Stein 1970). Substrate type typically determines the accept a ility of an area for bass spawning,but adjacent cover and structural complexity are als necessary for protection while the fish are concentrated in shallow water(Stein 1970; Tooper and Crowder 1979; Helf nan 1981b;Pflug and Pauley 1984).The substrate t e in the vicinity of the bulkhead and landing is gravel, cobble, and rock. Largemout bass prefer moderate to dense vegetation and silt or sand substrate, and nests are constru ed at depths from 0.6 to 1.5 meters, in vegetated areas with soft sediment or gravel su trate on moderate to steep slopes(Pflug 1981). The ATF project site possesses unsuitab habitat for bass, so it is doubtful that the ramp and float has/will increased/increase the c ncentration of bass at the site or the occurrence of juvenile salmonid predation by b ss. The ATF site supports no existing macrophyte vegetation and has no potential to s ipport macrophyte vegetation, due to the lake's (anthropogenic) seasonal water fluctuatic ns. In addition, White(1975) determined that phytoplankton primary production is not si nificantly reduced by narrow residential piers, due to the presence of more optimal light onditions than found in surface waters, where light intensities are higher than those in hich algae thrive. Data suggests that other fish species, including almonids, are also attracted to the shade produced by over-water structures, so it is poss le that adult salmonids could prey on juveniles at the site. However,researchers have 'ndicated that structural complexity can moderate predator-prey interactions by providi more refuges for prey species as well as reducing the foraging efficiency of the predator Cooper and Crowder 1979). This moderation may apply to naturally occurring st ctural habitat complexity, as well as habitat complexity due to the presence of dock piers, boathouses and associated pilings (WDFW, WDOE, WSDOT 2001). Shade can also affect migrating salmonids. It is not known whether over-water structures disrupt the migration of salmonids in lakes.Nu erous studies suggest that docks, piers, and floats attract fish, and that the attraction of ish is linked to shade produced by the object not tactile stimulus. While the effects of hade on migrating juvenile salmonids in lakes is unknown, it is also unclear in marine w iters, and there is no empirical evidence Hodges Habitat Management Plan 11 of mortality.The significance of predation to migrating populations has never been empirically assessed (Simenstad et al. 1999).No studies have examined mortality due to predation much less that mortality is attributable to overwater structures (Nightingale& Simenstad 2001). One final important fact: the overwater structures at the site lack water for approx. six to seven months each year. In conclusion, shade created by the existing ramp and float is expected to have had/have discountable and insignificant direct effects on ESA listed salmonids that may be in the ATF project vicinity. 3)The leaching of wood preservatives is a common contaminant-related issue with the construction of shoreline SFR appurtenances.ACZA pressure treated wood,which is more prevalent on the west coast because it effectively treats Douglas fir, contains copper, zinc, chromium, and arsenic. The main active ingredient of concern for effects to fish is copper.Environmentally realistic concentrations of free copper are noted to impact the resistance of fishes to disease, cause hyperactivity, impair respiration, disrupt osmoregulation or impair olfactory performance (NOAA 2009). The majority of projects proposing to use treated wood are smaller than the 100 piling size which predicts potentially problematic water column concentrations of copper at current velocities of 1 cm/sec or less (NOAA 2009).Also, ACZA leaching rates were very low in fresh water within ten days of installation (Brooks 1995,NMFS 1998, Hutton& Samis 2000). A boardwalk study(FPL 2000)was conducted in Oregon on a 1,800 foot long boardwalk, constructed in a wetland area from three different copper treated products,to evaluate the product's environmental effects. The environment was slow moving freshwater,with fine grained sediments and heavy rainfall (NOAA 2009).A localized pattern of distribution indicated that the majority of leached copper was bound to suspended materials that settled into the sediments(NOAA 2009). Monitoring of leaching found that the greatest amount leached during initial rainfall (NOAA 2009). Four invertebrate sampling events were conducted at the AZCA site over a one year period to detect potential adverse effects.Results did not show a significant reduction in habitat quality, and no taxa were extirpated from the study area, despite elevated concentrations of copper near the boardwalk(NOAA 2009). It is unlikely that leaching from treated wood has had/will have a noticeable impact on aquatic life in Lake Cushman at the proposed project site, due to the small amount of treated wood used in the ATF project. 4) The proposed replacement of the float's exposed Styrofoam® float material with polyethylene encapsulated Styrofoam® floats is expected to prevent the structure from becoming an eventual source of pollution to Lake Cushman. Expanded polystyrene foam (EPS), commonly known by the trade name of as Styrofoam® is pervasive in the marine environment(CWAC 2008). Polystyrene is made from petroleum and is not biodegradable.Polystyrene is a principle component of urban litter and marine debris, and it is detrimental to wildlife that ingests it(Harvard University 2008). Polystyrene is lightweight and floats. It eventually breaks down into smaller and smaller pieces that fish Hodges Habitat Management Plan 12 and other wildlife mistake for food and consumd The lifetime of plastics in the marine environment is unknown. Some researchers feel that the composition of conventional petroleum-based plastics as durable polymers in ans they will degrade to increasingly smaller sizes but never disappear(CWAC 2008 In conclusion,the replacement of the existing in encapsulated float material with encapsulated floats is expected to have a benefic ial impact to the Lake Cushman ecosystem. 5.2 Indirect Effects Indirect effects are those effects that are caused y or will result from the proposed action and are later in time, but are still reasonably ce in to occur(50 CFR 402.02). Possible indirect effects from the ATF project include: 1 The loss of shoreline aquatic vegetation. 2)Potential increased motorized bo t presence in the area. 1)The overwater structures at the site have cau ed/will cause a reduction in light to the underlying aquatic environment, which can hav significant impacts on the health and productivity of both native and non-native mac phytes and algae. Macrophytes and algae are the foundation for most freshwater fo webs and their presence or absence affects many higher trophic levels(NMFS 200 . It is expected that the impact of the lake's fluctuating water level on littoral product vity will overshadow the impacts of shading from the overwater structures at the sitd As previously discussed, White (1975) determined that phytoplankton primary product on is not significantly reduced by narrow residential piers, due to the presence of more o imal light conditions than found in surface waters where light intensities are higher than those in which algae thrive. It is expected that the impact of the lake's fluctuatin r,water level on littoral productivity will overshadow the impacts of shading from the sta rs, pier, and float at the site. 2)The overwater structures at the site may hav caused/may cause an increased motorized boat presence in the area. Fuel spills From powerboats can contaminate water quality and potentially affect listed salmonids d rectly or indirectly through their prey source(NMFS 2005). Powerboats also create z mplified wave action that can erode the shoreline, and prop scouring can erode benthic abitat, although benthic habitat in the littoral zone is already significantly marginaliz by the lake's fluctuating water levels. Powerboats also provide some oxygenation of rface waters, although the extent is probably negligible at best. Overall,the indirec effects of powerboat usage on Lake Cushman is likely insignificant due to the lake' large size,the small number of boats that access the remote lake, and the short boating sc son(primarily May thru September). Hodges Habitat Management Plan 13 5.3 Cumulative Effects Cumulative effects are defined as"those effects of future state or private activities, not involving Federal activities, that are reasonably certain to occur within the action area of the action subject to consultation"(50 CFR 402.02). Cumulative impacts are difficult to access. Continued growth and urbanization is likely to detrimentally impact fish and wildlife resources. Global warming could raise the water level of Puget Sound, leaving many waterfront properties underwater. Global warming could also result in warmer water temperatures,to the detriment of species such as bull trout. Additionally, over- fishing may deplete stocks of salmon, even as restoration of habitat in the watershed furthers their likelihood of survival. 6.0 Conclusion 6.1 Take Analysis Section 9 of the ESA prohibits take of endangered or threatened species, "take"being defined in Section 3 as to harass, harm, pursue, hunt, shoot,wound,trap, capture, or collect listed species, or attempt to engage in any such conduct. "Harm" is further defined as a significant habitat modification or degradation that actually kills or injures listed species by"significantly impairing behavioral patterns such as breeding, spawning, rearing, migrating, feeding, and sheltering"(50 CFR 222.102). "Harass"is further defined as an intentional or negligent act which creates the likelihood of injury to wildlife by annoying it to such an extent as to significantly disrupt normal behavior patterns which include, but are not limited to, breeding, feeding, or sheltering(50 CFR 17.3). In regards to the ATF project, it is extremely unlikely that any"take"has or will occur. The proposed mitigation will further insure the likelihood that no "take"will occur. 6.2 Determination of Effect A determination of May affect, not likely to adversely affect is the appropriate conclusion when effects on the species or their critical habitat are expected to be beneficial, discountable, or insignificant. After reviewing the appropriate data and survey information, I have concluded that the ATF project has had/will have an insignificant impact on the previously discussed Endangered or Threatened species. In my most honest and professional opinion, while the ATF project may have/may impact individual Endangered or Threatened species in the project area, it is not likely to adversely affect or jeopardize the continued existence of those species or their designated Critical Habitat. The determination of effect for each of the listed species is: 1. Bull trout and their designated Critical Habitat May affect, not likely to adversely affect. 2. Chinook salmon--May affect, not likely to adversely affect. Hodges Habitat Management Plan 14 7.0 References Literature Federal Register/Vol. 70,No. 170/September 2, 2005/Rules and Regulations Federal Register/Vol. 70,No.185 /September 26, 2005/Rules and Regulations Federal Register/Vol. 71,No. 176/Tuesday, September 12, 2006/Proposed Rules Federal Register/Vol. 75,No. 200/October 18, 2010/Rules and Regulations Federal Register/77 FR 14062/March 8, 2012/Proposed Rules Google Earth. 2013.Aerial Imagery. Internet report. https://www.gooizle.com/earth/ Harvard University. 2008. Polystyrene Fast Facts. Internet report. URL: http://isites.harvard.edu/fs/docs/icb.topic96785 8.files/Pol�styreneFactSheets.pdf Johannessen, J.,A.MacLennan, A. Blue, J. Waggoner, S. Williams, W. Gerstel,R. Barnard,R. Carman, and H. Shipman, 2014.Marine Shoreline Design Guidelines. Washington Department of Fish and Wildlife, Olympia, Washington. Kelty,R.A. and S. Bliven. 2003.Environmental and Aesthetic Impacts of Small Docks and Piers, Workshop Report: Developing a Science-Based Decision Support Tool for Small Dock Management, Phase 1: Status of the Science.NOAA Coastal Ocean Program Decision Analysis Series No. 22.National Centers for Coastal Ocean Science, Silver Spring,MD. 69 pp. Kleinschmidt. 2012. Shoreline Management Plan, Cushman Project,FERC Project Number 460. Tacoma Power, Tacoma Washington. Leigh, M. 1996. Grow your own native landscape: a guide to identifying,propagating, and landscaping with Western Washington native plants. Washington State University Cooperative Extension/Thurston County, Olympia, WA. Mason County, Washington. 2016.Assessor-Treasurer Electronic Property Information Profile. Internet report. URL: http://property.co.mason.wa.us/Taxsifter/Search/results.aspx?g=423 07-5 0-00025 National Geographic. 2002.Field Guide to the Birds of North America.National Geographic Society, Washington, D.C. pg. 226, 244, 250, & 320. Hodges Habitat Management Plan 16 National Marine Fisheries Service. 2014. Distri tion of Threatened and Endangered Species. Internet report. http://www.nwr.noaa. v Nightingale, B. and C. Simenstad. 2001. Overw ter Structures: Marine Issues. Washington Departments of Fish and Wildlife, cology, and Transportation. Olympia, Washington. 177 p. NOAA. 2014.Endangered and Threatened Mar'ie Species. Internet report. http://www.nmfs.noaa.gov/pr/species/esa/ Poston, T. 2001. Treated Wood Issues Associatc J with Overwater Structures in Marine and Freshwater Environments. Pacific Northwe Laboratory, Richland, Washington. Skokomish Indian Tribe&Washington Departn ent of Fish and Wildlife.2010. Recovery Plan for Skokomish River Chinook S lmon. Internet Report. htt ://hccc.wa. ov/Downloads/Downloads Get ile.as x?id=397519&fd=0 Tacoma Public Utilities. 2014. Cushman Hydro Project. Internet report. https://www.mZpu.ora/tacomapower/about-tac ma- ower/dams- ower-sources/h dro- power/cushman-hydro-project/ Tacoma Public Utilities. 2015. Cushman Fisher s Program. Internet report. URL: http://www.m3lpu.org/tacomgpower/fish-wildli -environment/cushman-h dro- proj ect/cushman-fisheries-program.htm Tahja,A. 2016. Hodges Project Plans, 2-10-17. npublished document. 11 p. U.S. Fish and Wildlife Service. 2004. Draft Rec very Plan for the Coastal-Puget Sound Distinct Population Segment of Bull Tro t(Salvelinus confluentus). Volume II(of II): Olympic Peninsula Management Unit. Portland, Oregon. 277+xvi pp U.S.Fish and Wildlife Service.2011. Species ofile, Marbled Murrelet. Internet report. http://www.fws.gov/arcata/es/birds/mm/m mu elet.html U.S.Fish and Wildlife Service. 2012. Guidance for Identifying Marbled Murrelet Nest Trees in Washington State. Internet report. http://www.wsdot.wa.gov/NR/rdonlyres/2D97E 3D8-D448-43A7-8249- E2319095C8C2/0/MAMUhabitatF WS.pdf U.S. Fish and Wildlife Service.2012.Marbled urrelet Nesting Season and Analytical Framework for Section 7 Consultation in Wash ngton. Internet report. http://www.wsdot.wa.gov/NR/rdonlyres/F3847.)4F-BF IC-476C-8E9D- A45A715B624C/O/CoverLtrNestin Season. d Hodges Habitat Management Plan 17 U.S.Fish and Wildlife Service.2013. Conducting Masking Analysis for Marbled Murrelets and Pile Driving Projects. Internet report. http://www.wsdot.wa.gov/NR/rdonlyres/3506DAAA-4B 13-4E 1 B-855D- 36E047E07090/0/MAMU MaskAnalysis.pdf U.S. Fish and Wildlife Service.2014. Species fact sheet, Streaked Horned Lark, Eremophila alpestris strigata. Internet report. http://www.fws.gov/wafwo/species/Fact%20sheets/streakedhornedlarkfinal pdf Washington State Department of Ecology. 2012. 2012 Water Quality Assessment 303(d) List: Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16). Internet report.URL: http://www.ecy.wa.gov/pro2rams/wq/303d/currentassessmt.html Washington State Department of Natural Resources. 2014. FPARS ARCIMS mapping application. Internet report: http://fortress.wa..Rov/dnr/appl/fpars/viewer.htm Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List. Olympia, Washington. 177 pp. Washington Department of Fish and Wildlife. 2012. Annual Report: Marbled Murrelet. Internet report. http://wdfw.wa.jzov/conservation/endan e�pecies/marbled murrelet.pdf Washington Department of Fish and Wildlife. 2012.Annual Report: Northern Spotted Owl. Internet report. http://wdfw.wa.gov/conservation/endanizered/species/northem spotted owl.pdf Washington Department of Fish and Wildlife. 2012.Annual Report: Streaked Horned Lark. Internet report. http://wdfw.wa.gov/conservation/endangered/species/streaked rd/species/streaked horned lark.pdf Washington Department of Fish and Wildlife. 2012.Annual Report: Yellow-billed Cuckoo. Internet report. http://wdfw.wa.gov/conservation/endan eg red/species/yellow- billed cuckoo.pdf Washington Department of Fish and Wildlife. 2016. SalmonScape. Internet report. http://4pps.wdfw.wa.gov/salmonscgpe/ Washington State Department of Transportation.2014. BA Preparation for Transportation Projects—Advanced Training Manual—Version 4-02-2014. http://www.wsdot.wa.gov/NR/rdonlyres/A 1 F85352-90EO-457B-9A8C- B5103E097FAE 10/BA_manualpart2.pdf Hodges Habitat Management Plan 18 Attachment 1 Vicinity map. Iil lake Cushman r?d ---- .}ake Cushman Church Dr, 01y" attooel Forest p°tlafch Dr N Hodges Residence N^ 111 N Potlatch Drive North 6 L a k a G h m a .a C— -- Hodges Habitat Management Plan 19 Attachment 2 Site Plan (NTS). i .,> o- n } I z < r v y .r Ir Hodges Habitat Management Plan 20 Attachment 3 Site plan showing shoreline ATF development( TS). iF _r �M mac ,, � �G• g - z " t � _ ry u Y Hill„ j � zj ri 3 2 4 Im Nz ! i r r ,�.........� " ✓ Hodges Habitat Management Plan 21 Attachment 4 Float details (NTS). E € � 3; / r s / tp!if $z, n ',1 — r tact � +. I 'a e ' t 2\ti i C: r � � s e Hodges Habitat Management Plan 22 Attachment 5 Cross Section (NTS). > W f i f { � ,awe � j•'� C�z _ ,�.� r g w t rr � pr� r* I 742 i /F k � 3 Hodges Habitat Management Plan 23 Attachment 6 The existing pier and float at the site. i„ "r n sY �tY 6 ,w Hodges Habitat Management Plan 24 Attachment 7 The existing pier and float(in background with a life preserver hanging on the pier during the low water season. s b� t Hodges Habitat Management Plan 25 Attachment 8 The existing permitted rock bulkhead with the wood retaining wall to the right. ° :. 7-5 AI llmllslkdna&'� x e Hodges Habitat Management Plan 26 s Attachment 9 Existing native plantings (conifers) on the shor ine at the site � x n t i IIff a Hodges Habitat Management Plan 27 Attachment 10 Another view of existing native plantings on the shoreline at the site +"e n sW,: i e Hodges Habitat Management Plan 28 �PyON-C ATF0- MASON COUNTY A o �N DEPARTMENT OF COMMUNITY DEVELOPMENT o T Planning Division o N Y o~ 615 W Alder St, Shelton, WA 98584 1864 (360)427-9670 MASON COUNTY ENVIRONMENTAL PERMIT March 06, 2017 DIREK HODGES 12784 ROAD# 35 MADERA CA 93636 Parcel Number(s): 423075000039 Expiration Date: 3/6/2019 12:00:OOAN Date Issued: 3/6/2017 Case Number: MEP2016-00050 Project Description: ATF PERMITTING FOR CONCRETE STEPPING STONES, RETAINING WALL, PIER WITH BEACH ACCESS STAIRS AND FLOAT The following critical areas are present on this property: Long-Term Commercial Forest XK FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands H Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. 1� �31-7 Authorized L c Government Official Date Conditions: 3/6/2017 Page 1 of MEP2016-00050 MASON COUNTY ENVIRONMENTAL PERMIT 3/6/2017 Case No.: MEP2016-00050 No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showin go d cause, may extend the initial two year period by one year. No permit shall be extended unless the apl i s requested such review and extension prior to the exporation date. Signature Date (--OVVkER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate) 3/6/2017 Page 2 of 2 MEP2016-00050 vo&Eb -? QQQ UiLe- oc 12- Habitat Management Plan Hodges Pier and Float After-the-Fact Permitting Project Lake Cushman, Hoodsport WA For: Direk Hodges 12784 Road #35 Madera,CA 93636 Prepared by: BioResources, LLC Kim Schaumburg Fisheries biologist,University of Washington, 1981 10112 Bay View Rd. KPN Vaughn,WA, 98394 (253) 884-5776 225-2973 Email: kimberly035, centurytel.net August 5, 016 Revised February 22,2017 Table of Contents 1.0 Proposed Action.............................................................................. 3 1.1 Background&ATF Development........................................................ 3-4 1.2 ATF Development Need&Objectives.................................................... 4 2.0 Project Description&Activities............................................................. 3 2.1 Mitigation....................................................................................... 4-5 2.2 Timing....................................................................................... ... 5 2.3 Best Management Practices.................................................................. 5 2.4 Conservation Measures....................................................................... 6 3.0 ESA Species and Habitat Information...................................................... 6 3.1 ESA Listed Species........................................................................... 7-9 4.0 Environmental Baseline Conditions........................................................ 9 4.1 ATF Project Vicinity......................................................................... 9-10 4.2 ATF Project Site.............................................................................. 10 5.0 Effects of the Action.......................................................................... 10 5.1 Direct Effects.................................................................................. 10-13 5.2 Indirect Effects................................................................................. 13 5.3 Cumulative Effects............................................................................ 13 6.0 Conclusion......................................................................................14 6.1 Take Analysis.................................................................................. 14 6.2 Determination of Effect...................................................................... 14-15 7.0 References......................................................................................16-18 Attachments 1. Project location...................................................................................19 2. Site plan....................................................................................... ...20 3. Site plan........................................................................................... 21 4. Float details........................................................................................22 5. Cross section..................................................................................... 23 6. Site Photographs.................................................................................. 24 7. Site Photographs.................................................................................. 25 8. Site Photographs.................................................................................. 26 9. Site Photographs.................................................................................. 27 10. Site Photographs.................................................................................. 28 Hodges Habitat Management Plan 2 1.0 Proposed Action This Habitat Management Plan has been submi ed on behalf of Direk Hodges at the request of Mason County to comply with the C nty's regulations and procure after-the- fact(ATF)permits for existing shoreline devel ment on his Lake Cushman property. The ATF development includes the following: fire pit, shoreline access (concrete stepping stone) steps, a wood retaining wall, a er and attached beach access stairs, and a float. An existing rock bulkhead is permitted. I addition, a new project is also being proposed as Tacoma Power requires that the ex ting float be fitted with polyethylene encapsulated Styrofoam®floats;the existing fl at currently utilizes un-encapsulated float material.Mitigation for ATF development is pr viously installed native plantings(trees) on the shoreline. 1.1 Background & ATF Development The proposed project site is located in Mason C unty at 11 I North Potlatch Drive North, Hoodsport Washington(Attachment 1).The M on County tax parcel number is 42307- 50-00039. The property is located in Section 07 Township 23N,Range 04 of the Western Meridian. The latitude is 47.49316 nor h, and the longitude is -123.24718 west. The proposed project site is located on Lake C hman in the Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16)on shoreline designated Urban Residential by the Shoreline Master Program of Mason Co ty. Lake Cushman is regulated under the Mason County Shoreline Master Program and t e Mason County Resource Ordinance as a Fish and Wildlife Habitat Conservation Area. he Shoreline Management Act of 1971 designated Lake Cushman as a Shoreline of St a wide Significance. In addition,Lake Cushman is regulated by Tacoma Public Utiliti (aka Tacoma Power),which has designated Shoreline Management Classificatio i(SMC)zones.The proposed project site is located in an SMC zone classified as "A."Ta oma Power defines the"A"management classification as shoreline areas with no known ignificant environmental/cultural resources or associated resource management g, ials precluding existing or future shoreline uses;this classification acknowledges existing private uses and anticipates potential future private and light commercial sh reline uses (Kleinschmidt 2012). The proposed project site is located in a rural n ghborhood on a shoreline lot with approximately(approx.) 70 feet of frontage,wh ch supports a single-family residence located approximately twenty feet vertically an sixty-five feet horizontally from the shoreline of Lake Cushman. The site features a noderate cover of mature native conifers. Additionally, native trees have been recently pl nted along the shoreline, on a bank directly landward of the bulkhead area.Existin shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot(4' x 1 ') set of shoreline access(concrete stepping stone) steps, a rock fire pit on top of t bank(above the bulkhead), an approx. twenty-two-foot(21' 8")wood retaining wall th electrical outlets along the base of the bank that is between the bulkhead and an appro . four-foot(4')walking path, an approx. fifty-eight by five-foot(58' x 5')rock bulkhead (installed in 1995), an approx. six by Hodges Habitat Management Plan 3 r { fifteen-foot(5' 10"x 15' 6")pier, an approx.twenty-seven by fifty-inch (27"x 8') set of wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot(8' x 7' 4") float. The pier is supported by the bank and four(4)metal pilings,two which are shared with the float. The float utilizes four float positioning steel pilings(6").A vertical wood ladder on the pier accesses the float. The total overwater coverage at the site (lakebed access stairs,pier, and float is 155 square feet). 1.2 ATF Development Need and Objectives The existing shoreline appurtenances are common to shoreline properties on Lake Cushman; however,with the exception of the bulkhead,they were installed without the proper permits from Mason County. It is probable that the former owners were unaware that permits were mandatory.Now,the applicant(and new owner)wants to bring his property into compliance by obtaining all the required regulatory permits. To this end, permits will be procured from the following agencies: Mason County, the Washington Department of Fish& Wildlife(WDFW), Tacoma Power,the Lake Cushman Management Company, and the United States Army Corps of Engineers(USACE). Additionally, as per Tacoma Power rules,the float will be fitted with new, polyethylene encapsulated Styrofoam® floats. The WDFW does not issue after-the-fact permits, but an HPA (hydraulic permit application)will be required for the latter action. 2.0 Project Description & Activities As previously noted, the existing float will be fitted with new, polyethylene encapsulated Styrofoam® floats, as per Tacoma Power rules. Four(4)twenty-four by forty-eight by twelve-inch(24"x 48"x 12")polyethylene encapsulated Styrofoam® floats will be installed on the existing float, as per the manufacturers installation instructions.Also,to ensure that the float is resting a minimum of one foot above the lakebed during the low water season,the float positioning steel pilings will be fitted with two by eight-foot(2' x 8') landing planks,utilizing galvanized carriage bolts and other hardware. 2.1 Mitigation Mitigation for the ATF development is previously installed native plantings (trees) on the shoreline(Attachments 9 & 10).The trees are primarily conifers and are approx. one to three feet in height. They appear to have been planted within the last two years. The following species and quantities were observed: Hodges Habitat Management Plan 4 Approximately twenty-five(25)Douglas fir anc twenty(20) Western red cedar. Seven red huckleberry also appear to have been plante 1. It is recommended that existing ivy be removed. Additionally,the replacement of the float mater al with encapsulated floats is self- mitigating as the removal of the existing un-enc ipsulated float material is expected to have a beneficial impact to the lake's water qua ity(see 5.1 Direct Effects). 2.2 Timing Work on the float will be completed over an apl,rox. seven (7) day period during daylight working hours normal to a rural residential neig iborhood. Work will only take place when the water level of Lake Cushman is low, hich is generally between October and April. 2.3 Best Management Practices In order to maintain the present water quality of Lake Cushman during project construction, Best Management Practices (B )will be implemented. BMPs are defined as physical, structural, and/or managerial practices that prevent or reduce the pollution of water(WDOE). The following additional BMP shall be used lo insure that water quality is not degraded during construction: 1. Equipment shall be cleaned and checkec for leaks, offsite and daily, before commencing work. In addition,the following Spill Prevention Coni rol measures shall also be followed: 1) The applicant will supply the site with a portab bathroom or allow workers access to the onsite bathroom so that solid or liquid waste wi I not become a source of stormwater pollution. 2)The applicant will be responsible br alerting the appropriate authorities in the event of a hazardous spill. 3)The applicant will have a spill kit and be able to perform basic control, containment, and/or coni nement operations within the capabilities of the resources and personnel protective equipi ient available. In other words, small spills, such as paint or oil, shall be promptly an fully collected and disposed of at a suitable disposal site. In the event of a significa t spill, a fish kill, and/or if fish are observed in distress the Washington State Depa tment of Ecology(800.258.5990)and the Washington State Department of Fish and Wild ife's Area Habitat Biologist, Joshua Benton(360.602.0364),will be notified immed ately. Hodges Habitat Management Plan 5 2.4 Conservation Measures 1. No construction to occur unless Lake Cushman's waters are low. 2. An existing float will be refitted with polyethylene encapsulated Styrofoam®. 3. Construction to take place as per the 14PA provisions from the Washington Department of Fish and Wildlife. 4. Previously discussed BMPs to be strictly adhered to. 5. Existing small native trees planted on the shoreline to be maintained with weeding and watering as necessary. 6. Electrical outlets,located on a wood retaining wall along the base of the bank that is between the bulkhead and a walking path,to be removed,as per Tacoma Power's regulations. 3.0 ESA Species and Habitat Information In the ATF project area,there are six species listed under the Endangered Species Act by the U.S. Fish and Wildlife Service (USFWS) as either threatened, endangered, or candidate species. The bull trout(Salvelinus confluentus), marbled murrelet (Brachyramphus marmoratus),northern spotted owl (Stridex occidentalis), and streaked horned lark(Eremophila alpestris strigata) are listed as threatened and critical habitat has been designated for these species. The ATF project site is in the bull trout's critical habitat.The yellow-billed cuckoo (Coccyzus americanus) and the fisher(Mantes pennanti) are listed as proposed threatened and candidate species, respectively. In the proposed project area,there is one species listed under the Endangered Species Act by the National Marine Fisheries Service(NMFS) as either threatened, endangered, or candidate species.The Puget Sound Chinook salmon(Oncorhynchus tshawytscha) is listed as threatened and critical habitat has been designated. Lake Cushman is a historical watershed of the Chinook that has been anthropogenically blocked;however, it has been designated critical habitat. The Washington Department of Fish and Wildlife(WDFW) GIS maps reveal the documented presence of two other species of salmonids on the State's PHS list within the action area: Kokanee(Oncorhynchus nerka) and the Puget Sound/Coastal cutthroat trout (Oncorhynchus clarki clarki).The presence of these two species has been documented in Lake Cushman. WDFW data reveals that Lake Cushman was stocked with 23,896 cutthroat trout in 2005 and 205,800 Kokanee (landlocked sockeye salmon) in 2004. A WDFW biologist reported that other species that inhabit the lake include rainbow trout (Oncorhynchus mykiss) and non-native largemouth bass(Micropterus salmoides). Hodges Habitat Management Plan 6 Additionally, Tacoma Power is presently workit g in association with the Skokomish Tribe and the WDFW to re-establish migrating E almonid runs in the North fork of the Skokomish River.The North Fork Skokomish Pov erhouse and Fish Facility has recently been completed.This facility collects adult fish at the I iase of Cushman Dam No. 2 and transports them to the top of the dam for sorting It also provides sorting facilities for juvenile fish and transports them to the base of edam for release into the river. The fry will be released in Lake Cushman, and smolts 11 be collected and released into the lower North Fork Skokomish River.Returning ult sockeye will eventually be collected at the base of Cushman Dam No. 2. Two new h cheries are also under construction, one on the Hood Canal at Potlatch for sockeye,the her on Lake Kokanee for Chinook, coho, and steelhead.Hatchery construction is pl nned to be complete in 2015 (Tacoma Public Utilities 2015). 3.1 ESA Listed Species BULL TROUT Bull trout are members of the char subgroup of e salmon family and are native to the Pacific Northwest and western Canada. Water t perature above 15 degrees Celsius is believed to limit bull trout distribution, as eggs d juveniles require extremely cold water for survival. Bull trout are also vulnerabl to degraded stream habitat, poor water quality, dams and other stream blocking structu s, and predation by non-native fish. Critical habitat includes the upper North Fork o the Skokomish River(70 FR 56304). Critical Habitat in the North Fork of the Skokor iish River includes spawning and rearing habitat.Lake Cushman provides rearing, foragii g, and migration habitat, so it is expected that bull trout may be found in the vicinity of th ATF project site. MARBLED MURRELET A small, diving seabird in the family Alcidae,tf e marbled murrelet forages for small fish and invertebrates almost exclusively in nearsho marine waters, while nesting inland in old-growth or mature conifer forests.Threats in Jude loss of habitat, predation, gill-net fishing operations, oil spills,marine pollution, d disease. The USFWS assembled a team of scientists in October 2011 to investigat causes for the continued decline in murrelet populations.The outcome of these dis ssions listed many factors, chiefly loss of potential nesting habitat as the main reason f ir hindrance of population recovery goals (WDFW 2012). Potential nest trees are coniferous trees within 5 5 mi(88.5 km) of marine waters that support at least one 4-inch(10.2-cm) diameter I latform located at least 33 feet(10 meters) above the ground,with horizontal and rtical cover(USFWS 2012). If a tree or forested area does not support these habitat feat res, it is"extremely unlikely"to support a murrelet nest(USFWS 2012).Nest success is influenced by forest structure,the spatial Hodges Habitat Management Plan 7 mix of habitat and non-habitat, human disturbance,prey availability, and marine foraging conditions. Human disturbance can lead to higher predation levels by Steller's and gray jays, crows, ravens, and other species that seek human-related foods and refuse at high- use recreational areas (Peery et al. 2004,Marzluff and Neatherlin 2006). Critical habitat for the marbled murrelet,which was designated in May of 1996 and revised in October of 2011, is located to the northwest of the ATF project site; therefore, it must be assumed that marbled murrelets may be found nesting in the vicinity. NORTHERN SPOTTED OWL The Northern Spotted Owl is one of the largest owls in North America, and the average adult female is approximately 18 inches tall with a 48-inch wingspan.Northern spotted owls are strictly nocturnal, and require old-growth forests with multi-layered canopies of trees, including large trees with broken tops, deformed limbs, and large holes and cavities to nest in. The Northern spotted owl is very territorial and intolerant of habitat disturbance, and a pair requires a large amount of forest for hunting and nesting.Habitat loss has occurred as a result of forest conversion,timber harvest, fire,windthrow, insect outbreak and disease (WDFW 2012). The USFWS designated revised critical habitat for the northern spotted owl under the Endangered Species Act. In total, approximately 9,577,969 acres (ac) (3,876,064hectares (ha)) in 11 units and 60 subunits in California, Oregon, and Washington fall within the boundaries of the 2 critical habitat designation. Critical habitat for the Northern spotted owl is located in the vicinity of Lake Cushman.However, due to the close proximity of human habitation, it is unlikely that any Northern spotted owls may be found in the neighborhood of the ATF project site. STREAKED HORNED LARK Horned larks are birds that utilize wide open spaces with no trees and few or no shrubs. The streaked horned lark nests on the ground in sparsely vegetated sites dominated by grasses and shrubs.Historically this type of habitat was found in prairies in western Oregon and Washington, in dune habitats along the coast of Washington, on the sandy beaches and spits along the Columbia and Willamette Rivers, and in grasslands, estuaries, and sandy beaches in British Columbia(WDFW 2012). Today the streaked horned lark nests in a broad range of habitats, including native prairies, coastal dunes, fallow and active agricultural fields,wetland mudflats, sparsely-vegetated edges of grass fields, recently planted Christmas tree farms with extensive bare ground,moderately-to heavily- grazed pastures, gravel roads or gravel shoulders of lightly-traveled roads, airports, and dredge deposition sites in the lower Columbia River(WDFW 2012). It is expected that the ATF project site contains unsuitable habitat for the streaked horned lark. Hodges Habitat Management Plan 8 CHINOOK SALMON Chinook salmon in Lake Cushman are a land-lo ked population that originated from anadromous fish, although loss of genetic varia on makes it difficult to determine whether they are descended from historical Ho Canal populations or introduced hatchery fish(NOAA 2006). Lake Cushman Ch nook are genetically different, smaller in size(and presumably less fecund)than their ana Iromous counterparts(Myers et al. 1998). On Jan. 12,2009,Tacoma Power,the Skoko nish Tribal Nation and state and federal agencies signed a settlement agreement that res ved a$5.8 billion damages claim and long-standing disputes over the terms of a long- erm license for Cushman Hydroelectric Project. Tacoma Power has proposed to introdu e sockeye and spring Chinook and enhance the existing winter steelhead and coho opulations in the North Fork in cooperation with the WDFW and the Skokomis Tribe (Tacoma Public Utilities 2014). In addition, Tacoma Power will annually release u o to 100,000 rainbow trout for sport harvest(TPU 2014). Lake Cushman has been designated Critical ha tat, and the ATF project site provides rearing, foraging, and migration habitat, so it is xpected that adult and/or juvenile Chinook salmon may be found in the vicinity ol the site. 4.0 Environmental Baseline Cond tions 4.1 ATF Project Vicinity The environmental baseline represents the exist g set of conditions,to which the effects of the proposed action are then added. The envii onmental baseline is defined as"the past and present impacts of all Federal, state, and pr' iate actions and other human activities in the action area,the anticipated impacts of all pr posed Federal projects in the action area that have already undergone formal or informal ection 7 consultation, and the impact of state or private actions which are contemporane us with the consultation process" (50 CFR 402.02). The proposed project site is in S komish/Dosewallips WRIA 16 (Water Resource Inventory Area), on Lake Cushman in Mason County.The majority of the fresh and marine waterbodies in WRIA 16 suffer fror i water quality issues; however Lake Cushman is not listed on the state's 2012 Watei Quality 303(d)list of impaired waterbodies for any parameters. Two waterbodi 1,s in the Skokomish watershed,the South Fork of the Skokomish River and Lebar Creek i re listed for the parameter of temperature (high). The proposed project site is located in a rural n ghborhood on a lot with approximately 70 feet of frontage on Lake Cushman, in an are classified as an Urban Residential shoreline environment by the Shoreline Master rogram of Mason County.Neighboring parcels support single-family residences(or rec eational cabins), bulkheads,piers, floats, and other appurtenances common to waterfront properties. Forested land in the vicinity of Hodges Habitat Management Plan 9 Lake Cushman has been logged heavily. Erosion impacts from surface flows have been particularly damaging in the logged areas above the lake's west shore. Before the completion of two dams in 1926 and 1930, Lake Cushman was a natural oligotrophic lake with a mean depth of 200 feet.Now Lake Cushman is 4,010-acre water body in the Olympic National Forest,having been altered in size to accommodate the hydroelectric dams. Because of the dams,water levels in Lake Cushman can fluctuate up to 21 meters(69 feet),with peak levels occurring during summer and minimum levels during winter. The magnitude of these fluctuations results in periodic inundation of 12 hectares(30 acres)of land surrounding the inlet to the reservoir, resulting in high water temperatures in the shallow waters of the inlet during the summer months (Brenkman 1998).Currently,the reservoir inundates 17.2 kilometers(10.7 miles) of river, including areas of the original Lake Cushman(Brenkman 1998). 4.2 ATF Project Site A field investigation was conducted on June 19, 2016, at approximately one in the afternoon. The project area was surveyed visually on foot. The elevation of the lake's water level was approx. 736 feet,two feet below full pool or the current ordinary high water mark of 738 feet. The site supports a single-family residence and the previously described shoreline appurtenances.Native vegetation coverage at the site is substantial, and there are numerous large trees.As previously noted, native trees that are approx.two to three feet in height have been planted on the bank, landward of the bulkhead. They appear to have been planted within the last two years. The shoreline at the site is located in a small cove. A perennial stream on the second adjacent property to the north discharges into the lake via an 18 inch culvert that collects stormwater throughout the north end of the neighborhood. The cove accumulates large quantities of woody debris, as it is blown in by prevailing winds.Adjacent properties support bulkheads, piers, and/or piers and floats. 5.0 Effects of the Action 5.1 Direct Effects Direct effects to the shoreline include: 1) The loss of benthic habitat from the installation of the beach access stairs' concrete landing and posts and the pier/float pilings. 2) Creation of shade to the shoreline from the stairs,pier, and float. 3) Contamination to Lake Cushman from the leaching of wood preservatives.4)The prevention of Styrofoam®pollution. Hodges Habitat Management Plan 10 1)The footprint of the landing,posts, and pilin utilized in this project are located waterward of the lake's high water mark of 738 eet. All of the posts and pilings occupy less than eight square feet(sf)of benthic habitat Due to the seasonal fluctuations of the lake's water level, it is probable that benthic sp ies do not thrive in the nearshore areas of the lake that lack permanent water.No empir cal evidence was found to document if both terrestrial and aquatic species utilize the u er shoreline habitat, or if it has been too altered to support normal concentrations of eith(r species. 2)Another direct effect is the creation of overw ter shade from the beach access stairs, pier, and float. The stair, pier, and float produce a reduction in light to the underlying aquatic environment by creating a light/dark boi ndary that may give piscivorous species an advantage over their prey. The use of over-w tter structures in western Washington waters by bass, a common,non-native predator f juvenile salmonids, has been documented by several authors. Largemouth ba in Lake Washington prefer areas of heavy log and brush cover over other habitat ty s;however,they are commonly found under docks in early spring and are thought to b present until late summer(Stein 1970). Substrate type typically determines the acceptab lity of an area for bass spawning,but adjacent cover and structural complexity are als necessary for protection while the fish are concentrated in shallow water(Stein 1970; ooper and Crowder 1979;Helfinan 1981b;Pflug and Pauley 1984). The substrate t) 3e in the vicinity of the bulkhead and landing is gravel, cobble, and rock. Largemouth bass prefer moderate to dense vegetation and silt or sand substrate, and nests are construc ed at depths from 0.6 to 1.5 meters, in vegetated areas with soft sediment or gravel sub trate on moderate to steep slopes(Pflug 1981). The ATF project site possesses unsuitab habitat for bass, so it is doubtful that the ramp and float has/will increased/increase the c ncentration of bass at the site or the occurrence of juvenile salmonid predation by b s.The ATF site supports no existing macrophyte vegetation and has no potential to s pport macrophyte vegetation, due to the lake's (anthropogenic) seasonal water fluctuati s. In addition, White(1975)determined that phytoplankton primary production is not si ificantly reduced by narrow residential piers, due to the presence of more optimal light onditions than found in surface waters, where light intensities are higher than those in v hich algae thrive. Data suggests that other fish species, including lmonids, are also attracted to the shade produced by over-water structures, so it is possi le that adult salmonids could prey on juveniles at the site. However, researchers have ndicated that structural complexity can moderate predator-prey interactions by providi more refuges for prey species as well as reducing the foraging efficiency of the predator Cooper and Crowder 1979). This moderation may apply to naturally occurring st ctural habitat complexity, as well as habitat complexity due to the presence of docks piers, boathouses and associated pilings (WDFW, WDOE, WSDOT 2001). Shade can also affect migrating salmonids. It is of known whether over-water structures disrupt the migration of salmonids in lakes.Nui ierous studies suggest that docks,piers, and floats attract fish, and that the attraction of sh is linked to shade produced by the object not tactile stimulus. While the effects of hade on migrating juvenile salmonids in lakes is unknown, it is also unclear in marine w ters, and there is no empirical evidence Hodges Habitat Management Plan 11 of mortality. The significance of predation to migrating populations has never been empirically assessed (Simenstad et al. 1999).No studies have examined mortality due to predation much less that mortality is attributable to overwater structures(Nightingale& Simenstad 2001). One final important fact: the overwater structures at the site lack water for approx. six to seven months each year. In conclusion, shade created by the existing ramp and float is expected to have had/have discountable and insignificant direct effects on ESA listed salmonids that may be in the ATF project vicinity. 3) The leaching of wood preservatives is a common contaminant-related issue with the construction of shoreline SFR appurtenances. ACZA pressure treated wood,which is more prevalent on the west coast because it effectively treats Douglas fir, contains copper, zinc, chromium, and arsenic. The main active ingredient of concern for effects to fish is copper.Environmentally realistic concentrations of free copper are noted to impact the resistance of fishes to disease, cause hyperactivity, impair respiration, disrupt osmoregulation or impair olfactory performance (NOAA 2009).The majority of projects proposing to use treated wood are smaller than the 100 piling size which predicts potentially problematic water column concentrations of copper at current velocities of 1 cm/sec or less(NOAA 2009).Also,ACZA leaching rates were very low in fresh water within ten days of installation(Brooks 1995,NMFS 1998, Hutton& Samis 2000). A boardwalk study(FPL 2000)was conducted in Oregon on a 1,800 foot long boardwalk, constructed in a wetland area from three different copper treated products,to evaluate the product's environmental effects. The environment was slow moving freshwater,with fine grained sediments and heavy rainfall (NOAA 2009).A localized pattern of distribution indicated that the majority of leached copper was bound to suspended materials that settled into the sediments(NOAA 2009). Monitoring of leaching found that the greatest amount leached during initial rainfall (NOAA 2009). Four invertebrate sampling events were conducted at the AZCA site over a one year period to detect potential adverse effects. Results did not show a significant reduction in habitat quality, and no taxa were extirpated from the study area, despite elevated concentrations of copper near the boardwalk(NOAA 2009). It is unlikely that leaching from treated wood has had/will have a noticeable impact on aquatic life in Lake Cushman at the proposed project site, due to the small amount of treated wood used in the ATF project. 4) The proposed replacement of the float's exposed Styrofoam®float material with polyethylene encapsulated Styrofoam®floats is expected to prevent the structure from becoming an eventual source of pollution to Lake Cushman. Expanded polystyrene foam (EPS), commonly known by the trade name of as Styrofoam® is pervasive in the marine environment(CWAC 2008).Polystyrene is made from petroleum and is not biodegradable. Polystyrene is a principle component of urban litter and marine debris, and it is detrimental to wildlife that ingests it(Harvard University 2008). Polystyrene is lightweight and floats. It eventually breaks down into smaller and smaller pieces that fish Hodges Habitat Management Plan 12 and other wildlife mistake for food and consum . The lifetime of plastics in the marine environment is unknown. Some researchers fee that the composition of conventional petroleum-based plastics as durable polymers rr.rans they will degrade to increasingly smaller sizes but never disappear(CWAC 2008 . In conclusion,the replacement of the existing u -encapsulated float material with encapsulated floats is expected to have a beneficial impact to the Lake Cushman ecosystem. 5.2 Indirect Effects Indirect effects are those effects that are caused y or will result from the proposed action and are later in time,but are still reasonably cer ain to occur(50 CFR 402.02). Possible indirect effects from the ATF project include: The loss of shoreline aquatic vegetation. 2)Potential increased motorized bo it presence in the area. 1)The overwater structures at the site have ca ed/will cause a reduction in light to the underlying aquatic environment, which can hav significant impacts on the health and productivity of both native and non-native mac phytes and algae. Macrophytes and algae are the foundation for most freshwater fo webs and their presence or absence affects many higher trophic levels(NMFS 2004 1. It is expected that the impact of the lake's fluctuating water level on littoral product ity will overshadow the impacts of shading from the overwater structures at the sit As previously discussed, White (1975) determined that phytoplankton primary product n is not significantly reduced by narrow residential piers, due to the presence of more op imal light conditions than found in surface waters where light intensities are higher than those in which algae thrive. It is expected that the impact of the lake's fluctuatin water level on littoral productivity will overshadow the impacts of shading from the sta rs, pier, and float at the site. 2)The overwater structures at the site may havc caused/may cause an increased motorized boat presence in the area. Fuel spills Tom powerboats can contaminate water quality and potentially affect listed salmonids d rectly or indirectly through their prey source(NMFS 2005). Powerboats also create a nplified wave action that can erode the shoreline, and prop scouring can erode benthic abitat, although benthic habitat in the littoral zone is already significantly marginaliz by the lake's fluctuating water levels. Powerboats also provide some oxygenation of rface waters, although the extent is probably negligible at best. Overall,the indirec effects of powerboat usage on Lake Cushman is likely insignificant due to the lake' large size,the small number of boats that access the remote lake, and the short boating se son(primarily May thru September). Hodges Habitat Management Plan 13 5.3 Cumulative Effects Cumulative effects are defined as "those effects of future state or private activities, not involving Federal activities,that are reasonably certain to occur within the action area of the action subject to consultation" (50 CFR 402.02). Cumulative impacts are difficult to access. Continued growth and urbanization is likely to detrimentally impact fish and wildlife resources. Global warming could raise the water level of Puget Sound, leaving many waterfront properties underwater. Global warming could also result in warmer water temperatures,to the detriment of species such as bull trout. Additionally, over- fishing may deplete stocks of salmon, even as restoration of habitat in the watershed furthers their likelihood of survival. 6.0 Conclusion 6.1 Take Analysis Section 9 of the ESA prohibits take of endangered or threatened species, "take"being defined in Section 3 as to harass, harm, pursue, hunt, shoot,wound,trap, capture, or collect listed species, or attempt to engage in any such conduct. Harm is further defined as a significant habitat modification or degradation that actually kills or injures listed species by"significantly impairing behavioral patterns such as breeding, spawning, rearing,migrating, feeding, and sheltering"(50 CFR 222.102). "Harass" is further defined as an intentional or negligent act which creates the likelihood of injury to wildlife by annoying it to such an extent as to significantly disrupt normal behavior patterns which include,but are not limited to,breeding, feeding, or sheltering(50 CFR 17.3). In regards to the ATF project, it is extremely unlikely that any"take"has or will occur. The proposed mitigation will further insure the likelihood that no "take"will occur. 6.2 Determination of Effect A determination of May affect, not likely to adversely affect is the appropriate conclusion when effects on the species or their critical habitat are expected to be beneficial, discountable, or insignificant. After reviewing the appropriate data and survey information, I have concluded that the ATF project has had/will have an insignificant impact on the previously discussed Endangered or Threatened species. In my most honest and professional opinion, while the ATF project may have/may impact individual Endangered or Threatened species in the project area, it is not likely to adversely affect or jeopardize the continued existence of those species or their designated Critical Habitat. The determination of effect for each of the listed species is: 1. Bull trout and their designated Critical Habitat May affect, not likely to adversely affect. 2. Chinook salmon--May affect, not likely to adversely affect. Hodges Habitat Management Plan 14 3. Marbled murrelet No effect. 4. Northern spotted owl No effect. 5. Streaked horned lark---No effect. 6. Yellow-billed cuckoo—No effect. Hodges Habitat Management Plan 15 7.0 References Literature Federal Register/Vol. 70, No. 170/September 2, 2005/Rules and Regulations Federal Register/Vol. 70, No.185 /September 26, 2005/Rules and Regulations Federal Register/Vol. 71,No. 176/Tuesday, September 12, 2006/Proposed Rules Federal Register/Vol. 75,No. 200/October 18, 2010/Rules and Regulations Federal Register/77 FR 14062/March 8, 2012/Proposed Rules Google Earth. 2013.Aerial Imagery. Internet report. https://www.aooizle.com/earth/ Harvard University.2008. Polystyrene Fast Facts. Internet report. URL: http•//isites harvard edu/fs/docs/icb.topic967858.files/PolystyreneFactSheets.pdf Johannessen,J.,A.MacLennan,A. Blue, J. Waggoner, S. Williams, W. Gerstel,R. Barnard, R. Carman, and H. Shipman, 2014.Marine Shoreline Design Guidelines. Washington Department of Fish and Wildlife, Olympia, Washington. Kelty, R.A. and S. Bliven. 2003. Environmental and Aesthetic Impacts of Small Docks and Piers, Workshop Report: Developing a Science-Based Decision Support Tool for Small Dock Management, Phase 1: Status of the Science.NOAA Coastal Ocean Program Decision Analysis Series No. 22.National Centers for Coastal Ocean Science, Silver Spring,MD. 69 pp. Kleinschmidt. 2012. Shoreline Management Plan, Cushman Project, FERC Project Number 460. Tacoma Power, Tacoma Washington. Leigh, M. 1996. Grow your own native landscape: a guide to identifying,propagating, and landscaping with Western Washington native plants. Washington State University Cooperative Extension/Thurston County, Olympia, WA. Mason County, Washington. 2016.Assessor-Treasurer Electronic Property Information Profile. Internet report. URL: http•//property co mason wa.us/Taxsifter/Search/results.aspx?q=42307-50-00025 National Geographic. 2002.Field Guide to the Birds of North America.National Geographic Society, Washington, D.C.pg. 226, 244, 250, & 320. Hodges Habitat Management Plan 16 National Marine Fisheries Service. 2014.Distri ution of Threatened and Endangered Species. Internet report. http://www.nwr.noaa. v Nightingale, B. and C. Simenstad.2001. OverN iter Structures: Marine Issues. Washington Departments of Fish and Wildlife, Elcology, and Transportation. Olympia, Washington. 177 p. NOAA.2014. Endangered and Threatened Mar ne Species. Internet report. http://www.nmfs.noaa.gov/pr/species/esa/ Poston,T. 2001.Treated Wood Issues Associat id with Overwater Structures in Marine and Freshwater Environments. Pacific Northwe it Laboratory, Richland, Washington. Skokomish Indian Tribe &Washington Departi ient of Fish and Wildlife. 2010. Recovery Plan for Skokomish River Chinook S lmon. Internet Report. http://hccc.wa.gov/Downloads/Downloads Get ile.as x?id=397519&fd=0 Tacoma Public Utilities.2014. Cushman Hydro Project. Internet report. https://www.mMu.org/tacomapower/about-tac ma- ower/dams- ower-sources/h dro- power/cushman-hYdro_project/ Tacoma Public Utilities. 2015. Cushman Fisher es Program. Internet report. URL: http://www.m3lpu.orgLtacomgpower/fish-wildli e-environment/cushman-h dro- pro j ect/cushman-fisheries-pro gram.htm Tahja,A. 2016. Hodges Project Plans, 2-10-17. Unpublished document. 11 p. U.S. Fish and Wildlife Service. 2004. Draft Re very Plan for the Coastal-Puget Sound Distinct Population Segment of Bull Tro it(Salvelinus confluentus). Volume 11(of 11): Olympic Peninsula Management Unit. Portland, Oregon.277+xvi pp U.S. Fish and Wildlife Service.2011. Species ofile, Marbled Murrelet. Internet report. http://www.fws.gov/arcata/esibirds/mm/M mu elet.html U.S. Fish and Wildlife Service.2012. Guidance for Identifying Marbled Murrelet Nest Trees in Washington State. Internet report. htt ://www.wsdot.wa. ov/NR/rdonl res/2D97 3D8-D448-43A7-8249- E2319095 C 8C2/0/MAMUhabitatF W S.pdf U.S. Fish and Wildlife Service.2012.Marbled Aurrelet Nesting Season and Analytical Framework for Section 7 Consultation in Wash ngton. Internet report. http://www.wsdot.wa.gov/NR/rdonlyres/F3847 4F-BF1C-476C-8E9D- A45A715B624C/0/CoverLtrNestin Season. d Hodges Habitat Management Plan 17 U.S. Fish and Wildlife Service. 2013. Conducting Masking Analysis for Marbled Murrelets and Pile Driving Projects. Internet report. http•//www wsdot.wa.gov/NR/rdonlyres/3506DAAA-4B13-4EIB-855D- 36E047E07090/0/MAMU MaskAnalysis.pdf U.S. Fish and Wildlife Service. 2014. Species fact sheet, Streaked Horned Lark, Eremophila alpestris strigata. Internet report. http•//www fws gov/wafwo/species/Fact%20sheets/streakedhomedlarkfinal.pdf Washington State Department of Ecology. 2012. 2012 Water Quality Assessment 303(d) List: Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16). Internet report.URL: http://www.ecy.wa.gov/programs/wg/303d/cuffentassessmt.html Washington State Department of Natural Resources. 2014.FPARS ARCIMS mapping application. Internet report: http://fortress.wa.gov/dnr/appl/fpars/viewer.htm Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List. Olympia, Washington. 177 pp. Washington Department of Fish and Wildlife. 2012. Annual Report: Marbled Murrelet. Internet report. http•//wdfw wa gov/conservation/endan eg red/species/marbled murrelet.pdf Washington Department of Fish and Wildlife. 2012. Annual Report:Northern Spotted Owl. Internet report. http•//wdfw wa gov/conservation/endan eg red/species/northern spotted owl.pdf Washington Department of Fish and Wildlife. 2012.Annual Report: Streaked Horned Lark. Internet report. http•//wdfw wa gov/conservation/endan eg red/species/streaked horned lark.pdf Washington Department of Fish and Wildlife. 2012. Annual Report: Yellow-billed Cuckoo. Internet report. http•//wdfw wa.gov/conservation/endan eg red/species/ elm low- billed cuckoo.pdf Washington Department of Fish and Wildlife. 2016. SalmonScape. Internet report. http://apps.wdfw.wa.gov/salmonscgpe/ Washington State Department of Transportation. 2014.BA Preparation for Transportation Projects—Advanced Training Manual—Version 4-02-2014. http://www wsdot wa gov/NR/rdonlyres/AIF85352-90EO-457B-9A8C- B5103E097FAE10/BA manualpart2.pdf Hodges Habitat Management Plan 18 Attachment 1 Vicinity map. 1 N Lake Cushman P,d Cushman Ru `119J NF_24 -...... N� Church Dr O'Y-Pi "tianulForest N pGf7afdl Dr N F, YL g Hodges Residence N^ 2` ll l N Potlatch Drive North '9 O.t L a e C a s h a t7 r r� 4 ., It.,...... i i Hodges Habitat Management Plan 19 Attachment 2 Site Plan(NTS). > � JR ca�5Spp c Y x ,..- r� m Y y A r t r' Hodges Habitat Management Plan 20 Attachment 3 Site plan showing shoreline ATF development NTS). S iF r t _{ TyAfi V r` ;Se f r W6k ay�a>a tag di>,�` 4.�,.r"T^• ¢.� ' e, '`; LL o 5 ry Hodges Habitat Management Plan 21 Attachment 4 Float details (NTS). rpOFL Js Le G i E ( oc 'a r } Ct_ e / "cam F YTT j I IIII Hodges Habitat Management Plan 22 Attachment 5 Cross Section (NTS). Tj i2R 74 f i o l00 1 x c w {i4 } S (t Hodges Habitat Management Plan 23 Attachment 6 The existing pier and float at the site. s ` �r a r: us C v Hodges Habitat Management Plan 24 Attachment 7 The existing pier and float(in background with life preserver hanging on the pier during the low water season. Hodges Habitat Management Plan 25 Attachment 8 The existing permitted rock bulkhead with the wood retaining wall to the right. r i c h u „; � f W Y r Hodges Habitat Management Plan 26 Attachment 9 Existing native plantings (conifers) on the shor ine at the site 04 ¢ . it i Hodges Habitat Management Plan 27 Attachment 10 Another view of existing native plantings on the shoreline at the site i f Hodges Habitat Management Plan 28 DIVISION 2, LAKE CUSHMN i� / o-A 7 COF ; 6 � WttS ' a / LOtJ�J ' / <Exi5th s / / Lot 39 o i Exl5tiq Kock Bulkhead 0/ Q�0 / / / / / / / / / DOCK / / / Lot / / l LAKE CU5HMAN N Scale: i Ke viri HouSen,5154 5W 324th 'lace,Federal Way,WA 98023 (253) 874-0481 0 20ft 4�ft