Loading...
HomeMy WebLinkAbout83-97 - Res. Initiating County Road Projects and Assigning CRP numbers e� BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON. RESOLUTION NO.: --- --r In the matter of initiating county road projects and assigning CRP numbers. IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.080, 36.80.070) (Optional References). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in the amount and for the purposes shown: (1) (2) (3) (4) :(5):(6): (7) (8) (9) ----- ----------------------------------------------------------------------------------------------------------------------- :DAY: : C L : : ANNUAL : ROAD TYPE OF 0 A :COST ESTIMATE (THOUSANDS) CONST. ITEM ROAD NAME AND/OR LOG WORK N B ENGIN. : CONSTRUCTION PROG. CRP BRIDGE NUMBER NO, :----------------: (see code): S 0 :-------------------------------: ITEM NO. M.P. to T R CONST. COUNTY TOTAL NO. -----° ----------------------- ------- ----------------°------------°--- --- --------- -------------------------------------- 1. CRAIG ROAD 12080 0.00 0.14 E X 14.6 14.6 1 1567 2. PICKERING ROAD 28850 2.39 3.35 E X 90.6 90.6 1 1568 3. HARSTINE BRIDGE ROAD 30000 0.47 0.66 E X 15.2 15.2 1 1569 4. NORTH ISLAND DRIVE 39630 0.00 0.31 E X 26.8 26.8 1 1570 5. MASON LAKE ROAD 52210 0.00 0.57 E X 51.7 51.7 1 1571 6. NORTH SHORE ROAD 70390 9.65 10.49 E X 71.9 71.9 1 1572 7. BROCKDALE ROAD 90090 1.98 3.22 E X 125.7 125.7 1 1573 8. McREAVY ROAD 97670 0.00 1.80 E X 107.5 107.5 1 1574 9. ------------------------------------------------------------------------------------------------------------------------------ 4. TYPE OF WORK CODE (5) The construction is to accomplished by contract A. Preliminary Engineering F. Curbs & Gutters in accordance with RCW 36.77.020 et. seq. B. Right-of-Way G. Sidewalks C. Grading, Draining, SurfacingH. Traffic Facilities (6) The construction is to be accomplished by county D. Light Bit. Surf. Treatment I. Bridge Construction forces in accordance with RCW 36.77.060 and WAC E. A.C. or P.C.C. Pavement J. Paths & Trails (RCW 136.18. 47.301) ADOPTED this 12th day of August, 1997. BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON - - -- i ; ----- Chairperson ATTEST: Excused, Absence 8/12/97 --- - ---- -- - =- Member Clerk of the Board € � '-- ' ' cc: Co. Commissioners --- ' ----------- -,-- -�- -- Engineer Member JOURNAL: Publ. 1t.: 08-21-97 (Bill Road Dept.) scv h:\lotus\acpr-97.wkl