Exemption from Shoreline Management Act
Case No.: SHX2016-00081 Substantial Development Permit Requirement
The Proposal By: DIREK HODGES
12784 ROAD # 35
MADERA, CA 93636
Parcel Number: 423075000039
Site Address: 111 N POTLATCH DR NORTH HOODSPORT
To undertake the following development:
HODGES PIER, FLOAT and STAIRS AFTER THE FACT PERMITTING PROJECT
Within LAKE CUSHMAN and/or its associated wetlands is exempt from the requirement of substantial
development because the development is categorized under WAC 173-27-040(2) as being category:
A-does not exceed dollar threshold
Please contact Kell McAboy at ext 365 if you have any questions.
Issued:12/12/2016 Authorized Local Govern�ent Official
SHX2016-00081 December 12, 201E
v Pd^� -�YV-A- l f hLi lu fLP
----------------------------------------
AGENCY USE ONLY
Date received:
O US Army corps � �G• � �
WASHINGTON STATE of Engineers•
Seattle District
Joint Aquatic Resources PermitAgency reference
#: SNXZo(tQ- t
Application (DARPA) Form
; Tax Parcel#(S): �23n7' 1-0003`�
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW.
i 7
� 1
L--------------------------------------+
Part 1—Project Identification
1 Project Name (A name for your project that you create. Example Smith's Dock or Seabrook Lane Development) [help]
Hodges Pier and Float After the Fact Permitting & Float Repair Projects
Part 2—Applicant
The person and/or organization responsible for the project. net ]
2a. Name (Last, First, Middle)
Hodges, Direk
21b. Organization(If applicable)
2c. Mailing Address (Street or PO Box)
12784 Road #35
2d. City, State, Zip
Madera, Ca, 93636
2e. Phone(i) A Phone`(2) 2 .` Fax 21h E-mail
(559) 474-1486
Additional forms maybe required for the following permits:
• If your project may qualify for Department of the Army authorization throug a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Adt,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
httl)://www nws usace army mii/Missions/CivilWorks/Regulatory/PermitGui4pbook/EndancieredSpecies.as1)x.
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
htti)://www.epermitting.wa.gov/site/alias resourcecenter/iarpa iarpa form/99844arpa form aspx.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or helpe__ora.wa.gov.
JARPA Revision 2012.1 Page 1 of 14
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) [hel
3a. Name (Last, First, Middle)
Schaumburg, Kimberly
3b. Organization (if applicable)
BioResources, LLC.
3c. Mailing Address (Street or Po Box)
10112 Bayview Rd KPN
3d. City, State, Zip
Vaughn, WA 09394
3e. Phone(1) 3f. Phone(2) 3 `. Fax 3h. E-mail
(253) 884-5776 (253) 225-2973 Kimberly035@centurytel.net
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help]
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at(360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name (Last, First,Middle)
4b. Organization(if applicable)
Tacoma Power
4c. Mailing Address (Street or Po Box)
P.O. Box 11007
4d. City, State, Zip
Tacoma, WA 98411-0007
4e. Phone(1) 4f. Phone(2) 4 . Fax 4h.. E-mail
JARPA Revision 2012.1 Page 2 of 14
Part 5—Project Location(s)
Identifying information about the property or properties whe e the project will occur. [help]
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check a that apply.) [help]
X ❑ Private
❑ Federal
❑ Publicly owned (state,county, city,special districts like schools, ports, etc.)
❑ Tribal
❑ Department of Natural Resources (DNR) —managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel
111 N Potlatch Dr
5c. City, State, Zip(If the project is not in a city or town, provide th name of the nearest city or town.) [help]
Hoodsport, WA 98548
5d. County hl eIp]
Mason
5e. Provide the section, township, and range for the project location. [hem]
1/4 Section Section Towns'llip Range
07 23N 4W
5f. Provide the latitude and longitude of the project location. [help]
• Example:47.03922 N lat./-122,89142 W long. (Use decimal degrees NAD 83)
47.49316 N -123.24718 W
5g. List the tax parcel number(s) for the project location. [help]
• The local county assessor's office can provide this information.
42307-50-00039
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) [hef
Name Mailing Address Tax Parcel#(if known)
Nesbitt, Douglas M. & Elizabeth 131 N Potlatch Dr, Hoodsport Wa, 98548 42307-50-00038
.........................................................................................................................................................................................................................
101 N Potlatch Dr, Hoodsport Wa, 98548 42307-50-00040
Delbert, William G. &Sharon D.
..................................................................................................... ..................I...............................................................................................
JARPA Revision 2012.1 Page 3 of 14
5i. List all wetlands on or adjacent to the project location. [he-is]
No wetlands on or adjacent to the project location.
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. het
Lake Cushman.
5k. Is any part of the project area within a 100-year floodplain? [hei
X❑ Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. [ham]
Site has a moderate cover of native vegetation.
5m. Describe how the property is currently used. h[ eip]
Recreational and residential.
5n. Describe how the adjacent properties are currently used. [help]
Recreational and residential.
5o. Describe the structures (above and below ground)on the property, including their purpose(s) and current
condition. '[help]
There is a single-family residence (SFR), a fire pit, shoreline access (concrete stepping stone)
steps, a wood retaining wall, a pier and attached beach access stairs, a float, and a rock
bulkhead (the latter is permitted).
5p. Provide driving directions from the closest highway to the project location, and attach a map. [hem]
From SR 119 heading North, turn right onto N Mount Church Dr, then keep left as N Mount Church Dr
turns into N Potlatch Drive. At the bottom of the hill, turn right at the stop sign and follow addresses to
the site. The property is on the left.
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. [help]
JARPA Revision 2012.1 Page 4 of 14
Existing shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot (4' x 15') set
of shoreline access (concrete stepping stone) steps, a rock fire pit on top of the bank (above
the bulkhead), an approx. twenty-two-foot (21' 8")wood retaining wall with electrical outlets
along the base of the bank that is between the bul head and an approx. four-foot (4') walking
path, an approx. fifty-eight by five-foot (58' x 5') r k bulkhead (installed in 1995), an approx. six
by fifteen-foot (5' 10" x 15' 6") pier, an approx. tw my-seven by fifty-inch (27" x 8') set of wood
stairs running from the pier to the lakebed, and an approx. eight by seven-foot (8' x 7' 4") float.
The pier is supported by the bank and four(4) metal pilings, two which are shared with the
float. The float utilizes four float positioning steel pilings (6"). A vertical wood ladder on the pier
accesses the float. The total overwater coverage at the site (lakebed access stairs, pier, and
float is 155 square feet).
In addition, one new project is proposed: the existing float will be fitted with polyethylene
encapsulated Styrofoam®floats when the lake's waters are lowered.
6b. Describe the purpose of the project and why you wan or need to perform it. h[ eip]
The existing shoreline appurtenances are common to shoreline properties on Lake Cushman;
however, they were installed without the proper permits from Mason County. The applicants
were unaware that permits were mandatory and want to bring their property into compliance by
obtaining all the required regulatory permits. Tacoma Power requires that the existing float be
fitted with polyethylene encapsulated Styrofoam®.floats as the existing float currently utilizes
un-encapsulated float material.
6c. Indicate the project category. (check all that apply) hf eLm
❑ Commercial x❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert X❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam/Weir ❑ Floating Home (upland)
❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift X❑ Dock/ Pier Marina/ Moorage
X❑ Stairs
❑ Bridge ❑ Dredging Mining
❑ Stormwater facility
❑ Bulkhead ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin
❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
JARPA Revision 2012.1 Page 5 of 14
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. ,[help]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
The existing float will be fitted with new, polyethylene encapsulated Styrofoam®floats, as per
Tacoma Power rules. Four(4) twenty-four by forty-eight by twelve-inch (24" x 48" x 12")
polyethylene encapsulated Styrofoam®floats will be installed on the existing float, as per the
manufacturers installation instructions. Also, to ensure that the float is resting a minimum of
one foot above the lakebed during the low water season, the float positioning steel pilings will
be fitted with two by eight-foot (2' x 8') landing planks, utilizing galvanized carriage bolts and
other hardware.
6f. What are the anticipated start and end dates for project construction? (Month/Year) [help]
• If the project will be constructed in phases or stages, use DARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: _ASAP, after receiving all required permits._ End date: Project is expected to
take one day. ❑ See JARPA Attachment D
6g., Fair market value of the project, including materials, labor, machine rentals, etc. [heipi
Unknown.
6h. Will any portion of the project receive federal funding? [Leipi
• If yes, list each agency providing funds.
❑ Yes x❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)[heipi
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [help]
X❑ Not applicable
7b. Will the project impact wetlands? [help]
❑ Yes ❑ No ❑ Don't know
JARPA Revision 2012.1 Page 6 of 14
7c. Will the project impact wetland buffers? [help]
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? [help]
• If Yes,submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [heipj
• If Yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? [help]
• If Yes, submit the plan with the JARPA package and answer 7g.
• If No,or Not applicable, explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. [help]
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. [help]
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type' (sq. ft. or
category' Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents, such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Walshington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent'if applicable.
°Creation(C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
JARPA Revision 2012.1 Page 7 of 14
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. [help]
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. n[ elp]
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [hgjpi
x❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
NAI
❑ Not applicable
The ATF project located on the shoreline of Lake Cushman has had/will have minimal negative impacts
on aquatic habitat or any other uses of the lake. BMPs and HPA stipulations will be followed during the
installation of the encapsulated floats.
8b. Will your project impact a waterbody or the area around a waterbody? [hLld
x❑ Yes ❑ No
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies?[help]
JARPA Revision 2012.1 Page 8 of 14
• If Yes,submit the plan with the JARPA package and answer'
.
• If No,or Not applicable,explain below why a mitigation plan s ould not be required.
X❑ Yes x❑ No ❑ Not applicable
Mitigation for the ATF development is previously installed native plantings (trees) on the
shoreline. The trees are primarily conifers and are approx. two to three feet in height.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your an wer here. [help]
An existing planting plan will improve habitat at the site.
8e. Summarize impact(s) to each waterbody in the table b low. hf elpl
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft.or
dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbody
Install Lake shoreline Les than none Approx. 57 sf
polyethylene Cushman 7 da s
encapsulated
Styrofoam®
floats on an
existing float
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3Indicate the days,months or years the waterbody will be measurably impacted b the work. Enter"permanent"if applicable.
8f. For all activities identified in`8e, describe the source a nature of the fill material, amount(in cubic yards)
you will use, and how and where it will be placed into t waterbody. [help]
JARPA Revision 2012.1 Page 9 of 14
N/A.
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. help]
N/A.
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. [help]
Agency Name Contact Name Phone Most Recent
Date of Contact
91b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? [help]
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
httl2://www.ecy.wa.gov/programs/wq/303d/.
❑ Yes X❑ No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help]
• Go to http://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
17110018
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? [help]
JARPA Revision 2012.1 Page 10 of 14
• Go to http//www ecy.wa. ov/services/qis/maps/wria/wria.htm t find the WRIA#.
WRIA 16
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? [help]
• Go to http://www.ecy.wa.aov/r)rocirams/wq/swqs/criteria.html for the standards.
x❑ Yes ❑ No [I Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? Lneip]
• If you don't know, contact the local planning department.
• For more information, go to: http//www.ecy_wa. ov/ ro rams/:_ea/sma/laws rules/173-26/211 designations.html.
❑ Rural X❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? [help]
• Go to http://www.dnr.wa.gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertypinq.aspx for the Forest
Practices Water Typing System.
X❑ Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [help]
• If No, provide the name of the manual your project is designed to meet.
X❑ Yes ❑ No
Name of manual: Stormwater Management Manual for Western Washington.
9i. Does the project site have known contaminated sediment? [help]
• If Yes, please describe below.
❑ Yes X ❑ No
9j. If you know what the property was used for in the past, describe below. [help]
Prior to the early 1900's it was a forest. I
9k. Has a cultural resource (archaeological) survey been performed on the project area? [help]
• If Yes, attach it to your JARPA package.
X❑ Yes ❑ No
i
JARPA Revision 2012.1 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. [hep]
The Chinook salmon, the bull trout, the Puget Sound steelhead, the marbled murrelet, streaked
horned lark, yellow-billed cuckoo, and the spotted owl are the ESA listed threatened or
endangered species in the area.
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [ham]
See above, plus cutthroat trout, Kokanee, and fisher.
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at(800) 917-0043 or help@ora.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) [help]
For more information about SEPA,go to www.egy.wa.gov/Droaramsisea/sepa/e-review.htmt.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
X❑ A SEPA determination is pending with_Mason County_(lead agency). The expected decision date is
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 1 ob.)[help]
❑ This project is exempt(choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
10b. Indicate the permits you are applying for. (Check all that apply.) [hely]
LOCAL GOVERNMENT
Local Government Shoreline permits:
X❑ Substantial Development ❑ Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit X❑ Critical Areas Ordinance
STATE GOVERNMENT
JARPA Revision 2012.1 Page 12 of 14
Washington Department of Fish and Wildlife:
X ❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form
Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife,
unless your project qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
X❑ $150 check enclosed. (Check# )
Attach check made payable to Washington Department of Fish and Wildlife.
❑Charge to billing account under agreement with WDFW. (Agreement# )
❑ My project is exempt from the application fee. (Check appropriate exemption)
❑ HPA processing is conducted by applicant-funded WDFW staff.
(Agreement # )
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded ovith the county auditor, or other proof of current land use.)
❑ Project is a modification of an existing HPA oric inally applied for, prior to July 10, 2012.
(HPA# )
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 p ayable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
❑ SEPA is pre-empted by federal law.
JARPA Revision 2012.1 Page 13 of 14
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. [help]
11a. Applicant Signature (required) Lhgjpj
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. (initial)
Applicant Printed Name Applicant Signature Date
11 b. Authorized Agent Signature [help]
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Printed Name Authorized Agent Signature Date
11 c. Property Owner Signature (if not applicant). [help]
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043.
People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORA publication number: ENV-019-09 rev. 06-12
JARPA Revision 2012.1 Page 14 of 14
I
oN.srgTF MASON COUNTY
�Py M� Department of Community Services
0 s"° '= Planning Division
i o T �? 615 W Alder St, Shelton, WA 98584
�oJ Y C,o~ (360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2016-00119
Description of Proposal: HODGES PIER, FLOAT and STAIRS AFTER THE FACT
PERMITTING PROJECT, POSSIBLE NEW WORK TO REMOVE
CONCRETE FROM LAKEBED.
Proponent: DIREK HODGES
Location of Proposal: 111 N POTLATCH DR NORTH HOODSPOF
Parcel Number: 423075000039
Legal Description: LAKE CUSHMAN #2 TR 39
Directions to Site: US HIGHWAY 101 NORTH, L ON LAKE CUSHMAN RD, R ONTO
MOUNT CHURCH DR, FOLLOW TO POTLATCH DR NORTH TO
SITE ADDRESS
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Kell McAboy at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, 615 W Alder St, Shelton WA 98584 by 12/27/2016. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
�LQ
Authorized Local Gov ment Official Date
°N-STATE MA$ON COUNTY
�P5 C 4-, DEPARTMENT OF COMMUNITY DEVELOPMENT
4 MO r
o N Planning Division
N Y y 615 W Alder St, Shelton, WA 98584
(360)427-9670
rasa
MASON COUNTY ENVIRONMENTAL PERMIT
March 06, 2017
DIREK HODGES
12784 ROAD # 35
MADERA CA 93636
Parcel Number(s): 423075000039
Expiration Date: 3/6/2019 12:00:OOAN
Date Issued: 3/6/2017
Case Number: MEP2016-00050
Project Description:
ATF PERMITTING FOR CONCRETE STEPPING STONES, RETAINING WALL, PIER WITH BEACH
ACCESS STAIRS AND FLOAT
The following critical areas are present on this property:
Long-Term Commercial Forest xx FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Ma on County Resource Ordinance (Chapter 17.01
MCC.) Nothing in this permit shall excuse the applicant frpm compliance with any other federal, state, or local
statutes, ordinances, or regulations applicable to this prOjE ct. This permit may be rescinded if the permitee
fails to complete the project as proposed or fails to comp) with the standards of this ordinance.
Authorized L6qaDGovemment Official Date
Conditions:
3/6/2017 Pagel 0 2 MEP2016-00050
MASON COUNTY ENVIRONMENTAL PERMIT
3/6/2017 Case No.: MEP2016-00050
No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of
a development for which a permit has been granted has not begun within two years after approval, the Review
Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon
showin go cl cause, may extend the initial two year period by one year. No permit shall be extended unless the
appli s requested such review and extension prior to the exporation date.
444
Signature Date
( O NE - REPRESENTATIVE - CONTRACTOR
Print Name (Circle one to indicate)
3/6/2017 Page 2 of 2 MEP2016-00050
T&Q-Trtd 261 co -61 A
MASON ENVIRONMENTAL PERMIT($630 or$380 w/other permit) Mason County Permit Center Use:
Ll CONDITIONAL USE($1520) MEP -
.X1 HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd
MASON COUNTY ��-
DEPARTMENT OF COMMUNITY DEVELOPMENT
`S 1 Alder Street
Mason County Resource Ordinance(Chapter 17.01 MCC)
ENVIRONMENTAL PE IT APPLICATION
The purpose of the Resource Ordinance is to protect Mason C ounty's natural resource lands and critical areas and
is under the authority of Chapters 36.32,36.70A,39.34, 58.1 , 76.09, 84.33, 84.34 and 90.58 RCW.
PLEASE PRINT
1.PROPERTY OWNER
Name: Hodges,Direk
Mailing Address: 12784 Road#35,
Madera,Ca 93636
Work Phone: Email Address:
Home/Cell Phone: Fax#:
If an agent is actin or theproperty owner during the permitprocess,_ om lete#2.
2. AUTHORIZED AGENT
Name: Kimberly Lee Schaumburg
Mailing Address: 10112 Bayview Rd KPN,Vaughn,Wa 90394
Work Phone: (253)884-5776 Email Address:Kimberly035@centuryel.net
Home/Cell Phone: (253)225-2973 Fax#
3.PROJECT SITE
Site Address: 111 N Potlatch Dr N,Hoodsport Wa,98548
Parcel#: 42307-50-00039 Legal Description: Lake Cushman#2 TR 39
Directions to Site: From Wa-119 Going North,turn right onto
N Mount Church Dr,then keep left when N Mount Church
Dr turns into N Potlatch Dr.The property is on the right.
Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences,
Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed
Improvements,Easements,North Arrow,and Scale.Also draw a separate topography diagram.
Re-,i4xd
Mlle
IaCommunat Devepop�.ne��ORAC'� R-P Pau I oft 201fp
4. State which section requires permit:
❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090
❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100
❑ Aquifer Recharge Area,Chapter 17.01.080 ❑' Seismic Hazard Areas,Chapter 17.01.102
❑ Erosion Hazard Area,Chapter 17.01.1041 Fish & Wildlife Habitat Conservation Areas,
❑ In-Holding Lands,Chapter 17.01.062 Chapter 17.01.110
❑ Wetlands,Chapter 17.01.070
5. Identify current use of the property with existing improvements:
There is a single-family residence with a bulkhead,pieir,float,shoreline and beach access steps/stairs,
a retaining wall,and fire pit.
6. Identify and describe the proposed project, including the type of materials to be used, construction methods,
principle dimensions, and other pertinent information(attach additional sheets, if needed):
The float will be upgraded with the addition of polyethylene encapsulated
Styro oam. As per acoma ower s regu ations,a small ece o concre a on e akefied will need to be
removed if it is determined to be unattached to the stair tin?
.
Unconnected to the existing stairway.
7. Describe why the action requiring this permit cannot be a oided.
ATF permitting is required by MC.
8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes XNo
9. Identify any surface water on or adjacent to property(circle one):
Saltwater XLake Stream Pond Wetland Drainage Ditch
10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records.
XConnected to Septic Connected to Community Septic
11. Identify existing water supply(circle one): Public Water Supply $Well
11. Type of Job(circle one):
X
New Add XAlteration Repair Demptition Other: ATF
J '
Print'Name Signatuie Date
P q,
SGP2D(La —001t 1
1,D2Oue — Ott ' Z
MASON COUNTY ENVIRONMENTAL CHECKLIST 1
MASON CO. ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable: Hodges After-the Fact
Permitting Project.
2. Name of applicant: Direk Hodges.
3. Address and phone number of applicant and contact person: 312
Canyon Valley Drive, Richardson, TX 75080-1934, (972) 755-1505.
4. Date checklist prepared: 7-27-16, revised 2-27-16.
5. Agency requesting checklist: Mason County
6. Proposed timing or schedule (including phasing, if applicable): Repair of
an existing float will occur in 2017, when the lake's waters are
lowered.
7. Do you have any plans for future expansion, or further activity related to or
connected with this proposal: if yes,�explain. No.
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal. HMP &
MEP.
9. Do you know whether applications are pending for governmental
approvals of other proposals directly affecting the property covered by
your proposal? If yes, explain. No.
10. List any government approvals or permits that will be needed for your
proposal, if known. A Mason County shoreline substantial permit, an
HPA from the WDFW, and permits from Tacoma Power, the USACE,
and the Lake Cushman Management Company.
11. Give a brief, complete description of your proposal, including the proposed
uses and the size of the project and site. There are several questions
later in this checklist that ask you to describe certain aspects of your
proposal. You do not need to repeat those answers on this page. (Lead
MASON COUNTY ENVIRONMENTAL CHECKLIST 2
agencies may modify this form to include additional specific information on
project description).
Existing shoreline appurtenances include (Attachments 2-8) a four
by fifteen-foot (4' x 15') set of shoreline access (concrete stepping
stone) steps, a rock fire pit on top of the bank (above the bulkhead),
an approx. twenty-two-foot (21' 8") wood retaining wall with electrical
outlets along the base of the bank that is between the bulkhead and
an approx. four-foot (4') walking path, an approx. fifty-eight by five-
foot (58' x 5') rock bulkhead (installed in 1995), an approx. six by
fifteen-foot (5' 10" x 15' 6") pier, an approx. twenty-seven by fifty-
inch (27" x 8') set of wood stairs running from the pier to the
lakebed, and an approx. eight by seven-foot (8' x 7' 4") float. The pier
is supported by the bank and four(4) metal pilings, two which are
shared with the float. The float utilizes four float positioning steel
pilings (6"). A vertical wood ladder on the pier accesses the float.
The total overwater coverage at the site (lakebed access stairs, pier,
and float is 155 square feet).
The existing float will be fitted with new, polyethylene encapsulated
Styrofoam®floats, as per Tacoma Power rules. Four(4) twenty-four
by forty-eight by twelve-inch (24" x 48" x 12") polyethylene
encapsulated Styrofoam®floats will be installed on the existing float,
as per the manufacturers installation instructions. Also, to ensure
that the float is resting a minimum of one foot above the lakebed
during the low water season, the float positioning steel pilings will be
fitted with two by eight-foot (2' x 8') landing planks, utilizing
galvanized carriage bolts and other hardware.
12. What is the location of the proposal? Give sufficient information for a
person to understand the precise location of your proposed project
including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range
or boundaries of the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you should
submit any plans required by the agency, you are not required to duplicate
maps or detailed plans submitted with any permit applications related to
this checklist The site is located on Lake Cushman at 111 N Potlatch
Dr, Hoodsport. Section 07, Township 23N, Range 04W. Parcel
number 42307-50-00039. The legal description is: Lake Cushman #2
TR 39.
MASON COUNTY ENVIRONMENTAL CHECKLIST 3
B. ENVIRONMENTAL ELEMENTS:
1. EARTH: I
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes,
mountainous, other. Moderately steep slope to the shoreline.
b. What is the steepest slope on the site (approx. percent slope)? Approx.
60%.
C. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know classification of agricultural soils, specify
them and note any prime farmland. Sand, gravel, and clay.
Cl. Are there surface indications of history of unstable soils in the immediate
vicinity: If so, describe. No.
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill. No filling or grading proposed.
f. Could erosion occur as a result of clE aring, construction, or use: If so,
generally describe. No.
g. About what percentage of the site will be covered with impervious
surfaces after project constructions (for example, asphalt or buildings)?
The ATF project created an extremely small amount of impervious
surface area.
h. Proposed measures to reduce or control erosion, or other impacts to the
earth, if any. BMPs will be implemented during construction.
2. AIR:
a. What types of emissions to the air would result from the proposal (i.e.
duct, automobile, odors, industrial wood smoke) during construction and
when the project is completed? If any, generally describe and give
approximate quantities, if known N/�►
b. Are there any off-site sources of emissions or odors that may affect your
proposal? If so, generally describe.
N/A
MASON COUNTY ENVIRONMENTAL CHECKLIST 4
C. Proposed measures to reduce or control emissions or other impacts to air,
if any: N/A
3. WATER:
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of
the site (including year-round and seasonal streams, saltwater,
lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
Lake Cushman.
2) Will the project require any work over, in, or adjacent to (within 200
feet) the described waters? If yes, please describe and attach
available plans. Yes, see HMP entitled Hodges ATF Permitting
Project 7-18-16.
3) Estimate the amount of fill and dredge material that would be
placed in or removed from surface water or wetlands and indicate
the area of the site that would be affected. Indicate the source of fill
material.
None.
4) Will the proposal require surface water withdrawals or diversions?
Give general description, purpose, and approximate quantities if
known. No.
5) Does the proposal lie within a 100-year floodplain? If so, note
location on the site plan. Yes, the ATF site is located on the
shoreline of Lake Cushman.
6) Does the proposal involve any discharges of waste materials to
surface waters? If so, describe the type of waste and anticipated
volume of discharge. No.
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground
water? Give general description, purpose, and approximate quantities,
if known. N/A.
MASON COUNTY ENVIRONMENTAL CHECKLIST 5
2) Describe waste material that will )e discharged into the ground from
septic tanks or other sources, if any (for example: domestic sewage,
industrial, containing the following chemicals...,agricultural, etc.).
Describe the general size of the system, the number of such systems,
the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve. N/A.
C. Water runoff(including storm water):
1) Describe the source of runoff(including storm water) and method of
collection and disposal, if any (include quantities, if known). Where
will this water flow? Will this flow into other waters? If so, describe.
N/A.
2) Could waste materials enter ground or surface waters: if so,
generally describe. N/A.
d. Proposed measures to reduce or control surface, ground, and
runoff water impacts, if any: /A.
4. PLANTS:
a. Check or circle types of vegetation f and on the site:
X_deciduous tree: alder, maple, aspen, other
x_evergreen tree: fir, cedar, pine, other
x_shrubs
x_ grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bul' ush, skunk cabbage, other
_water plants: water lily, eelgrass, mil oil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
None.
C. List threatened or endangered species known to be on or near the site.
Unknown.
MASON COUNTY ENVIRONMENTAL CHECKLIST 6
d. Proposed landscaping, use of native plants, or other measures to
preserve or enhance vegetation on the site, if any: None proposed. See
HMP mitigation, please.
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
The Chinook salmon, the bull trout, the Puget Sound steelhead, the
northern spotted owl, the Hood Canal summer-run chum, the
streaked horned lark, and the yellow-billed cuckoo.
C. Is the site part of a migration route? If so, explain. No, Lake Cushman is
land-locked due to two dams.
d. Proposed measures to preserve or enhance wildlife, if any: See above
(4d)•
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be
used to meet the completed project's energy needs? Describe whether it
will be used for heating, manufacturing, etc.
N/A.
b. Would your project affect the potential use of solar energy by adjacent
properties: If so, generally describe. N/A.
C. What kinds of energy conservation features are included in the plans of
this proposal? List other proposed measures to reduce or control energy
MASON COUNTY ENVIRONMENTAL CHECKLIST 7
impacts, if any: N/A.
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, which
could occur as a result of this proposal? If so, describe. N/A.
1) Describe special emergency services that might be required.
An ambulance in the event of a construction accident.
2) Proposed measures to reduce or control environmental health
hazards, if any: N/A.
b. Noise:
1) What types of noise exist in t area which may affect your project
(for example: traffic, equipment, operation, other)? N/A.
2) What types and levels of noi4 would be created by or associated
with the project on a short-term or a long-term basis (for example:
traffic, construction, operation, other)? Indicate what hours noise
would come from the site. N/A
3) Proposed measures to reduce or control noise impacts, if any"
N/A
8) LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
Recreational.
b. Has the site been used for agriculture? If so, describe.
No.
MASON COUNTY ENVIRONMENTAL CHECKLIST g
C. Describe any structures on the site.
There is a single-family residence (SFR), a fire pit, shoreline access
(concrete stepping stone) steps, a wood retaining wall, a pier and
attached beach access stairs, a float, and a rock bulkhead (the latter
is permitted).
Cl. Will any structures be demolished? If so, what?
No. The float will be repaired to accommodate encapsulated float
material.
e. What is the current zoning classification of the site?
Unknown.
f. What is the current comprehensive plan designation of the site?
Unknown.
g. If applicable, what is the current Shoreline Master Program designation of
the site? Urban residential.
h. Has any part of the site been classified as an "Environmentally sensitive"
area? If so, specify. Lake Cushman is a "lake of statewide
significance."
i. Approximately how many people would reside or work in the completed
project? N/A.
j. Approximately how may people would the completed project displace?
N/A.
k. Proposed measures to avoid or reduce displacement impacts, if any:
N/A.
i. Proposed measure to ensure the proposal is compatible with existing and
projected land uses and plans, if any: N/A.
9. HOUSING:
MASON COUNTY ENVIRONMENTAL CHECKLIST 9
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing. N/A.
b. Approximately how many units, if any would be eliminated? Indicate
whether high, middle, or low-income housing. N/A.
C. Proposed measures to reduce or co trot housing impacts, if any:
N/A.
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
The ATF bulkhead is approx. 5 feet in height.
b. What views in the immediate vicinity would be altered or obstructed?
The project does not obstruct anylviews.
C. Proposed measure to reduce or control aesthetic impacts, if any:
N/A.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day
would it mainly occur?
b.
The project does not produce any light or glare.
b.Could light or glare from the finished project be a safety hazard or
interfere with views? N/A.
C. What existing off-site sources of light or glare may affect your proposal:
N/A.
d. Proposed measures to reduce or control light and glare impacts, if any:
N/A.
MASON COUNTY ENVIRONMENTAL CHECKLIST 10
12. RECREATION
a. What designated and informal recreational opportunities are in the
immediate vicinity?
Boating, fishing, hiking, etc.
b. Would the proposed project displace any existing recreational uses? If so,
describe. The project enhances recreational opportunities.
C. Proposed measures to reduce or control impacts on recreation, including
recreational opportunities to be provided by the project or applicant, if any:
N/A.
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state,
or local preservation registers known to be on or next to the site? If so,
generally describe. Not that the applicants know of.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
None.
C. Proposed measures to reduce or control impacts, if any:
N/A.
14. TRANSPORTATION
a. Identify public streets and highways serving the site and describe
proposed access to the existing street system. Show on site plans, if any.
N/A.
MASON COUNTY ENVIRONMENTAL CHECKLIST 11
b. Is site currently served by public transit? If not, what is the approximate
distance to the existing street system? Show on site plans, if any.
Unknown.
C. How many parking spaces would the completed project have? How many
would the project eliminate? N/A.
N
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so, generally
describe (indicate whether public or F rivate). No.
N
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. No.
f. How many vehicular trips per day would be generated by the completed
project. If known, indicated when peak volumes would occur. N/A.
g. Proposed measures to reduce or cor trol transportation impacts, if any:
N/A.
15. PUBLIC SERVICES
a. Would the project result in an increased need for public service (for
example: fire protection, police prot ction, health care, schools, other)? If
so, generally describe: No.
b. Proposed measures to reduce or control direct impacts on public services,
if any: N/A.
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas,
water, refuse service, telephone, E anitary sewer, septic system, other:
MASON COUNTY ENVIRONMENTAL CHECKLIST 12
b. Describe the utilities that are proposed for the project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be needed. N/A.
Signature:
The above answers are true and complete to the best of my knowledge.
understand that the lead agency is relying on them to make its decision.
Signature: I sign
Date submitted: revised 2-27-17
MASON COUNTY ENVIRONMENTAL CHECKLIST 12
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas,
water, refuse service, telephone, sanitary sewer, septic system, other:
b. Describe the utilities that are proposed for the project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be needed. N/A.
Signature:
The above answers are true and complete the best of my knowledge.
understand that the lead agency is relying o them to make its decision.
Signature:
Date submitted: 10-07-16
v
•--------------------------------------,
AGENCY USE ONLY
Date received:
WASHINGTON STATE US Army Corps t
of Engineers
Seattle District
Agency reference# �
Joint Aquatic Resources Permit
Parcel#(s):
Application (JARPA) Form
Tax � �
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. "
t �
t i
L--------------------------------------'
N
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) h( elp]
Hodges Pier and Float After the Fact Permitting & Float Repair Projects
Part 2—Applicant I
The person and/or organization responsible for the project. [help]
2a. Name (Last, First, Middle)
Hodges, Direk
2b. Organization(If applicable)
2c. Mailing Address (Street or Po Box)
12784 Road #35
2d. City, State, Zip
Madera, Ca, 93636
2e. Phone(1) 2f. Phone(2) 2g. fax 2h. E-mail
(559) 474-1486
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization througli a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www nws usace army mil/Missions/CivilWorks/Regulatory/PermitGuioebook/Endan-qeredSpecies aspx.
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
httr)://www.epermitting.wa.gov/site/alias resourcecenter/iarpa marpa form/9984�rpa form aspx.
For other help,contact the Governor's Office of Regulatory Assistance at 1-800-917-0043 or help(Wora.wa.gov.
JARPA Revision 2012.1 Page 1 of 14
v
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) hf elp]
3a. Name (Last, First, Middle)
Schaumburg, Kimberly
3b. Organization(if applicable)
BioResources, LLC.
3c. Mailing Address (Street or PO Box)'
10112 Bayview Rd KPN
3d. City, State, Zip
Vaughn, WA 09394
3e. Phone(1) 3f. Phone(2) 3 . Fax 3h. E-mail
(253) 884-5776 (253) 225-2973 Kimberly035@centurytel.net
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [Help)
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
4b. Organization cif applicable)
Tacoma Power
4c. Mailing Address (street or PO Box)
P.O. Box 11007
4d. City, State, Zip
Tacoma, WA 98411-0007
4e. Phone(1) 4f. Phone(2) 4 . Fax 4h. E-mail
JARPA Revision 2012.1 Page 2 of 14
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [help]
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) h[�el ]
X❑ Private
❑ Federal
❑ Publicly owned (state,county, city,special districts like schools, ports, etc.)
❑ Tribal
❑ Department of Natural Resources (DNR)—managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box.if there is no address,provide other location information in 5p.) h[ elp]
111 N Potlatch Dr
5c. City,, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) [help]
Hoodsport, WA 98548
5d. County h[ipj
Mason
5e. Provide the section, township, and range for the proje location. [hy]
'/4 Section Section Township Range
07 23N 4W
5f. Provide the latitude and longitude of the project locatio [but ]
• Example:47.03922 N lat./-122,89142 W long. (Use decimal grees-NAD 83)
47.49316 N -123.24718 W
5g. List the tax parcel number(s)for the project location. e ]
• The local county assessor's office can provide this information.
42307-50-00039
5h. Contact information for all adjoining'property owners. l If you need more space, use JARPA Attachment C.)°�[help]
Name Mailing Address Tax Parcel#(if known)
Nesbitt, Douglas M. & Elizabeth 131 N Potlatch Dr, Ho dsport Wa, 98548 42307-50-00038
101 N Potlatch Dr, Hoodsport Wa, 98548 42307-50-00040
...................................._...................................... ..._..............._................_.................._...............................................
Deibert, William G. &Sharon D.
...........
JARPA Revision 2012.1 Page 3 of 14
r
5i. List all wetlands on or adjacent to the project location. [heipj
No wetlands on or adjacent to the project location.
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hel
Lake Cushman.
5k. Is any part of the project area within'a 100-year floodplain? hei j
X❑ Yes ❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. [help]
Site has a moderate cover of native vegetation.
5m. Describe how the property is currently used. hf M
Recreational and residential.
5n. Describe how the adjacent properties are currently used. h[ eipj
Recreational and residential.
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. h�j
There is a single-family residence (SFR), a fire pit, shoreline access (concrete stepping stone)
steps, a wood retaining wall, a pier and attached beach access stairs, a float, and a rock
bulkhead (the latter is permitted).
5p. Provide driving directions from the closest highway to the project location, and attach a map. [help]
From SR 119 heading North, turn right onto N Mount Church Dr, then keep left as N Mount Church Dr
turns into N Potlatch Drive. At the bottom of the hill, turn right at the stop sign and follow addresses to
the site. The property is on the left.
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. [heip
JARPA Revision 2012.1 Page 4 of 14
Existing shoreline appurtenances include (Attachments 2-8) a four by fifteen-foot (4' x 15') set
of shoreline access (concrete stepping stone) steps, a rock fire pit on top of the bank (above
the bulkhead), an approx. twenty-two-foot (21' 8")wood retaining wall with electrical outlets
along the base of the bank that is between the bulkhead and an approx. four-foot (4') walking
path, an approx. fifty-eight by five-foot(58' x 5') rock bulkhead (installed in 1995), an approx. six
by fifteen-foot (5' 10" x 15' 6") pier, an approx. twenty-seven by fifty-inch (27" x 8') set of wood
stairs running from the pier to the lakebed, and an approx. eight by seven-foot (8' x 7' 4") float.
The pier is supported by the bank and four(4) metal pilings, two which are shared with the
float. The float utilizes four float positioning steel pilings (6"). A vertical wood ladder on the pier
accesses the float. The total overwater coverage at the site (lakebed access stairs, pier, and
float is 155 square feet).
In addition, one new project is proposed: the existing float will be fitted with polyethylene
encapsulated Styrofoam®floats when the lake's waters are lowered.
6b. Describe the purpose of the project and why you want r need to perform it. tr[he ]
The existing shoreline appurtenances are common to shoreline properties on Lake Cushman;
however, they were installed without the proper permits from Mason County. The applicants
were unaware that permits were mandatory and want to bring their property into compliance by
obtaining all the required regulatory permits. Tacoma Power requires that the existing float be
fitted with polyethylene encapsulated Styrofoam®floats as the existing float currently utilizes
un-encapsulated float material.
6c. Indicate the project category. (check all that apply), hr eM
❑ Commercial x❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all t at apply) [help]
❑Aquaculture ❑ Culvert X❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam/Weir Floating Home
(upland)
❑ Boat House ❑ Dike/ Levee/Jetty Geotechnical Survey
❑ Road
❑❑ Boat Launch ❑ Ditch Land Clearing Scientific
Device
❑ Boat Lift X❑ Dock/ Pier Marina/ Moorage X❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility
❑ Bulkhead ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
JARPA Revision 2012.1 Page 5 of 14
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. [help]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
The existing float will be fitted with new, polyethylene encapsulated Styrofoam®floats, as per
Tacoma Power rules. Four(4) twenty-four by forty-eight by twelve-inch (24" x 48" x 12")
polyethylene encapsulated Styrofoam®floats will be installed on the existing float, as per the
manufacturers installation instructions. Also, to ensure that the float is resting a minimum of
one foot above the lakebed during the low water season, the float positioning steel pilings will
be fitted with two by eight-foot (2' x 8') landing planks, utilizing galvanized carriage bolts and
other hardware.
6f. What are the anticipated start and end dates for project construction? (Month/Year) h[�el ]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: _ASAP, after receiving all required permits._ End date: Project is expected to
take one day. ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. [help)
Unknown.
6h. Will any portion of the project receive federal funding? h[h2]
• If yes, list each agency providing funds.
❑ Yes x❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) [help]
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. [help]
X❑ Not applicable
7b. Will the project impact wetlands? [help]
❑ Yes ❑ No ❑ Don't know
JARPA Revision 2012.1 Page 6 of 14
7c. Will the project impact wetland buffers? [L ]
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared?, [held)
• If Yes,submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Was ngton or Eastern Washington Wetland Rating
System? [ham]
• If Yes,submit the wetland rating forms and figures with the JAR A package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared amitigation plan to compensate fo' any adverse impacts to wetlands?'[help]
• If Yes,submit the plan with the JARPA package and answer 7g
• If No,or Not applicable,explain below why a mitigation plans ould not be required.
❑ Yes ❑ No ❑ Not applicable
7g. Summarize what the mitigation plan is meant to acco plish, and describe how a watershed approach was
used to design the plan. [help]
7h. Use the table below to list the type and rating of each etland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below)where we can find his information,in the plan. [help]
Activity (fill, Wetland Wetland Irr>ipact Duration Proposed Wetland
drain, excavate, Name type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type (sq. ft. or
category' Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3 Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
"Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
JARPA Revision 2012.1 Page 7 of 14
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
__yards that will be used,and how and where it will be placed into the wetland. [Leis]
7j. For all excavating activities identified in 7h, describe the excavation'method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. h(�l
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hei i
x❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hL e�]
❑ Not applicable
The ATF project located on the shoreline of Lake Cushman has had/will have minimal negative impacts
on aquatic habitat or any other uses of the lake. BMPs and HPA stipulations will be followed during the
installation of the encapsulated floats.
8b. Will your project impact a waterbody or the area around a waterbody? [help]
x❑ Yes ❑ No
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? [help
JARPA Revision 2012.1 Page 8 of 14
• If Yes,submit the plan with the JARPA package and answer 8d
• If No,or Not applicable,explain below why a mitigation plans uld not be required.
X❑ Yes x❑ No ❑ Not applicable
Mitigation for the ATF development is previously installed native plantings (trees) on the
shoreline. The trees are primarily conifers and are approx. two to three feet in height.
8d. Summarize what the mitigation plan is meant to acco plish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. [he]p]
An existing planting plan will improve habitat at the site.
8e. Summarize impact(s) to each waterbody in the table b low. [help]
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location of impact3 (cubic yards) to be linear.ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbody
Install Lake shoreline Less than none Approx. 57 sf
polyethylene Cushman 7 days
encapsulated
Styrofoam®
floats on an
existina float
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3 Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. [help]
i
JARPA Revision 2012.1 Page 9 of 14
N/A.
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hel
N/A.
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project,list them below. [help]
Agency Name Contact Name Phone Most Recent
Date of Contact
91b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? h[ eipi
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.-gov/programs/wci/303d/.
❑ Yes X❑ No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [help]
• Go to http://cfpub.ega.gov/surf/locate/index.cfm to help identify the HUG
17110018
9d. What Water Resource Inventory Area Number(WRIA#)'is the project in? h[ eipt
JARPA Revision 2012.1 Page 10 of 14
• "Go to http7/lwww.ecy.wa.gov/ g� to find the WRIA#.
WRIA 16
9e. Will the in-water construction work comply with the Sta e of Washington water quality standards for
turbidity? L�elpj
• Go to http://www.ecy.wa.gov/programs/Wq/sMs/criteria.html for the standards.
x❑ Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? rhelp]
• If you don't know, contact the local planning department.
• for more information,go to: http://www.ecy.wa.gov/programs/§ea/sma/laws rules/173-26/211—designations.html.
❑ Rural X❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? [help]
• Go to http://www dnr wa gov/BusinessPermits/Topics/ForestPracticesApplications/Pages/fp watertypina aspx for the Forest
Practices Water Typing System.
X❑ Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington [department of Ecology's most current stormwater
manual? [ham] i
• If No, provide the name of the manual your project is designed o meet.
X❑ Yes ❑ No
Name of manual: Stormwater Management Manual for Western Washington.
9i. Does the project site have known contaminated sediment? [he1pI
• If Yes, please describe below.
❑ Yes X ❑ No
9j. If you know what the property was used for in the past,describe below. h[ ela]
Prior to the early 1900's it was a forest.
9k. Has a cultural resource (archaeological) survey been performed on the project area? [help)
• If Yes, attach it to your JARPA package:
X❑ Yes ❑ No
i
JARPA Revision 2012.1 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. h[ elpl
The Chinook salmon, the bull trout, the Puget Sound steelhead, the marbled murrelet, streaked
horned lark, yellow-billed cuckoo, and the spotted owl are the ESA listed threatened or
endangered species in the area.
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [km
See above, plus cutthroat trout, Kokanee, and fisher.
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at httl):Hapr)s.ecy.wa.gov/ol)as/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or heIP(c-ora.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
1 Oa. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hl elpl
• for more information about SEPA,go to www.ecy.wa.ciov/programs/sea/sepa/e-review.html.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
X❑ A SEPA determination is pending with_Mason County_(lead agency). The expected decision date is
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 100[help]
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
1 Ob. Indicate the permits you are applying for. (Check all that apply.) he[ el l
LOCAL GOVERNMENT
Local Government Shoreline permits:
X❑ Substantial Development ❑ Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other city/county permits:
❑ Floodplain Development Permit X❑ Critical Areas Ordinance
STATE GOVERNMENT
JARPA Revision 2012.1 Page 12 of 14
Washington Department of Fish and Wildlife:
X ❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form
Effective July 10, 2012, you must submit a check for $150 to Washington Department of Fish and Wildlife,
unless your project qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
X❑ $150 check enclosed. (Check# )
Attach check made payable to Washington Department of Fish and Wildlife.
❑Charge to billing account under agreement with WDFW. (Agreement#
❑ My project is exempt from the application fee. (Check appropriate exemption)
❑ HPA processing is conducted by applicant-funded WDFW staff.
(Agreement # )
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded ith the county auditor, or other proof of current land use.)
❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012.
(HPA#
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOV RNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
❑ SEPA is pre-empted by federal law.
JARPA Revision 2012.1 Page 13 of 14
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. help]
11a. Applicant Signature (required) h[�el j
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. (initial)
Applicant Printed Name Applicant Signature Date
11 b. Authorized Agent Signature [help]
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Printed Name Authorized Agent Signature Date
11 c. Property Owner Signature (if not applicant). [help]
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick, scheme, or device a material fact or makes any false, fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false, fictitious, or fraudulent statement or
entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact the Governor's Office of Regulatory Assistance(ORA)at(800)917-0043.
People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORA publication number: ENV-019-09 rev. 06-12
JARPA Revision 2012.1 Page 14 of 14
Habitat Management Plan
Hodges Pier and Float After-the-Fact Permitting Project
Lake Cushman, Hoodsport WA.
For:
Direk Hodges
12784 Roa1 #35
Madera, CA 93636
Prepared by:
BioResourc ,LLC
Kim Schaumburg
Fisheries biologist,Universi of Washington, 1981
10112 Bay Viev Rd. KPN
Vaughn,W ,98394
(253) 884-5776 225-2973
Email: kimberly035 centurytel.net
August 5,2016
Revised February 22, 2017
Table of Contents
1.0 Proposed Action.............................................................................. 3
1.1 Background&ATF Development........................................................ 3-4
1.2 ATF Development Need&Objectives.................................................... 4
2.0 Project Description&Activities............................................................. 3
2.1 Mitigation....................................................................................... 4-5
2.2 Timing....................................................................................... ... 5
2.3 Best Management Practices.................................................................. 5
2.4 Conservation Measures....................................................................... 6
3.0 ESA Species and Habitat Information..................................................... . 6
3.1 ESA Listed Species........................................................................... 7-9
4.0 Environmental Baseline Conditions........................................................ 9
4.1 ATF Project Vicinity......................................................................... 9-10
4.2 ATF Project Site.............................................................................. 10
5.0 Effects of the Action.......................................................................... 10
5.1 Direct Effects.................................................................................. 10-13
5.2 Indirect Effects................................................................................. 13
5.3 Cumulative Effects............................................................................ 13
6.0 Conclusion......................................................................................14
6.1 Take Analysis.................................................................................. 14
6.2 Determination of Effect...................................................................... 14-15
7.0 References......................................................................................16-18
Attachments
1. Project location...................................................................................19
2. Site plan....................................................................................... ...20
3. Site plan........................................................................................... 21
4. Float details........................................................................................22
5. Cross section..................................................................................... 23
6. Site Photographs.................................................................................. 24
7. Site Photographs.................................................................................. 25
8. Site Photographs.................................................................................. 26
9. Site Photographs.................................................................................. 27
10. Site Photographs.................................................................................. 28
Hodges Habitat Management Plan 2
1.0 Proposed Action
This Habitat Management Plan has been submi d on behalf of Direk Hodges at the
request of Mason County to comply with the Cc anty's regulations and procure after-the-
fact(ATF)permits for existing shoreline develo ment on his Lake Cushman property.
The ATF development includes the following: a fire pit, shoreline access(concrete
stepping stone) steps, a wood retaining wall, a p er and attached beach access stairs, and a
float.An existing rock bulkhead is permitted. In addition, a new project is also being
proposed as Tacoma Power requires that the exi iting float be fitted with polyethylene
encapsulated Styrofoam® floats;the existing fl t currently utilizes un-encapsulated float
material. Mitigation for ATF development is pr viously installed native plantings(trees)
on the shoreline.
1.1 Background & ATF Develop ent
The proposed project site is located in Mason C unty at 11I North Potlatch Drive North,
Hoodsport Washington(Attachment 1). The M on County tax parcel number is 42307-
50-00039.The property is located in Section 07 Township 23N,Range 04 of the
Western Meridian. The latitude is 47.49316 no , and the longitude is-123.24718 west.
The proposed project site is located on Lake Cu hman in the Skokomish/Dosewallips
Water Resource Inventory Area(WRIA 16) on shoreline designated Urban Residential
by the Shoreline Master Program of Mason Coll
o ty. Lake Cushman is regulated under the
Mason County Shoreline Master Program and t e Mason County Resource Ordinance as
a Fish and Wildlife Habitat Conservation Area. rhe Shoreline Management Act of 1971
designated Lake Cushman as a Shoreline of Sta ewide Significance. In addition,Lake
Cushman is regulated by Tacoma Public Utiliti (aka Tacoma Power),which has
designated Shoreline Management Classificati (SMC)zones. The proposed project site
is located in an SMC zone classified as "A."Ta -,oma Power defines the"A"management
classification as shoreline areas with no known ignificant environmental/cultural
resources or associated resource management g als precluding existing or future
shoreline uses;this classification acknowledges existing private uses and anticipates
potential future private and light commercials reline uses (Kleinschmidt 2012).
The proposed project site is located in a rural n ighborhood on a shoreline lot with
approximately(approx.) 70 feet of frontage,w ch supports a single-family residence
located approximately twenty feet vertically an sixty-five feet horizontally from the
shoreline of Lake Cushman. The site features a oderate cover of mature native conifers.
Additionally,native trees have been recently p nted along the shoreline, on a bank
directly landward of the bulkhead area. Existin shoreline appurtenances include
(Attachments 2-8) a four by fifteen-foot(4' x 1 ') set of shoreline access(concrete
stepping stone) steps, a rock fire pit on top of tl e bank(above the bulkhead), an approx.
twenty-two-foot(21' 8")wood retaining wall v ith electrical outlets along the base of the
bank that is between the bulkhead and an apprc x. four-foot(4')walking path, an approx.
fifty-eight by five-foot(58' x 5')rock bulkhea (installed in 1995), an approx. six by
Hodges Habitat Management Plan 3
fifteen-foot(5' 10"x 15' 6")pier, an approx.twenty-seven by fifty-inch (27"x 8') set of
wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot(8' x
7' 4") float. The pier is supported by the bank and four(4)metal pilings,two which are
shared with the float. The float utilizes four float positioning steel pilings (6"). A vertical
wood ladder on the pier accesses the float. The total overwater coverage at the site
(lakebed access stairs,pier, and float is 155 square feet).
1.2 ATF Development Need and Objectives
The existing shoreline appurtenances are common to shoreline properties on Lake
Cushman; however,with the exception of the bulkhead,they were installed without the
proper permits from Mason County. It is probable that the former owners were unaware
that permits were mandatory.Now,the applicant(and new owner)wants to bring his
property into compliance by obtaining all the required regulatory permits. To this end,
permits will be procured from the following agencies: Mason County, the Washington
Department of Fish& Wildlife(WDFW), Tacoma Power,the Lake Cushman
Management Company, and the United States Army Corps of Engineers(USACE).
Additionally, as per Tacoma Power rules, the float will be fitted with new, polyethylene
encapsulated Styrofoam® floats. The WDFW does not issue after-the-fact permits,but an
HPA(hydraulic permit application)will be required for the latter action.
2.0 Project Description & Activities
As previously noted,the existing float will be fitted with new, polyethylene encapsulated
Styrofoam® floats, as per Tacoma Power rules. Four(4)twenty-four by forty-eight by
twelve-inch(24"x 48"x 12")polyethylene encapsulated Styrofoam®floats will be
installed on the existing float, as per the manufacturers installation instructions.Also,to
ensure that the float is resting a minimum of one foot above the lakebed during the low
water season, the float positioning steel pilings will be fitted with two by eight-foot(2' x
8') landing planks, utilizing galvanized carriage bolts and other hardware.
2.1 Mitigation
Mitigation for the ATF development is previously installed native plantings (trees)on the
shoreline (Attachments 9 & 10).The trees are primarily conifers and are approx. one to
three feet in height. They appear to have been planted within the last two years. The
following species and quantities were observed:
Hodges Habitat Management Plan 4
Approximately twenty-five(25)Douglas fir and twenty(20)Western red cedar. Seven
red huckleberry also appear to have been plant& . It is recommended that existing ivy be
removed.
Additionally,the replacement of the float materi d with encapsulated floats is self-
mitigating as the removal of the existing un-enc psulated float material is expected to
have a beneficial impact to the lake's water qual ty(see 5.1 Direct Effects).
2.2 Timing
Work on the float will be completed over an ap ox. seven(7) day period during daylight
working hours normal to a rural residential neig borhood. Work will only take place
when the water level of Lake Cushman is low, which is generally between October and
April.
2.3 Best Management Practices
In order to maintain the present water quality of Lake Cushman during project
construction,Best Management Practices (B )will be implemented. BMPs are
defined as physical, structural, and/or manageri 1 practices that prevent or reduce the
pollution of water(WDOE).
The following additional BMP shall be used to insure that water quality is not
degraded during construction:
1. Equipment shall be cleaned and check& for leaks, offsite and daily, before
commencing work.
In addition,the following Spill Prevention Con of measures shall also be followed: 1)
The applicant will supply the site with a portab bathroom or allow workers access to the
onsite bathroom so that solid or liquid waste wi l not become a source of stormwater
pollution. 2)The applicant will be responsible or alerting the appropriate authorities in
the event of a hazardous spill. 3)The applicant will have a spill kit and be able to
perform basic control, containment, and/or con nement operations within the capabilities
of the resources and personnel protective equip nent available. In other words, small
spills, such as paint or oil, shall be promptly an I fully collected and disposed of at a
suitable disposal site. In the event of a signific t spill, a fish kill, and/or if fish are
observed in distress the Washington State Dep ment of Ecology(800.258.5990)and the
Washington State Department of Fish and Wil ife's Area Habitat Biologist, Joshua
Benton(360.602.0364), will be notified imme ately.
Hodges Habitat Management Plan 5
2.4 Conservation Measures
1. No construction to occur unless Lake Cushman's waters are low.
2. An existing float will be refitted with polyethylene encapsulated Styrofoam®.
3. Construction to take place as per the HPA provisions from the Washington
Department of Fish and Wildlife.
4. Previously discussed BMPs to be strictly adhered to.
5. Existing small native trees planted on the shoreline to be maintained with
weeding and watering as necessary.
6. Electrical outlets,located on a wood retaining wall along the base of the bank that
is between the bulkhead and a walking path,to be removed,as per Tacoma
Power's regulations.
3.0 ESA Species and Habitat Information
In the ATF project area,there are six species listed under the Endangered Species Act by
the U.S. Fish and Wildlife Service (USFWS) as either threatened, endangered, or
candidate species. The bull trout(Salvelinus confluentus), marbled murrelet
(Brachyramphus marmoratus),northern spotted owl (Stridex occidentalis), and streaked
horned lark(Eremophila alpestris strigata) are listed as threatened and critical habitat has
been designated for these species. The ATF project site is in the bull trout's critical
habitat.The yellow-billed cuckoo(Coccyzus americanus) and the fisher(Mantes
pennanti) are listed as proposed threatened and candidate species, respectively.
In the proposed project area,there is one species listed under the Endangered Species Act
by the National Marine Fisheries Service(NMFS) as either threatened, endangered, or
candidate species. The Puget Sound Chinook salmon(Oncorhynchus tshawytscha) is
listed as threatened and critical habitat has been designated. Lake Cushman is a historical
watershed of the Chinook that has been anthropogenically blocked; however, it has been
designated critical habitat.
The Washington Department of Fish and Wildlife(WDFW) GIS maps reveal the
documented presence of two other species of salmonids on the State's PHS list within the
action area: Kokanee(Oncorhynchus nerka) and the Puget Sound/Coastal cutthroat trout
(Oncorhynchus clarki clarki). The presence of these two species has been documented in
Lake Cushman. WDFW data reveals that Lake Cushman was stocked with 23,896
cutthroat trout in 2005 and 205,800 Kokanee(landlocked sockeye salmon) in 2004. A
WDFW biologist reported that other species that inhabit the lake include rainbow trout
(Oncorhynchus mykiss) and non-native largemouth bass (Micropterus salmoides).
Hodges Habitat Management Plan 6
i
Additionally,Tacoma Power is presently worki g in association with the Skokomish
Tribe and the WDFW to re-establish migrating lmonid runs in the North fork of the
Skokomish River. The North Fork Skokomish Pov erhouse and Fish Facility has recently been
completed.This facility collects adult fish at the )ase of Cushman Dam No. 2 and
transports them to the top of the dam for sorting It also provides sorting facilities for
juvenile fish and transports them to the base of t ie dam for release into the river. The fry
will be released in Lake Cushman, and smolts m ill be collected and released into the
lower North Fork Skokomish River.Returning ult sockeye will eventually be collected
at the base of Cushman Dam No. 2. Two new h tcheries are also under construction, one
on the Hood Canal at Potlatch for sockeye,the her on Lake Kokanee for Chinook,
coho, and steelhead.Hatchery construction is pl nned to be complete in 2015 (Tacoma
Public Utilities 2015).
3.1 ESA Listed Species
BULL TROUT
Bull trout are members of the char subgroup of he salmon family and are native to the
Pacific Northwest and western Canada. Water t mperature above 15 degrees Celsius is
believed to limit bull trout distribution, as eggs nd juveniles require extremely cold
water for survival. Bull trout are also vulnerabl to degraded stream habitat, poor water
quality, dams and other stream blocking structu s, and predation by non-native fish.
Critical habitat includes the upper North Fork o the Skokomish River(70 FR 56304).
Critical Habitat in the North Fork of the Skokor kish River includes spawning and rearing
habitat. Lake Cushman provides rearing, foraging, and migration habitat, so it is expected
that bull trout may be found in the vicinity of th ATF project site.
MARBLED MURRELET
A small, diving seabird in the family Alcidae,tl e marbled murrelet forages for small fish
and invertebrates almost exclusively in nearsho e marine waters, while nesting inland in
old-growth or mature conifer forests. Threats i lude loss of habitat, predation, gill-net
fishing operations, oil spills, marine pollution, z rid disease. The USFWS assembled a
team of scientists in October 2011 to investigat causes for the continued decline in
murrelet populations. The outcome of these dis ssions listed many factors, chiefly loss
of potential nesting habitat as the main reason r hindrance of population recovery goals
(WDFW 2012).
Potential nest trees are coniferous trees within f 5 mi(88.5 km)of marine waters that
support at least one 4-inch(10.2-cm) diameter I latform located at least 33 feet(10
meters)above the ground,with horizontal and rtical cover(USFWS 2012). If a tree or
forested area does not support these habitat feat res, it is"extremely unlikely"to support
a murrelet nest(USFWS 2012).Nest success is influenced by forest structure,the spatial
Hodges Habitat Management Plan 7
mix of habitat and non-habitat, human disturbance, prey availability, and marine foraging
conditions. Human disturbance can lead to higher predation levels by Steller's and gray
jays, crows, ravens, and other species that seek human-related foods and refuse at high-
use recreational areas (Peery et al. 2004,Marzluff and Neatherlin 2006).
Critical habitat for the marbled murrelet, which was designated in May of 1996 and
revised in October of 2011, is located to the northwest of the ATF project site; therefore,
it must be assumed that marbled murrelets may be found nesting in the vicinity.
NORTHERN SPOTTED OWL
The Northern Spotted Owl is one of the largest owls in North America, and the average
adult female is approximately 18 inches tall with a 48-inch wingspan.Northern spotted
owls are strictly nocturnal, and require old-growth forests with multi-layered canopies of
trees, including large trees with broken tops, deformed limbs, and large holes and cavities
to nest in. The Northern spotted owl is very territorial and intolerant of habitat
disturbance, and a pair requires a large amount of forest for hunting and nesting. Habitat
loss has occurred as a result of forest conversion, timber harvest, fire,windthrow, insect
outbreak and disease (WDFW 2012).
The USFWS designated revised critical habitat for the northern spotted owl under the
Endangered Species Act. In total, approximately 9,577,969 acres (ac) (3,876,064hectares
(ha)) in 11 units and 60 subunits in California, Oregon, and Washington fall within the
boundaries of the 2 critical habitat designation. Critical habitat for the Northern spotted
owl is located in the vicinity of Lake Cushman. However, due to the close proximity of
human habitation, it is unlikely that any Northern spotted owls may be found in the
neighborhood of the ATF project site.
STREAKED HORNED LARK
Horned larks are birds that utilize wide open spaces with no trees and few or no shrubs.
The streaked horned lark nests on the ground in sparsely vegetated sites dominated by
grasses and shrubs. Historically this type of habitat was found in prairies in western
Oregon and Washington, in dune habitats along the coast of Washington, on the sandy
beaches and spits along the Columbia and Willamette Rivers, and in grasslands, estuaries,
and sandy beaches in British Columbia(WDFW 2012).Today the streaked horned lark
nests in a broad range of habitats, including native prairies, coastal dunes, fallow and
active agricultural fields, wetland mudflats, sparsely-vegetated edges of grass fields,
recently planted Christmas tree farms with extensive bare ground, moderately-to heavily-
grazed pastures, gravel roads or gravel shoulders of lightly-traveled roads, airports, and
dredge deposition sites in the lower Columbia River(WDFW 2012).
It is expected that the ATF project site contains unsuitable habitat for the streaked horned
lark.
Hodges Habitat Management Plan 8
CHINOOK SALMON
Chinook salmon in Lake Cushman are a land-1 ked population that originated from
anadromous fish, although loss of genetic varial on makes it difficult to determine
whether they are descended from historical Hoc I Canal populations or introduced
hatchery fish(NOAA 2006). Lake Cushman C nook are genetically different, smaller in
size (and presumably less fecund)than their anz romous counterparts (Myers et al.
1998). On Jan. 12,2009,Tacoma Power,the Skokc nish Tribal Nation and state and federal
agencies signed a settlement agreement that res ved a$5.8 billion damages claim and
long-standing disputes over the terms of a long erm license for Cushman Hydroelectric
Project.Tacoma Power has proposed to introdu e sockeye and spring Chinook and
enhance the existing winter steelhead and coho opulations in the North Fork in
cooperation with the WDFW and the Skokomis i Tribe(Tacoma Public Utilities 2014). In
addition, Tacoma Power will annually release u to 100,000 rainbow trout for sport
harvest(TPU 2014).
Lake Cushman has been designated Critical ha at, and the ATF project site provides
rearing, foraging, and migration habitat, so it is xpected that adult and/or juvenile
Chinook salmon may be found in the vicinity ol the site.
4.0 Environmental Baseline Cond[tions
4.1 ATF Project Vicinity
The environmental baseline represents the exist g set of conditions,to which the effects
of the proposed action are then added. The envi onmental baseline is defined as"the past
and present impacts of all Federal, state, and pri vate actions and other human activities in
the action area,the anticipated impacts of all pri 1posed Federal projects in the action area
that have already undergone formal or informal ection 7 consultation, and the impact of
state or private actions which are contemporan us with the consultation process"(50
CFR 402.02).The proposed project site is in S komish/Dosewallips WRIA 16 (Water
Resource Inventory Area), on Lake Cushman ir Mason County.The majority of the fresh
and marine waterbodies in WRIA 16 suffer fro water quality issues;however Lake
Cushman is not listed on the state's 2012 Watei Quality 303(d) list of impaired
waterbodies for any parameters. Two waterbod s in the Skokomish watershed,the South
Fork of the Skokomish River and Lebar Creek Are listed for the parameter of temperature
(high).
The proposed project site is located in a rural n ighborhood on a lot with approximately
70 feet of frontage on Lake Cushman, in an area classified as an Urban Residential
shoreline environment by the Shoreline Master rogram of Mason County. Neighboring
parcels support single-family residences (or rec eational cabins), bulkheads,piers, floats,
and other appurtenances common to waterfront properties.Forested land in the vicinity of
Hodges Habitat Management Plan 9
Lake Cushman has been logged heavily. Erosion impacts from surface flows have been
particularly damaging in the logged areas above the lake's west shore.
Before the completion of two dams in 1926 and 1930, Lake Cushman was a natural
oligotrophic lake with a mean depth of 200 feet.Now Lake Cushman is 4,010-acre water
body in the Olympic National Forest, having been altered in size to accommodate the
hydroelectric dams. Because of the dams,water levels in Lake Cushman can fluctuate up
to 21 meters (69 feet), with peak levels occurring during summer and minimum levels
during winter.The magnitude of these fluctuations results in periodic inundation of 12
hectares (30 acres) of land surrounding the inlet to the reservoir, resulting in high water
temperatures in the shallow waters of the inlet during the summer months (Brenkman
1998). Currently,the reservoir inundates 17.2 kilometers(10.7 miles) of river, including
areas of the original Lake Cushman(Brenkman 1998).
4.2 ATF Project Site
A field investigation was conducted on June 19, 2016, at approximately one in the
afternoon. The project area was surveyed visually on foot. The elevation of the lake's
water level was approx. 736 feet,two feet below full pool or the current ordinary high
water mark of 738 feet.
The site supports a single-family residence and the previously described shoreline
appurtenances.Native vegetation coverage at the site is substantial, and there are
numerous large trees.As previously noted,native trees that are approx. two to three feet
in height have been planted on the bank, landward of the bulkhead. They appear to have
been planted within the last two years.
The shoreline at the site is located in a small cove. A perennial stream on the second
adjacent property to the north discharges into the lake via an 18 inch culvert that collects
stormwater throughout the north end of the neighborhood.The cove accumulates large
quantities of woody debris, as it is blown in by prevailing winds.Adjacent properties
support bulkheads,piers, and/or piers and floats.
5.0 Effects of the Action
5.1 Direct Effects
Direct effects to the shoreline include: 1) The loss of benthic habitat from the installation
of the beach access stairs' concrete landing and posts and the pier/float pilings. 2)
Creation of shade to the shoreline from the stairs,pier, and float. 3)Contamination to
Lake Cushman from the leaching of wood preservatives. 4)The prevention of
Styrofoam®pollution.
Hodges Habitat Management Plan 10
1)The footprint of the landing, posts, and pilin utilized in this project are located
waterward of the lake's high water mark of 738 feet.All of the posts and pilings occupy
less than eight square feet(sf) of benthic habitat Due to the seasonal fluctuations of the
lake's water level, it is probable that benthic sp(cies do not thrive in the nearshore areas
of the lake that lack permanent water.No empi cal evidence was found to document if
both terrestrial and aquatic species utilize the ul per shoreline habitat, or if it has been too
altered to support normal concentrations of eith r species.
2)Another direct effect is the creation of ove iter shade from the beach access stairs,
pier, and float. The stair, pier, and float produce a reduction in light to the underlying
aquatic environment by creating a light/dark bo indary that may give piscivorous species
an advantage over their prey. The use of over-A iter structures in western Washington
waters by bass, a common, non-native predator f juvenile salmonids, has been
documented by several authors.Largemouth ba s in Lake Washington prefer areas of
heavy log and brush cover over other habitat t es; however,they are commonly found
under docks in early spring and are thought to b present until late summer(Stein 1970).
Substrate type typically determines the accept a ility of an area for bass spawning,but
adjacent cover and structural complexity are als necessary for protection while the fish
are concentrated in shallow water(Stein 1970; Tooper and Crowder 1979; Helf nan
1981b;Pflug and Pauley 1984).The substrate t e in the vicinity of the bulkhead and
landing is gravel, cobble, and rock. Largemout bass prefer moderate to dense vegetation
and silt or sand substrate, and nests are constru ed at depths from 0.6 to 1.5 meters, in
vegetated areas with soft sediment or gravel su trate on moderate to steep slopes(Pflug
1981). The ATF project site possesses unsuitab habitat for bass, so it is doubtful that the
ramp and float has/will increased/increase the c ncentration of bass at the site or the
occurrence of juvenile salmonid predation by b ss. The ATF site supports no existing
macrophyte vegetation and has no potential to s ipport macrophyte vegetation, due to the
lake's (anthropogenic) seasonal water fluctuatic ns. In addition, White(1975) determined
that phytoplankton primary production is not si nificantly reduced by narrow residential
piers, due to the presence of more optimal light onditions than found in surface waters,
where light intensities are higher than those in hich algae thrive.
Data suggests that other fish species, including almonids, are also attracted to the shade
produced by over-water structures, so it is poss le that adult salmonids could prey on
juveniles at the site. However,researchers have 'ndicated that structural complexity can
moderate predator-prey interactions by providi more refuges for prey species as well as
reducing the foraging efficiency of the predator Cooper and Crowder 1979). This
moderation may apply to naturally occurring st ctural habitat complexity, as well as
habitat complexity due to the presence of dock piers, boathouses and associated pilings
(WDFW, WDOE, WSDOT 2001).
Shade can also affect migrating salmonids. It is not known whether over-water structures
disrupt the migration of salmonids in lakes.Nu erous studies suggest that docks, piers,
and floats attract fish, and that the attraction of ish is linked to shade produced by the
object not tactile stimulus. While the effects of hade on migrating juvenile salmonids in
lakes is unknown, it is also unclear in marine w iters, and there is no empirical evidence
Hodges Habitat Management Plan 11
of mortality.The significance of predation to migrating populations has never been
empirically assessed (Simenstad et al. 1999).No studies have examined mortality due to
predation much less that mortality is attributable to overwater structures (Nightingale&
Simenstad 2001).
One final important fact: the overwater structures at the site lack water for approx. six to
seven months each year. In conclusion, shade created by the existing ramp and float is
expected to have had/have discountable and insignificant direct effects on ESA listed
salmonids that may be in the ATF project vicinity.
3)The leaching of wood preservatives is a common contaminant-related issue with the
construction of shoreline SFR appurtenances.ACZA pressure treated wood,which is
more prevalent on the west coast because it effectively treats Douglas fir, contains
copper, zinc, chromium, and arsenic. The main active ingredient of concern for effects to
fish is copper.Environmentally realistic concentrations of free copper are noted to impact
the resistance of fishes to disease, cause hyperactivity, impair respiration, disrupt
osmoregulation or impair olfactory performance (NOAA 2009). The majority of projects
proposing to use treated wood are smaller than the 100 piling size which predicts
potentially problematic water column concentrations of copper at current velocities of 1
cm/sec or less (NOAA 2009).Also, ACZA leaching rates were very low in fresh water
within ten days of installation (Brooks 1995,NMFS 1998, Hutton& Samis 2000).
A boardwalk study(FPL 2000)was conducted in Oregon on a 1,800 foot long boardwalk,
constructed in a wetland area from three different copper treated products,to evaluate the
product's environmental effects. The environment was slow moving freshwater,with fine
grained sediments and heavy rainfall (NOAA 2009).A localized pattern of distribution
indicated that the majority of leached copper was bound to suspended materials that
settled into the sediments(NOAA 2009). Monitoring of leaching found that the greatest
amount leached during initial rainfall (NOAA 2009). Four invertebrate sampling events
were conducted at the AZCA site over a one year period to detect potential adverse
effects.Results did not show a significant reduction in habitat quality, and no taxa were
extirpated from the study area, despite elevated concentrations of copper near the
boardwalk(NOAA 2009).
It is unlikely that leaching from treated wood has had/will have a noticeable impact on
aquatic life in Lake Cushman at the proposed project site, due to the small amount of
treated wood used in the ATF project.
4) The proposed replacement of the float's exposed Styrofoam® float material with
polyethylene encapsulated Styrofoam® floats is expected to prevent the structure from
becoming an eventual source of pollution to Lake Cushman. Expanded polystyrene foam
(EPS), commonly known by the trade name of as Styrofoam® is pervasive in the marine
environment(CWAC 2008). Polystyrene is made from petroleum and is not
biodegradable.Polystyrene is a principle component of urban litter and marine debris,
and it is detrimental to wildlife that ingests it(Harvard University 2008). Polystyrene is
lightweight and floats. It eventually breaks down into smaller and smaller pieces that fish
Hodges Habitat Management Plan 12
and other wildlife mistake for food and consumd The lifetime of plastics in the marine
environment is unknown. Some researchers feel that the composition of conventional
petroleum-based plastics as durable polymers in ans they will degrade to increasingly
smaller sizes but never disappear(CWAC 2008
In conclusion,the replacement of the existing in encapsulated float material with
encapsulated floats is expected to have a benefic ial impact to the Lake Cushman
ecosystem.
5.2 Indirect Effects
Indirect effects are those effects that are caused y or will result from the proposed action
and are later in time, but are still reasonably ce in to occur(50 CFR 402.02). Possible
indirect effects from the ATF project include: 1 The loss of shoreline aquatic
vegetation. 2)Potential increased motorized bo t presence in the area.
1)The overwater structures at the site have cau ed/will cause a reduction in light to the
underlying aquatic environment, which can hav significant impacts on the health and
productivity of both native and non-native mac phytes and algae. Macrophytes and
algae are the foundation for most freshwater fo webs and their presence or absence
affects many higher trophic levels(NMFS 200 . It is expected that the impact of the
lake's fluctuating water level on littoral product vity will overshadow the impacts of
shading from the overwater structures at the sitd As previously discussed, White (1975)
determined that phytoplankton primary product on is not significantly reduced by narrow
residential piers, due to the presence of more o imal light conditions than found in
surface waters where light intensities are higher than those in which algae thrive. It is
expected that the impact of the lake's fluctuatin r,water level on littoral productivity will
overshadow the impacts of shading from the sta rs, pier, and float at the site.
2)The overwater structures at the site may hav caused/may cause an increased
motorized boat presence in the area. Fuel spills From powerboats can contaminate water
quality and potentially affect listed salmonids d rectly or indirectly through their prey
source(NMFS 2005). Powerboats also create z mplified wave action that can erode the
shoreline, and prop scouring can erode benthic abitat, although benthic habitat in the
littoral zone is already significantly marginaliz by the lake's fluctuating water levels.
Powerboats also provide some oxygenation of rface waters, although the extent is
probably negligible at best. Overall,the indirec effects of powerboat usage on Lake
Cushman is likely insignificant due to the lake' large size,the small number of boats that
access the remote lake, and the short boating sc son(primarily May thru September).
Hodges Habitat Management Plan 13
5.3 Cumulative Effects
Cumulative effects are defined as"those effects of future state or private activities, not
involving Federal activities, that are reasonably certain to occur within the action area of
the action subject to consultation"(50 CFR 402.02). Cumulative impacts are difficult to
access. Continued growth and urbanization is likely to detrimentally impact fish and
wildlife resources. Global warming could raise the water level of Puget Sound, leaving
many waterfront properties underwater. Global warming could also result in warmer
water temperatures,to the detriment of species such as bull trout. Additionally, over-
fishing may deplete stocks of salmon, even as restoration of habitat in the watershed
furthers their likelihood of survival.
6.0 Conclusion
6.1 Take Analysis
Section 9 of the ESA prohibits take of endangered or threatened species, "take"being
defined in Section 3 as to harass, harm, pursue, hunt, shoot,wound,trap, capture, or
collect listed species, or attempt to engage in any such conduct. "Harm" is further defined
as a significant habitat modification or degradation that actually kills or injures listed
species by"significantly impairing behavioral patterns such as breeding, spawning,
rearing, migrating, feeding, and sheltering"(50 CFR 222.102). "Harass"is further
defined as an intentional or negligent act which creates the likelihood of injury to wildlife
by annoying it to such an extent as to significantly disrupt normal behavior patterns
which include, but are not limited to, breeding, feeding, or sheltering(50 CFR 17.3). In
regards to the ATF project, it is extremely unlikely that any"take"has or will occur. The
proposed mitigation will further insure the likelihood that no "take"will occur.
6.2 Determination of Effect
A determination of May affect, not likely to adversely affect is the appropriate conclusion
when effects on the species or their critical habitat are expected to be beneficial,
discountable, or insignificant. After reviewing the appropriate data and survey
information, I have concluded that the ATF project has had/will have an insignificant
impact on the previously discussed Endangered or Threatened species. In my most honest
and professional opinion, while the ATF project may have/may impact individual
Endangered or Threatened species in the project area, it is not likely to adversely affect or
jeopardize the continued existence of those species or their designated Critical Habitat.
The determination of effect for each of the listed species is:
1. Bull trout and their designated Critical Habitat May affect, not likely to
adversely affect.
2. Chinook salmon--May affect, not likely to adversely affect.
Hodges Habitat Management Plan 14
7.0 References
Literature
Federal Register/Vol. 70,No. 170/September 2, 2005/Rules and Regulations
Federal Register/Vol. 70,No.185 /September 26, 2005/Rules and Regulations
Federal Register/Vol. 71,No. 176/Tuesday, September 12, 2006/Proposed Rules
Federal Register/Vol. 75,No. 200/October 18, 2010/Rules and Regulations
Federal Register/77 FR 14062/March 8, 2012/Proposed Rules
Google Earth. 2013.Aerial Imagery. Internet report. https://www.gooizle.com/earth/
Harvard University. 2008. Polystyrene Fast Facts. Internet report. URL:
http://isites.harvard.edu/fs/docs/icb.topic96785 8.files/Pol�styreneFactSheets.pdf
Johannessen, J.,A.MacLennan, A. Blue, J. Waggoner, S. Williams, W. Gerstel,R.
Barnard,R. Carman, and H. Shipman, 2014.Marine Shoreline Design Guidelines.
Washington Department of Fish and Wildlife, Olympia, Washington.
Kelty,R.A. and S. Bliven. 2003.Environmental and Aesthetic Impacts of Small Docks
and Piers, Workshop Report: Developing a Science-Based Decision Support Tool for
Small Dock Management, Phase 1: Status of the Science.NOAA Coastal Ocean Program
Decision Analysis Series No. 22.National Centers for Coastal Ocean Science, Silver
Spring,MD. 69 pp.
Kleinschmidt. 2012. Shoreline Management Plan, Cushman Project,FERC Project
Number 460. Tacoma Power, Tacoma Washington.
Leigh, M. 1996. Grow your own native landscape: a guide to identifying,propagating,
and landscaping with Western Washington native plants. Washington State University
Cooperative Extension/Thurston County, Olympia, WA.
Mason County, Washington. 2016.Assessor-Treasurer Electronic Property Information
Profile. Internet report. URL:
http://property.co.mason.wa.us/Taxsifter/Search/results.aspx?g=423 07-5 0-00025
National Geographic. 2002.Field Guide to the Birds of North America.National
Geographic Society, Washington, D.C. pg. 226, 244, 250, & 320.
Hodges Habitat Management Plan 16
National Marine Fisheries Service. 2014. Distri tion of Threatened and Endangered
Species. Internet report. http://www.nwr.noaa. v
Nightingale, B. and C. Simenstad. 2001. Overw ter Structures: Marine Issues.
Washington Departments of Fish and Wildlife, cology, and Transportation. Olympia,
Washington. 177 p.
NOAA. 2014.Endangered and Threatened Mar'ie Species. Internet report.
http://www.nmfs.noaa.gov/pr/species/esa/
Poston, T. 2001. Treated Wood Issues Associatc J with Overwater Structures in Marine
and Freshwater Environments. Pacific Northwe Laboratory, Richland, Washington.
Skokomish Indian Tribe&Washington Departn ent of Fish and Wildlife.2010.
Recovery Plan for Skokomish River Chinook S lmon. Internet Report.
htt ://hccc.wa. ov/Downloads/Downloads Get ile.as x?id=397519&fd=0
Tacoma Public Utilities. 2014. Cushman Hydro Project. Internet report.
https://www.mZpu.ora/tacomapower/about-tac ma- ower/dams- ower-sources/h dro-
power/cushman-hydro-project/
Tacoma Public Utilities. 2015. Cushman Fisher s Program. Internet report. URL:
http://www.m3lpu.org/tacomgpower/fish-wildli -environment/cushman-h dro-
proj ect/cushman-fisheries-program.htm
Tahja,A. 2016. Hodges Project Plans, 2-10-17. npublished document. 11 p.
U.S. Fish and Wildlife Service. 2004. Draft Rec very Plan for the Coastal-Puget
Sound Distinct Population Segment of Bull Tro t(Salvelinus confluentus). Volume II(of
II): Olympic Peninsula Management Unit.
Portland, Oregon. 277+xvi pp
U.S.Fish and Wildlife Service.2011. Species ofile, Marbled Murrelet. Internet report.
http://www.fws.gov/arcata/es/birds/mm/m mu elet.html
U.S.Fish and Wildlife Service. 2012. Guidance for Identifying Marbled Murrelet Nest
Trees in Washington State. Internet report.
http://www.wsdot.wa.gov/NR/rdonlyres/2D97E 3D8-D448-43A7-8249-
E2319095C8C2/0/MAMUhabitatF WS.pdf
U.S. Fish and Wildlife Service.2012.Marbled urrelet Nesting Season and Analytical
Framework for Section 7 Consultation in Wash ngton. Internet report.
http://www.wsdot.wa.gov/NR/rdonlyres/F3847.)4F-BF IC-476C-8E9D-
A45A715B624C/O/CoverLtrNestin Season. d
Hodges Habitat Management Plan 17
U.S.Fish and Wildlife Service.2013. Conducting Masking Analysis for Marbled
Murrelets and Pile Driving Projects. Internet report.
http://www.wsdot.wa.gov/NR/rdonlyres/3506DAAA-4B 13-4E 1 B-855D-
36E047E07090/0/MAMU MaskAnalysis.pdf
U.S. Fish and Wildlife Service.2014. Species fact sheet, Streaked Horned Lark,
Eremophila alpestris strigata. Internet report.
http://www.fws.gov/wafwo/species/Fact%20sheets/streakedhornedlarkfinal pdf
Washington State Department of Ecology. 2012. 2012 Water Quality Assessment 303(d)
List: Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16). Internet
report.URL: http://www.ecy.wa.gov/pro2rams/wq/303d/currentassessmt.html
Washington State Department of Natural Resources. 2014. FPARS ARCIMS mapping
application. Internet report: http://fortress.wa..Rov/dnr/appl/fpars/viewer.htm
Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List.
Olympia, Washington. 177 pp.
Washington Department of Fish and Wildlife. 2012. Annual Report: Marbled Murrelet.
Internet report.
http://wdfw.wa.jzov/conservation/endan e�pecies/marbled murrelet.pdf
Washington Department of Fish and Wildlife. 2012.Annual Report: Northern Spotted
Owl. Internet report.
http://wdfw.wa.gov/conservation/endanizered/species/northem spotted owl.pdf
Washington Department of Fish and Wildlife. 2012.Annual Report: Streaked Horned
Lark. Internet report.
http://wdfw.wa.gov/conservation/endangered/species/streaked rd/species/streaked horned lark.pdf
Washington Department of Fish and Wildlife. 2012.Annual Report: Yellow-billed
Cuckoo. Internet report. http://wdfw.wa.gov/conservation/endan eg red/species/yellow-
billed cuckoo.pdf
Washington Department of Fish and Wildlife. 2016. SalmonScape. Internet report.
http://4pps.wdfw.wa.gov/salmonscgpe/
Washington State Department of Transportation.2014. BA Preparation for
Transportation Projects—Advanced Training Manual—Version 4-02-2014.
http://www.wsdot.wa.gov/NR/rdonlyres/A 1 F85352-90EO-457B-9A8C-
B5103E097FAE 10/BA_manualpart2.pdf
Hodges Habitat Management Plan 18
Attachment 1
Vicinity map.
Iil lake Cushman r?d ---- .}ake Cushman
Church Dr, 01y" attooel Forest
p°tlafch Dr N
Hodges Residence N^
111 N Potlatch Drive North
6
L a k a G h m a .a
C— --
Hodges Habitat Management Plan 19
Attachment 2
Site Plan (NTS).
i
.,>
o-
n
}
I
z <
r v y
.r Ir
Hodges Habitat Management Plan 20
Attachment 3
Site plan showing shoreline ATF development( TS).
iF
_r �M mac ,, � �G•
g - z "
t �
_ ry
u Y Hill„ j �
zj
ri
3
2 4
Im Nz ! i
r r
,�.........� " ✓
Hodges Habitat Management Plan 21
Attachment 4
Float details (NTS).
E
€ � 3; / r
s /
tp!if
$z,
n
',1 —
r
tact �
+. I
'a e '
t 2\ti i
C:
r � �
s e
Hodges Habitat Management Plan 22
Attachment 5
Cross Section (NTS).
>
W
f i
f { � ,awe � j•'� C�z _ ,�.� r g
w
t rr
� pr�
r* I
742
i
/F
k � 3
Hodges Habitat Management Plan 23
Attachment 6
The existing pier and float at the site.
i„
"r n
sY
�tY
6 ,w
Hodges Habitat Management Plan 24
Attachment 7
The existing pier and float(in background with a life preserver hanging on the pier
during the low water season.
s
b�
t
Hodges Habitat Management Plan 25
Attachment 8
The existing permitted rock bulkhead with the wood retaining wall to the right.
°
:.
7-5
AI llmllslkdna&'�
x
e
Hodges Habitat Management Plan 26
s
Attachment 9
Existing native plantings (conifers) on the shor ine at the site
� x
n t i
IIff
a
Hodges Habitat Management Plan 27
Attachment 10
Another view of existing native plantings on the shoreline at the site
+"e
n
sW,:
i
e
Hodges Habitat Management Plan 28
�PyON-C ATF0- MASON COUNTY
A o �N DEPARTMENT OF COMMUNITY DEVELOPMENT
o T Planning Division
o N Y o~ 615 W Alder St, Shelton, WA 98584
1864
(360)427-9670
MASON COUNTY ENVIRONMENTAL PERMIT
March 06, 2017
DIREK HODGES
12784 ROAD# 35
MADERA CA 93636
Parcel Number(s): 423075000039
Expiration Date: 3/6/2019 12:00:OOAN
Date Issued: 3/6/2017
Case Number: MEP2016-00050
Project Description:
ATF PERMITTING FOR CONCRETE STEPPING STONES, RETAINING WALL, PIER WITH BEACH
ACCESS STAIRS AND FLOAT
The following critical areas are present on this property:
Long-Term Commercial Forest XK FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands H Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01
MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local
statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee
fails to complete the project as proposed or fails to comply with the standards of this ordinance.
1� �31-7
Authorized L c Government Official Date
Conditions:
3/6/2017 Page 1 of MEP2016-00050
MASON COUNTY ENVIRONMENTAL PERMIT
3/6/2017 Case No.: MEP2016-00050
No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of
a development for which a permit has been granted has not begun within two years after approval, the Review
Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon
showin go d cause, may extend the initial two year period by one year. No permit shall be extended unless the
apl i s requested such review and extension prior to the exporation date.
Signature Date
(--OVVkER - REPRESENTATIVE - CONTRACTOR
Print Name (Circle one to indicate)
3/6/2017 Page 2 of 2 MEP2016-00050
vo&Eb
-? QQQ UiLe- oc 12-
Habitat Management Plan
Hodges Pier and Float After-the-Fact Permitting Project
Lake Cushman, Hoodsport WA
For:
Direk Hodges
12784 Road #35
Madera,CA 93636
Prepared by:
BioResources, LLC
Kim Schaumburg
Fisheries biologist,University of Washington, 1981
10112 Bay View Rd. KPN
Vaughn,WA, 98394
(253) 884-5776 225-2973
Email: kimberly035, centurytel.net
August 5, 016
Revised February 22,2017
Table of Contents
1.0 Proposed Action.............................................................................. 3
1.1 Background&ATF Development........................................................ 3-4
1.2 ATF Development Need&Objectives.................................................... 4
2.0 Project Description&Activities............................................................. 3
2.1 Mitigation....................................................................................... 4-5
2.2 Timing....................................................................................... ... 5
2.3 Best Management Practices.................................................................. 5
2.4 Conservation Measures....................................................................... 6
3.0 ESA Species and Habitat Information...................................................... 6
3.1 ESA Listed Species........................................................................... 7-9
4.0 Environmental Baseline Conditions........................................................ 9
4.1 ATF Project Vicinity......................................................................... 9-10
4.2 ATF Project Site.............................................................................. 10
5.0 Effects of the Action.......................................................................... 10
5.1 Direct Effects.................................................................................. 10-13
5.2 Indirect Effects................................................................................. 13
5.3 Cumulative Effects............................................................................ 13
6.0 Conclusion......................................................................................14
6.1 Take Analysis.................................................................................. 14
6.2 Determination of Effect...................................................................... 14-15
7.0 References......................................................................................16-18
Attachments
1. Project location...................................................................................19
2. Site plan....................................................................................... ...20
3. Site plan........................................................................................... 21
4. Float details........................................................................................22
5. Cross section..................................................................................... 23
6. Site Photographs.................................................................................. 24
7. Site Photographs.................................................................................. 25
8. Site Photographs.................................................................................. 26
9. Site Photographs.................................................................................. 27
10. Site Photographs.................................................................................. 28
Hodges Habitat Management Plan 2
1.0 Proposed Action
This Habitat Management Plan has been submi ed on behalf of Direk Hodges at the
request of Mason County to comply with the C nty's regulations and procure after-the-
fact(ATF)permits for existing shoreline devel ment on his Lake Cushman property.
The ATF development includes the following: fire pit, shoreline access (concrete
stepping stone) steps, a wood retaining wall, a er and attached beach access stairs, and a
float. An existing rock bulkhead is permitted. I addition, a new project is also being
proposed as Tacoma Power requires that the ex ting float be fitted with polyethylene
encapsulated Styrofoam®floats;the existing fl at currently utilizes un-encapsulated float
material.Mitigation for ATF development is pr viously installed native plantings(trees)
on the shoreline.
1.1 Background & ATF Development
The proposed project site is located in Mason C unty at 11 I North Potlatch Drive North,
Hoodsport Washington(Attachment 1).The M on County tax parcel number is 42307-
50-00039. The property is located in Section 07 Township 23N,Range 04 of the
Western Meridian. The latitude is 47.49316 nor h, and the longitude is -123.24718 west.
The proposed project site is located on Lake C hman in the Skokomish/Dosewallips
Water Resource Inventory Area(WRIA 16)on shoreline designated Urban Residential
by the Shoreline Master Program of Mason Co ty. Lake Cushman is regulated under the
Mason County Shoreline Master Program and t e Mason County Resource Ordinance as
a Fish and Wildlife Habitat Conservation Area. he Shoreline Management Act of 1971
designated Lake Cushman as a Shoreline of St a wide Significance. In addition,Lake
Cushman is regulated by Tacoma Public Utiliti (aka Tacoma Power),which has
designated Shoreline Management Classificatio i(SMC)zones.The proposed project site
is located in an SMC zone classified as "A."Ta oma Power defines the"A"management
classification as shoreline areas with no known ignificant environmental/cultural
resources or associated resource management g, ials precluding existing or future
shoreline uses;this classification acknowledges existing private uses and anticipates
potential future private and light commercial sh reline uses (Kleinschmidt 2012).
The proposed project site is located in a rural n ghborhood on a shoreline lot with
approximately(approx.) 70 feet of frontage,wh ch supports a single-family residence
located approximately twenty feet vertically an sixty-five feet horizontally from the
shoreline of Lake Cushman. The site features a noderate cover of mature native conifers.
Additionally, native trees have been recently pl nted along the shoreline, on a bank
directly landward of the bulkhead area.Existin shoreline appurtenances include
(Attachments 2-8) a four by fifteen-foot(4' x 1 ') set of shoreline access(concrete
stepping stone) steps, a rock fire pit on top of t bank(above the bulkhead), an approx.
twenty-two-foot(21' 8")wood retaining wall th electrical outlets along the base of the
bank that is between the bulkhead and an appro . four-foot(4')walking path, an approx.
fifty-eight by five-foot(58' x 5')rock bulkhead (installed in 1995), an approx. six by
Hodges Habitat Management Plan 3
r {
fifteen-foot(5' 10"x 15' 6")pier, an approx.twenty-seven by fifty-inch (27"x 8') set of
wood stairs running from the pier to the lakebed, and an approx. eight by seven-foot(8' x
7' 4") float. The pier is supported by the bank and four(4)metal pilings,two which are
shared with the float. The float utilizes four float positioning steel pilings(6").A vertical
wood ladder on the pier accesses the float. The total overwater coverage at the site
(lakebed access stairs,pier, and float is 155 square feet).
1.2 ATF Development Need and Objectives
The existing shoreline appurtenances are common to shoreline properties on Lake
Cushman; however,with the exception of the bulkhead,they were installed without the
proper permits from Mason County. It is probable that the former owners were unaware
that permits were mandatory.Now,the applicant(and new owner)wants to bring his
property into compliance by obtaining all the required regulatory permits. To this end,
permits will be procured from the following agencies: Mason County, the Washington
Department of Fish& Wildlife(WDFW), Tacoma Power,the Lake Cushman
Management Company, and the United States Army Corps of Engineers(USACE).
Additionally, as per Tacoma Power rules,the float will be fitted with new, polyethylene
encapsulated Styrofoam® floats. The WDFW does not issue after-the-fact permits, but an
HPA (hydraulic permit application)will be required for the latter action.
2.0 Project Description & Activities
As previously noted, the existing float will be fitted with new, polyethylene encapsulated
Styrofoam® floats, as per Tacoma Power rules. Four(4)twenty-four by forty-eight by
twelve-inch(24"x 48"x 12")polyethylene encapsulated Styrofoam® floats will be
installed on the existing float, as per the manufacturers installation instructions.Also,to
ensure that the float is resting a minimum of one foot above the lakebed during the low
water season,the float positioning steel pilings will be fitted with two by eight-foot(2' x
8') landing planks,utilizing galvanized carriage bolts and other hardware.
2.1 Mitigation
Mitigation for the ATF development is previously installed native plantings (trees) on the
shoreline(Attachments 9 & 10).The trees are primarily conifers and are approx. one to
three feet in height. They appear to have been planted within the last two years. The
following species and quantities were observed:
Hodges Habitat Management Plan 4
Approximately twenty-five(25)Douglas fir anc twenty(20) Western red cedar. Seven
red huckleberry also appear to have been plante 1. It is recommended that existing ivy be
removed.
Additionally,the replacement of the float mater al with encapsulated floats is self-
mitigating as the removal of the existing un-enc ipsulated float material is expected to
have a beneficial impact to the lake's water qua ity(see 5.1 Direct Effects).
2.2 Timing
Work on the float will be completed over an apl,rox. seven (7) day period during daylight
working hours normal to a rural residential neig iborhood. Work will only take place
when the water level of Lake Cushman is low, hich is generally between October and
April.
2.3 Best Management Practices
In order to maintain the present water quality of Lake Cushman during project
construction, Best Management Practices (B )will be implemented. BMPs are
defined as physical, structural, and/or managerial practices that prevent or reduce the
pollution of water(WDOE).
The following additional BMP shall be used lo insure that water quality is not
degraded during construction:
1. Equipment shall be cleaned and checkec for leaks, offsite and daily, before
commencing work.
In addition,the following Spill Prevention Coni rol measures shall also be followed: 1)
The applicant will supply the site with a portab bathroom or allow workers access to the
onsite bathroom so that solid or liquid waste wi I not become a source of stormwater
pollution. 2)The applicant will be responsible br alerting the appropriate authorities in
the event of a hazardous spill. 3)The applicant will have a spill kit and be able to
perform basic control, containment, and/or coni nement operations within the capabilities
of the resources and personnel protective equipi ient available. In other words, small
spills, such as paint or oil, shall be promptly an fully collected and disposed of at a
suitable disposal site. In the event of a significa t spill, a fish kill, and/or if fish are
observed in distress the Washington State Depa tment of Ecology(800.258.5990)and the
Washington State Department of Fish and Wild ife's Area Habitat Biologist, Joshua
Benton(360.602.0364),will be notified immed ately.
Hodges Habitat Management Plan 5
2.4 Conservation Measures
1. No construction to occur unless Lake Cushman's waters are low.
2. An existing float will be refitted with polyethylene encapsulated Styrofoam®.
3. Construction to take place as per the 14PA provisions from the Washington
Department of Fish and Wildlife.
4. Previously discussed BMPs to be strictly adhered to.
5. Existing small native trees planted on the shoreline to be maintained with
weeding and watering as necessary.
6. Electrical outlets,located on a wood retaining wall along the base of the bank that
is between the bulkhead and a walking path,to be removed,as per Tacoma
Power's regulations.
3.0 ESA Species and Habitat Information
In the ATF project area,there are six species listed under the Endangered Species Act by
the U.S. Fish and Wildlife Service (USFWS) as either threatened, endangered, or
candidate species. The bull trout(Salvelinus confluentus), marbled murrelet
(Brachyramphus marmoratus),northern spotted owl (Stridex occidentalis), and streaked
horned lark(Eremophila alpestris strigata) are listed as threatened and critical habitat has
been designated for these species. The ATF project site is in the bull trout's critical
habitat.The yellow-billed cuckoo (Coccyzus americanus) and the fisher(Mantes
pennanti) are listed as proposed threatened and candidate species, respectively.
In the proposed project area,there is one species listed under the Endangered Species Act
by the National Marine Fisheries Service(NMFS) as either threatened, endangered, or
candidate species.The Puget Sound Chinook salmon(Oncorhynchus tshawytscha) is
listed as threatened and critical habitat has been designated. Lake Cushman is a historical
watershed of the Chinook that has been anthropogenically blocked;however, it has been
designated critical habitat.
The Washington Department of Fish and Wildlife(WDFW) GIS maps reveal the
documented presence of two other species of salmonids on the State's PHS list within the
action area: Kokanee(Oncorhynchus nerka) and the Puget Sound/Coastal cutthroat trout
(Oncorhynchus clarki clarki).The presence of these two species has been documented in
Lake Cushman. WDFW data reveals that Lake Cushman was stocked with 23,896
cutthroat trout in 2005 and 205,800 Kokanee (landlocked sockeye salmon) in 2004. A
WDFW biologist reported that other species that inhabit the lake include rainbow trout
(Oncorhynchus mykiss) and non-native largemouth bass(Micropterus salmoides).
Hodges Habitat Management Plan 6
Additionally, Tacoma Power is presently workit g in association with the Skokomish
Tribe and the WDFW to re-establish migrating E almonid runs in the North fork of the
Skokomish River.The North Fork Skokomish Pov erhouse and Fish Facility has recently been
completed.This facility collects adult fish at the I iase of Cushman Dam No. 2 and
transports them to the top of the dam for sorting It also provides sorting facilities for
juvenile fish and transports them to the base of edam for release into the river. The fry
will be released in Lake Cushman, and smolts 11 be collected and released into the
lower North Fork Skokomish River.Returning ult sockeye will eventually be collected
at the base of Cushman Dam No. 2. Two new h cheries are also under construction, one
on the Hood Canal at Potlatch for sockeye,the her on Lake Kokanee for Chinook,
coho, and steelhead.Hatchery construction is pl nned to be complete in 2015 (Tacoma
Public Utilities 2015).
3.1 ESA Listed Species
BULL TROUT
Bull trout are members of the char subgroup of e salmon family and are native to the
Pacific Northwest and western Canada. Water t perature above 15 degrees Celsius is
believed to limit bull trout distribution, as eggs d juveniles require extremely cold
water for survival. Bull trout are also vulnerabl to degraded stream habitat, poor water
quality, dams and other stream blocking structu s, and predation by non-native fish.
Critical habitat includes the upper North Fork o the Skokomish River(70 FR 56304).
Critical Habitat in the North Fork of the Skokor iish River includes spawning and rearing
habitat.Lake Cushman provides rearing, foragii g, and migration habitat, so it is expected
that bull trout may be found in the vicinity of th ATF project site.
MARBLED MURRELET
A small, diving seabird in the family Alcidae,tf e marbled murrelet forages for small fish
and invertebrates almost exclusively in nearsho marine waters, while nesting inland in
old-growth or mature conifer forests.Threats in Jude loss of habitat, predation, gill-net
fishing operations, oil spills,marine pollution, d disease. The USFWS assembled a
team of scientists in October 2011 to investigat causes for the continued decline in
murrelet populations.The outcome of these dis ssions listed many factors, chiefly loss
of potential nesting habitat as the main reason f ir hindrance of population recovery goals
(WDFW 2012).
Potential nest trees are coniferous trees within 5 5 mi(88.5 km) of marine waters that
support at least one 4-inch(10.2-cm) diameter I latform located at least 33 feet(10
meters) above the ground,with horizontal and rtical cover(USFWS 2012). If a tree or
forested area does not support these habitat feat res, it is"extremely unlikely"to support
a murrelet nest(USFWS 2012).Nest success is influenced by forest structure,the spatial
Hodges Habitat Management Plan 7
mix of habitat and non-habitat, human disturbance,prey availability, and marine foraging
conditions. Human disturbance can lead to higher predation levels by Steller's and gray
jays, crows, ravens, and other species that seek human-related foods and refuse at high-
use recreational areas (Peery et al. 2004,Marzluff and Neatherlin 2006).
Critical habitat for the marbled murrelet,which was designated in May of 1996 and
revised in October of 2011, is located to the northwest of the ATF project site; therefore,
it must be assumed that marbled murrelets may be found nesting in the vicinity.
NORTHERN SPOTTED OWL
The Northern Spotted Owl is one of the largest owls in North America, and the average
adult female is approximately 18 inches tall with a 48-inch wingspan.Northern spotted
owls are strictly nocturnal, and require old-growth forests with multi-layered canopies of
trees, including large trees with broken tops, deformed limbs, and large holes and cavities
to nest in. The Northern spotted owl is very territorial and intolerant of habitat
disturbance, and a pair requires a large amount of forest for hunting and nesting.Habitat
loss has occurred as a result of forest conversion,timber harvest, fire,windthrow, insect
outbreak and disease (WDFW 2012).
The USFWS designated revised critical habitat for the northern spotted owl under the
Endangered Species Act. In total, approximately 9,577,969 acres (ac) (3,876,064hectares
(ha)) in 11 units and 60 subunits in California, Oregon, and Washington fall within the
boundaries of the 2 critical habitat designation. Critical habitat for the Northern spotted
owl is located in the vicinity of Lake Cushman.However, due to the close proximity of
human habitation, it is unlikely that any Northern spotted owls may be found in the
neighborhood of the ATF project site.
STREAKED HORNED LARK
Horned larks are birds that utilize wide open spaces with no trees and few or no shrubs.
The streaked horned lark nests on the ground in sparsely vegetated sites dominated by
grasses and shrubs.Historically this type of habitat was found in prairies in western
Oregon and Washington, in dune habitats along the coast of Washington, on the sandy
beaches and spits along the Columbia and Willamette Rivers, and in grasslands, estuaries,
and sandy beaches in British Columbia(WDFW 2012). Today the streaked horned lark
nests in a broad range of habitats, including native prairies, coastal dunes, fallow and
active agricultural fields,wetland mudflats, sparsely-vegetated edges of grass fields,
recently planted Christmas tree farms with extensive bare ground,moderately-to heavily-
grazed pastures, gravel roads or gravel shoulders of lightly-traveled roads, airports, and
dredge deposition sites in the lower Columbia River(WDFW 2012).
It is expected that the ATF project site contains unsuitable habitat for the streaked horned
lark.
Hodges Habitat Management Plan 8
CHINOOK SALMON
Chinook salmon in Lake Cushman are a land-lo ked population that originated from
anadromous fish, although loss of genetic varia on makes it difficult to determine
whether they are descended from historical Ho Canal populations or introduced
hatchery fish(NOAA 2006). Lake Cushman Ch nook are genetically different, smaller in
size(and presumably less fecund)than their ana Iromous counterparts(Myers et al.
1998). On Jan. 12,2009,Tacoma Power,the Skoko nish Tribal Nation and state and federal
agencies signed a settlement agreement that res ved a$5.8 billion damages claim and
long-standing disputes over the terms of a long- erm license for Cushman Hydroelectric
Project. Tacoma Power has proposed to introdu e sockeye and spring Chinook and
enhance the existing winter steelhead and coho opulations in the North Fork in
cooperation with the WDFW and the Skokomis Tribe (Tacoma Public Utilities 2014). In
addition, Tacoma Power will annually release u o to 100,000 rainbow trout for sport
harvest(TPU 2014).
Lake Cushman has been designated Critical ha tat, and the ATF project site provides
rearing, foraging, and migration habitat, so it is xpected that adult and/or juvenile
Chinook salmon may be found in the vicinity ol the site.
4.0 Environmental Baseline Cond tions
4.1 ATF Project Vicinity
The environmental baseline represents the exist g set of conditions,to which the effects
of the proposed action are then added. The envii onmental baseline is defined as"the past
and present impacts of all Federal, state, and pr' iate actions and other human activities in
the action area,the anticipated impacts of all pr posed Federal projects in the action area
that have already undergone formal or informal ection 7 consultation, and the impact of
state or private actions which are contemporane us with the consultation process" (50
CFR 402.02). The proposed project site is in S komish/Dosewallips WRIA 16 (Water
Resource Inventory Area), on Lake Cushman in Mason County.The majority of the fresh
and marine waterbodies in WRIA 16 suffer fror i water quality issues; however Lake
Cushman is not listed on the state's 2012 Watei Quality 303(d)list of impaired
waterbodies for any parameters. Two waterbodi 1,s in the Skokomish watershed,the South
Fork of the Skokomish River and Lebar Creek i re listed for the parameter of temperature
(high).
The proposed project site is located in a rural n ghborhood on a lot with approximately
70 feet of frontage on Lake Cushman, in an are classified as an Urban Residential
shoreline environment by the Shoreline Master rogram of Mason County.Neighboring
parcels support single-family residences(or rec eational cabins), bulkheads,piers, floats,
and other appurtenances common to waterfront properties. Forested land in the vicinity of
Hodges Habitat Management Plan 9
Lake Cushman has been logged heavily. Erosion impacts from surface flows have been
particularly damaging in the logged areas above the lake's west shore.
Before the completion of two dams in 1926 and 1930, Lake Cushman was a natural
oligotrophic lake with a mean depth of 200 feet.Now Lake Cushman is 4,010-acre water
body in the Olympic National Forest,having been altered in size to accommodate the
hydroelectric dams. Because of the dams,water levels in Lake Cushman can fluctuate up
to 21 meters(69 feet),with peak levels occurring during summer and minimum levels
during winter. The magnitude of these fluctuations results in periodic inundation of 12
hectares(30 acres)of land surrounding the inlet to the reservoir, resulting in high water
temperatures in the shallow waters of the inlet during the summer months (Brenkman
1998).Currently,the reservoir inundates 17.2 kilometers(10.7 miles) of river, including
areas of the original Lake Cushman(Brenkman 1998).
4.2 ATF Project Site
A field investigation was conducted on June 19, 2016, at approximately one in the
afternoon. The project area was surveyed visually on foot. The elevation of the lake's
water level was approx. 736 feet,two feet below full pool or the current ordinary high
water mark of 738 feet.
The site supports a single-family residence and the previously described shoreline
appurtenances.Native vegetation coverage at the site is substantial, and there are
numerous large trees.As previously noted, native trees that are approx.two to three feet
in height have been planted on the bank, landward of the bulkhead. They appear to have
been planted within the last two years.
The shoreline at the site is located in a small cove. A perennial stream on the second
adjacent property to the north discharges into the lake via an 18 inch culvert that collects
stormwater throughout the north end of the neighborhood. The cove accumulates large
quantities of woody debris, as it is blown in by prevailing winds.Adjacent properties
support bulkheads, piers, and/or piers and floats.
5.0 Effects of the Action
5.1 Direct Effects
Direct effects to the shoreline include: 1) The loss of benthic habitat from the installation
of the beach access stairs' concrete landing and posts and the pier/float pilings. 2)
Creation of shade to the shoreline from the stairs,pier, and float. 3) Contamination to
Lake Cushman from the leaching of wood preservatives.4)The prevention of
Styrofoam®pollution.
Hodges Habitat Management Plan 10
1)The footprint of the landing,posts, and pilin utilized in this project are located
waterward of the lake's high water mark of 738 eet. All of the posts and pilings occupy
less than eight square feet(sf)of benthic habitat Due to the seasonal fluctuations of the
lake's water level, it is probable that benthic sp ies do not thrive in the nearshore areas
of the lake that lack permanent water.No empir cal evidence was found to document if
both terrestrial and aquatic species utilize the u er shoreline habitat, or if it has been too
altered to support normal concentrations of eith(r species.
2)Another direct effect is the creation of overw ter shade from the beach access stairs,
pier, and float. The stair, pier, and float produce a reduction in light to the underlying
aquatic environment by creating a light/dark boi ndary that may give piscivorous species
an advantage over their prey. The use of over-w tter structures in western Washington
waters by bass, a common,non-native predator f juvenile salmonids, has been
documented by several authors. Largemouth ba in Lake Washington prefer areas of
heavy log and brush cover over other habitat ty s;however,they are commonly found
under docks in early spring and are thought to b present until late summer(Stein 1970).
Substrate type typically determines the acceptab lity of an area for bass spawning,but
adjacent cover and structural complexity are als necessary for protection while the fish
are concentrated in shallow water(Stein 1970; ooper and Crowder 1979;Helfinan
1981b;Pflug and Pauley 1984). The substrate t) 3e in the vicinity of the bulkhead and
landing is gravel, cobble, and rock. Largemouth bass prefer moderate to dense vegetation
and silt or sand substrate, and nests are construc ed at depths from 0.6 to 1.5 meters, in
vegetated areas with soft sediment or gravel sub trate on moderate to steep slopes(Pflug
1981). The ATF project site possesses unsuitab habitat for bass, so it is doubtful that the
ramp and float has/will increased/increase the c ncentration of bass at the site or the
occurrence of juvenile salmonid predation by b s.The ATF site supports no existing
macrophyte vegetation and has no potential to s pport macrophyte vegetation, due to the
lake's (anthropogenic) seasonal water fluctuati s. In addition, White(1975)determined
that phytoplankton primary production is not si ificantly reduced by narrow residential
piers, due to the presence of more optimal light onditions than found in surface waters,
where light intensities are higher than those in v hich algae thrive.
Data suggests that other fish species, including lmonids, are also attracted to the shade
produced by over-water structures, so it is possi le that adult salmonids could prey on
juveniles at the site. However, researchers have ndicated that structural complexity can
moderate predator-prey interactions by providi more refuges for prey species as well as
reducing the foraging efficiency of the predator Cooper and Crowder 1979). This
moderation may apply to naturally occurring st ctural habitat complexity, as well as
habitat complexity due to the presence of docks piers, boathouses and associated pilings
(WDFW, WDOE, WSDOT 2001).
Shade can also affect migrating salmonids. It is of known whether over-water structures
disrupt the migration of salmonids in lakes.Nui ierous studies suggest that docks,piers,
and floats attract fish, and that the attraction of sh is linked to shade produced by the
object not tactile stimulus. While the effects of hade on migrating juvenile salmonids in
lakes is unknown, it is also unclear in marine w ters, and there is no empirical evidence
Hodges Habitat Management Plan 11
of mortality. The significance of predation to migrating populations has never been
empirically assessed (Simenstad et al. 1999).No studies have examined mortality due to
predation much less that mortality is attributable to overwater structures(Nightingale&
Simenstad 2001).
One final important fact: the overwater structures at the site lack water for approx. six to
seven months each year. In conclusion, shade created by the existing ramp and float is
expected to have had/have discountable and insignificant direct effects on ESA listed
salmonids that may be in the ATF project vicinity.
3) The leaching of wood preservatives is a common contaminant-related issue with the
construction of shoreline SFR appurtenances. ACZA pressure treated wood,which is
more prevalent on the west coast because it effectively treats Douglas fir, contains
copper, zinc, chromium, and arsenic. The main active ingredient of concern for effects to
fish is copper.Environmentally realistic concentrations of free copper are noted to impact
the resistance of fishes to disease, cause hyperactivity, impair respiration, disrupt
osmoregulation or impair olfactory performance (NOAA 2009).The majority of projects
proposing to use treated wood are smaller than the 100 piling size which predicts
potentially problematic water column concentrations of copper at current velocities of 1
cm/sec or less(NOAA 2009).Also,ACZA leaching rates were very low in fresh water
within ten days of installation(Brooks 1995,NMFS 1998, Hutton& Samis 2000).
A boardwalk study(FPL 2000)was conducted in Oregon on a 1,800 foot long boardwalk,
constructed in a wetland area from three different copper treated products,to evaluate the
product's environmental effects. The environment was slow moving freshwater,with fine
grained sediments and heavy rainfall (NOAA 2009).A localized pattern of distribution
indicated that the majority of leached copper was bound to suspended materials that
settled into the sediments(NOAA 2009). Monitoring of leaching found that the greatest
amount leached during initial rainfall (NOAA 2009). Four invertebrate sampling events
were conducted at the AZCA site over a one year period to detect potential adverse
effects. Results did not show a significant reduction in habitat quality, and no taxa were
extirpated from the study area, despite elevated concentrations of copper near the
boardwalk(NOAA 2009).
It is unlikely that leaching from treated wood has had/will have a noticeable impact on
aquatic life in Lake Cushman at the proposed project site, due to the small amount of
treated wood used in the ATF project.
4) The proposed replacement of the float's exposed Styrofoam®float material with
polyethylene encapsulated Styrofoam®floats is expected to prevent the structure from
becoming an eventual source of pollution to Lake Cushman. Expanded polystyrene foam
(EPS), commonly known by the trade name of as Styrofoam® is pervasive in the marine
environment(CWAC 2008).Polystyrene is made from petroleum and is not
biodegradable. Polystyrene is a principle component of urban litter and marine debris,
and it is detrimental to wildlife that ingests it(Harvard University 2008). Polystyrene is
lightweight and floats. It eventually breaks down into smaller and smaller pieces that fish
Hodges Habitat Management Plan 12
and other wildlife mistake for food and consum . The lifetime of plastics in the marine
environment is unknown. Some researchers fee that the composition of conventional
petroleum-based plastics as durable polymers rr.rans they will degrade to increasingly
smaller sizes but never disappear(CWAC 2008 .
In conclusion,the replacement of the existing u -encapsulated float material with
encapsulated floats is expected to have a beneficial impact to the Lake Cushman
ecosystem.
5.2 Indirect Effects
Indirect effects are those effects that are caused y or will result from the proposed action
and are later in time,but are still reasonably cer ain to occur(50 CFR 402.02). Possible
indirect effects from the ATF project include: The loss of shoreline aquatic
vegetation. 2)Potential increased motorized bo it presence in the area.
1)The overwater structures at the site have ca ed/will cause a reduction in light to the
underlying aquatic environment, which can hav significant impacts on the health and
productivity of both native and non-native mac phytes and algae. Macrophytes and
algae are the foundation for most freshwater fo webs and their presence or absence
affects many higher trophic levels(NMFS 2004 1. It is expected that the impact of the
lake's fluctuating water level on littoral product ity will overshadow the impacts of
shading from the overwater structures at the sit As previously discussed, White (1975)
determined that phytoplankton primary product n is not significantly reduced by narrow
residential piers, due to the presence of more op imal light conditions than found in
surface waters where light intensities are higher than those in which algae thrive. It is
expected that the impact of the lake's fluctuatin water level on littoral productivity will
overshadow the impacts of shading from the sta rs, pier, and float at the site.
2)The overwater structures at the site may havc caused/may cause an increased
motorized boat presence in the area. Fuel spills Tom powerboats can contaminate water
quality and potentially affect listed salmonids d rectly or indirectly through their prey
source(NMFS 2005). Powerboats also create a nplified wave action that can erode the
shoreline, and prop scouring can erode benthic abitat, although benthic habitat in the
littoral zone is already significantly marginaliz by the lake's fluctuating water levels.
Powerboats also provide some oxygenation of rface waters, although the extent is
probably negligible at best. Overall,the indirec effects of powerboat usage on Lake
Cushman is likely insignificant due to the lake' large size,the small number of boats that
access the remote lake, and the short boating se son(primarily May thru September).
Hodges Habitat Management Plan 13
5.3 Cumulative Effects
Cumulative effects are defined as "those effects of future state or private activities, not
involving Federal activities,that are reasonably certain to occur within the action area of
the action subject to consultation" (50 CFR 402.02). Cumulative impacts are difficult to
access. Continued growth and urbanization is likely to detrimentally impact fish and
wildlife resources. Global warming could raise the water level of Puget Sound, leaving
many waterfront properties underwater. Global warming could also result in warmer
water temperatures,to the detriment of species such as bull trout. Additionally, over-
fishing may deplete stocks of salmon, even as restoration of habitat in the watershed
furthers their likelihood of survival.
6.0 Conclusion
6.1 Take Analysis
Section 9 of the ESA prohibits take of endangered or threatened species, "take"being
defined in Section 3 as to harass, harm, pursue, hunt, shoot,wound,trap, capture, or
collect listed species, or attempt to engage in any such conduct. Harm is further defined
as a significant habitat modification or degradation that actually kills or injures listed
species by"significantly impairing behavioral patterns such as breeding, spawning,
rearing,migrating, feeding, and sheltering"(50 CFR 222.102). "Harass" is further
defined as an intentional or negligent act which creates the likelihood of injury to wildlife
by annoying it to such an extent as to significantly disrupt normal behavior patterns
which include,but are not limited to,breeding, feeding, or sheltering(50 CFR 17.3). In
regards to the ATF project, it is extremely unlikely that any"take"has or will occur. The
proposed mitigation will further insure the likelihood that no "take"will occur.
6.2 Determination of Effect
A determination of May affect, not likely to adversely affect is the appropriate conclusion
when effects on the species or their critical habitat are expected to be beneficial,
discountable, or insignificant. After reviewing the appropriate data and survey
information, I have concluded that the ATF project has had/will have an insignificant
impact on the previously discussed Endangered or Threatened species. In my most honest
and professional opinion, while the ATF project may have/may impact individual
Endangered or Threatened species in the project area, it is not likely to adversely affect or
jeopardize the continued existence of those species or their designated Critical Habitat.
The determination of effect for each of the listed species is:
1. Bull trout and their designated Critical Habitat May affect, not likely to
adversely affect.
2. Chinook salmon--May affect, not likely to adversely affect.
Hodges Habitat Management Plan 14
3. Marbled murrelet No effect.
4. Northern spotted owl No effect.
5. Streaked horned lark---No effect.
6. Yellow-billed cuckoo—No effect.
Hodges Habitat Management Plan 15
7.0 References
Literature
Federal Register/Vol. 70, No. 170/September 2, 2005/Rules and Regulations
Federal Register/Vol. 70, No.185 /September 26, 2005/Rules and Regulations
Federal Register/Vol. 71,No. 176/Tuesday, September 12, 2006/Proposed Rules
Federal Register/Vol. 75,No. 200/October 18, 2010/Rules and Regulations
Federal Register/77 FR 14062/March 8, 2012/Proposed Rules
Google Earth. 2013.Aerial Imagery. Internet report. https://www.aooizle.com/earth/
Harvard University.2008. Polystyrene Fast Facts. Internet report. URL:
http•//isites harvard edu/fs/docs/icb.topic967858.files/PolystyreneFactSheets.pdf
Johannessen,J.,A.MacLennan,A. Blue, J. Waggoner, S. Williams, W. Gerstel,R.
Barnard, R. Carman, and H. Shipman, 2014.Marine Shoreline Design Guidelines.
Washington Department of Fish and Wildlife, Olympia, Washington.
Kelty, R.A. and S. Bliven. 2003. Environmental and Aesthetic Impacts of Small Docks
and Piers, Workshop Report: Developing a Science-Based Decision Support Tool for
Small Dock Management, Phase 1: Status of the Science.NOAA Coastal Ocean Program
Decision Analysis Series No. 22.National Centers for Coastal Ocean Science, Silver
Spring,MD. 69 pp.
Kleinschmidt. 2012. Shoreline Management Plan, Cushman Project, FERC Project
Number 460. Tacoma Power, Tacoma Washington.
Leigh, M. 1996. Grow your own native landscape: a guide to identifying,propagating,
and landscaping with Western Washington native plants. Washington State University
Cooperative Extension/Thurston County, Olympia, WA.
Mason County, Washington. 2016.Assessor-Treasurer Electronic Property Information
Profile. Internet report. URL:
http•//property co mason wa.us/Taxsifter/Search/results.aspx?q=42307-50-00025
National Geographic. 2002.Field Guide to the Birds of North America.National
Geographic Society, Washington, D.C.pg. 226, 244, 250, & 320.
Hodges Habitat Management Plan 16
National Marine Fisheries Service. 2014.Distri ution of Threatened and Endangered
Species. Internet report. http://www.nwr.noaa. v
Nightingale, B. and C. Simenstad.2001. OverN iter Structures: Marine Issues.
Washington Departments of Fish and Wildlife, Elcology, and Transportation. Olympia,
Washington. 177 p.
NOAA.2014. Endangered and Threatened Mar ne Species. Internet report.
http://www.nmfs.noaa.gov/pr/species/esa/
Poston,T. 2001.Treated Wood Issues Associat id with Overwater Structures in Marine
and Freshwater Environments. Pacific Northwe it Laboratory, Richland, Washington.
Skokomish Indian Tribe &Washington Departi ient of Fish and Wildlife. 2010.
Recovery Plan for Skokomish River Chinook S lmon. Internet Report.
http://hccc.wa.gov/Downloads/Downloads Get ile.as x?id=397519&fd=0
Tacoma Public Utilities.2014. Cushman Hydro Project. Internet report.
https://www.mMu.org/tacomapower/about-tac ma- ower/dams- ower-sources/h dro-
power/cushman-hYdro_project/
Tacoma Public Utilities. 2015. Cushman Fisher es Program. Internet report. URL:
http://www.m3lpu.orgLtacomgpower/fish-wildli e-environment/cushman-h dro-
pro j ect/cushman-fisheries-pro gram.htm
Tahja,A. 2016. Hodges Project Plans, 2-10-17. Unpublished document. 11 p.
U.S. Fish and Wildlife Service. 2004. Draft Re very Plan for the Coastal-Puget
Sound Distinct Population Segment of Bull Tro it(Salvelinus confluentus). Volume 11(of
11): Olympic Peninsula Management Unit.
Portland, Oregon.277+xvi pp
U.S. Fish and Wildlife Service.2011. Species ofile, Marbled Murrelet. Internet report.
http://www.fws.gov/arcata/esibirds/mm/M mu elet.html
U.S. Fish and Wildlife Service.2012. Guidance for Identifying Marbled Murrelet Nest
Trees in Washington State. Internet report.
htt ://www.wsdot.wa. ov/NR/rdonl res/2D97 3D8-D448-43A7-8249-
E2319095 C 8C2/0/MAMUhabitatF W S.pdf
U.S. Fish and Wildlife Service.2012.Marbled Aurrelet Nesting Season and Analytical
Framework for Section 7 Consultation in Wash ngton. Internet report.
http://www.wsdot.wa.gov/NR/rdonlyres/F3847 4F-BF1C-476C-8E9D-
A45A715B624C/0/CoverLtrNestin Season. d
Hodges Habitat Management Plan 17
U.S. Fish and Wildlife Service. 2013. Conducting Masking Analysis for Marbled
Murrelets and Pile Driving Projects. Internet report.
http•//www wsdot.wa.gov/NR/rdonlyres/3506DAAA-4B13-4EIB-855D-
36E047E07090/0/MAMU MaskAnalysis.pdf
U.S. Fish and Wildlife Service. 2014. Species fact sheet, Streaked Horned Lark,
Eremophila alpestris strigata. Internet report.
http•//www fws gov/wafwo/species/Fact%20sheets/streakedhomedlarkfinal.pdf
Washington State Department of Ecology. 2012. 2012 Water Quality Assessment 303(d)
List: Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16). Internet
report.URL: http://www.ecy.wa.gov/programs/wg/303d/cuffentassessmt.html
Washington State Department of Natural Resources. 2014.FPARS ARCIMS mapping
application. Internet report: http://fortress.wa.gov/dnr/appl/fpars/viewer.htm
Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List.
Olympia, Washington. 177 pp.
Washington Department of Fish and Wildlife. 2012. Annual Report: Marbled Murrelet.
Internet report.
http•//wdfw wa gov/conservation/endan eg red/species/marbled murrelet.pdf
Washington Department of Fish and Wildlife. 2012. Annual Report:Northern Spotted
Owl. Internet report.
http•//wdfw wa gov/conservation/endan eg red/species/northern spotted owl.pdf
Washington Department of Fish and Wildlife. 2012.Annual Report: Streaked Horned
Lark. Internet report.
http•//wdfw wa gov/conservation/endan eg red/species/streaked horned lark.pdf
Washington Department of Fish and Wildlife. 2012. Annual Report: Yellow-billed
Cuckoo. Internet report. http•//wdfw wa.gov/conservation/endan eg red/species/ elm low-
billed cuckoo.pdf
Washington Department of Fish and Wildlife. 2016. SalmonScape. Internet report.
http://apps.wdfw.wa.gov/salmonscgpe/
Washington State Department of Transportation. 2014.BA Preparation for
Transportation Projects—Advanced Training Manual—Version 4-02-2014.
http://www wsdot wa gov/NR/rdonlyres/AIF85352-90EO-457B-9A8C-
B5103E097FAE10/BA manualpart2.pdf
Hodges Habitat Management Plan 18
Attachment 1
Vicinity map.
1
N Lake Cushman P,d Cushman Ru
`119J NF_24 -......
N� Church Dr O'Y-Pi "tianulForest
N pGf7afdl Dr N
F,
YL g
Hodges Residence N^ 2`
ll l N Potlatch Drive North '9
O.t
L a e C a s h a t7 r
r�
4 ., It.,...... i
i
Hodges Habitat Management Plan 19
Attachment 2
Site Plan(NTS).
> �
JR
ca�5Spp
c
Y
x ,..-
r�
m
Y y A
r
t
r'
Hodges Habitat Management Plan 20
Attachment 3
Site plan showing shoreline ATF development NTS).
S iF r t _{ TyAfi V
r`
;Se f r
W6k ay�a>a tag di>,�` 4.�,.r"T^• ¢.� ' e, '`;
LL
o
5 ry
Hodges Habitat Management Plan 21
Attachment 4
Float details (NTS).
rpOFL
Js
Le
G
i E
( oc 'a
r } Ct_
e /
"cam F
YTT j
I IIII
Hodges Habitat Management Plan 22
Attachment 5
Cross Section (NTS).
Tj
i2R 74
f
i
o l00
1
x c
w
{i4 }
S (t
Hodges Habitat Management Plan 23
Attachment 6
The existing pier and float at the site.
s `
�r
a
r:
us
C
v
Hodges Habitat Management Plan 24
Attachment 7
The existing pier and float(in background with life preserver hanging on the pier
during the low water season.
Hodges Habitat Management Plan 25
Attachment 8
The existing permitted rock bulkhead with the wood retaining wall to the right.
r
i
c
h
u
„;
� f
W Y
r Hodges Habitat Management Plan 26
Attachment 9
Existing native plantings (conifers) on the shor ine at the site
04
¢ .
it
i
Hodges Habitat Management Plan 27
Attachment 10
Another view of existing native plantings on the shoreline at the site
i
f
Hodges Habitat Management Plan 28
DIVISION 2, LAKE CUSHMN
i�
/ o-A
7
COF ;
6 �
WttS '
a /
LOtJ�J ' /
<Exi5th
s /
/
Lot 39 o i
Exl5tiq Kock Bulkhead 0/
Q�0
/
/
/
/
/
/
/
/
/
DOCK /
/
/
Lot
/
/
l
LAKE CU5HMAN
N
Scale:
i
Ke viri HouSen,5154 5W 324th 'lace,Federal Way,WA 98023 (253) 874-0481
0 20ft 4�ft