HomeMy WebLinkAbout116-97 - Res. Annual Construction Program for 1998 RESOLUTION NO. r , -97
Annual Construction Program
WHEREAS, Chapter 136-16 WAC, sets forth the procedures for the adoption of the Annual
Construction Program;and,
WHEREAS, in compliance therewith, the Board of County Commissioners has held a public hearing
on the Annual Construction Program this 30th day of September, 1997,at 11:15 A.M.
NOW THEREFORE, BE IT RESOLVED by the Board of Mason County Commissioners, in
regular session assembled, that the attached Annual Construction Program for 1998 be adopted as set forth in
detail, consisting of Item No's. 1 through 12,which are incorporated and made part of this Resolution.
ADOPTED this 30th day of September, 1997.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
MARY J6tA'D , Chairperson
J N A. BOLENDER, Commissioner
CYNTHIA OLSEN, Commissioner
i`
ATTEST:
REBECCA S. ROGERS
Clerk of the Board
APPROVED AS TO FORM:
r
C� ► r an
MICHAEL CLIFT
Deputy Prosecuting Attorney
cc_ Cmmr.
Public Works
General Services
County Road Admin.Board
WSDOT/TransAid
C:\WPWIN\FILES\RESOLUT\98ANNUAL.DOC
ANNUAL CONSTRUCTION PROGRAM FOR 1998
AGENCY ACTION
COUNTY:..... ............... ...... MASON
(7)TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING& DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM -columns(14)+(15) _ $3,523,000.00 Recommended Program.. 9/9/1997
B. BASE&TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) _ $704,600.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS,TRAILS&BIKEWAYS C TOTAL DAY LABOR CONSTRUCTION PROGRAM-column 15 $645,000,00 Assessement.......... 2/28/1997
D. A.C./P.C.C. PAVEMENT 1. BRIDGES **Line C must be smaller than line B "` Date of Final Adoption. c.•3 •c 1
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 _
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1 000
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION 1
PROGRAM ROAD N A WORK VS FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) CS I E PRELIM. RIGHT GRAND
NO. NO. NO. MP's or Bridge#) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
COUNTY WIDE PROJECTS
codes) N S 1 000's 1 000's SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595.
1
1 1 &2 AC PAVING VAR D E 166.7 264.3 CAPP 431 431
i
15500 Lynch Rd mp 1.89 to 2.75 0.86 08 D E j
41640 Skokomish Valley Rd mp 0.00 to 0.62 0.62 08 D E
70390 North Shore Rd mp 10.47 to 11.27 0.80 08 D E
II
2 3 BST PAVING-2 shots VAR C 145 145 145!
62670 Anthony Road mp 0.00 to 2.42 2.42 09 C
3 4 COUNTY WIDE SAFETY PROJECTS VAR FGH E 302 17 15 270' 3021I
Traffic Control-Drainage-Walkways
Bikeways-Guardrail Program
90100 Ever's Bridge Tuning mp 23.23 to 23.28 0.04 07 1 E
i
PAGE TOTALS==> 614 264 17 15 701 145 878
CRAB FORM NO. 3 (REV 11/91) Page 1 of 2
ANNUAL CONSTRUCTION PROGRAM FOR 1998
AGENCY ACTION
COUNTY-............................ MASON
(7)TYPE OF WORK CODES DAY LABOR COMPUTATION Date of Submittal of
A. GRADING& DRAINING F. SIDEWALKS (A)TOTAL CONSTRUCTION PROGRAM-columns(14)+(15) _ $ 3,523,000,00 Recommended Program.. 9/9/1997
B. BASE &TOP COURSE G. TRAFFIC FACILITIES (B)COMPUTED DAY LABOR LIMIT(see back of page) _ $ 704,600.00 Date of Environmental
C. BITUM SURF TREATMENT H. PATHS, TRAILS& BIKEWAYS C TOTAL DAY LABOR CONSTRUCTION PROGRAM-column(15 $ 645,000.00 Assessement.......... 8/28/1997
D. A.C. /P.C.C. PAVEMENT I. BRIDGES **Line C must be smaller than line (B)** Date of Final Adoption. - .e�
E. CURBS AND GUTTERS J. FERRY FACILITIES Ordinance\Resolution No. 1 i L,a c3�
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
6 YEAR F C TYPE E A SOURCE OF FUNDS ESTIMATED EXPENDITURES $1 000
ROAD ROAD/PROJECT NAME AND LOCATION LENGTH U L OF N S COUNTY OTHER FUNDS CONSTRUCTION
PROGRAM ROAD N A WORK VS FUNDS
ITEM ITEM LOG (Include brief termini description or (Miles) CS I E PRELIM. RIGHT GRAND
NO, NO. NO. MP's or Bridge#) T S (See work R S AMOUNT PROGRAM ENGR. OF WAY TOTAL
codes) N S 1 000's 1 000's SOURCE 595.10 595.20 CONTRACT DAY LABOR All 595,
4 5 COUNTY WIDE MINOR CONSTRUCTION VAR AC E 165 165 165
Reconstruction of sub-base and resurfacing
Intersections-sight distance improvements
5 6 BRIDGE& LARGE CULVERT CONSTRUCTION VAR A 1 335 27 29 279 335
ROADS& BRIDGES (New Construction)
6 7* 15500 Lynch Road-3 mp 4.95 to 6.85 1.90 08 ABD 1 1045 1045 1045
7 8* 15500 Lynch Road-4 mp 6.85 to 8.85 2.00 08 ABD 1 1100 1100 1100
ROADS& BRIDGES(P\E&R\W only)
8 9 n/a 101 Connector Study 25+ 07 ABDGI 1 925 925 925
9 10 28850 Pickering Road-3 mp 3.41 to 4.51 1.10 08 ABD 1 104 71 33 101
10 . 11 20900 Crestview Drive mp 0.00 to 2.02 2.02 08 ABD I 110 60 50 1,;
11 12 97500 Belfair-Tahuya Road -2 mp 6.40 to 7 26 0.86 07 ABD 1 61 38 23 611
12 13 10000 Cloquallum- 1 mp11.75 to 12.47 0.72 08 ABD 1 75 50 25
75
PROGRAM TOTALS=====> $4 534 $264 $1 188 $175 $2 846 $589 �e;.798
NOTE: As per WAC 136-16-030, a list of all major equipment purchases contemplated for the year 1998 is attatched hereto,with
the E R & R Budget Submitted separately and by this reference made a part of this Annual Construction Program.
CRAB FORM NO. 3(REV 11/91) Page 2 of 2