HomeMy WebLinkAboutSHX2016-00002 MEP2016-00001 SEP2016-00002 - SHX Permit / Conditions - 2/19/2016 gON.Sr4 TE MASON COUNTY
op St DEPARTMENT OF COMMUNITY DEVELOPMENT
OY 01
o, �o Planning Division
1884 426 W Cedar St,Shelton,WA 98584
(360)427-9670
Exemption from Shoreline Management Act
Case No.: Substantial Development Permit Requirement
The Proposal By: DAN BOGGS
33024 48TH AVE SW
FEDERAL WAY,WA 98023
To undertake the following development:
The existing dock and bulkhead were not originally permitted by the County. Applicant has
submitted permit applications and proposed modifications to existing structures to bring into
compliance with current dimensional standards.
RENOVATION OF EXISTING DOCK: REDUCING SIZE OF PIER TO 590 SQ FT, ELIMINATING 360
SQ FT. RENOVATION OF ATTACHED FLOAT - REPLACING ROTTED LUMBER, REPLACING
ENCASED STYROFOAM. Resulting dimensions are 8'wide mainstem of dock, total width dock
(excluding 8' mainstem) is 13.3". Total length of dock measured from OWHM is 47'.
RENOVATION OF EXISTING BULKHEAD: The existing 65' long bulkhead is composed of rock
and concrete mortar. Concrete is is also poured (unfor ed) in front of the base of the rock
bulkhead. The bulkhead includes some concrete/rock steps to the beach. Some of the unformed
concrete on the waterward side of the bulkhead will be broken off and hauled away. And a 2 foot
depth by 3 foot tall reinforced concrete footing will be poured in front of the bulkhead.
A Biological Evaluation has been submitted which recommends a 10' by 20' area be planted with
native vegetation.
Within LAKE CUSHMAN and/or its associated wetlands is exempt fr m the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
C-normal protective bulkhead
Please contact Rebecca Hersha at ext 287 if you have any questions.
Digitally sig ed by Rebecca Hersha
Date:: .18 10:35:41-08'00'
Issued: 2/19/2016
Expires: 2/19/2018 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
i
r---- ------------------------------t
' AGENCY USE ONLY '
t ,
t � t ,
Date received: Z/2/"� ,
1 USArmyCorps
S. i
WASHINGTON STATE Engine
Seattle Oistri ers.Ct
Joint Aquatic Resources Permit Agency reference
t ,
Application (JARPA) Form',2 r Tax Parcel#(s)s
y?30
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACE 7 BELOW. ;
' t
Part 1—Project Identification
1. Project Name(A name for your project that you create.Examples:Smith's Dock or Seabrook Lane Development) hel
Boggs Dock
Part 2—Applicant
The person and/or organization responsible for the project. h[ elp�
2a. Narhe(Last,First,Middle)
Boggs, Dan and Boggs, Kim
2b. Organization(If applicable)
2c. Mailing Address(Street or Po Box)
33024 48th Ave SW
2d. City, State, Zip
Federal Way, WA 98023
2e. Phone(1) A Phone(2) 29. Fax 2h. E-mail
206 930 0070 ?O &U/.4A40
lAdditional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www.nws usace.army mil/Missions/CivilWorks/Reoulatory/PermitGuidebook/EndangeredSpecies asi)
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.epermittina wa qov/site/alias resourcecenter/iarpa jarpa form/998�/area form ash.
For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or hel�a gov.
JARPA Revision 2015.1 Page 1 of 17
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) plp)
3a. Name(Last,First,Middle)
Valdeman, Caralyn, M.
3b. Organization (if applicable)
Integrated Northwest Construction
3c. Mailing Address(street or PO Box)
1727 S. Cushman Ave, Tacoma WA 98405
3d. City, State, Zip
Tacoma WA 98405
3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail
(206) 310-4239 (253) 888-5314 ( ) IntegratedNWConstruction@Gmail.com
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [help]
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (pNR)-managed aquatic lands. If you don't know,
contact the DNR at(360)902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name(Last,First,Middle)
Boggs, Dan and Boggs, Kim
4b. Organization (if applicable)
4c. Mailing Address(street or Po Box)
33024 48In Ave SW
4d. City, State, Zip
Federal Way, WA 98023
4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail
206 930 0070 ( ) ( )
JARPA Revision 2015.1 Page 2 of 17
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [ham]
❑ There are multiple project locations (e.g. linear project). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) h[ epj
X❑ Private
❑ Federal
❑ Publicly owned (state,county,city,special districts like schools,ports,etc.)
❑ Tribal
❑ Department of Natural Resources (DNR)—managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address,provide other location information in 5p.) h[:eld
321 Potlatch Drive N, Hoodsport, WA, 98548
5c. City, State, Zip(If the project is not in a city or town,provide the name of the nearest city or town.) [help]
Hoodsport, WA, 98548
5d. County [ham]
Mason
5e. Provide the section, township, and range for the project location. heI
Section Section Township Range
07 23N 4W
5f. Provide the latitude and longitude of the project location. h�eei
• Example:47.03922 N lat../-122.89142 W long.(Use decimal degrees-NAD 83)
47-29.026 N 123-14.193 W
5g. List the tax parcel number(s)for the project location. h[ el]
• The local county assessor's office can provide this information.
42307-50-00022
5h. Contact information for all adjoining property owners', (If you need more space,use JARPA Attachment C.) heI
Name Mailing Address Tax Parcel #(if known)
331 N Potlatch Dr 42307-50-00021
......................_..... .... ....... ................
Michael Knorr Hoodsport WA 98548
Gallimore Family Trust 311 N Potlatch Dr 42307-50-00023
__._. . .. ..... _..... .. . ..__ _ __._....._
Hoodsport WA 985
JARPA Revision 2015.1 Page 3 of 17
51. List all wetlands on or adjacent to the project location. [hei]
5j. List all waterbodies (other than wetlands)on or adjacent to the project location. hei ]
Lake Cushman
5k. Is any part of the project area within a 100-year flood' lain? Lei ]
❑ Yes X❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. net
Site has native deciduous, and evergreen trees. moderate native vegetation, shrubs and bushes.
5m. Describe how the property is currently used. hei
Residential/recreational.
5n. Describe how the adjacent properties are currently used. hf elo
Residential /recreational.
5o. Describe the structures (above and below ground)on the property, including their purpose(s) and current
condition. hei ]
There is a SFR, Bulkhead approx. 62 lineal feet, land scape pavers 200 sq.feet, grass lawn , floating dock and
pier.
5p. Provide driving directions from the closest highway to the project location, and attach a map. hei ]
From Shelton, take SR 101 North to Hoodsport, turn left on Lake Cushman Rd, follow to Division Two
and turn left onto Mount Church rd, turn left onto N Potlatch Dr.
JARPA Revision 2015.1 Page 4 of 17
Part 6—Project Description
6a. Briefly summarize the overall project. You can provi more detail in 6b. hf giW
Renovation of existing pier, floating dock, and bulkhead, Reducing existing peir to 590 sq. feet
eliminating 360 sq. feet. Renovation of floating dock replacing rotted lumber and exposed
Styrofoam billets. Eliminating jet ski lift. Addition of boat slip using existing foot print.
Reconstruction of exsiting concrete stairs moving them land side by 1 foot.
6b. Describe the purpose of the project and why you want or need to perform it. h[ eiA
6c. Indicate the project category. (check all that apply) [hell
❑ Commercial X❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancemen
6d. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall
X❑ Bank Stabilization ❑ Dam/Weir ❑ Floating Home (upland)
❑ Boat House ❑ Dike/ Levee /Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift X❑ Dock/ Pier ❑ Marina / Moorage
X❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining
❑ Bulkhead El Stormwater facility
X ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin
❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
JARPA Revision 2015.1 Page 5 of 17
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. [help]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
Bank Stabilization / Bulkhead: Update and re-enforce existing bulkhead which will provide bank stabilization by
preventing erosion along retaining wall. Construction method will be renovating existing concrete bulkhead
which is undercut and rendered nonfunctional by water erosion and repouring with a three foot in ground footer
to prevent erosion around bulkhead.
Pier: pier is directly on Lake Cushman. Pier will be reduced by 360 sq. ft in order to meet state and federal
guidelines construction will consist of removal and disposal of existing treated lumber. Cutting and fitting of new
yellow cedar pier lumber will take place in a designated location away from the water in order to reduce polution
of site with lumber waste and materials.
Stairs: extend to high water mark by two feet. New concrete landing will be formed and poured above water
level reducing footprint of existing stair way, no stairs will extend below water level.
6f.What are the anticipated start and end dates for project construction?(Month/Year) [help]
• If the project will be constructed in phases or stages, use JAFJPA Attachment D to list the start and end dates of each phase or
stage.
Start date: Feb. 2016 End date: April 2016 ❑
6g. Fair market value of the project, including materials, labor, machine rentals, etc. hei
$37634.00
6h. Will any portion of the project receive federal funding? Leipj
• If yes,list each agency providing funds.
❑ Yes X❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) pl I
7a. Describe how the project has been designed to avoid,and minimize adverse impacts to wetlands. help]
❑ Not applicable
JARPA Revision 2015.1 Page 6 of 17
7b. Will the project impact wetlands? MIA
❑ Yes ® No ❑ Don't know
7c. Will the project impact wetland buffers? h[ elat
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? h pa
• If Yes,submit the report,including data sheets,with the DARPA package.
❑ Yes ® No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? pAl
• If Yes,submit the wetland rating forms and figures with the JARPA package.
❑ Yes ® No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? eel
• If Yes,submit the plan with the JARPA package and answer 7g.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No ® Not applicable
No wet lands
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. he[ _l
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposied. Or if you are submitting a mitigation plan with a
similar table, you can state (below)where we can find this information in the plan. hel
Activity(fill, Wetland Wetland Iimpact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type4 (sq.ft. or
category' Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted b the activity.Enter"permanent"if applicable.
JARPA Revision 2015.1 Page 7 of 17
"Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E),Prese ation(P),Mitigation Bank/in-lieu fee(B)
Page number(s)for similar information in the mitigation plan, if available:
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. het
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material to
cubic yards you will remove, and where the material will be disposed. [held
Part 8-Waterbodies (other than wetlands) Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) bet )
X❑ Check here if there are waterbodies on or adjacent tc the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
MiM
❑ Not applicable
Tarps will be placed under pier during teardown and construction to reduce any lumber waste and debri from
remaining on shore after project completion, concrete will be poured in forms to reduce/eliminate spillage onto
beach. Lumber will be cut above the shoreline in an area prepped for removal of construction debri. Project is
slated to be completed during low water levels to avoid adverse effects on wildlife. Sustainably harvested
Alaskan Yellow Cedar will be used which is 50 percent stronger than treated lumber and rot and insect resistant.
8b.Will your project impact a waterbody or the area around a waterbody? Ih.�l
JARPA Revision 2015.1 Page 8 of 17
X❑ Yes ❑ No
JARPA Revision 2015.1 Page 9 of 17
8c. Have you prepared a mitigation plan to compensate r the project's adverse impacts to non-wetland
waterbodies? hel
• If Yes,submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes X❑ No ❑ Not applicable
See 8d.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used
to design the plan.
• If you already completed 7g you do not need to restate your answer here. hem
Alleviate flooding from storm water runoff and improve the water quality of stormwater being discharged into
Lake Cushman. Native vegetation will be planted along tc pside edge of bulkhead.
8e. Summarize impact(s)to each waterbody in the table below. hel
Activity(clear, Waterbody Impact Duration Amount of material Area (sq.ft. or
dredge,fill, pile namel location of irri (cubic yards) to be linear ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbody
Remove Lake Shoreline Unknown 6 pilings and 360 sq. 360 sq. feet
Cushman feet of pier
Add Lake Shoreline Unknown 20 cubic yards 60 lin feet
Cushman concrete
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount(in cubic yards)
you will use, and how and where it will be placed into the waterbody. hel
JARPA Revision 2015.1 Page 10 of 17
20 cubic yards of concrete will be added to the face of the exsiting failing bulk head. Concrete will be formed
and delivered by pump truck.
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. [help
l
Exsiting bulkhead is is rock cemented together which is under cut on face from water erosion. This will be
manually broke away with sledge hammers , all debris will be manually removed from lake bed and disposed of
in a state lic. Land fill.
Part 9-Additional Information
Any additional information you can provide helps the revie er(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. LWO
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in P rt 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? Ai
• If Yes,list the parameter(s)below.
• If you don't know,use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.gov/procirams/wq/303d/.
❑ Yes X❑ No
JARPA Revision 2015.1 Page 11 of 17
9c. What U.S. Geological Survey Hydrological Unit Code(HUC) is the project in? hel
• Go to http://cfDub.eDa.ciov/surf/locate/index.cfm to help identify the HUC.
17110018
9d. What Water Resource Inventory Area Number(WRIA#) is the project in? [help]
• Go to http://www.ecv.wa.cov/services/gis/maps/wria/wria.htm to find the WRIA#.
WRIA 16
9e.Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? gel
• Go to http://www.eCy.wa.aov/proarams/w /q swgs/criteria,htmi for the standards.
❑ Yes ❑ No X❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? [help]
• If you don't know,contact the local planning department.
• For more information,go to:ht //www.e .wa.q,ovlprogramjs/sea/sma/laws rules/173-26/211 designations.html.
❑ Rural Urban ❑ Natural ❑ Aquatic ❑ Conservancy X❑ Other
9g. What is the Washington Department of Natural Resources Water Type? eI
• Go to http://www.dnr.wa.aov/forest-practices-water-typing for the Forest Practices Water Typing System.
X❑ Shoreline ❑ Fish ❑ Non-Fish Perennial [I Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? [h, eip]
• If No,provide the name of the manual your project is designed to meet.
X❑ Yes ❑ No
Name of manual:Stormwater Management Manual*Western Washington
911. Does the project site have known contaminated sedi `ent? hel l
• If Yes,please describe below.
❑ Yes X❑ No
9j. If you know what the property was used for in the past, describe below. hei
Prior to residence area was a forest
JARPA Revision 2015.1 Page 12 of 17
9k. Has a cultural resource (archaeological) survey been performed on the project area? hf eipl
• If Yes,attach it to your JARPA package.
❑ Yes X❑ No
JARPA Revision 2015.1 Page 13 of 17
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hel
Bull trout, , marbled murrelet, horned lark, Northern spotted owl Yellow billed cuckoo are the ESA listed
endangered species in the area.
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [hel
See above
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apis.oria.w ov/o as/.
• Governor's Office for Regulatory Innovation and Assistance at(800) 917-0043 or help(a oria.wa.c�ov.
• For a list of addresses to send your JARPA to, cli�k on aciencv addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act(SEPA). (Check all that apply.) hel
• For more information about SEPA,go to www.ecy.wa,90V/Drbclrams/sea/seDa/e-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
E'A SEPA determination is pending with 4so0) (lead agency). The expected decision date is
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) nel
❑ This project is exempt(choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other
❑ SEPA is pre-empted by federal law.
JARPA Revision 2015.1 Page 14 of 17
10b. Indicate the permits you are applying for. (Check all that apply.) hr elpl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use / ❑ Variance
(j.n/e�Iii' d
/'it�w
Shoreline Exemption Type (explain): o%o,AG 1"Qom
Other CitylCounty permits:
❑ Floodplain Development Permit ErCritical Areas Ordinance . eR,2v/G—/
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
[]'Hydraulic Project Approval (HPA) ❑Fish Habitat Enhancement Exemption—Attach Exemption Form
You must submit a check for$150 to Washington Department of Fish and Wildlife, unless your project qualifies
for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
®$150 check enclosed. Check#
Attach check made payable to Washington Department of Ash and Wildlife.
❑My project is exempt from the application fee. (Check appropriate exemption)
❑ HPA processing is conducted by applicant-funded WDFW staff.
Agreement#
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use.)
❑ Project is a modification of an existing HPA riginally applied for, prior to July 10, 2012.
HPA#
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete DARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404(discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ Private Aids to Navigation (for non-bridge projects)
JARPA Revision 2015.1 Page 15 of 17
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. bgip]
11a.Applicant Signature (required) (help)
i certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize t��h''e agent named in Part 3 of this application to act on my behalf in matters related to this
�application. initial)
By By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property whfze the project is located to inspect the project site or any work
,related to the project. (initial)
''. J
Applicant Pr ted Name Applican ignature Date
1.J�� �s T--
c�. t t /I
t
Applicant Printed Name Ap'pli ant Signature Date
11 b.Authorized Agent Signature they)
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Printed Name 4ze� ignature Date
Applicant Printed Name Applicant Signature Date
11c. Property Owner Signature (if not applicant) hel
Not required if project is on existing rights-of-way or easements.
consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more tha 15 years or both.
JARPA Revision 2015.1 Page 16 of 17
If you require this document in another format,contact the Governo-e 3 Office for Regulatory Innovation and Assistance(ORIA)at(800)
917-0043. People with hearing loss can call 711 for Washington Rol iy Service. People with a speech disability can call(877)833-6341.
ORIA publication number. ENV-019-09 rev.09/2015
JARPA Revision 2015.1
Page 17 of 17
Rev# Description Date TAHMENGEVEERING,INC. SITE PLAN-EXISTING h4.FO.
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 NPotlatch Dr.N sb�
Hoodsport, WA 98548 Hoodsport, WA 98548 2 of 8
Mason Co.hn No.:42307-50-00022 (360)877-9512 1 (206)930-6314 & (253)677-6746
o � o0 0 -o 'u. z•�- —g
4 !� 3
�\ Cz
LL ¢ E ^^
�I
7d
l� C�OII
4-6
w
frl
� U U
a i . 4
w �
N
Z N
\ W o
O
L
w U N
O U
W a�
S M
m W
I- f- 8w O> L
7
O t
Rev# Description Date TAHJA ENGINEERING,INC. SITE PLAN-PROPOSED �Pik
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 N Potlatch Dr.N
Hoodspoi t, WA 98548 HoodspoA WA 98548 3 of 8
Mason Co.NO No.:42307-50-00022 (360)877-9512 (206)930-6314 & (253)677-6746
� � S
�ww W
� � a
o
0
o
C.)
Ca
� •"O o Y i�
>
o Q Q
00
:.$...;::. GO O
t..; O o
N
^ M
� � 3
Y
z 4-j
2 oo �9£ O
a L1 � ,-•
Y W •~
>
E I--I
j+ W n N fl U 200
CO cV .� > 2as o 0. 0 Tr
F- E- U CGS U N y O Li (L
a v a - 0 F-
U Ek aUi
Ct
f, C) o
Rev# Description Date TAHJA ENGINEERNG,INC. SITE PLAN
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 NPotlatch Dr.N sb,
HoodspoA WA 98548 Hoodsport, WA 98548 4 of 8
Mason Co.NO No.:42307-50-00022 (360)877-9512 (206)930-6314 & (253)677-6746
aa � Q•
Cd o "
3
N �
d U R -
Z O
CIA
J� ^
J A
• '-
L 3
ZtL7
O
N
O
Q
,r un
o wcs o
l jj, 4g0�' n o
L)
o
_---- X a --- ---
--- ---
09L
---
Rev# Description Date TAHJA ENGINEEMNG,INC. ROCKERY FOUNDATIONS) f F&
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 N Potlatch Dr.N
Hoodsport, WA 98548 Hoodspoi t, WA 98548 5 of 8
Mason Co.PrO No.:42307-50-00022 (360)877-9512 1 (206)930-6314 & (253)677-6746
4 o y
o t F
a
T•
r,
3 E
0
o
p o o aQ
bb
OQfo. ❑ ��PwW�.�w
o �� � F
�0 o
H ` hb, w�
44pa
W
Rev# Description Date TAHJA ENGLNEERD FG,INC. SITE PLAN ft."''
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 N Potlatch Dr.N
Hoodspoi t, WA 98548 Hoodsport, WA 98548 6 of 8
Mason Co.Prcl No.:42307-50-00022 (360)877-9512 (206)930-6314 & (253)677-6746
c A
_o tb Cz � ,c
0 °_' x
CD
,- O 0 C9 O
4� G�" O)I
O O
U !� t
O lY 404
� � ° U c .. 4
4. >
O 2
tD
U O o O o
V
Q Lij
U a
o z
N
M
N
N
O
1-7�L N
O
0.ObL O •� �
Cn
U
an ,U
o 0
a
U
0
T
Rev# Description Date TAHJAENGINEERDrG,INC. FLOAT DETAILS
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 NPotlatch Dr.N
Hoodsport, WA 98548 HoodspoA WA 98548 7 of 8
Mason Co.PrO No.:42307-50-00022 (360)877-9512 (206)930-6314 & (253)677-6746
� w
CO
Cr
�v r3
o ZnCn
o O O
Cz
Q �
2 E � Z
w 3 .
x of O o -o
c QO U .O " a
U U
Cn
m k �J
U G� •«� y L.' GYJ N 1�
t s.. C C U rl
O 3 q c� 0 2 y .O_
> n v U Z N
_ M
° °O F 3 ' '0 o
o Q a
¢
C ¢ ¢
¢ ¢ O cz
p U Q R
Uto
..-
>
O
� c
i O ..I
72Ct
O cd G.
tb
bA p I E_ O, C E C O O
O O. C O cd
Wt: N [i. U C�1l
u c C i O
U U
Cv�i
E r O G C m W cd O
U Ca O 00 O
0
C
O ^
U � �
Rev# Description Date TAHJA ENGINEERING,INC PIER&SLIP DETAILS pkq.pu.
Alan Tabia,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 N Potlatch Dr.N Shm
Hoodsport, WA 98548 HoodspoA WA 98548 8of8
Mason Co.Prd No.:42307-50-00022 (360)877-9512 1 (206)930-6314 & (253)677-6746
I
o
CC) C)
CO .2 N
>
o pp >1
S2
O
>
>
>
- -
7
CIA
4-j
00
CO
F(C.}.,.; -:
41 >
V-0 Cl
1;& 11 v I
00
u
co 14
r---------------
1 ,
° "•" I Date received:
t
US Army Corps ; JAN 04 2016
of Engineers t I
WASHINGTON STATE Seattle District
Agency refs @#Wien w4;�YYJ�i@fWT+
Joint Aquatic Resources Permit TaxP reel#(s): '
Application RPA) Form',2 h[�el j I ,
I ,
I 1
USE BLACK OR BLUE INK TO ENTE NSWERS IN THE WHITE SPACES BELOW. ,
t i
t I
t ---------
�--------------------------
5re RE C: E
PLANN NG 0 6 2016
Part 1—P
roject Identification 428 W. CEDAR ST.
1. Project Name (A name for your project that you cre .Examples Smith's Dock or Seabr Lane Development) hel
Boggs Dock
Part 2—Applicant
The person and/or organization responsible for the project.
2a. Name (Last, First,Middle)
Boggs, Dan
2b. Organization(If applicable)
2c. Mailing Address (Street or Po Box)
33024 48fh Ave SW
2d. City, State, Zip
Federal Way, WA 98023
2e. Phone(i) . Phone(2) 2g. Fax 2h. E ail
(206) 930-0070 DLBogg0070@AOL.com
lAdditional forms y be required for the following permits:
• If your proje may qualify for Department of the Army authorization through a Regional General Permit(RGP),cortl{act the U.S.Army Corps of
Engineers r application information(206)764-3495.
• If your pr ct might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project.lnformation Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at I
http://www.nws.usace.army-miI/Missions/CivilWorks/Regulato /PermitG idebook/EndangeredSpecies.aspx.
• Not all cities and counties accept the JARPA for their local Shoreline pertnits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.epermitting.wa.gov/site/alias resourcecenter/jar a Jarpa form/99 /'ar a form.as x.
For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or help(a oria wa.gov.
Page 1 of 16
JARPA Revision 2015.1
Part 3-Authorized Agent or Contact '
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) Lteipj
E
me (Last, First, Middle)an, Carolyn, M. LL
3b. Organization (if applicable)
Integrated Northwest Construction , w ,
3c. Mailing Address (street or PO Box)
1727 S. Cushman Ave
3d. City, State, Zip
Tacoma WA 98405
3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail
(206) 310-4239 (253) 888-5314 ( ) IntegratedNWConstruction@Gmail.com
Part 4-Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. hel
❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E
to apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
Boggs, Dan
4b. Organization (if applicable)
4c. Mailing Address (street or PO Box)
33024 481h Ave SW
4d. City, State, Zip
Federal Way, WA 98023
4e. Phone(i) 4f. Phone(2) 4g. Fax 4h. E-mail
(206) 930-0070 ( )
( ) DLBoggs0070@AOL.com
JARPA Revision 2015.1
Page 2 of 16
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. [help]
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) hel ]
X❑ Private
❑ Federal
❑ Publicly owned (state,county, city, special districts like schools,It
rts,etc.)
❑ Tribal
❑ Department of Natural Resources (DNR)— managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel
321 Potlatch Dr. N
5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel
Hoodsport, WA, 98548
5d. County MIA
Mason
5e. Provide the section, township, and range for the project location. Lei ]
'/4 Section Section Township Range
07 23N 4W
5f. Provide the latitude and longitude of the project locatio hel ]
• Example:47.03922 N lat./-122.89142 W long.(Use decimal degrees-NAD 83)
47-29.026 N 123-14.193 W
5g. List the tax parcel number(s)for the project location. el
• The local county assessor's office can provide this information
42307-50-00022
5h. Contact information for all adjoining property owners. If you need more space, use JARPA Attachment C.) hel
pl
Name MailinG Address Tax Parcel #(if known)
Kyle C Knorr 331 N Potlatc 11 h Dr. 42307-50-00021
Hoodsport WA 98548 '
Mike Knopp 311 N Potlatch Dr. _._ ........................................................... 42307-50-00023
. _ _ ...........
Hoodsport WA 98548
L.... _ _..... ........................_............................._.....
................................................................................................................................................................................................................................................
Page 3 of 16
JARPA Revision 2015.1
51. List all wetlands on or adjacent to the project location. hei
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hem
pj
Lake Cushman
5k. Is any part of the project area within a 100-year floodplain? hem
pj
❑ Yes X❑ No ❑ Don't know
51. Briefly describe the vegetation and habitat conditions on the property. hei
Site has native deciduous, and evergreen trees. moderate native vegetation, shrubs and bushes.
5m. Describe how the property is currently used. nei
Residential / recreational.
5n. Describe how the adjacent properties are currently used. her
Residential / recreational.
5o. Describe the structures (above and below ground) on the property, including their purpose(s)and current
condition. hem
There is a SFR , Bulkhead 62 lineal ft, landscape pavers 200 sq ft, grass lawn 750 sq ft, floating pier 196 sq ft,
treated lumber pier 662 sq. ft.
5p. Provide driving directions from the closest highway to the project location, and attach a map. hem
From Shelton, take SR 101 North to Hoodsport, turn left onto Lake Cushman Rd, turn Left onto N Mount Church
Rd, turn Left onto N Potlatch Dr.
JARPA Revision 2015.1
Page 4 of 16
Part 6—Project Description
6a. Briefly summarize the overall project. You can provid=head,
il in 6b. hel
Renovation of existing pier, floating dock, and bith reducing size of pier to 590 sq. ft.
eliminating 360 sq. ft. Renovation of floating dock replacing rotted lumber, replacing encased
Styrofoam, addition of Boat slip using existing footprint with no addition of extra piles. Addition
of rip rap along all bulkheads two ft. high sloping t wards beach
6b. Describe the purpose of the project and why you want r need to perform it. hel
See 6a.
6c. Indicate the project category. (Check all that apply) [tdipl
❑ Commercial X❑ Residential ❑ Institutiona ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (check all t t apply) [help]
❑ Aquaculture ❑ Culvert Float ❑ Retaining Wall
X❑ Bank Stabilization ❑ Dam /Weir Floating Home
(upland)
❑ Boat House ❑ Dike / Levee /Jetty Geotechnical Survey
❑ Road
Land Clearing ❑ Scientific
❑ Boat Launch ❑ Ditch g Measurement Device
❑ Boat Lift X❑ Dock/ Pier Marina / Moorage X❑ Stairs
❑ Bridge ❑ Dredging Mining ❑ Stormwater facility
X❑ Bulkhead ❑ Fence Outfall Structure
❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal Piling/Dolphin ❑ Utility Line
❑ Channel Modification ❑ Fishway Raft
❑ Other:
JARPA Revision 2015.1 Page 5 of 16
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. hei
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
Bank Stabilization / Bulkhead: Update and re-enforce existing bulkhead which will provide bank stabilization by
preventing erosion along retaining wall. Construction method will be renovating existing concrete bulkhead
which is undercut and rendered nonfunctional by water erosion and repouring with a three foot in ground footer
to prevent erosion around bulkhead.
Pier: pier is directly on Lake Cushman. Pier will be reduced by 360 sq. ft in order to meet state and federal
guidelines construction will consist of removal and disposal of existing treated lumber. Cutting and fitting of new
yellow cedar pier lumber will take place in a designated location away from the water in order to reduce polution
of site with lumber waste and materials.
Stairs: extend to high water mark by two feet. New concrete landing will be formed and poured above water
level reducing footprint of existing stair way, no stairs will extend below water level.
6f. What are the anticipated start and end dates for project construction? (MonthNear) hei
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: January 2016 End date: February 2016 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. [help]
$37634.00
6h. Will any portion of the project receive federal funding? [Lei ]
• If yes, list each agency providing funds.
❑ Yes X❑ No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) hei ]
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel
❑ Not applicable
JARPA Revision 2015.1
Page 6 of 16
7b. Will the project impact wetlands? heel l
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? hel
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? hel
• If Yes,submit the report, including data sheets,with the JAR1PJ package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [MIA
• If Yes,submit the wetland rating forms and figures with the JAI PA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate f4 any adverse impacts to wetlands? hel
• If Yes,submit the plan with the JARPA package and answer 7Ihould
.
• If No,or Not applicable,explain below why a mitigation plan not be required.
❑ Yes ❑ No ❑ Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. h[ ell
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below)where we can find this information in the plan. hel
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type (sq. ft. or
category2 Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern lashington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted y the activity.Enter" ermanent"if applicable.
JARPA Revision 2015.1 Page 7 of 16
^Creation(C),Re-establishment/Rehabilitation(R),Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B)
Page number(s)for similar information in the mitigation plan, if available:
71i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. hei
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. help]
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) [help]
X❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
[help]
❑ Not applicable
Tarps will be placed under pier during teardown to reduce any treated lumber waste and debri from remaining
on shore after project completion, concrete will be poured in forms to reduce /eliminate spillage onto beach.
Lumber will be cut above the shoreline in an area prepped for removal of construction debri. Project is slated to
be completed during low water levels to avoid adverse effects on wildlife.
8b. Will your project impact a waterbody or the area around a waterbody? hel
JARPA Revision 2015.1
Page 8 of 16
X❑ Yes ❑ No
JAR PA Revision 2015.1 Page 9 of 16
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? heel ]
• If Yes,submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes X❑ No ❑ Not applicable
See 8d.
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used
to design the plan.
• If you already completed 7g you do not need to restate your answer here. [help]
Alleviate flooding from storm water runoff and improve the water quality of stormwater being discharged into
Lake Cushman. Native vegetation will be planted along topside edge of bulkhead.
8e. Summarize impact(s)to each waterbody in the table below. Ehel
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location' of impact' (cubic yards) to be linear ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbody
Remove Lake Shoreline Unknown 6 pilings and 360 sq. 360 sq. feet
Cushman feet of pier
Add Lake Shoreline Unknown 20 cubic yards 60 s . feet
Cushman q
If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
'Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. [Lei ]
JARPA Revision 2015.1
Page 10 of 16
Rip rap from local quarry located in Shelton, will be hand pl iced to shore pilings and act as a breakwater for
pier.
8g. For all excavating or dredging activities identified in 8e describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hel
Part 9-Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. hel
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in P art 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? [helps
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's ater Quality Assessment tools at:
hftp://www.ecy.wa.c programs/wa/303d/.
❑ Yes X❑ No
JAR PA Revision 2015.1 Page 11 of 16
9C. 7haS. Geological Survey Hydrological Unit Code (HUC) is the project in? hei
http://cfi)ub.epa qov/surf/locate/index cfm to help identify the HUC.
171
9d. What Water Resource Inventory Area Number(WRIA#) is the project in? heI
• Go to http://www.ecY wa aov/services/gis/maps/wria/wria htm to find the WRIA#.
r
A 16
Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? [help]
• Go to hftp://www.ecy.wa-gov/programs/wg/swqs/criteria.htmi for the standards.
❑ Yes ❑ No X❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hei ]
• If you don't know,contact the local planning department.
• For more information,go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173 26/211 designations html.
❑ Rural ❑ Urban ❑ Natural ❑ Aquatic
❑ Conservancy X❑ Other
9g. What is the Washington Department of Natural Resources Water Type? hel
• Go to hftp://www.dnr.wa.gov/forest-Dractices-water-typing for the Forest Practices Water Typing System.
X❑ Shoreline ❑ Fish ❑ Non-Fish Perennial
❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? hel ]
• If No,provide the name of the manual your project is designed to meet.
X❑ Yes ❑ No
Name of manual:Stormwater Management Manual for Western Washington
9L Does the project site have known contaminated sediment? [help]
• If Yes, please describe below.
❑ Yes X❑ No
9j. If you know what the property was used for in the past, describe below. hei
Prior to residence area was a forest
JARPA Revision 2015.1
Page 12 of 16
9k. Has a cultural resource (archaeological) survey been performed on the project area? "el• If Yes,attach it to your JARPA package.
❑ Yes X❑ No
JARPA Revision 2015.1 Page 13 of 16
F
Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hel
e Chinook Salmon, bull trout, Puget sound steelhead, marbled murrelet, horned lark, and spotted owl are the
ESA listed endangered species in the area.
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. hel
See above
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.oria.wa gov/opas/.
• Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or helpt_oria.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (check all that apply.) hel ]
• For more information about SEPA,go to www.ecy.wa.gov/programs/sea/sepa/e-review.html.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.)[help]
X❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
X❑ Other: WAC 173-27-040
❑ SEPA is pre-empted by federal law.
JARPA Revision 2015.1
Page 14 of 16
10b. Indicate the permits you are applying for. (Check all thatapply.) qlDl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ( ❑ Variance
X❑ Shoreline Exemption Type (explain): WAC 173-27-,040
Other City/County permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE COVE NMENT
Washington Department of Fish and Wildlife:
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitait Enhancement Exemption —Attach Exemption Form
You must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies
for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
$150 check enclosed. Check#
Attach check made payable to Washington Department of Fisi and Wildlife.
❑ My project is exempt from the application fee. (Check appropriate exemption
❑ HPA processing is conducted by applicant-funded WDFW staff.
Agreement#
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use.)
❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012.
HPA#
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ Private Aids to Navigation (for non-bridge projects)
JARPA Revision 2015.1 Page 15 of 16
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc. help]
11 a. Applicant Signature (required) heI
certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the oject is located to inspect the project site or any work
relat d to the project. (initial) J
\�i
Applicant Printed Name Applica t Signature Date
11 b. Authorized Agent Signature [help]
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Prin ed Name Authorized ent Signature Dat
C. Property Owner Signature (if not applicant) heI
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies, conceals,or covers up by any trick,scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800)
917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORIA publication number: ENV-019-09 rev. 09/2015
JARPA Revision 2015.1
Page 16 of 16
r
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
426 W Cedar St,Shelton,WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NIONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
Description of Proposal: The existing dock and bulkhead were not originally permitted by
the County. Applicant has submitted permit applications and
proposed modifications to existing structures to bring into
compliance with current dimensional standards.
RENOVATION OF EXISTING DOCK: REDUCING SIZE OF PIER
TO 590 SO FT, ELIMINATING 360 SO FT. RENOVATION OF
ATTACHED FLOAT- REPLACING ROTTED LUMBER,
REPLACING ENCASED STYROFOAM. Resulting dimensions are
8'wide mainstem of dock, total width dock(excluding 8'
mainstem) is 13.3". Total length of dock measured from OWHM is
47'.
RENOVATION OF EXISTING BULKHEAD: The existing 65' long
bulkhead is compos d of rock and concrete mortar. Concrete is is
also poured (unformed) in front of the base of the rock bulkhead.
The bulkhead includes some concrete/rock steps to the beach.
Some of the unformed concrete on the waterward side of the
bulkhead will be bro en off and hauled away. And a 2 foot depth
by 3 foot tall reinforc d concrete footing will be poured in front of
the bulkhead.
A Biological Evaluation has been submitted which recommends a
10' by 20' area be planted with native vegetation.
Proponent: DAN BOGGS
Site Address(if Assigned): 321 N POTLATCH DR NORTH HOODSPORT
Directions to Site: LAKE CUSHMAN RD, FOLLOW TO THE TOP, TURN LEFT ,
THEN LEFT ONTO MT TEBO WY, THEN MT CHURCH, THEN
RIGHT ON POTLATCH DR NORTH TO SITE
Parcel Number: 423075000022
Legal Description: LAKE CUSHMAN # TR 22
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it doeE not have a probable significant adverse
impact on the environment. An Environmental Impact Statement(EIS) is not required under RCW
43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other
information on file with the Lead Agency. This information is available to the public upon request.
MITIGATED MEASURES ARE ATTACHED.
SEP2016-00002 Page 1 of 4
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
426 W Cedar St,Shelton,WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
Please contact Rebecca Hersha at ext. 287 with any questions. This DNS is issued under WAC
197-11-350. The Lead Agency will not act on this proposal for 14 days from the date shown below, when
the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box
279, Shelton WA 98584 by 3/4/2016. Appeal of this determination must be filed within a 14-day period
following this final determination date, per Mason County Code Chapter 15.11 Appeals.
Digitally signed by Rebecca Hersha
Date:2016.02.18 10:30:12-08'00'
Authorized Local Government Official Date
SEP2016-00002 Page 2 of 4
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
aft
Planning Division
426 W Cedar St,Shelton,WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
CONDITIONS OF THIS DETERMINATION
1) Tacoma Power Ownership
Tacoma Power owns and manages the land at ano below 742 feet elevation (the
shoreline). The applicant must obtain a permit from Tacoma Power prior to placing a
permanent structure or fill below the 742 foot contour line.
X
Biological Evaluation
All activities related to this proposal shall adhere to the recommendations made in the
Habitat Management Plan prepared by BioResources LLC (Kim Schaumburg), dated
December 30, 2015 and revised February 8, 201 .
X
Floatation
Floatation for the structure shall be entirely enclo ed and contained to permanently prevent
the breakup or loss of the floatation material into a water.
X
Erosion Control
Erosion control measures must be in place prior to any clearing, grading, or construction.
These control measures must be effective to prevent soil from being carried into surface
water by stormwater runoff. Sand, silt, clay particles, and soil will damage aquatic habitat
and are considered pollutants when discharged to waters of the state.
X
Sediment
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality
Standards for Surface Waters of the State of Washington, and is subject to enforcement
action.
X
Construction
During construction, all releases of oils, hydraulic fluids, fuels, other petroleum products,
paints, solvents, and other deleterious materials must be contained and removed in a
manner that will prevent their discharge to waters and soils of the state. The cleanup of
spills should take precedence over all other work on the site.
SEP2016-00002 Page 3 of 4
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
426 W Cedar St,Shelton,WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
X
Debris
Proper disposal of construction debris must be on land in such a manner that debris cannot
enter Mason Lake or cause water quality degradation of state waters.
X
Stormwater
All stormwater discharges must be constructed in a manner that will not cause scouring on
the beach.
X
Protected Lake Buffer
All vegetation that is removed or damaged for the project must be replanted with native
vegetation. Removal of trees or shrubs requires additional permitting.
X
Hydraulic Approval
A Hydraulic Project Approval from the Washington Department of Fish and Wildlife shall be
obtained prior to work on the banks of or within the waters of the State.
X
SEP2016-00002 Page 4 of 4
TAHJA ENGIN ERING, Inc.
PO Box 235, Hood ort, WA 98548 ay
(360) 87 9512
Mason County DCD
Planning Division
PO Box 279
Shelton, WA 98584
Dan& Kim Boggs
321 N Potlatch Dr N
Hoodsport, Wa 98548
(206) 930-6314 & (253) 677-6746
Re; C eotechnical Report Opinion
3 1 N Potlatch Dr N
odsport, WA 98548
ason Case No.s: BLD2016-00014,
EP2016-00001 SEP2016-00002
X2016-00002
cel No.: 42307-50-00022
Mason County's document reviews and site i pection have raised a question regarding
the need for a geotechnical Assessment or Re ort for the proposed Boggs shoreline work
identified in the Mason County Cases above.
The steepest slopes on the Boggs' property ar located at the northerly end of the
rectangular shaped property, with the closest ope greater then 15% and 10 feet in height
more than 100 feet away from the proposed s reline work. The proposed shoreline
improvements include reconstructing the eros n protection bulkhead existing along the
shoreline of the Bogg's property. This feature s critical in protecting the existing
improvements at the Bogg's site. Recondition g and reconstructing the waterfront
bulkhead will not jeopardize or cause instabili y to the Bogg's property or the
surrounding neighborhood.
In summary, I perceive no need for a geotec 'cal assessment or a geotechnical report for
this activity. Please feel free to contact me if t ere are any questions regarding this
opinion, or if additional information is needed,
Sincerely,
A.
o� WA�
30784
�SSr0NAL t
Alan A. Tahja, P.E.
File:C:WrojectslBoggslGeo-Doc Opinion 1 f 1 2/8/2016
I
Rev#t Description Date TAHJA ENGINEERNG,INC. SITE PLAN
Alan Tahja,P.E. Dan&Kim Boggs Boggs
PO Box 235 321 N Potlatch Dr.N
Hoodsport WA 98548 Hoodsport, WA 98548 1 of 8
Mason Co.NO No.:42307-50-00022 (360)877-9512 (206)930-6314 & (253)677-6746
w / �
CI-i CI
W / / � ;
Z.)
� o �
0
m �n
N U
Cd
' Z8Z9/
Z=1
/ ,0LC. M
l /9/ N
o
adO�d � CIA
� s
i
4;"+
C m E, !
O
^°� a U
5
S
S
.............
Z:L-7� dO 1
PLEASE PRINT
1. PROPERTY OWNER
Name: Boggs, Dan
Mailing Address: 33024 4811 Ave SW, Federal Way, WA 98023
Work Phone: (206)930-0070 E ail Address: DLBoggs0070@AOL.com
Home/Cell Phone: same as above Fa K#:NA
If an agent is acting for the property owner during the permit proco Ws, complete#2.
2. AUTHORIZED AGENT
Name:Valdeman, Caralyn, M.
Mailing Address: 1727 S. Cushman Ave, Tacoma WA P8405
Work Phone: (253)888-5314 Email Address: intearatedNWConstructlona)Gmail.com
Horne/Cell Phone: (206)310-4239 FaK# :NA
3. PROJECT SITE
Site Address: 321 Potlatch Dr. N, Hoodsport, WA, 985 8
Parcel#: 42307-50-00022 - Lc gal Description: Lake Cushman#2TR38
Directions to Site: From Shelton, take SR 101 North to oodsport, turn left onto Lake Cushman Rd, turn
Left onto N Mount Church Rd. turn Left onto N Potlatch Dr.
Attach a site plan showing the following: Lot Dimensio s,Flood Zones,Existing Structures,Fences,
Water Lines,Driveways,Drainage Plans,Shorelines,Se itic System,Topography,Proposed
Improvements,Easements,North Arrow,and Scale. Al o draw a separate topography diagram.
t:1C:rnnwuta )evrlv}+Rr°nrt4'.1E'=1�3'' Revisedhue2010
4. State which section requires permit: ❑ Wetlands,Chapter 17.01.070
❑ Long Term Commercial Forest,Chapter ❑ Frequently Flooded Areas,Chapter 17.01.090
17.10.060 ❑ Landslide Hazard Area,Chapter 17.01.100
❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Seismic Hazard Areas,Chapter 17.01.102
❑ Aquifer Recharge Area,Chapter 17,01.080 2( Fish&Wildlife Habitat Conservation Areas,
❑ Erosion Hazard Area,Chapter 17.01.104 Chapter
❑ In-Holding Lands,Chapter 17.01.062 17.01.110
5. Identify current use of the property with existing improve ents: SFH, used for seasonal recreation.
6. Identify and describe the proposed project,including the pe of materials to be used,construction methods,
principle dimensions,and other pertinent information(att kch additional sheets,if needed):
Bank Stabilization I Bulkhead: Update and re-enforce existing bulkhead which will provide bank
stabilization by preventing erosion along retaining wall. Construction method will be renovating
existing concrete bulkhead which is undercut and rendered nonfunctional by water erosion and
repouring with a three foot in ground footer to prevent erosion around bulkhead.
Pier: pier is directly on Lake Cushman. Pier will be reduced by 360 sq. ft in order to meet state
and federal guidelines construction will consist of removal and disposal of existing treated
lumber. Cutting and fitting of new yellow cedar pier lumber will take place in a designated
location away from the water in order to reduce polution of site with lumber waste and materials.
Stairs: extend to high water mark by two feet. New concrete landing will be formed and poured
above water level reducing footprint of existing stairway, no stairs will extend below water level.
See attached plans for additional information.
7. Describe why the action requiring this permit cannot be avoided.
Pier renovation is required in order to ensure pier meets new requirements for Lake Cushman, being
implemented by Army core of engineers.
8. Will there be an alteration of a wetland and/or wetland Agetation area(circle one)? Yes No
9. Identify any surface water on or adjacent to property(circle one):
Saltwater Lake Stream Pond Wetland Drainage Ditch
10. Identify existing septic/sewer connection(circle one): If septic is located on project site, include records.
Connected to Septic Connected to Community Septic
11. Identify existing water supply(circle one): Public Water Supply Well
11. Type of Job(circle one):
New Add Alteration Repair Demolition Other:
Lff-
Print Name Signatu4 Date
.............-
f
i
-srgTFo� MASON COUNTY
Q 'o
DEPARTMENT OF COMMUNITY DEVELOPMENT
N Planning Division
7 N Y Y 426 W Cedar St, Shelton, WA 98584
°J �° (360)427-9670
1864
MASON COUNTY ENVIRONMENTAL PERMIT
March 07, 2016
DAN BOGGS
33024 48TH AVE SW
FEDERAL WAY WA 98023
Parcel Number(s): 423075000022
Expiration Date: 3/7/2018 12:00:OOAh
Date Issued: 3/7/2016
Case Number: MEP2016-00001
Project Description:
The existing dock and bulkhead were not originally permitted by the County. Applicant has submitted permit
applications and proposed modifications to existing structures to bring into compliance with current
dimensional standards.
RENOVATION OF EXISTING DOCK: REDUCING SIZE OF PIER TO 590 SQ FT, ELIMINATING 360 SQ
FT. RENOVATION OF ATTACHED FLOAT- REPLACING ROTTED LUMBER, REPLACING ENCASED
STYROFOAM. Resulting dimensions are 8' wide mainstem of dock, total width dock (excluding 8'
mainstem) is 13.3". Total length of dock measured from OWHM is 47'.
RENOVATION OF EXISTING BULKHEAD: The existing 65' long bulkhead is composed of rock and
concrete mortar. Concrete is is also poured (unformed) in front of the base of the rock bulkhead. The
bulkhead includes some concrete/rock steps to the beach. Some of the unformed concrete on the
waterward side of the bulkhead will be broken off and hauled away. And a 2 foot depth by 3 foot tall
reinforced concrete footing will be poured in front of the bulkhead.
A Biological Evaluation has been submitted which recommends a 10' by 10' area be planted with native
vegetation.
The following critical areas are present on this property:
Long-Term Commercial Forest X FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands X Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01
MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local
statutes, ordinances, or regulations applicable to this pro ect. This permit may be rescinded if the permitee
fails to complete t e roject as proposed or fails to comply with the standards of this ordinance.
r l�,
Authorized Local Government Official ate
MASON COUNTY ENVIRONMENTAL PERMIT
3/7/2016 Case No.: MEP2016-00001
Conditions:
No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of
a development for which a permit has been granted has not begun within two years after approval, the Review
Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon
showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the
applican has requested such review,and extension prior to the exporation date.
Signature Date T
(i1`�h? 4y') //�- OWNER - REPRESENTATIVE - CONTRACTOR
Print Name (Circle one to indicate)
3/7/2016 Page 2 of 2 MEP2016-00001
�oN_STgTF�� MASON COUNTY
o P A o N
� SN" DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
IP o Y ti 426 W Cedar St, Shelton, WA 98584
1864 (360)427-9670
MASON COUNTY ENVIRONMENTAL PERMIT
March 07, 2016
DAN BOGGS
33024 48TH AVE SW
FEDERAL WAY WA 98023
Parcel Number(s): 423075000022
Expiration Date: 3/7/2018 12:00:OOAN
Date Issued: 3/7/2016
Case Number: MEP2016-00001
Project Description:
The existing dock and bulkhead were not originally permitted by the County. Applicant has submitted permit
applications and proposed modifications to existing structures to bring into compliance with current
dimensional standards.
RENOVATION OF EXISTING DOCK: REDUCING SIZE OF PIER TO 590 SQ FT, ELIMINATING 360 SQ
FT. RENOVATION OF ATTACHED FLOAT- REPLACING ROTTED LUMBER, REPLACING ENCASED
STYROFOAM. Resulting dimensions are 8' wide mainstem of dock, total width dock (excluding 8'
mainstem) is 13.3". Total length of dock measured from OWHM is 47'.
RENOVATION OF EXISTING BULKHEAD: The existing 65' long bulkhead is composed of rock and
concrete mortar. Concrete is is also poured (unformed) in front of the base of the rock bulkhead. The
bulkhead includes some concrete/rock steps to the beach. Some of the unformed concrete on the
waterward side of the bulkhead will be broken off and hauled away. And a 2 foot depth by 3 foot tall
reinforced concrete footing will be poured in front of the bulkhead.
A Biological Evaluation has been submitted which recommends a 10' by 10' area be planted with native
vegetation.
The following critical areas are present on this property:
Long-Term Commercial Forest X FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands X Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
i
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
424 W Cedar St,Shelton,WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
Description of Proposal: The existing dock and bulkhead were not originally permitted by
the County. Applicant has submitted permit applications and
proposed modificatiofis to existing structures to bring into
compliance with current dimensional standards.
RENOVATION OF EXISTING DOCK: REDUCING SIZE OF PIER
TO 590 SQ FT, ELIMINATING 360 SQ FT. RENOVATION OF
ATTACHED FLOAT- REPLACING ROTTED LUMBER,
REPLACING ENCAItal
D STYROFOAM. Resulting dimensions are
8' wide mainstem ofck, total width dock(excluding 8'
mainstem) is 13.3". length of dock measured from OWHM is
47'.
RENOVATION OF EXISTING BULKHEAD: The existing 65' long
bulkhead is composed of rock and concrete mortar. Concrete is is
also poured (unformed) in front of the base of the rock bulkhead.
The bulkhead includgs some concrete/rock steps to the beach.
Some of the unform d concrete on the waterward side of the
bulkhead will be bro en off and hauled away. And a 2 foot depth
by 3 foot tall reinforced concrete footing will be poured in front of
the bulkhead.
A Biological Evaluation has been submitted which recommends a
10' by 20' area be planted with native vegetation.
Proponent: DAN BOGGS
Site Address(if Assigned): 321 N POTLATCH DR NORTH HOODSPORT
Directions to Site: LAKE CUSHMAN RD, FOLLOW TO THE TOP, TURN LEFT ,
THEN LEFT ONTO MT TEBO WY, THEN MT CHURCH, THEN
RIGHT ON POTLATCH DR NORTH TO SITE
Parcel Number: 423075000022
Legal Description: LAKE CUSHMAN # TR 22
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement(EIS) is not required under RCW
43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other
information on file with the Lead Agency. This information is available to the public upon request.
MITIGATED MEASURES ARE ATTACHED.
SEP2016-00002 Page 1 of 4
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
i Planning Division
426 W Cedar St,Shelton,WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
Please contact Rebecca Hersha at ext. 287 with any questions. This DNS is issued under WAC
197-11-350. The Lead Agency will not act on this proposal for 14 days from the date shown below, when
the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box
279, Shelton WA 98584 by 3/4/2016. Appeal of this determination must be filed within a 14-day period
following this final determination date, per Mason County Code Chapter 15.11 Appeals.
Aut orized Local Government Official Date
SEP2016-00002 Page 2 of 4
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
426 HIV Cedar St, Shelton, WA 98584
Not$ (360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
CONDITIONS OF THIS DETERMINATION
1) Tacoma Power Ownership
Tacoma Power owns and manages the land at and below 742 feet elevation (the
shoreline). The applicant must obtain a permit from Tacoma Power prior to placing a
perms nt s ructure or fill below the 742 foot contour line.
X /Y
Biological Evaluation
All activities related to this proposal shall adhere to the recommendations made in the
Habitat Management Plan prepared by BioResources LLC (Kim Schaumburg), dated
Dece er 3 2015 and vised February 8, 2016.
X
Floatation
Floatation for the structure shall be entirely enclosed and contained to permanently prevent
the br kup r loss of th station material into the water.
x �I•
Erosion Control
Erosion control measures must be in place prior to any clearing, grading, or construction.
These control measures must be effective td prevent soil from being carried into surface
water by stormwater runoff. Sand, silt, clay particles, and soil will damage aquatic habitat
and co idered oll tants when discharged to waters of the state.
X
Sediment
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality
Standards for Surface Waters of the State of Washington, and is subject to enforcement
action.
X
Construction
During construction, all releases of oils, hydraulic fluids, fuels, other petroleum products,
paints, solvents, and other deleterious materials must be contained and removed in a
manner that will prevent their discharge to waters and soils of the state. The cleanup of
spills should take precedence over all other work on the site.
Page 3 of 4
SEP2016-00002
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning Division
426 W Cedar St, Shelton, WA 98584
(360)427-9670
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2016-00002
X
Debris
Proper disposal of construction debris must be on land in such a manner that debris cannot
enter � son ake off,cau water quality degradation of state waters.
X /`T
Stormwater
All stormwater discharges must be constructed in a manner that will not cause scouring on
the b h.
X
Protected Lake Buffer
All vegeta ' n that is removed or damaged for the project must be replanted with native
vegeta ' R oval of t or shrubs requires additional permitting.
X
Hydraulic Approval
A Hydra is Project Approval from the Washington Department of Fish and Wildlife shall be
obtain 'pri to iwok n banks of or within the waters of the State.
X
SEP2016-00002 Page 4 of 4
5 4?,,70/6 Dodo o�
MASON COUNTY ENVIRONMENTAL CHECKLIST Rew
MASON CO. ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable: Boggs Bulkhead, Pier& Float,
Shoreline Access Stairs.
2. Name of applicant: Boggs, Dan and Kim
3. Address and phone number of applicant and contact person:
33024 48th Ave SW, Federal Way,WA 98023;
Contact: Caralyn Valdeman 253 888-5314
4. Date checklist prepared: 2/11/2016.
5. Agency requesting checklist: Mason County.
6. Proposed timing or schedule (including phasing, if applicable
Project will begin after all applicable permits have been obtained
7. Do you have any plans for future expansion, or further activity related to or
connected with this proposal: if yes, explain. No.
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal. A BE and
a MEP.
9. Do you know whether applications re pending for governmental
approvals of other proposals directl affecting the property covered by
your proposal? If yes, explain. No.
10. List any government approvals or permits that will be needed for your
proposal, if known. A Mason county building permit.
11. Give a brief, complete description of your proposal, including the proposed
uses and the size of the project and site. There are several questions
later in this checklist that ask you to describe certain aspects of your
proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include additional specific information on
project description).
i
MASON COUNTY ENVIRONMENTAL CHECKLIST 2
Renovation of existing pier, floath g dock, and bulkhead, with
reducing size of pier to 590 sq. ft. elimi ating 360 sq. ft. Renovation of
floating dock replacing rotted lumber, r placing Styrofoam with encased
styrofoam, addition of Boat slip using existing footprint with no addition of
extra piles. Addition of concrete bulkhead approx. 2' high with a depth of
3'along face of existing failing bulkhead.,approx. 65'.
I
Activities were within the 100-year flood plain. The nearest
waterbody is Lake Cushman.
12. What is the location of the proposal. Give sufficient information for a
person to understand the precise location of your proposed project
including a street address, if any, an J section, township, and range, if
known. If a proposal would occur o r a range of area, provide the range
or boundaries of the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you should
submit any plans required by the agency, you are not required to duplicate
maps or detailed plans submitted with any permit applications related to
this checklist The site is located on Lake Cushman at 321 North
Potlatch. Section 07, Township 23N, Range 04W. The legal
description is: Lake Cushman #2TR38.
B. ENVIRONMENTAL ELEMENTS:
1. EARTH:
a. General description of the site (circle one): Flat, rolling, hilly, steep
slopes, mountainous, other.
b. What is the steepest slope on the site (approx. percent slope)? Greater
than 1 percent.
C. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know cla sification of agricultural soils, specify
them and note any prime farmland. Iacial till.
d. Are there surface indications of history of unstable soils in the immediate
vicinity: If so, describe. No.
I
MASON COUNTY ENVIRONMENTAL CHECKLIST 3
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill. The existing bulkhead is
cemented four man rock.
f. Could erosion occur as a result of clearing, construction, or use: If so,
generally describe. No
g. About what percentage of the site w II be covered with impervious
surfaces after project constructions (for example, asphalt or buildings)? 5
percent
h. Proposed measures to reduce or control erosion, or other impacts to the
earth, if any: plant native vegetation along shoreline.
2. AIR:
a. What types of emissions to the air uld result from the proposal (i.e.
duct, automobile, odors, industrial w)od smoke) during construction and
when the project is completed? If any, generally describe and give
approximate quantities, if known N/
b. Are there any off-site sources of emissions or odors that may affect your
proposal? If so, generally describe.
N/A
C. Proposed measures to reduce or control emissions or other impacts to air,
if any: NIA
3. WATER:
a. Surface:
1) Is there any surface water bo on or in the immediate vicinity of
the site (including year-roundy nd seasonal streams, saltwater,
lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
Lake Cushman.
MASON COUNTY ENVIRONMENTAL CHECKLIST 4
2) Will the project require any wbrk over, in, or adjacent to (within 200
feet) the described waters? If yes, please describe and attach
available plans. Yes. Plans attached
3) Estimate the amount of fill and dredge material that would be
placed in or removed from surface water or wetlands and indicate
the area of the site that would be affected. Indicate the source of fill
material. None
4) Will the proposal require surface water withdrawals or diversions?
Give general description, purpose, and approximate quantities if
known. No.
5) Does the proposal lie within a 100-year floodplain? If so, note
location on the site plan. Yet.
6) Does the proposal involve any discharges of waste materials to
surface waters? If so, describe the type of waste and anticipated
volume of discharge. No.
b. Ground:
1) Will ground water be withdrawn,'or will water be discharged to ground
water? Give general description, purpose, and approximate quantities,
if known. No.
2) Describe waste material that wil be discharged into the ground from
septic tanks or other sources, if Einy (for example: domestic sewage,
industrial, containing the followirig chemicals...,agricultural, etc.)>
Describe the general size of the system, the number of such systems,
the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve. None will be
discharged.
C. Water runoff(including storm water):
1) Describe the source of runoff(including storm water) and method of
collection and disposal, if any(include quantities, if known). Where
will this water flow? Will this flow into other waters? If so, describe.
Runoff at the site is from roads in the area.
MASON COUNTY ENVIRONMENTAL CHECKLIST 5
2) Could waste materials enter ground or surface waters: if so,
generally describe. No.
d. Proposed measures to redu e or control surface, ground, and
runoff water impacts, if any: no gr and water impacts are expected,
native vegetation will be planted.
4. PLANTS:
a. Check or circle types of vegetation found on the site:
X_deciduous tree: alder, maple, aspen, other
x_evergreen tree: fir, cedar, pine, other
x_shrubs
_ grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other
plants: water lily, eelgrass, milfoil, other
__Water other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
none
C. List threatened or endangered spe ies known to be on or near the site.
none
d. Proposed landscaping, use of nativb plants, or other measures to
preserve or enhance vegetation on the site, if any:
Native plants will be planted along shoreline to act as midigation for
erosion.
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
Birds: hawk, heron, eagle, songbirids, other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
MASON COUNTY ENVIRONMENTAL CHECKLIST 6
b. List any threatened or enda gered species known to be on or near
the site. bull trout (Salvelinus co fluentus), marbled murrelet
(brachyramphus marmoratus) ndrthern spotted owl (stridex
occidentalis) streaked horned lank (eremophila alpestris strigata) and
yellow billed cuckoo (coccyzus americanus)
C. Is the site part of a migration route? If so, explain. Fish migrate from
Lake Cushman to the North Fork of the Skokomish River, but
migration to or from Puget Sound is not possible due to major
anthropogenic blockages.
d. Proposed measures to preserve or enhance wildlife, if any: No
construction to occur unless water levels low,bird houses will be
placed on site, dock surface are will be reduced. Sustainably
harvested Alaskan yellow cedarrill be used which is 50 percent
stronger than traditional treated lumber and is insect and decay
resistant. Additionals see B.E.
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be
used to meet the completed project's energy needs? Describe whether it
will be used for heating, manufacturing, etc.
none
b. Would your project affect the potential use of solar energy by adjacent
properties: If so, generally describe. No.
C. What kinds of energy conservation features are included in the plans of
this proposal? List other proposed measures to reduce or control energy
impacts, if any: None.
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, which
could occur as a result of this proposal? If so, describe.
N/A
1) Describe special emergency services that might be required.
i
MASON COUNTY ENVIRONMENTAL CHECKLIST 7
N/A.
2) Proposed measures to reducb or control environmental health
hazards, if any: N/A
b. Noise:
1) What types of noise exist in the area which may affect your project
(for example: traffic, equipm Emt, operation, other)? None.
2) What types and levels of noise would be created by or associated
with the project on a short-term or a long-term basis (for example:
traffic, construction, operation, other)? Indicate what hours noise
would come from the site. See B.E. Hand tools will be utilized
throughout construction to limit noise. To protect marbled
murrelets No work will begin until 2 hours after sunrise and
end 2 hours before sunset.
3) Proposed measures to reduce or control noise impacts, if any"
Hand tools will be utilized throughout construction to limit noise,
sledge hammers will be wrapped in thick towel when used.
8) LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
Residential and recreational.
b. Has the site been used for agriculture? If so, describe.
No.
C. Describe any structures on the site.
A SFR, deck, peir and floating dock.
d. Will any structures be demolished? If so, what?
Yes, 360 ft of existing dock, existing jet ski lift, concrete stairway.
e. What is the current zoning classification of the site?
Unknown.
MASON COUNTY ENVIRONMENTAL CHECKLIST g
f. What is the current comprehensive plan designation of the site?
Unknown.
g. If applicable, what is the current Shpreline Master Program designation of
the site? Urban Residential.
h. Has any part of the site been classified as an "Environmentally sensitive"
area? If so, specify. Lake Cushman is a Fish and Wildlife Habitat
Conservation Area .
i. Approximately how many people w uld reside or work in the completed
project? None.
j. Approximately how may people would the completed project displace?
None.
k. Proposed measures to avoid or red ce displacement impacts, if any:
None.
i. Proposed measure to ensure the proposal is compatible with existing and
projected land uses and plans, if an : Bulkheads are common to
residences on Lake Cushman.
9. HOUSING:
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing. None.
b. Approximately how many units, if any would be eliminated? Indicate
whether high, middle, or low-income housing. None.
C. Proposed measures to reduce or control housing p g impacts, If any.
MASON COUNTY ENVIRONMENTAL CHECKLIST 9
None.
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
Approx. level with grade. Alaskan yellow cedar.
b. What views in the immediate vicinity would be altered or obstructed?
None.
C. Proposed measure to reduce or co trol aesthetic impacts, if any:
None.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day
would it mainly occur?
None.
b. Could light or glare from the finishgd project be a safety hazard or interfere
with views? No.
C. What existing off-site sources of light or glare may affect your proposal:
None.
d. Proposed measures to reduce or control light and glare impacts, if any:
None.
12. RECREATION
a. What designated and informal recreational opportunities are in the
immediate vicinity?
Boating, fishing, hiking, etc.
MASON COUNTY ENVIRONMENTAL CHECKLIST 10
b. Would the proposed project displacle any existing recreational uses? If so,
describe. No.
C. Proposed measures to reduce or control impacts on recreation, including
recreational opportunities to be provided by the project or applicant, if any:
None.
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state,
or local preservation registers kno to be on or next to the site? If so,
generally describe. No.
b. Generally describe any landmarks r evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
None.
C. Proposed measures to reduce or control impacts, if any:
None.
14. TRANSPORTATION
a. Identify public streets and highwaysl serving the site and describe
proposed access to the existing street system. Show on site plans, if any.
SR 119, N Potlatch Rd.
b. Is site currently served by public transit? If not, what is the approximate
distance to the existing street system? Show on site plans, if any.
no
MASON COUNTY ENVIRONMENTAL CHECKLIST 11
C. How many parking spaces would the completed project have? How many
would the project eliminate? None.
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so, generally
describe (indicate whether public or private). No.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. No.
f. How many vehicular trips per day would be generated by the completed
project. If known, indicated when r eak volumes would occur. None.
i
g. Proposed measures to reduce or control transportation impacts, if any:
None.
15. PUBLIC SERVICES
a. Would the project result in an increased need for public service (for
example: fire protection, police protection, health care, schools, other)? If
so, generally describe: No.
b. Proposed measures to reduce or control direct impacts on public services,
if any:
None.
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas,
water, refuse service, telephone, sanitary sewer, septic system, other:
MASON COUNTY ENVIRONMENTAL CHECKLIST 12
b. Describe the utilities that are propo ed for the project, the utility providing
the service, and the general constr ction activities on the site or in the
immediate vicinity which might be needed. None.
Signature:
The above answers are true and complete to the best of my knowledge. I
understand that the lead agency is relying on them to make its decision.
Signature:
Printed Name: D n Boqqs
Date submitted: 1 j
Signature:
Printed Name: Irn Boggs
Date submitted: ��� PCs
Z6 i to - boao2,
MASON COUNTY ENVIRONMENTAL CHECKLIST 1
DECEIVED
MASON CO. E VIRONM NTAL CHECKLIST JAN 2 7 2016
A. BACK OU D 426 W. CEDAR ST.
1. Name of pr osed project, if applicable: Boggs Bulkhead, RHer & Float,
Shoreline A ess Stairs. >t
2. Name of applic t: Boggs, Dan G
3. Address and pho e number of applicant and contacperson:
33024 48th Ave S , Federal Way, WA 98023;
Contact: Richard K nedy 253 888-5314
4. Date checklist prepa d: 12-30-15.
t'
5. Agency requesting the list: Mason Count
6. Proposed timing or sched (includinghasing, if applicable
Project will begin after all plicab permits have been obtained
7. Do you have any plans for futur a pansion, or further activity related to or
connected with this proposal: ye explain. No.
E
8. List any environmental in rmation you krw about that has been
prepared, or will be pre red, directly relai d to this proposal. A BE and
a MEP.
9. Do you know wh her applications are pending f\includin
ental
approvals of of r proposals directly affecting th covered by
your proposal If yes, explain. No.
10. List any g ernment approvals or permits that wed for your
proposal, known. A Mason County Shorelineon permit and
a buildi g permit.
11. Give a brief, complete description of your proposn the proposed
uses and the size of the project and site. There al estions
later in this checklist that ask you to describe cects your
proposal. You do not need to repeat those answers on this page. (Lead
a ,
MASON COUNTY ENVIRONMENTAL CHECKLIST 2
agencies may modify this form to in ude additional specific information on
project description).
Renovation of existing pier, floatir g dock, and bulkhead, with
reducing size of pier to 590 sq. ft. eliminating 360 sq. ft. Renovation of
floating dock replacing rotted lumber, replacing encased Styrofoam,
addition of Boat slip using existing footr rint with no addition of extra piles.
Addition of rip rap along all bulkheads t o ft. hi�h sloping towards beach
�n4--1am{
Activities were within the 100-year flood plain. The nearest
waterbody is Lake Cushman.
12. What is the location of the proposal? Give sufficient information for a
person to understand the precise location of your proposed project
including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range
or boundaries of the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you should
submit any plans required by the agency, you are not required to duplicate
maps or detailed plans submitted with any permit applications related to
this checklist The site is located on Lake Cushman at 321 North
Potlatch. Section 07, Township 23N, Range 04W. The legal
description is: Lake Cushman #2TR38.
B. ENVIRONMENTAL ELEMENT
1. EARTH:
a. General description of the site (circle one): Flat, rolling, hilly, steep
slopes, mountainous, other.
b. What is the steepest slope on the site (approx. percent slope)? Greater
than 10 percent.
C. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know classification of agricultural soils, specify
them and note any prime farmland. Glacial till.
d. Are there surface indications of history of unstable soils in the immediate
vicinity: If so, describe. No.
MASON COUNTY ENVIRONMENTAL CHECKLIST 3
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill. The existing bulkhead is
cemented four man rock.
f. Could erosion occur as a result of clearing, construction, or use: If so,
generally describe. No
g. About what percentage of the site will be covered with impervious
surfaces after project constructions (for example, asphalt or buildings)?
30 percent
h. Proposed measures to reduce or control erosion, or other impacts to the
earth, if any: plant native vegetation along shoreline.
2. AIR:
a. What types of emissions to the air would result from the proposal (i.e.
duct, automobile, odors, industrial wood smoke) during construction and
when the project is completed? If any, generally describe and give
approximate quantities, if known N/A
b. Are there any off-site sources of emissions or odors that may affect your
proposal? If so, generally describe.
N/A
C. Proposed measures to reduce or cohtrol emissions or other impacts to air,
if any: N/A
3. WATER:
a. Surface:
1} Is there any surface water body on or in the immediate vicinity of
the site (including year-round and seasonal streams, saltwater,
lakes, ponds, wetlands)? If yes, describe type and provide names.
If appropriate, state what stream or river it flows into.
Lake Cushman.
1 ♦ � �
MASON COUNTY ENVIRONMENTAL CHECKLIST 4
2) Will the project require any w rk over, in, or adjacent to (within 200
feet) the described waters? If yes, please describe and attach
available plans. Yes.
3) Estimate the amount of fill and dredge material that would be
placed in or removed from surface water or wetlands and indicate
the area of the site that would be affected. Indicate the source of fill
material. Face of current bulkhead will be removed,
approximately two feet up one foot inward. Replaced with re-
enforced concrete bulkhead (see plan)
4) Will the proposal require surface water withdrawals or diversions?
Give general description, purpose, and approximate quantities if
known. No.
I
5) Does the proposal lie within a 100-year floodplain? If so, note
location on the site plan. Yes.
6) Does the proposal involve any discharges of waste materials to
surface waters? If so, describe the type of waste and anticipated
volume of discharge. No.
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground
water? Give general description, purpose, and approximate quantities,
if known. No.
2) Describe waste material that will be discharged into the ground from
septic tanks or other sources, if any (for example: domestic sewage,
industrial, containing the following chemicals...,agricultural, etc.)
Describe the general size of the system, the number of such systems,
the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve. None will be
discharged.
C. Water runoff(including storm water):
1) Describe the source of runoff(including storm water) and method of
collection and disposal, if any (include quantities, if known). Where
will this water flow? Will this flow into other waters? If so, describe.
Runoff at the site is from roads in the area.
MASON COUNTY ENVIRONMENTAL CHECKLIST 5
2) Could waste materials enter g ound or surface waters: if so,
generally describe. No.
d. Proposed measures to reduce or control surface, ground, and
runoff water impacts, if any: no ground water impacts are expected,
native vegetation will be planted.
4. PLANTS:
a. Check or circle types of vegetation found on the site:
X_deciduous tree: alder, maple, aspen, other
x_evergreen tree: fir, cedar, pine, other
x_shrubs
_ grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other
_water plants: water lily, eelgrass, milfpil, other
other types of vegetation
b. What kind and amount of vegetation,will be removed or altered?
none
C. List threatened or endangered spec es known to be on or near the site.
The Chinook Salmon, bull trout, Puget sound steelhead, marbled murrelet,
horned lark, and spotted owl are the ESA listed endangered species in the
area
d. Proposed landscaping, use of native plants, or other measures to
preserve or enhance vegetation on the site, if any:
Native plants will be planted along shoreline to act as midigation for
erosion.
5. ANIMALS f
a. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other
Mammals: deer, bear, elk, beaver, other
.......-------
MASON COUNTY ENVIRONMENTAL CHECKLIST 6
Fish: bass, salmon, trout, herring, hellfish, other
b. List any threatened or endangered species known to be on or near
the site. bull trout(Salvelinus confluentus), marbled murrelet
(Brachyramphus marmoratus marmoratus), Puget Sound Chinook
salmon (Oncorhynchus tshawytscha), Puget Sound Steelhead
(Oncorhynchus mykiss), the spotted owl (Strix occidentalis), and the
horned lark (Eremophila alpestris strigata).
C. Is the site part of a migration route? If so, explain. Fish migrate from
Lake Cushman to the North Fork of the Skokomish River, but
migration to or from Puget Sound is not possible due to major
anthropogenic blockages.
Cl. Proposed measures to preserve or enhance wildlife, if any: bird houses
will be placed on site dock surface area will be reduced.
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar)will be
used to meet the completed project's energy needs? Describe whether it
will be used for heating, manufacturing, etc.
none
b. Would your project affect the potential use of solar energy by adjacent
properties: If so, generally describe. No.
C. What kinds of energy conservation features are included in the plans of
this proposal? List other proposed measures to reduce or control energy
impacts, if any: None.
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hbzards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, which
could occur as a result of this proposal? If so, describe.
N/A
1) Describe special emergency services that might be required.
I . I .
MASON COUNTY ENVIRONMENTAL CHECKLIST 7
NIA.
2) Proposed measures to reduce or control environmental health
hazards, if any: N/A
b. Noise:
1) What types of noise exist in the area which may affect your project
(for example: traffic, equipment, operation, other)? None.
2) What types and levels of noise would be created by or associated
with the project on a short-term or a long-term basis (for example:
traffic, construction, operation, other)? Indicate what hours noise
would come from the site. N/A
3) Proposed measures to reduce or control noise impacts, if any"
N/A
8) LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
Residential and recreational.
b. Has the site been used for agriculture? If so, describe.
No.
C. Describe any structures on the site.
A SFR, deck.
d. Will any structures be demolished? If so, what?
Yes, 360 ft of existing dock
e. What is the current zoning classification of the site?
Unknown.
f. What is the current comprehensive plan designation of the site?
Unknown.
i i
MASON COUNTY ENVIRONMENTAL CHECKLIST
9. If applicable, what is the current Shol reline Master Program designation of
the site? Urban Residential.
h. Has any part of the site been classified as an "Environmentally sensitive"
area? If so, specify. Lake Cushman is a Fish and Wildlife Habitat
Conservation Area .
I. Approximately how many people would reside or work in the completed
project? None.
j. Approximately how may people would the completed project displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if any:
None.
i. Proposed measure to ensure the proposal is compatible with existing and
projected land uses and plans, if any: Bulkheads are common to
residences on Lake Cushman.
9. HOUSING:
a. Approximately how many units woulc be provided, if any? Indicate
whether high, middle, or low-income housing. None.
b. Approximately how many units, if any would be eliminated? Indicate
whether high, middle, or low-income housing. None.
C. Proposed measures to reduce or control housing impacts, if any:
None.
MASON COUNTY ENVIRONMENTAL CHECKLIST 9
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
Approx. level with grade. Alaskan yellow cedar.
b. What views in the immediate vicinity would be altered or obstructed?
None.
C. Proposed measure to reduce or control aesthetic impacts, if any:
None.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day
would it mainly occur?
None.
b. Could light or glare from the finished project be a safety hazard or interfere
with views? No. j
C. What existing off-site sources of light or glare may affect your proposal:
None.
d. Proposed measures to reduce or cor trol light and glare impacts, if any:
None.
12. RECREATION
a. What designated and informal recreational opportunities are in the
immediate vicinity?
Boating, fishing, hiking, etc.
b. Would the proposed project displace any existing recreational uses? If so,
describe. No.
MASON COUNTY ENVIRONMENTAL CHECKLIST 10
C. Proposed measures to reduce or colnitrol impacts on recreation, including
recreational opportunities to be provided by the project or applicant, if any:
None.
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state,
or local preservation registers known to be on or next to the site? If so,
generally describe. No.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
None.
C. Proposed measures to reduce or control impacts, if any:
None.
14. TRANSPORTATION
a. Identify public streets and highways erving the site and describe
proposed access to the existing sire t system. Show on site plans, if any.
SR 119, N Potlatch Rd.
b. Is site currently served by public transit? If not, what is the approximate
distance to the existing street system? Show on site plans, if any.
no I
I
C. How many parking spaces would the completed project have? How many
would the project eliminate? None.'
MASON COUNTY ENVIRONMENTAL CHECKLIST 11
d. Will the proposal require any new ro ds or streets, or improvements to
existing roads or streets, not including driveways? If so, generally
describe (indicate whether public or private). No.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. No.
I
f. How many vehicular trips per day would be generated by the completed
project. If known, indicated when peak volumes would occur. None.
g. Proposed measures to reduce or control transportation impacts, if any:
None.
15. PUBLIC SERVICES
a. Would the project result in an increa ed need for public service (for
example: fire protection, police protection, health care, schools, other)? If
so, generally describe: No.
b. Proposed measures to reduce or cor trol direct impacts on public services,
if any:
None.
16. UTILITIES
a. Circle utilities currently available at the site: electricity, natural gas,
water, refuse service, telephone, sanitary sewer, septic system, other:
b. Describe the utilities that are propos d for the project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be ne Aed. None.
MASON COUNTY ENVIRONMENTAL CHECKLIST 12
Signature:
The above answers are true and complete to the best of my knowledge. I
understand that the lead agency is relying n them to make its decision.
Signature:
Date submitted: 1 2- " rs'
coo 6/
��.• ��3d?- Sty-ooa�-Z.-
Biological Evaluation
Boggs Bulkhead Repair, Pier Reconfiguration, & Float
Renovation Project
Lake Cushman, Hoodsport WA
For,
Danny & K m Boggs
19124 3"d ve West
Shoreline, WA 98177-301.1
i
Prepareld by:
BioResour es, LLC
Kim Scha mburg
Fisheries biologist, Univer'ity of Washington, 1981
10112 Bay Vicw Rd. KPN
Vaughn, WA, 98394
(253) 884-5776 or 225-2973
Email: kimberly03 @centurytel.net
December 30, 2015
Revised February 8,2016
Table of Contents
1.0 Proposed Action.............................................................................. 3
1.1 Background ........................................................................ ........... 3
1.2 Project Need and Objectives................................................................ 4
2.0 Project Description.................................................................... ...... 4
2.1 Project Activities.............................................................................. 5-7
2.2 Timing.......................................................................................... 7
2.3 Conservation Measures....................................................................1. 7
2.4 Best Management Practices.................................................................. 8-10
3.0 Action Area.................................................................................... 10-11
4.0 ESA Species and Habitat Information..................................................... 11-12
4.1 ESA Listed Species.......................................................................... 12-15
5.1 Environmental Baseline Conditions....................................................... 15
5.2 Action Area................................................................................. 15
5.3 Proposed Project Area..................................................................... 16
6.0 Effects of the Action.......................................................................... 16
6.1 Direct Effects.................................................................................. 16-19
6.2 Primary Constituent Elements............................................................ 19-21
6.3 Direct Effects to ESA Listed Species...................................................... 21-22
6.4 Indirect Effects................................................................................. 22-23
6.5 Primary Constituent Elements............................................................ 23-24
6.6 Direct Effects to ESA Listed Species....................................................... 24-25
6.7 Interrelated/Interdependent Effects......................................................... 25
6.8 Primary Constituent Elements............................................................ ..25-26
6.9 Cumulative Effects............................................................................ 26
7.0 Conclusion...................................................................................... 26
7.1 Take Analysis.................................................................................. 26
7.2 Determination of Effect....................................................................... 27
8.0 References.......................................................................................28-30
Attachments
1. Project location...................................................................................31
2. Site plan with existing development.......................................................... 32
3. Site plan with proposed development........................................................ 33
4. Site plan with proposed development...........................................................34
5. Site plan with proposed development...........................................................35
6. Cross Section......................................................................................36
7. Cross Section.................................................................................... 37
8. Site Photograph.................................................................................. 38
9. Site Photograph.................................................................................. 39
10. Site Photograph.................................................................................. 40
11. Site Photograph.................................................................................. 41
12. Site Photograph........................................................................ .......... 42
13. Essential Fish Habitat............................................................................ 43-44
Boggs Biological Evaluation 2
s
1.0 Proposed Action
This Biological Evaluation has been submitted on behalf of Danny and Kim Boggs at the
request of the Seattle District United States Ar ny Corps of Engineers to comply with
Endangered Species Act(ESA)regulations re ding shoreline development. The
proposed action is the repair of an existing roc c and concrete bulkhead and the
bulkhead's concrete beach access steps, and t reconfiguration/renovation of an existing
pier and float. Mitigation for the proposed pro ct includes downsizing the footprint of
the access steps and the pier structure. The pr osed action will result in a reduction of
overwater coverage at the site of approx. 460 uare feet (sf).
1.1 Background
The proposed project site is located in Mason ounty at 321 North Potlatch Drive North,
Hoodsport Washington(Attachment 1). The ason County tax parcel number is 42307-
50-00022. The property is located in Section , Township 23N, Range 04 of the
Western Meridian. The latitude is 47.49329 n h, and the longitude is -123.25093 west.
The proposed project site is located on Lake C ishman in the Skokomish/Dosewallips
Water Resource Inventory Area 16 (WRIA 16 on a shoreline designated Urban
Residential by the Shoreline Master Program f Mason County. Lake Cushman is
regulated under the Mason County Shoreline laster Program and the Mason County
Resource Ordinance as a Fish and Wildlife H itat Conservation Area. The Shoreline
Management Act of 1971 designated Lake Cushman as a Shoreline of Statewide
Significance. In addition, Lake Cushman is re ulated by Tacoma Public Utilities (aka
Tacoma Power),which has designated Shorel' e Management Classification(SMC)
zones. The proposed project site is located in SMC zone classified as "A." Tacoma
Power defines the "A"management classifica on as shoreline areas with no known
significant environmental/cultural resources o associated resource management goals
precluding existing or future shoreline uses;t s classification acknowledges existing
private uses and anticipates potential future pr vate and light commercial shoreline uses
(Kleinschmidt 2012).
The proposed project site is located in a rural eighborhood on a shoreline lot,which
supports a single-family residence located ap oximately fifteen(15) feet vertically and
sixty-five (65) feet horizontally from the shor line of Lake Cushman. Existing shoreline
appurtenances include an approx. sixty-five-foot(65') failing rock and concrete bulkhead
with a failing concrete footing, concrete beacfi access steps, a pressure treated lumber
pier(874 sf of overwater coverage) including n affixed jet ski ramp, and an approx. ten
by seventeen-foot(10' x 17') float with two c ncrete landing pads (Attachments 8-12).
Boggs Biological Evaluation 3
r
1.2 Project Need and Objectives
The seasonal raising and lowering of Lake Cushman has resulted in severe erosion to the
footing of the bulkhead. As a result,the existing bulkhead is in danger of failing (i.e.
listing waterward and being breached by the lake's waters), which would necessitate the
construction of a replacement bulkhead at the site. The pier and float are old and require
significant renovation. The float's floatation is presently un-encapsulated and a potential
source of Styrofoam®pollution. The existing beach access steps are unsafe. The
applicants wish to extend the life of all of their existing shoreline structures, making them
safer for both humans and the environment. They would also like to reconfigure the
existing pier by downsizing it and creating a boat slip. Therefore,the project objective is
to repair the existing bulkhead, beach access steps, pier, and float while avoiding or
minimizing impacts to ESA-listed species and improving shoreline habitat at the site.
2.0 Project Description
As per the engineered design by P.E. Alan Tahja(Attachments 2-7), the existing, approx.
65' rock and concrete bulkhead will have the entire length of its failing footing reinforced
with new concrete. The existing concrete and rock beach access steps will be replaced
with new concrete steps that will terminate one-foot(1') landward of the existing steps.
The existing pier with 874 sf of overwater coverage will be renovated with new
galvanized steel or aluminum hardware, and yellow cedar posts,joists, decking, and trim.
Sustainably harvested Alaska yellow cedar, which is insect and decay resistant, will be
utilized.No pressure treated lumber will be used in this project. The pier will be
reconfigured with a 360 sf(overwater) section on the north end that includes a Jet Ski
ramp to be removed, along with a 206 sf section on the south end; the latter will be
replaced with a 114 sf boat slip. An existing 176 sf float will be renovated, utilizing the
same materials as the deck, and refitted with polyethylene encapsulated Styrofoam®
floats.
A circular saw and various hand tools will be used throughout the proposed project. All
materials, equipment, debris, and workers will be transported to and from the site in cars
or trucks. Geo-textile fabric will be spread over the dry lakebed before commencement of
project construction in order to contain any manmade construction debris. At the
completion of construction, the geo-textile fabric will be removed from the shoreline at
the site, along with all construction debris and other existing manmade debris. All debris
will be disposed of at a licensed landfill or other licensed disposal site.
Boggs Biological Evaluation 4
2.1 Project Activities
Demolition of the Bulkhead's Footing rind Steps
The bulkhead's existing concrete footing will e broken and chipped off, as necessary,
using hand tools, including a sledge hammer, provide clearance for the new footing.
The sledgehammer(hammer end)will be wral ped in a thick towel for noise attenuation.
The bulkhead's beach access steps have failed where they land on the beach and will
require only a small amount demolition with a sledgehammer. Following demolition of
both structures, all concrete debris will be gat red from the geo-textile fabric and placed
in an appropriate disposal bin prior to removal from the site.
Excavation of the New Footing
Due to the difficulty of accessing the beach w' h heavy machinery, it will be necessary to
manually excavate substrate material along an beneath the bulkhead's failing footing.
The substrate will be excavated to a depth of t ee feet(3') and a width of two feet(2').
Excavated substrate material will be stockpile4 on the shoreline (either on the beach or
landward of the bulkhead); a small amount of ubstrate will be utilized in the project to
fill in holes or depressions after removal of th footing forms; the remainder will be
removed from the shoreline following the prof ct's completion. In the event of heavy
precipitation, silt fencing (see Best Manageme rit Practices 2.5) will be utilized to contain
the exposed footing trench and the stockpiled ediments.
Construction of the Bulkhead's new oting and Steps
Rebar will be bent to a 90 degree angle and pii ined into the existing bulkhead's lower
face. Rebar will also be set horizontally along he footing. Forms for the replacement
footing and steps will be constructed using luipber, a circular saw, and other hand tools.
The replacement footing will be poured to a dth of approx. two feet(2') and a depth of
three feet(3'). The steps will be poured over the existing(post demolition) steps; the
repaired steps will be located at least one foot andward of the waterward extent of the
original steps.
Concrete will be delivered via a concrete pum truck and poured into the footing and step
forms. After the concrete has dried, the forms will be removed from the shoreline at the
site, along with other project debris.
Boggs Biological Evaluation 5
Disassembly of the Pier and Float
Wood components of the existing pier section to be removed, specifically, a 360 sf
overwater section on the north end that includes a jet ski ramp and a 206 sf section on the
south end, will be disassembled using a circular saw and various hand tools. Six pier
posts will be removed; their concrete footings will be excavated to one-foot in depth
using manual labor and hand tools, and then broken apart with a sledgehammer(wrapped
with a thick towel for noise attenuation). Disassembled/demolished material will be
removed from the shoreline via manual labor. The remainder of the pier and the float will
have the existing decking, face boards, and joists removed. The 176 sf float will also have
its existing un-encapsulated floatation material removed.
Renovation of the Pier chic Float and construction of the new Boat Slip
The pier and float renovation, and the new boat slip construction will utilize the
following materials: galvanized steel or aluminum hardware, and yellow cedar joists,
decking, trim, and posts. In addition,the existing float will be fitted with polyethylene
encapsulated Styrofoam®floats. The yellow cedar posts (6"x 6 ") will be affixed(using
hardware)to existing pilings and their concrete footing pads. The boat slip will utilize
existing pilings.
Mitigation Planting
Native vegetation will be planted in a ten by ten foot(10' x 20') area immediately
landward of the shoreline, where vegetation is currently lacking. The exact location of the
plantings and the 10' by 20' area will be at the applicants' discretion. Due to the potential
for the roots of trees and large shrubs to damage the bulkhead, especially during summer
drought conditions, it is recommended that any trees or large shrubs be installed at least
ten feet(10') landward of the bulkhead. At least 20 plants and five different species will
be installed. Planting will occur in the fall (after the cessation of drought conditions) or in
the early spring. Vegetation will be in one or two gallon pots, bare root, or harvested
from the site.
Recommended native species include: shore pine (Pinus contorta contorta), vine maple
(Acer circinatum), Pacific dogwood(Cornus nuttallii), Western yew(Taxus brevifolia),
mountain hemlock(Tsuga mertensiana), evergreen huckleberry(Vaccinium ovatum), red
huckleberry (Vaccinium parvifolium), mock orange (Philadelphia lewisii), Rhododendron
(Rhododendron macrophyllum), Western azalea(Rhododendron occidentale), Pacific
ninebark(Physocarpus capitatus), Indian plum (Oemleria cerasiformis), common
snowberry(Symphoricarpos albus), snowbrush(Ceanothus velutinus var. hookeri), salal
(Gaultheria shallon), Oregon-grape (Mahonia aquifolium, nervosa or repens),
Thimbleberry (Rubus parviflorus var.parviflorus), sword fern (Polystichum munitum),
deer fern(Blechnum spicant), kinnikinnick(Arctostaphylos uva-ursi), bleeding heart
Boggs Biological Evaluation 6
}
(Dicentra formosa), creeping dogwood (Cornu canadensis), and wild strawberry
(Frageria virginiana).
Additional plant species that are native to Wes ern Washington may be added to the
above list at the applicant's discretion.
2.2 Monitoring and Maintenance
The property owners will monitor and water any native vegetation plantings as needed
during dry months, until the vegetation has be ome established. Dead plants will be
replaced throughout the monitoring period. In asive, non-native vegetation will be
removed or cut back as necessary.
2.3 Timing
Work on the bulkhead repair and the pier and I loat renovation will be completed over an
approx. thirty (30) day period during daylight orking hours normal to a rural
neighborhood. Work will only take place whe the water level of Lake Cushman is low,
which is generally between October and April
2.4 Conservation Measures
1. No construction to occur unless Lae Cushman's waters are low.
2. An existing pier, including a jet ski ramp, will be reconfigured and downsized,
which will result in a decrease of o erwater coverage at the site from 1,050 sf
to 590 sf with an overall reduction f approx. 460 square feet. Replacement
beach access steps will be relocated one foot landward of the existing failing
steps.
3. No pressure treated lumber will be ' sed in this project. Sustainably harvested
Alaska yellow cedar, which is inse 't and decay resistant, will be utilized for
posts,joists, decking, and trim.
4. Concrete demolition will be comp, ted utilizing a sledgehammer(with the
hammer end)wrapped in a thick to wel for noise attenuation.
5. For the protection of marbled murr lets that may be nesting in the action area,
project activities will occur betweei two hours after sunrise and two hours
before sunset; suitable nesting hab'tat will not be removed.
Boggs Biological Evaluation 7
6. Construction to take place as per the HPA provisions from the Washington
Department of Fish and Wildlife.
7. Previously discussed BMPs to be strictly adhered to.
8. Native vegetation will be planted in a ten by ten foot(10' x 20')area
immediately landward of the shoreline, where vegetation is currently lacking.
(see Mitigation Planting)
2.5 Best Management Practices
In order to maintain the present water quality of Lake Cushman during project
construction, Best Management Practices (BMPs) will be implemented. BMPs are
defined as physical, structural, and/or managerial practices that prevent or reduce the
pollution of water(WDOE). The following source control BMPs, which are detailed in
the WDOE's Stormwater Management Manual for Western Washington, Volume II
Construction Stormwater Pollution Prevention (2012), will be implemented for long-term
protection of water quality at the site:
BMP C154: Concrete Washout Area
Purpose: Prevent or reduce the discharge of pollutants to stormwater from concrete waste
by conducting washout off-site, or performing on-site washout in a designated area to
prevent pollutants from entering surface waters or ground water.
Conditions of Use: Concrete washout area best management practices are implemented
on construction projects where:
*Concrete is used as a construction material.
•It is not possible to dispose of all concrete wastewater and washout off-site (ready
mix plant, etc.).
*Concrete trucks, pumpers, or other concrete coated equipment are washed on-site.
•Note: If less than 10 concrete trucks or pumpers need to be washed out on-site,the
wash water may be disposed of in a formed area awaiting concrete or an upland
disposal site where it will not contaminate surface or ground water. The upland
disposal site shall be at least 50 feet from sensitive areas such as storm drains,
open ditches, or water bodies, including wetlands.
•A temporary washout facility shall be constructed on-site or the concrete truck will be
washed out off-site.
*When temporary concrete washout facilities are no longer required for the work,the
hardened concrete, slurries and liquids shall be removed and properly disposed of.
*Materials used to construct temporary concrete washout facilities shall be removed from
the site of the work and disposed of or recycled.
Boggs Biological Evaluation 8
BMP C151: Concrete Handling
Purpose: Concrete work can generate process ater and slurry that contain fine particles
and high pH, both of which can violate water uality standards in the receiving water.
Concrete spillage or concrete discharge to surf ce waters of the State is prohibited. Use
this BMP to minimize and eliminate concrete, oncrete process water, and concrete slurry
from entering waters of the state.
Conditions of Use: Any time concrete is used,utilize these management practices.
•Wash out concrete truck chutes, pumps, a id internals into formed areas only. Assure
that washout of concrete trucks is perf rmed offsite or in designated concrete
washout areas. DO not wash out concri to trucks onto the ground, or into storm
drains, open ditches, streets, or stream
*Return unused concrete remaining in theruck and pump to the originating batch
plant for recycling. Do not dump exce concrete on site, except in designated
concrete washout areas.
*Wash off hand tools including,but not li ited to, screeds, shovels, rakes, floats, and
trowels into formed areas only. 7
*Wash equipment difficult to move in areas that do not directly drain to natural or
constructed stormwater conveyances. .
*Do not allow washdown from areas, such as concrete aggregate driveways, to drain
directly to natural or constructed storm ater conveyances (or Puget Sound).
•Contain washwater and leftover product i a a lined container when no formed areas
are available. Dispose of contained co rete in a manner that does not violate
ground water or surface water quality s andards.
•Always use forms or solid barriers for co crete pours, such a pilings, within 15-feet
of surface waters.
BMP C101: Preserving Natural Vegetation
Wherever practical, native vegetation shall be reserved to reduce erosion. Natural
vegetation should be preserved on steep slope,,, near perennial and intermittent
watercourses or swales, and on building sites 'a wooded areas.
BMP C233: Silt Fence
Silt fence may be used downslope of all distu ed areas. Silt fence shall prevent soil
carried by runoff water from going beneath, through, or over the top of the silt fence but
shall allow the water to pass through the fence,
Boggs Biological Evaluation 9
The following additional BMP shall be used to insure that water quality is not
degraded during and after construction:
1. Equipment will be cleaned and checked for leaks, offsite and daily, before
commencing work.
In addition, the following Spill Prevention Control measures shall also be followed: 1)
The applicant will supply the site with a portable bathroom or allow workers access to an
onsite bathroom so that solid or liquid waste will not become a source of stormwater
pollution. 2) The applicant will be responsible for alerting the appropriate authorities in
the event of a hazardous spill. 3) The applicant will have a spill kit and be able to
perform basic control, containment, and/or confinement operations within the capabilities
of the resources and personnel protective equipment available. In other words, small
spills, such as paint or oil, will be promptly and fully collected and disposed of at a
suitable disposal site. In the event of a significant spill, a fish kill, and/or if fish are
observed in distress the Washington State Department of Ecology (800.258.5990) and the
Washington State Department of Fish and Wildlife's Area Habitat Biologist, Joshua
Benton(360.602.0364), will be notified immediately.
3.0 Action Area
The action area is located on the shoreline of Lake Cushman at the proposed project site.
Besides the proposed project location,the action area includes the surrounding area
within a designated distance from the site in order to account for construction impacts
that may affect species listed under the Endangered Species Act by the U.S. Fish and
Wildlife Service and the National Marine Fisheries Service as either endangered or
threatened. The limits of the action area are based upon the geographic extent(in both
aquatic and terrestrial environments) of the physical, chemical, and biological effects
resulting from the proposed action, including direct and indirect effects, as well as effects
of interrelated and interdependent activities (WSDOT 2010). Turbidity and noise are
expected to be the most detrimental project effects. Because work will occur when Lake
Cushman is lowered, project turbidity is expected to be no greater than turbidity that is
common to the area during heavy rains, when various ephemeral and perennial streams
and the north fork of the Skokomish River discharge sediment laden water into Lake
Cushman. It is probable that the project's distance from the lake's lowered shoreline will
be great enough that disturbed sediments will disperse gradually(via precipitation) over
the exposed lakebed without ever reaching water until the lake is raised. Therefore,
terrestrial noise is expected to be the most far-reaching effect from the proposed repair of
the bulkhead's failing footing/steps and the reconfiguration/renovation of the pier and
float at the site.
The action area for terrestrial noise effects is based upon an ambient sound level of 40
dBA for an area with a population of less than 100 people per mile (WSDOT 2010). In
addition, the Olympic National Forest programmatic biological assessment uses an
Boggs Biological Evaluation 10
estimated ambient level of 40 dBA for undistu bed forested areas (USDI 2003). Noise
frequency and levels for the manual demolitioi L of the bulkhead's concrete steps and
footing are expected to be short term and mod rate (the latter, providing previously
discussed noise attenuating measures are adhe d to). Noise frequency and levels for the
manual excavation(with pick and shovel) of e footing is expected to be regular and
moderate during the project's initial constructs n phase.Noise from the sawing of the
footing forms and pier and float reconfiguration/renovation will be louder(assuming
noise from manual labor will be less than that of a circular saw) but intermittent and
short-term. Therefore, the sawing of lumber will produce the proposed project's
maximum noise level.
The noise level of a chain saw was used to asc rtain the noise level of a circular saw. The
noise level at 50 feet from a chain saw is 84 d A (WSDOT 2014). The noise level of a
chain saw at three feet is 110 dBA, while a cir ular saw is 100 dBA. Assuming that a
chain saw is between approx. five and ten perc ent noisier than a circular saw, the noise
level of a circular saw at fifty feet was assign 179 dBA (at fifty feet).
To determine the distance that the proposed p ' is maximum point source construction
noise will travel before it attenuates to the ambient sound level; the following Practical
Spreading Loss Model equation was used:
D =Do * 10((Construction Noise—Ambient Sound Level in dBA)/a) Where D =the
distance from the noise & Do=the reference measurement distance of 50'.
Average construction noise from the proposed project will travel approx. 3,970 feet over
hard site conditions (Lake Cushman) and 1,65 feet over soft site conditions (forested
areas) before it(the noise) attenuates to the an bient sound level. Therefore,the extent of
the action area is 3,970 feet or 0.75 mi. over t lake's surface and 1,656 feet or 0.31 mi.
inland from the proposed project site and adja ent shorelines (Attachment 1).
In addition, the action area includes several ur riamed fish-bearing streams that are
located approx. approx. 0.16, 0.46, 0.85 mi. t the southeast of the site. Numerous
ephemeral streams are located throughout the iction area.
4.0 ESA Species and Habitat Inf rmation
In the proposed project area, there are five species listed under the Endangered Species
Act by the U.S. Fish and Wildlife Service (U FWS) as either threatened or endangered.
The bull trout(Salvelinus confluentus), marbl d murrelet(Brachyramphus manmoratus),
northern spotted owl (Stridex occidentalis), st eaked horned lark(Enemophila alpestnis
strigata), and yellow-billed cuckoo (Coccyzus amenicanus) are listed as threatened and
critical habitat has been designated for the for er four species. The project area is located
on Lake Cushman, which has been designated critical habitat for the bull trout. Two other
species in the project area are listed as proposed. The fisher(Mantes pennanti) is listed as
Boggs Biological Evaluation 11
proposed threatened, and the Dolly Varden (Salvelinus malma) is listed as proposed
under the ESA "similarity of appearance"provision.
In the proposed project area, there is one species listed under the Endangered Species Act
by the National Marine Fisheries Service (NMFS) as either threatened, endangered, or a
candidate species. The Puget Sound Chinook salmon(Oncorhynchus tshawytscha) is
listed as threatened and critical habitat has been designated. Lake Cushman is a historical
watershed of the Chinook that has been anthropogenically blocked; however, it has been
designated critical habitat.
The Washington Department of Fish and Wildlife(WDFW) GIS maps reveal the
documented presence of two other species of salmonids on the State's Priority Habitat
and Species list within the action area: Kokanee (Oncorhynchus nerka) and the Puget
Sound/Coastal cutthroat trout(Oncorhynchus clarki clarki). The presence of these two
species has been documented in Lake Cushman. WDFW data reveals that Lake Cushman
was stocked with 23,896 cutthroat trout in 2005 and 205,800 Kokanee (landlocked
sockeye salmon) in 2004. A WDFW biologist reported that other species that inhabit the
lake include rainbow trout(Oncorhynchus mykiss) and non-native largemouth bass
(Micropterus salmoides).
Additionally, Tacoma Power is presently working in association with the Skokomish
Tribe and the WDFW to reestablish migrating salmonid runs in the North fork of the
Skokomish River. The North Fork Skokomish Powerhouse and Fish Facility has been
completed. This facility collects adult fish at the base of Cushman Dam No. 2 and
transports them to the top of the dam for sorting. It also provides sorting facilities for
juvenile fish and transports them to the base of the dam for release into the river. The fry
will be released in Lake Cushman, and smolts will be collected and released into the
lower North Fork Skokomish River. Returning adult sockeye will eventually be collected
at the base of Cushman Dam No. 2. Two new hatcheries are also under construction, one
on the Hood Canal at Potlatch for sockeye, the other on Lake Kokanee for Chinook,
coho, and steelhead. Hatchery construction is planned to be complete in 2015 (Tacoma
Public Utilities 2015).
4.1 ESA Listed Species
BULL TROUT
Bull trout are members of the char subgroup of the salmon family and are native to the
Pacific Northwest and western Canada. Water temperature above 15 degrees Celsius is
believed to limit bull trout distribution, as eggs and juveniles require extremely cold
water for survival. Bull trout are also vulnerable to degraded stream habitat, poor water
quality, dams and other stream blocking structures, and predation by non-native fish.
Critical habitat includes Lake Cushman and the upper North Fork of the Skokomish
River(70 FR 56304). Critical Habitat in the former includes spawning and rearing
Boggs Biological Evaluation 12
habitat,while the latter provides rearing, forag ng, and migration habitat, so it is expected
that bull trout may be found in the action area f the proposed project site.
MARBLED MURRELET
A small, diving seabird in the family Alcidae, he marbled murrelet forages for small fish
and invertebrates almost exclusively in nearsh re marine waters, while nesting inland in
old-growth or mature conifer forests. Threats i iclude loss of habitat, predation, gill-net
fishing operations, oil spills, marine pollution, and disease. The USFWS assembled a
team of scientists in October 2011 to investiga ie causes for the continued decline in
murrelet populations. The outcome of these di VO
ussions listed many factors, chiefly loss
of potential nesting habitat as the main reasonr hindrance of population recovery goals
(WDFW 2012).
Potential nest trees are coniferous trees within 5 mi (88.5 km) of marine waters that
support at least one 4-inch(10.2-cm) diameter platform located at least 33 feet(10
meters) above the ground, with horizontal and vertical cover(USFWS 2012). If a tree or
forested area does not support these habitat fe tures, it is "extremely unlikely"to support
a murrelet nest(USFWS 2012).Nest success i influenced by forest structure,the spatial
mix of habitat and non-habitat, human disturbnee,prey availability, and marine foraging
conditions. Human disturbance can lead to hig ier predation levels by Steller's and gray
jays, crows, ravens, and other species that seel human-related foods and refuse at high-
use recreational areas (Peery et al. 2004, Mar z uff and Neatherlin 2006).
Critical habitat for the marbled murrelet,whic i was designated in May of 1996 and
revised in October of 2011, is located within t e proposed project's action area to the
northwest of the project site; therefore, it mus be assumed that marbled murrelets may be
found nesting in the action area. State Route 1 9 is located between the project site, Lake
Cushman, and the marbled murrelets critical h ibitat, so it is expected that any marbled
murrelets nesting in the action area, will do so on the far side (north side) of the highway.
Additionally,the proposed project will not res Rlt in the loss of any trees or other
vegetation, and water quality at the site will bJ minimally impacted.
NORTHERN SPOTTED OWL
The Northern Spotted Owl is one of the larg4th
owls in North America, and the average
adult female is approximately 18 inches tall a 48-inch wingspan. Northern spotted
owls are strictly nocturnal, and require old-gwth forests with multi-layered canopies of
trees, including large trees with broken tops, deformed limbs, and large holes and cavities
to nest in. The Northern spotted owl is very to Titorial and intolerant of habitat
disturbance, and a pair requires a large amour of forest for hunting and nesting. Habitat
loss has occurred as a result of forest conversi n, timber harvest, fire, windthrow, insect
outbreak and disease (WDFW 2012).
Boggs Biological Evaluation 13
The USFWS designated revised critical habitat for the northern spotted owl under the
Endangered Species Act. In total, approximately 9,577,969 acres (ac) (3,876,064 hectares
(ha)) in 11 units and 60 subunits in California, Oregon, and Washington fall within the
boundaries of the 2 critical habitat designation. The action area includes designated
critical habitat for the Northern spotted owl; however, due to the close proximity of
human habitation, it is unlikely that any Northern spotted owls may be found in the action
area. Additionally, the proposed project will not result in the loss of any trees or shrubs.
STREAKED HORNED LARK
Horned larks are birds that utilize wide open spaces with no trees and few or no shrubs.
The streaked horned lark nests on the ground in sparsely vegetated sites dominated by
grasses and shrubs. Historically this type of habitat was found in prairies in western
Oregon and Washington, in dune habitats along the coast of Washington, on the sandy
beaches and spits along the Columbia and Willamette Rivers, and in grasslands, estuaries,
and sandy beaches in British Columbia(WDFW 2012). Today the streaked horned lark
nests in a broad range of habitats, including native prairies, coastal dunes, fallow and
active agricultural fields, wetland mudflats, sparsely-vegetated edges of grass fields,
recently planted Christmas tree farms with extensive bare ground, moderately-to heavily-
grazed pastures, gravel roads or gravel shoulders of lightly-traveled roads, airports, and
dredge deposition sites in the lower Columbia River (WDFW 2012).
It is expected that the action area contains unsuitable habitat for the streaked horned lark.
YELLOW-BILLED CUCKOO
The yellow-billed cuckoo (Coccyzus americanus) is a neotropical migrant bird that
winters in South America and breeds in western North America. The yellow-billed
cuckoo is insectivorous and lives in riparian woodlands (USFWS 2014). Reports of
individual cuckoos have been very rare in recent decades,with only three known reports
since 2000, these being near Lind(Adams Co.) in 2001, near Eureka(Walla Walla Co.)
in June 2007, and from Little Pend Oreille National Wildlife Refuge (Stevens Co.) in
June 2012. Habitat loss and pesticide use are thought to be two of the main causes for the
precipitous decline of western yellow-billed cuckoos. Agriculture, grazing, reservoir
construction, flood control, urbanization, and other factors across the West have caused
the large-scale loss and degradation of lowland riparian forest, which is the cuckoo's
primary habitat.
It is expected that the action area contains unsuitable habitat for the yellow-billed cuckoo.
CHINOOK SALMON
Chinook salmon in Lake Cushman are a land-locked population that originated from
anadromous fish, although loss of genetic variation makes it difficult to determine
Boggs Biological Evaluation 14
whether they are descended from historical Ho d Canal populations or introduced
hatchery fish(NOAA 2006). Lake Cushman C iinook are genetically different, smaller in
size (and presumably less fecund)than their ari idromous counterparts (Myers et al.
1998). On Jan. 12,2009,Tacoma Power,the Sko mish Tribal Nation and state and federal
agencies signed a settlement agreement that reaAved a$5.8 billion damages claim and
long-standing disputes over the terms of a Ion term license for Cushman Hydroelectric
Project. Tacoma Power has proposed to introd cc sockeye and spring Chinook and
enhance the existing winter steelhead and cohq populations in the North Fork in
cooperation with the WDFW and the Skokomi�h Tribe (Tacoma Public Utilities 2014). In
addition, Tacoma Power will annually release up to 100,000 rainbow trout for sport
harvest(TPU 2014).
Lake Cushman has been designated Critical ha I bitat, and the site provides rearing,
foraging, and migration habitat, so it is expect that adult and/or juvenile Chinook
salmon may be found in the action area.
5.0 Environmental Baseline Conditions
5.1 Action Area
The environmental baseline represents the exi ing set of conditions, to which the effects
of the proposed action are then added. The en ronmental baseline is defined as "the past
and present impacts of all Federal, state, and p 'ivate actions and other human activities in
the action area, the anticipated impacts of all p-oposed Federal projects in the action area
that have already undergone formal or informe I section 7 consultation, and the impact of
state or private actions which are contemporan-1ous with the consultation process" (50
CFR 402.02). The proposed project site is in RIA 16 on Lake Cushman in Mason
County. The majority of the fresh and marine aterbodies in WRIA 16 suffer from water
quality issues; however, Lake Cushman is not isted on the state's 2012 Water Quality
303(d) list of impaired waterbodies for any pa ' meters. Two waterbodies in the
Skokomish watershed, the South Fork of the S cokomish River and Lebar Creek are listed
for the parameter of temperature (high).
The proposed project site is located in a rural i eighborhood on a lot with approximately
65' of frontage on Lake Cushman, in an area cassified as an Urban Residential shoreline
environment by the Shoreline Master Progra of Mason County. Neighboring parcels
support single-family residences (or recreatio I cabins), bulkheads, piers, and floats.
Forested land in the vicinity of Lake Cushman has been logged heavily. Erosion impacts
from surface flows have been particularly darr aging in the logged areas above the lake's
west shore.
Before the completion of two dams in 1926 1930, Lake Cushman was a natural
oligotrophic lake with a mean depth of 200 fe t. Now Lake Cushman is 4,010-acre water
body in the Olympic National Forest,having en altered in size to accommodate the
hydroelectric dams. Because of the dams, water levels in Lake Cushman can fluctuate up
to 21 meters (69 feet), with peak levels occurring during summer and minimum levels
Boggs Biological Evaluation 15
during winter. The magnitude of these fluctuations results in periodic inundation of 12
hectares (30 acres) of land surrounding the inlet to the reservoir, resulting in high water
temperatures in the shallow waters of the inlet during the summer months (Brenkman
1998). Currently, the reservoir inundates 17.2 kilometers(10.7 miles)of river, including
areas of the original Lake Cushman(Brenkman 1998).
5.2 Proposed Project Area
Field investigations were conducted on the afternoons of October 1"and November 24th
of 2015. The project area was surveyed visually on foot on both occasions. The elevation
of the lake's water level was approx. 726 feet, which is approx. 12 feet lower than the
current ordinary high water mark of 738 feet. Site photographs included in this report
were taken during the October field investigation.
The site supports a single-family residence located approximately 15 feet vertically and
65 feet horizontally from the shoreline of Lake Cushman. The lot is moderately vegetated
with native vegetation and supports about a dozen medium to large conifers. The
shoreline is accessed via a wide lineal path located along the north property line. The
lake's beach is accessed via concrete steps inset into the bulkhead. The steps that extend
onto the beach are failing.
The slope of the beach is moderate in the vicinity of the bulkhead, and the substrate
consists primarily of sand, gravel, clay, and cobble. The shoreline of Lake Cushman at
the site is exposed to significant fetch. Wave action has exposed the rock and concrete
bulkhead's concrete footing, which appears to have been constructed rather
unsubstantially without forms or a subgrade placement. The pier was constructed on top
of the bulkhead and is supported by pressure treated lumber posts bolted onto poured
concrete footings. The float rests on two concrete pads that support two float positioning
pilings.
The decomposing head of a juvenile (parr) salmonid was observed on the beach. No other
fish, invertebrates, or macroalgae were observed.
6.0 Effects of the Action
6.1 Direct Effects
Direct effects to the shoreline include: 1) Loss of benthic habitat from the repair of the
existing bulkhead's footing and steps. 2) Creation of shade from the reconfigured pier
and renovated float. 3) Contamination to Lake Cushman from the leaching of wood
preservatives. 4) The prevention of Styrofoam®pollution.
Boggs Biological Evaluation 16
1)As per the engineered design by P.E. Alan I ahja(Attachments 2-7),the existing,
approx. 65' rock and concrete bulkhead will h e the entire length of its failing footing
reinforced with new concrete. The existing cor crete beach access steps will be replaced
with new concrete steps that will terminate on -foot(1') landward of the existing steps;
therefore,the proposed replacement steps will kcupy approx. three sf less benthic habitat
than the existing steps. In addition,the existin failed steps that are scattered over the
upper beach will be removed from the site.
The footprint of the repaired footing will be to ated landward of the existing failing
footing for approx. thirty feet at the bulkhead' south end and (approx. 2')waterward of
the footing for the remaining approx. thirty-fi feet. The footprint of the replacement
footing will be installed subgrade,to a depth o three feet, where the footprint of the
existing, poorly constructed footing was never nstalled. The new footing will occupy
approx. 130 sf of benthic habitat. Due to the s sonal fluctuations of the lake's water
level, it is probable that benthic species do not hrive in the nearshore areas of the lake
that lack permanent water.No empirical evide ce was found to document if both
terrestrial and aquatic species utilize the upper shoreline habitat, or if it has been too
altered to support normal concentrations of eit er species.
2) Another direct effect is the creation of shady from the reconfigured pier and the
renovated float. The overwater structures at th site produce a reduction in light to the
underlying aquatic environment by creating a 'ght/dark boundary that may give
piscivorous species an advantage over their pr y. The use of over-water structures in
western Washington waters by bass, a commo i, non-native predator of juvenile
salmonids,has been documented by several a hors. Largemouth bass in Lake
Washington prefer areas of heavy log and bru cover over other habitat types; however,
they are commonly found under docks in earl spring and are thought to be present until
late summer(Stein 1970). Substrate type typi lly determines the acceptability of an area
for bass spawning,but adjacent cover and stru tural complexity are also necessary for
protection while the fish are concentrated in s How water(Stein 1970; Cooper and
Crowder 1979; Helfman 1981b; Pflug and Pa ey 1984). The substrate type in the
vicinity of the bulkhead and landing is gravel, obble, and rock. Largemouth bass prefer
moderate to dense vegetation and silt or sand ubstrate, and nests are constructed at
depths from 0.6 to 1.5 meters, in vegetated are s with soft sediment or gravel substrate on
moderate to steep slopes (Pflug 1981). The pr 'ect site possesses unsuitable habitat for
bass, so it is doubtful that the proposed float r air will increase the concentration of bass
at the site or the occurrence of juvenile salmoi id predation by bass. The project site
supports no existing macrophyte vegetation aild has no potential to support macrophyte
vegetation, due to the lake's (anthropogenic) seasonal water fluctuations. In addition,
White (1975) determined that phytoplankton primary production is not significantly
reduced by narrow residential piers, due to the presence of more optimal light conditions
than found in surface waters, where light inter ities are higher than those in which algae
thrive.
Data suggests that other fish species, includinj I salmonids, are also attracted to the shade
produced by over-water structures, so it is pos ible that adult salmonids could prey on
Boggs Biological Evaluation 17
juveniles at the site. However, researchers have indicated that structural complexity can
moderate predator-prey interactions by providing more refuges for prey species as well as
reducing the foraging efficiency of the predator(Cooper and Crowder 1979). This
moderation may apply to naturally occurring structural habitat complexity, as well as
habitat complexity due to the presence of docks,piers, boathouses and associated pilings
(WDFW, WDOE, WSDOT 2001).
Shade can also affect migrating salmonids. It is not known whether over-water structures
disrupt the migration of salmonids in lakes. Numerous studies suggest that docks,piers,
and floats attract fish, and that the attraction of fish is linked to shade produced by the
object not tactile stimulus. While the effects of shade on migrating juvenile salmonids in
lakes is unknown, it is also unclear in marine waters, and there is no empirical evidence
of mortality. The significance of predation to migrating populations has never been
empirically assessed (Simenstad et al. 1999). No studies have examined mortality due to
predation much less that mortality is attributable to overwater structures (Nightingale &
Simenstad 2001).
As previously noted, the proposed project will result in a significant reduction of
overwater structure coverage at the site from 1,050 to 590 square feet. In conclusion,
shade created by the proposed project is expected to have discountable and insignificant
direct effects on ESA listed salmonids that may be in the action area.
3) The leaching of wood preservatives is a common contaminant-related issue with the
construction of shoreline SFR appurtenances. As previously note, no pressure treated
lumber will be used in this project. Sustainably harvested Alaska yellow cedar, which is
insect and decay resistant, will be utilized for posts,joists, decking, and trim.
4) The proposed replacement of the float's exposed Styrofoam® float material with
polyethylene encapsulated Styrofoam®floats is expected to prevent the structure from
becoming an eventual source of pollution to Lake Cushman. Expanded polystyrene foam
(EPS), commonly known by the trade name of as Styrofoam® is pervasive in the marine
environment(CWAC 2008). Polystyrene is made from petroleum and is not
biodegradable. Polystyrene is a principle component of urban litter and marine debris,
and it is detrimental to wildlife that ingests it (Harvard University 2008). Polystyrene is
lightweight and floats. It eventually breaks down into smaller and smaller pieces that fish
and other wildlife mistake for food and consume. The lifetime of plastics in the marine
environment is unknown. Some researchers feel that the composition of conventional
petroleum-based plastics as durable polymers means they will degrade to increasingly
smaller sizes but never disappear(CWAC 2008).
In conclusion, the replacement of the existing un-encapsulated float material with
encapsulated floats is expected to have a beneficial impact.
Temporary Direct Effects
Boggs Biological Evaluation 18
Temporary direct effects caused by the propos d project include: 1) Turbidity and
sedimentation in Lake Cushman. 2)Noise. 3) Water pollution from incidental release of
fuel, oil, or other contaminants.
1) Disturbed substrate from the installation of the replacement footing and steps may
result in increased turbidity and sedinic ritation. As previously discussed, BMPs
will be strictly adhered to during constj uction in order to maintain the present
water quality of Lake Cushman and pr(vent runoff and pollution. In addition,the
proposed project will take place when e water level in the lake is much lower
than the OHWM (738'), so it is probab e that rainfall will slowly disperse any
disturbed substrate before it comes intc direct contact with the lake's waters.
Therefore, it is expected that turbidity nd sedimentation will be minimal.
2) The main source of construction noise v ill be from the sawing of lumber for the
concrete forms (for the bulkhead footir g and beach access steps) and the wood
components of the reconfigured pier ar.J renovated float. Noise will be
intermittent and is expected to be a ma imum of 79 dBA at 50 feet.
3) Potential water pollution from accidentef release of fuel, oil, or other contaminants
is another possible temporary direct effect. As previously discussed, Spill
Prevention Control measures and 13MPs shall be implemented during the
proposed project.
6.2 Primary Constituent Elemen s
PRIMARY CONSTITUENT ELEMENTS
In order to properly analyze the effects on desi irnated critical habitat, a logical framework
must be utilized. In determining what areas ar critical habitat, agency regulations require
the NMFS to focus on the principal biological Dr physical constituent elements that are
essential to the conservation of the species. T regulations identify Primary Constituent
elements (PCEs) as including, but not limited o: "roost sites, nesting grounds, spawning
sites, feeding sites, seasonal wetland or drylan , water quality or quantity, host species or
plant pollinator, geological formation,vegetat on type,tide, and specific soil types (69
FR 71888)." In 2003 NMFS biologists developed a list of PCEs specific to salmon, based
on a decision matrix(NMFS, 1996)that descr bes general parameters and characteristics
of most of the essential features under consid ation when critical habitat is designated.
There are six specific types of sites essential t support one or more life stages of an ESU
(sites for spawning,rearing, migration, and f6i aging). Each site names physical or
biological features (PCEs) essential to the coit-
rvation of salmonids. In 2010, USFWS
biologists developed a list of PCEs specific toull trout,based on a decision matrix
(NMFS, 1996)that describes general paramets and characteristics of most of the
essential features under consideration when cical habitat is designated. Lakes and
reservoirs figure prominently in meeting the li -cycle requirements of adfluvial bull
trout. Lake Cushman is designated critical ha tat for the bull trout and the Chinook
Boggs Biological Evaluation 19
salmon; therefore, the direct effects on the designated critical habitat of bull trout and
Chinook salmon have been analyzed using the appropriate PCEs for the nearshore
lacustrine environment.
BULL TROUT PCEs:
Water temperatures that support bull trout use. Bull trout have been documented in
streams with temperatures from 32 to 72 degrees F but are found more frequently in
temperatures ranging from 36 to 59 degrees F--the project will have no direct effect on
water temperatures that support bull trout use.
Migratory corridors with minimal physical, biological, or water quality impediments
between spawning, rearing, overwintering, and foraging habitats, including
intermittent or seasonal barriers induced by high water temperatures or low flows—
the project will have no direct effect on migratory corridors that support bull trout use.
Passage will not be altered during construction as no construction will occur unless the
waters of Lake Cushman are low.
An abundant food base including terrestrial organisms of riparian origin, and aquatic
macroinvertebrates the project is expected to have a minimal direct effect on an
abundant food base for bull trout. Construction will take place when the lake's waters are
lowered and overwater coverage will be reduced by approx. 460 square feet.
Permanent water of sufficient quantity and quality such that normal reproduction,
growth, and survival are not inhibited--the project is expected to have a minimal direct
effect on water quality. Project construction is unlikely to cause temporary turbidity or
sedimentation as work will occur when the lake's waters have been lowered. BMPs are
expected to prevent or moderate potential water pollution during construction. No
pressure treated lumber will be used, and un-encapsulated Styrofoam® float material that
is a potential source of water pollution will be replaced with encapsulated floats.
CHINOOK SALMON PCEs:
Unobstructed passage passage will not be altered during construction as no
construction will occur unless the waters of Lake Cushman are low.
Water Quality—project construction is unlikely to cause temporary turbidity or
sedimentation. BMPs are expected to prevent or moderate potential water pollution
during construction.No pressure treated lumber will be used, and un-encapsulated
Styrofoam® float material that is a potential source of water pollution will be replaced
with encapsulated floats.
Water Quantity—the project will have no effect on water quantity.
Boggs Biological Evaluation 20
i
Forage—reduction in overwater coverage ma decrease foraging opportunities for adult
salmonids.
Natural Cover—the project will have no direc effect on natural cover.
6.3 Direct Effects to ESA Listed Species
The direct effect from the proposed project to other ESA listed species that are likely to
be found in the action area have been analyzed as follows:
NORTHERNSPOTTED OWL
Due to the close proximity of human habitatio and the small size of the action area, it is
unlikely that any Northern spotted owls may b found in the action area of the proposed
project site. However,the absence of spotted is in the action area is not a certainty.
While proposed project construction may occ between March 1st and September 30th,
which is the nesting season of Northern spotte owls,the following noise threshold
guidelines will be followed to ensure minimal isturbance during project construction:
*The proposed project will not remove dis ersal habitat and will be at least 0.25 mi.
(for noise-generating activities besides lasting) from northern spotted owl
suitable habitat (nesting, roosting, fora ing:NRF).
Note: The rural neighborhood where the site i located extends approx. 1.5 mi. south of
the proposed project site, 0.10 mi. north to Sta e Route 119, and 0.15 mi. northwest.
Beyond the northwest boundary of the neighborhood, SR 119 is located less than 0.08 mi.
from the shoreline of Lake Cushman for apprc k. three miles, heading toward the
Staircase recreation area. With the extensive a reage of undeveloped forest land nearby,
it seems unlikely that Northern spotted owls A ill be nesting, roosting, or foraging in the
vicinity of anthropogenic development.
MARBLED MURRELET
The primary threats to marbled murrelet from inthropogenic activities include loss of
nesting habitat, gill-net fishing operations, oil pills, and marine pollution. Previously
noted BMPs and Spill Prevention Control Me sures will be adhered to during project
construction to protect the water quality of L e Cushman.Noise impacts to any nesting
or foraging murrelets in the action area are extelet
cted to be negligible, although .
construction may occur during the marbled m nesting season between April 1
through September 23rd. To ensure minimal disturbance to any marbled murrelets that
may be nesting in the action area,the followi noise threshold guidelines will be
followed during project construction:
Boggs Biological Evaluation 21
*Project activities will occur between two hours after sunrise and two hours before
sunset.
•Suitable nesting habitat will not be removed.
Note: The rural neighborhood where the site is located extends approx. 1.5 mi. south of
the proposed project site, 0.10 mi. north to State Route 119, and 0.15 mi. northwest.
Beyond the northwest boundary of the neighborhood, SR 119 is located less than 0.08 mi.
from the shoreline of Lake Cushman for approx. three miles, heading toward the
Staircase recreation area. With the extensive acreage of undeveloped forest land nearby,
it seems unlikely that marbled murrelet will be nesting, roosting, or foraging in the
vicinity of anthropogenic development.
6.4 Indirect Effects
Indirect effects are those effects that are caused by or will result from the proposed action
and are later in time, but are still reasonably certain to occur(50 CFR 402.02). Possible
indirect effects from the proposed project include: 1)The loss of shoreline aquatic
vegetation. 2) The repaired bulkhead footing exacerbates passive erosion to the shoreline.
3) The repaired bulkhead footing causes a reduction in the accumulation of large drift
logs on the beach. 4) The renovated pier and float result in an increased motorized boat
presence at the site.
1) The reconfigured pier and renovated float will cause a reduction in light to the
underlying aquatic environment, which can have significant impacts on the health and
productivity of both native and non-native macrophytes and algae. Macrophytes and
algae are the foundation for most freshwater food webs and their presence or absence
affects many higher trophic levels (NMFS 2004). It is expected that the impact of the
lake's fluctuating water level on littoral productivity will overshadow the impacts of
shading from the pier and float at the site. In addition, the proposed project will result in a
reduction of overwater coverage at the site of approx. 460 square feet.
2) When waves reflect off shoreline armoring structures, particularly concrete or other
types of flat-faced bulkheads, they can cause scouring and hardening of the substrate and
steepening of the beach. The sediment in front of a bulkhead will gradually become
coarser as wave action and littoral drift removes the finer sediment and there is no
sediment available for replenishment because it is impounded behind the bulkhead
(Macdonald et al. 1994). Hard-armored bulkheads cut off sediment that was once
available to feed the beach, thus adversely affecting natural beach-forming processes.
The shoreline at the site is already unnaturally steep due to the lake's manmade origin.
Accordingly,the steepness has caused significant scouring and erosion, as there is no
shallow foreshore to diminish the energy from incoming wind waves. Any beach feeding
sediments are carried away to deeper water. The proposed replacement footing is not
Boggs Biological Evaluation 22
expected to minimize scouring and steepening f the beach. A small amount of excavated
sediments will be utilized in the project to fill 1i holes or depressions after the bulkhead
footing forms are removed, but the majority(o excavated sediments)will be removed
from the shoreline following the project's co letion, as Tacoma Power does not allow
excavated sediments to be spread over the sho line at Lake Cushman.
Referenced materials for this report primarily dssess bulkhead impacts to marine
shorelines and, in particular, Puget Sound. Wh le some impacts are applicable to lake
shorelines, beach feeding/forming processes a pear to differ significantly and be site
specific. On Lake Cushman, a lake whose sho lines lack water for roughly six months
each year, it seems counterproductive to consi er beach feeding a positive habitat process
as the lake was significantly enlarged to accon modate two hydroelectric dams (that
produce environmentally friendly electric po r free of carbon emissions).
3) Shoreline armoring can also limit the accun ulation of large drift logs on the beach, as
large woody debris is less likely to accumulatc on beaches that have steepened due to the
presence of a bulkhead(Macdonald et al. 199 ). Large woody debris (LWD)provides
detrital input, food sources, and potential refu for migrating juvenile salmon. Due to
the moderate number of power boats that utili the lake in the vicinity of the proposed
project site, it is not safe to recommend anchoi ing LWD to the beach.Nor is it allowed
by Tacoma Power. In addition,there are nume ous existing stumps along the shoreline
throughout the lake.
4) The reconfigured pier and renovated float ay result in an increased motorized boat
presence in the area. Fuel spills from powerbo is can contaminate water quality and
potentially affect listed salmonids directly or i directly through their prey source (NMFS
2005). Powerboats also create amplified wavc action that can erode the shoreline, and
prop scouring can erode benthic habitat, although benthic habitat in the littoral zone is
already significantly marginalized by the lakelay
fluctuating water levels. Powerboats also
provide some oxygenation of surface waters, hough the extent is probably negligible at
best. Overall,the indirect effects of powerbousage on Lake Cushman is likely
insignificant due to the lake's large size,the sall number of boats that access the remote
lake, and the short boating season(primarily thru September).
6.5 Primary Constituent Elemen s
PRIMARY CONSTITUENT ELEMENTS
The indirect effects on the designated critical I iabitat of Bull trout and Puget Sound
Chinook have been analyzed using the appropriate PCEs for the nearshore lacustrine
environment.
Boggs Biological Evaluation 23
BULL TROUT PCEs:
Water temperatures that support bull trout use. Bull trout have been documented in
streams with temperatures from 32 to 72 degrees F but are found more frequently in
temperatures rangingfrom 36 to 59 degrees F--the project will have no indirect effect
on water temperatures that support bull trout use.
Migratory corridors with minimal physical, biological, or water quality impediments
between spawning, rearing, overwintering, and foraging habitats, including
intermittent or seasonal barriers induced by high water temperatures or low flows—the
project will have no indirect effect on migratory corridors that support bull trout use.
An abundant food base including terrestrial organisms of riparian origin, aquatic
macroinvertebrates, and forage fish--mitigation plantings may eventually provide leaf
matter and insects for aquatic life in Lake Cushman, improving foraging opportunities for
bull trout.
Permanent water of sufficient quantity and quality such that normal reproduction,
growth, and survival are not inhibited—The use of yellow cedar(rather than pressure
treated lumber) and encapsulated float material are expected to improve water quality.
CHINOOK SALMON PCEs:
Unobstructed passage the project will not have any indirect effect on unobstructed
passage.
Water Quality—the project will benefit water quality (see bull trout).
Water Quantity the project will not have any indirect effect on water quantity.
Forage—mitigation plantings may eventually provide leaf matter and insects for aquatic
life in Lake Cushman, improving foraging opportunities for Chinook.
Natural Cover—the project will not have any indirect effect on natural cover.
6.6 Indirect Effects to ESA Listed Species
The indirect effects from the proposed project to other ESA listed species that are likely
to be found in the action area have been analyzed as follows:
NORTHERN SPOTTED OWL & MARBLED MURRELET
Boggs Biological Evaluation 24
While it is highly unlikely that either species A ould nest in trees that are located in a rural
neighborhood,the proposed project may result in increased recreational usage at the site,
which could prompt both species to nest elsewl iere.
6.7Interrelated/Interdependent I ffects
Interrelated and interdependent effects are des ibed as the effects of the action under
consultation analyzed together with the effects of other activities that are interrelated to,
or interdependent with,that action. An interrel ted activity is an activity that is part of the
proposed action and depends on the proposed ction for its justification. An
interdependent activity is an activity that has n independent utility apart from the action
under consultation(FWS &NMFS 1998). The'project will have no obvious interrelated
or interdependent effects.
6.8 Primary Constituent Elements
BULL TROUT PCEs:
Water temperatures that support bull trout u5 e. Bull trout have been documented in
streams with temperatures from 32 to 72 deg es F but are found more frequently in
temperatures ranging from 36 to 59 degrees J 7--the project will have no interrelated or
interdependent effects on water temperatures t iat support bull trout use.
Migratory corridors with minimal physical, b ological, or water quality impediments
between spawning, rearing, overwintering, a d foraging habitats, including
intermittent or seasonal barriers induced by igh water temperatures or low flows—the
project will have no interrelated or interdepen ent effects on migratory corridors that
support bull trout use.
An abundant food base including terrestrial organisms of riparian origin, aquatic
macroinvertebrates, and forage fish--the proj ct will have no interrelated or
interdependent effects on the bull trout's food :)ase.
Permanent water of sufficient quantity and ality such that normal reproduction,
growth, and survival are not inhibited--the p ject will have no interrelated or
interdependent effects on water supply or qua ty.
CHINOOK SALMON PCEs:
Unobstructed passage—the project will have io interrelated or interdependent effects on
unobstructed passage.
Boggs Biological Evaluation 25
Water Quality—the project will have no interrelated or interdependent effects on
unobstructed passage.
Water Quantity the project will have no interrelated or interdependent effects on water
quantity.
Forage the project will have no interrelated or interdependent effects on water quantity.
Natural Cover—the project will have no interrelated or interdependent effects on natural cover.
6.9 Cumulative Effects
Cumulative effects are defined as "those effects of future state or private activities, not
involving Federal activities, that are reasonably certain to occur within the action area of
the action subject to consultation"(50 CFR 402.02). Cumulative impacts are difficult to
access. Continued growth and urbanization is likely to detrimentally impact fish and
wildlife resources. Global warming could raise the water level of Puget Sound, leaving
many waterfront properties underwater. Global warming could also result in warmer
water temperatures, to the detriment of species such as bull trout. Additionally, over-
fishing may deplete stocks of salmon, even as restoration of habitat in the watershed
furthers their likelihood of survival.
7.0 Conclusion
7.1 Take Analysis
Section 9 of the ESA prohibits take of endangered or threatened species, "take"being
defined in Section 3 as to harass, harm, pursue, hunt, shoot, wound, trap, capture, or
collect listed species, or attempt to engage in any such conduct. "Harm" is further defined
as a significant habitat modification or degradation that actually kills or injures listed
species by"significantly impairing behavioral patterns such as breeding, spawning,
rearing, migrating, feeding, and sheltering" (50 CFR 222.102). "Harass" is further
defined as an intentional or negligent act which creates the likelihood of injury to wildlife
by annoying it to such an extent as to significantly disrupt normal behavior patterns
which include, but are not limited to, breeding, feeding, or sheltering (50 CFR 17.3). In
regards to the proposed project and the existing development activities, it is extremely
unlikely that any"take"will occur. Previously listed conservation measures will further
insure the likelihood that no "take" will occur.
Boggs Biological Evaluation 26
7.2 Determination of Effect
A determination of May affect, not likely to ad ersely affect is the appropriate conclusion
when effects on the species or their critical hat itat are expected to be beneficial,
discountable, or insignificant. After reviewing he appropriate data and survey
information, I have concluded that the propose I project will have an insignificant impact
on the previously discussed Endangered or Tlu atened species if the previously discussed
conservation measures are implemented. In m3 most honest and professional opinion,
while the proposed project may impact individ ial Endangered or Threatened species in
the project area, it is not likely to adversely of ct or jeopardize the continued existence
of those species or their designated Critical H itat. The determination of effect for each
of the listed species is:
1. Bull trout and their designated Critical abitat—May affect, not likely to
adversely affect.
2. Chinook salmon--May affect, not likely to adversely affect.
3. Marbled murrelet May affect, not lik y to adversely affect.
4. Northern spotted owl—No effect.
5. Streaked horned lark---No effect.
6. Yellow-billed cuckoo No effect.
Boggs Biological Evaluation 27
8.0 References
Literature
Federal Register/Vol. 70,No. 170/September 2, 2005/Rules and Regulations
Federal Register/Vol. 70, No.185 /September 26, 2005/Rules and Regulations
Federal Register/Vol. 71, No. 176 /Tuesday, September 12, 2006/Proposed Rules
Federal Register/Vol. 75, No. 200/October 18, 2010/Rules and Regulations
Federal Register/77 FR 14062/March 8, 2012/Proposed Rules
Federal Register/Vol. 77,No. 106/June 1, 2012/Proposed Rules
Federal Register/Vol. 76, No. 193/October 5, 2011/Rules and Regulations
Google Earth. 2013. Aerial Imagery. Internet report. URL:
https://www.gooizle.com/earth/
Johannessen, J., A. MacLennan, A. Blue, J. Waggoner, S. Williams, W. Gerstel, R.
Barnard, R. Carman, and H. Shipman. 2014. Marine Shoreline Design Guidelines.
Washington Department of Fish and Wildlife, Olympia, Washington.
Kleinschmidt.2012. Shoreline Management Plan, Cushman Project, FERC Project
Number 460. Tacoma Power, Tacoma Washington.
Leigh, Michael. 1996. Grow your own native landscape: a guide to identifying,
propagating, and landscaping with Western Washington native plants. Washington State
University Cooperative Extension/Thurston County, Olympia, WA.
National Geographic. 2002. Field Guide to the Birds of North America. National
Geographic Society, Washington, D.C. pg. 226, 244, 250, & 320.
National Marine Fisheries Service. 2014. Distribution of Threatened and Endangered
Species. Internet report. URL: http://www.nwr.noaa.gov
NOAA. 2014. Endangered and Threatened Marine Species. Internet report. URL:
http://www.mnfs.noaa.goy/pr/species/esa/
Boggs Biological Evaluation 28
Skokomish Indian Tribe & Washington Depart ent of Fish and Wildlife. 2010.
Recovery Plan for Skokomish River Chinook almon. Internet Report. URL:
htt ://hccc.wa. ov/Downloads/Downloads Ge File.as x?id=397519&fd=0
Tacoma Public Utilities. 2014. Cushman Hydri P Project. Internet report. URL:
https://www.mMu.org/tacomgpower/about-ta oma- ower/dams- ower-sources/h dro-
power/cushman-hydro-pro j ect/
Tacoma Public Utilities. 2015. Cushman Fish 'ies Program. Internet report. URL:
http://www.m3lpu.org/tacomapower/fish-wild]Ife-environment/cushman-h dro-
proj ect/cushman-fisheries-pro gram.htm
U.S. Fish and Wildlife Service. 1997. Recover r Plan for the Threatened Marbled
Murrelet in Washington, Oregon, and Californ a. Published by USFWS, Portland, OR.
URL: http://ecos.fws.gov/docs/recovery lans 1997/970924. df
U.S. Fish and Wildlife Service. 2004. Draft R overy Plan for the Coastal-Puget
Sound Distinct Population Segment of Bull Tr ut(Salvelinus confluentus). Volume Il (of
Il): Olympic Peninsula Management Unit.
Portland, Oregon. 277 +xvi pp
U.S. Fish and Wildlife Service. 2011. Species 3rofile, Marbled Murrelet. Internet report.
URL: http://www.fws.gov/arcata/es/birds/Mn-v m murrelet.html
U.S. Fish and Wildlife Service. 2012. Guidan for Identifying Marbled Murrelet Nest
Trees in Washington State. Internet report. U .
htt ://www.wsdot.wa. ov/NR/rdonl res/2D97 3D8-D448-43A7-8249-
E2319095 C 8 C2/0/MAMUhabitatF W S.pdf
U.S. Fish and Wildlife Service. 2012. Marble Murrelet Nesting Season and Analytical
Framework for Section 7 Consultation in Was ington. Internet report. URL:
htt ://www.wsdot.wa. ov/NR/rdonl res/F384 D4F-BF1C-476C-8E9D-
A45A715B624C/0/CoverLtrNestin Season.
U.S. Fish and Wildlife Service. 2013. Conduc ing Masking Analysis for Marbled
Murrelets and Pile Driving Projects. Internet r port. URL:
htt ://www.wsdot.wa. ov/NR/rdonl res/3506 AAA-4B13-4E1B-855D-
36E047E07090/0/MAMU MaskAnalysis.pdf
U.S. Fish and Wildlife Service. 2015. Official Species List#01EWFW00-2016-SLI-
0184. Internet report. URL: http://www.fws. v/wafwo/
U.S. Fish and Wildlife Service. 2014. Species act sheet, Streaked Horned Lark,
Eremophila alpestris strigata. Internet report.
URL: http://www.fws.gov/wafwo/species/Fac %20sheets/streakedhornedlarkfinal.pdf
Boggs Biological Evaluation 29
Washington State Department of Ecology. 2012. 2012 Water Quality Assessment 303(d)
List: Skokomish/Dosewallips Water Resource Inventory Area(WRIA 16). Internet
report. URL: http://www.ecy.wa.gov/programs/wq/303d/currentassessmt.html
Washington State Department of Ecology. 2012. 2012 Stormwater Management Manual
for Western Washington. Internet report. URL:
https:Hfortress.wa.gov/ecy/Publications/SummaryPages/I 410055.html
Washington State Department of Natural Resources. 2014. FPARS ARCIMS mapping
application. Internet report: URL: http://fortress.wa.gov/dnr/appl/fpars/viewer.htm
Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List.
Olympia, Washington. 177 pp.
Washington Department of Fish and Wildlife. 2012. Annual Report: Marbled Murrelet.
Internet report. URL:
http://wdfw.wa.gov/conservation/endan e� red/species/marbled murrelet pdf
Washington Department of Fish and Wildlife. 2012. Annual Report: Northern Spotted
Owl. Internet report. URL:
http://wdfw.wa.gov/conservation/endangered/species/northern spotted owl pdf
Washington Department of Fish and Wildlife. 2012. Annual Report: Streaked Horned
Lark. Internet report. URL:
http://wdfw.wa.gov/conservation/endan eg red/species/streaked horned lark pdf
Washington Department of Fish and Wildlife. 2012. Annual Report: Yellow-billed
Cuckoo. Internet report. URL:
http://wdfw.wa.gov/conservation/endangered/species/yellow-billed cuckoo pdf
Washington Department of Fish and Wildlife. 2014. SalmonScape. Internet report. URL:
http://apps.wdfw.wa.gov/salmonscape/
Washington State Department of Transportation. 2014. BA Preparation for
Transportation Projects—Advanced Training Manual—Version 4-02-2014. URL:
http://www.wsdot.wa.jzov/NR/rdonlyres/A 1 F85352-90EO-457B-9A8C-
B5103E097FAE10/BA manualpart2.pdf
Boggs Biological Evaluation 30
Attachment 1
The vicinity map and the extent of the action area from a few designated points.
'u�um �F.2a7a
Washington
�.t6Ul5t
Ellinor
Olympic National Park
Olympic National Forest 05 2419
BOGG5 PROPERTY N^ CIF
321 N POTLATCH DR N
m +Rd DO mi 1191 -
ts l a�R Gu NFz , j
0 300 mi
0.750 mi
L a k e f: a s h n a
l�\ of!
1
1
J
i -
;-l'dOY1CeC 19E8-< afA.tG�1?�D. ;X10.�b"4nr Fb z,, t'EZ Allr� 2bErAt.
Boggs Biological Evaluation 31
Attachment 2
Site Plan with existing development.
L TA IA ENGINEERING,INC. SITE PI AhT
Atm Tat;ja P.E. Dan&Kim Bogp HOW
_ PC)Aoat 235 321 N Potlatch Dr.N ,�
H WA 9850 Hoot WA 98548 i ot8
+iaeeaa CO,Prat tvo..427ft-50-t7OMZ (360)877-9512 (206)930-6314 & (233)b77-b746
CA
r f
a
l 1 u
E
tn
- .tn
CO
o,
Boggs Biological Evaluation 32
Attachment 3
Site plan with existing development and proposed overwater development
reconfiguration.
t4O �w
a x .'�..,„�..------
Fire
Ring
I
196
Eliminate
fi 9 r�n
\'c 301)SF Pict t 1,vation. 7401 Z
W4 W;e'r.738
Along face of
0 I#lK:kto Hulffwaj
St Al k.1"-10
'Total t-"ttting
115 3"x 1T-�
tAx7weter t'wcraRr ttJf`} I E d sf MuirY
i7{SP
1.050 Square beat Slip f ingrn n aof"igmed w
z�.. ., from 2W,sfof¢auirin$pier,
iu.Pier 206 of
Prea`surc TrcatexT(Pf tw.reconfigured,
f?calz Nor SN'
N
Lake Eixis,rING IMPROVEMENTS�X A ;AS TO BE REMOVED
Cushman Lake Cushman Division 2,Lot 22 321 N Potlatch Drive N I Ioodsport, WA
Boggs Biological Evaluation 33
Attachment 4
Site plan with proposed overwater development reconfiguration details.
+a f .
Pr uoc Treaxd(PTt '
l}eCk4n¢SIX Shortt. Fire
Ring
F.x Y,t!#rg
Rockcr)
Suit
Pier Construction;
Pk,Girdrrs; Pl 60,
Pic,Jo€sts; PT 20 24"Cenw,
All tumbsr tn#xr#iru Soto p
mcxal reini'orcoz^d.
,rp,,e Pitc4rraun# $TYPi =, `Ettr! S �y�.
(Concrete) ._'
Rrcmntn+c#rd Pic �JURf 73gl on f act of
(her Water,-312 SF y
90 of 'r
TQ p+crNib
+� #
nctr&r'laai robe da:krd `f
.kh Pre,wc Treated t r'i)
Lumber No.2x8 or
2x61 imlrer I ek l4mking. 4_1 x j
Pier to float acce's provided 3's 16`lltxvt Modrle l ar A Z to b
w't#h a n#a#tu!'arwred a)u#ritnnm
ladderox€silo+)Rcplutoicol Flow
tltr } ro J} O
176 Sr: a `^
4,3� Recon,t#ucYrd A--II +��4� t
Lake Prc um Treated tr Ti Over—cr 84caarx#�4�
l«; ,+h,w N�r 3(MX) L
Cushman r
Float 176
Slip i l4
total , 590 sl: y
PROPOSED PIER,FLOAT&SLIP �+
Lake Cushman Division 2,Lot 22 321 N Potlatch Drive N Iloodsport, WA
Boggs Biological Evaluation 34
Attachment 5
Bulkhead repair details
---�-_
---------------
s. 740 �.
7-4
F
_.rn+Pt+era f inNing{.7utlirx.__-.,!
a �>
Prxss�nn 7rratr4 Pk*Ir `� �..,. ,� � +�'� •�+
' � ixr5fi{r�('crn.mief�sin�C7u9irst
h
740 � a
fZec<{»lrcnt sx3nhn�. _
fT
.. Rw�i.•r�"itn6u�ay .�.,. _�""""""
'.im it ad)mxr�t .• �^r$
l wirnS.ctc.ays •. �; - 4 .,. { �Rr
a 4 w
Prcasurc trcatcd{#'71 � c
14"iN,NO Sperm. PROPOSIA) 'v
Boggs Biological Evaluation 35
Attachment 6
Cross section with proposed overwater development.
f
i
R : Lake
R
L E''G� Cushman
Boat Auoy 2
• kSt)'tram 011 W
+ (Propowj) w y
i_xistutt; h' V"o
Parking C::m ufig44
.
Resi�kix:c
v
SC At 1 V I NY t
a
CROSS SECTION ION"A-A" P,
Lake Cushman Division 2,Lot 22 321 N Potlatch Drive N NoodsPort, WA
Boggs Biological Evaluation 36
Attachment 7
Bulkhead cross section.
-------------:Z7......
Weak&chip oftexistirw voocmc insralw along
the oare,,ard face of the ctxisjing rmkcq as
necessary to provide clearance ftw new fixAl'ov.
footing comnMt In be 25010 psi',ar 28 day bleak,
0 I or Minfor Ment recommended along uhh
7. ..... air C"n"rinment,
Install 6 44 Steel Rrinfomcnkc"l RM,
, , .,.%U-ngth of new footing,Install
139 %cnical#4 wO reatforcruent Wars
on 12"centers and anchor ends—6'
into exi"Ahil;roAC(Y aOJWCUrC With
constructior,adhesive.
pit
i 19,'
3'735
Lxisfing Rockery Foundation
VA
ProrKned Rockcr)Foundation
Nk At I 1" 64
SUAI I V,10 arrTe.
Lake Cushman Division 2,Lot 22 321 N Potlatch[give N Hoodsport, WA
Boggs Biological Evaluation 37
Attachment 8
The existing pier, float, and jet ski ramp (foreground).
ib
n,
Boggs Biological Evaluation 38
Attachment 9
The existing bulkhead showing the undercut footing with the pier in the background.
l
. M, �� ' '',
9
e
5
� y
Boggs Biological Evaluation 39
Attachment 10
The existing bulkhead and the adjacent bulkhead to the south.
s
x
Boggs Biological Evaluation 40
Attachment 11
The existing beach access steps debris (lower left and center), bulkhead, and pier.
i
. .T
xA �
eb �
�•i
• W y
b
s u
t
�t wx
Boggs Biological Evaluation 41
Attachment 12
The north end of the existing bulkhead with the failed beach access steps.
b IL..
4
s "
` Y s
Boggs Biological Evaluation 42
1
Attachment 13
Essential Fish Habit Assessment
Essential Fish Hab tat Assessment
A. Background
The Magnuson Fishery Conservation and Man Bement Act was signed into law on April
13, 1976. Under provisions of the Act, eight gional Fishery Management Councils
were established to prepare FMP's in conform ce with national standards published in
50 CFR Part 600.305-340. The Magnuson Act vas renamed the Magnuson-Stevens Act
in a 1996 appropriations bill. On October 11, 1 96,the Sustainable Fisheries Act, which
amended the Magnuson-Stevens Act, was sign d into law. Provisions included a mandate
that the Councils amend each IMP to include description of Essential Fish Habitat,
including adverse impacts on EFH and conse tion measures to protect EFH. Essential
Fish Habitat is defined as those waters and sub'trate necessary to fish for spawning,
breeding, feeding, or growth to maturity.
The Pacific Fisheries Management Council haA designated EFH for federally-managed
species on the Pacific West Coast, including 83 species of groundfish, 5 coastal pelagic
species, and 3 species of salmon. The followin Y, species may occur in Lake Cushman
during some period of their life history: Chinoi ik salmon(Oncorhynchus tshawytscha)
and Coho salmon(Oncorhynchus kisutch).
B. Essential Fish Habitat
The designated EFH for Pacific salmon specie is identified using U.S. Geological
Survey (USGS) hydrologic units as well as habitat association tables and life history
descriptions of each life stage (PFMC 1999). The EFH for the Pacific coast salmon
fishery is defined as those waters and substratc necessary for salmon production needed
to support a long-term sustainable salmon fish ry and salmon contributions to a healthy
ecosystem(WSDOT 2014). To achieve that le el of production, EFH must include all
those streams, lakes, ponds, wetlands, and oth r currently viable water bodies and most
of the habitat historically accessible to salmon in Washington, Oregon, Idaho, and
California(WSDOT 2014). This does not incli ide habitats above the impassible barriers
identified by the Pacific Fishery Management ouncil Fishery Management Plan(PFMC
1999).
Boggs Biological Evaluation 43
r
C. Proposed Action
The proposed project is the footing repair (using poured concrete) of an existing failing
rock and mortor bulkhead and the repair/reconfiguration of an existing pier and float on
Lake Cushman. The action will result in a reduction of overwater coverage at the site of
approx. 460 square feet.
D. Effects of the Proposed Action
The effects of the proposed project on designated EFH are expected to be comparable to
the effects described in the attached BE.
E. Conservation Measures
The conservation measures and BMPs discussed in the attached BE will be implemented
to minimize any adverse effects to Essential Fish Habitat.
F. Conclusion
The proposed project is likely to have no significant impact on designated EFH for
Pacific salmon.
G. References
NOAA, 2006. Final environmental assessment and finding of no significant impact for
Magnuson-Stevens Act Provisions; Essential Fish Habitat. Internet report. Website:
http://www.nmfs.noaa.gov/habitat/efh/finalenvironmentalassessmentandfindingofno.htm
PFMC (Pacific Fishery Management Council), 1999. Fisheries Management Plans for
groundfish, coastal pelagic fish, and Pacific salmon. Internet reports. Website:
www.pcouncil.org/
Washington State Department of Transportation. 2014. BA Preparation for
Transportation Projects—Advanced Training Manual, Chapter 16—Version 4-02-2014.
Internet report. http://www.wsdot.wa.gov/NR/rdonlyres/AIF85352-90EO-457B-9A8C-
B5103E097FAE10/BA manualpart2 pdf
Boggs Biological Evaluation 44