Loading...
HomeMy WebLinkAbout41-97 - Res. Amendment to Six Year Transportation Program RESOLUTION NO. 41-97 MASON COUNTY SIX-YEAR TRANSPORTATION PROGRAM (1997 - 2002) AMENDMENT WHEREAS, in compliance with R.C.W. 36.81.121 and W.A.C. 136-14, the Board of Mason County Commissioners hereby certifies that an amendment to the priority array of potential projects on this County's road system was prepared by the County Engineer and was available to the Board of County Commissioners during the preparation of the amendment to the Six Year Transportation Improvement Program for the period January 1, 1997, through December 31, 2002; and WHEREAS, in further compliance with said law, the Board has held thereon public hearing dated April 22, 1997, to consider same. NOW, THEREFORE, BE IT HER-EBY RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Amendment to the Six Year Transportation Improvement Program for Mason County roads be adopted, as set forth in detail, for the period mentioned, consisting of pages numbered 1, 2, 3 and 5, which are incorporated and made part of this Resolution. THIS AMENDED DOCUMENT was passed and unanimously adopted this 22nd day of April, 1997. BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHNGTON MARY J0,6*Y, Chairper§' ATTEST: T, -A C�VN D. OLSEN, Commissioner REB6CCA S. ROGEF 3 Clerk of the Board C: Commissioners 7')L!A/—: o County Engineer JOHN A. BOLENDER, Commissioner County Road Administration Board Dept. of Transportation./Trans-Aid Division SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 MASON COUNTY-AMENDED TIP HEARING DATE : 04/22/97 ADOPTION DATE: 04/22/97 COUNTY NO: 23 RESOLUTION NO: 41-97 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 1I ICOUNTY WIDE PAVEMENT ON AC PAVEMENT I IFI 2641 2641 2641 7921 15841 650I 9341 I PE I I I I I MJR CLASS of WK: 5 CAPP IR/W I I I(ID-1) I I WORK CODES: BD ICON I I I TOTAL LENGTH: F.A. PROJ NO. I -I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 2I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 150I 150I 150I 450I 900I 3761 5241 I PE I I I I I MJR CLASS of WK: 5 CAPP IR/W I I ((ID-2) I I WORK CODES: ICON I I I I I TOTAL LENGTH: F.A. PROD NO. I -I I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 3I ICOUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 220I 2201 2201 660I 1320I 1320I I I PE I I I I I MJR CLASS of WK: 4 IR/W I I I(ID-3) I I WORK CODES: ABC ICON I TOTAL LENGTH: F.A. PROJ NO. I -I - UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 4I ICOUNTY WIDE SAFETY PROJECTS I IFI 220I 220I 220I 660I 1320I 1320I I I PE I I I I I MJR CLASS of WK: IR/W I I (Includes traffic control, drainage, walks, I ( WORK CODES: ABHKO ICON I I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROJ NO. I -I - I (Projects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 5I ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1101 110I 110I 330I 660I 660I I I PE I I I I I MJR CLASS of WK: IR/W I I (Reconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I I (Intersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I -I - I(ID-5) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 6I ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 791 791 791 2371 4741 4741 I I PE I I I I I MJR CLASS of WK: 4 IR/W I I I(ID-6) I I WORK CODES: L ICON I TOTAL LENGTH: F.A. PROJ NO. I I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 2 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 7I08I86070 SAND HILL ROAD 1 I IFI 9321 I I I 9321 9321 I I PE I I 10.33 TO 2.66 I I MJR CLASS of WK: 4 IR/W I I (From mile post 0.33 to Transfer Station I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 2.33 F.A. PROD NO. I I I I(ID-88) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 8I08I15500 LYNCH ROAD - 3 I IFI 7601 I I I 7601 7601 I I PE I I 14.95 TO 6.85 I I MJR CLASS of WK: 4 IR/W I I 10.30 North of Bay East to Totten Shores I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.90 F.A. PROJ NO. I I I I(ID-45 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 9I09I54650 ST. ANDREWS DR I IFI 44I I I I 441 oI I 441 PE I I 12.00 TO 2.04 I I MJR CLASS of WK: 6 IR/W I I IRailroad Crossing I I WORK CODES: I ICON I I I(ID-95) I I TOTAL LENGTH: .04 F.A. PROJ NO. I I — I I I I UTILITY CODES: RRS - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 10I07I90090 BROCKDALE RD I IFI 1471 I I I 1471 221 I 1251 PE 31 I 11.98 TO 3.22 I I MJR CLASS of WK: 5 IR/W I I 190090 Brockdale Rd 2R-Overlay I I WORK CODES: D ICON 1221 I (Island Lake Rd to Jensen Rd I I TOTAL LENGTH: 1.24 F.A. PROJ NO. I —I — I I(ID-66) I I UTILITY CODES: - - ITOT 1251 0 ------------------------------------------------------------------------------------------------------------------------------------ 11I08I10000 CLOQUALLUM ROAD - 1 I IFI 5601 I I I 5601 5601 I I PE I I 111.75 TO 12.47 I I MJR CLASS of WK: 4 IR/W I I (Rock Bluff Curve (1 mile west of Bulb Farm Road) I I WORK CODES: ABD ICON I I (Realign (Relax Curve) I I TOTAL LENGTH: .72 F.A. PROD NO. I —I — I I(ID-51 RAP-41) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 12I08I15500 LYNCH ROAD - 4 I IFI I 8001 I I 8001 8001 I I PE I I 16,85 TO 8.85 I I MJR CLASS of WK: 4 IR/W I I (Totten Shores Road to Arcadia Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.00 F.A. PROD NO. I —I — I I(ID-52 RAP-31) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 13I07I"RIDGE ROAD" I IUI 3001 I I 1 3001 3001 I I PE I I IBROCKDALE RD TO SR 3 (VICINITY OF E MASON/KITSAP LINE) I I MJR CLASS of WK: 1 IR/W I I IEIS and feasibility study for an overland route along I I WORK CODES: U ICON I I Ithe north ridge paralleling SR 106. Approx 25 miles . I I TOTAL LENGTH: 25.00 F.A. PROJ NO. I —I — I I(ID-97) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 3 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R (U I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 14I08I28850 PICKERING ROAD - 3 I IPI 631 6361 I I 6991 6991 I I PE I I 13.41 TO 4.51 I I MJR CLASS of WK: 4 IR/W I I IHartstene Bridge Road South to Scenic View Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.10 F.A. PROJ NO. I -I - I I(ID-47 RAP-42) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 15I07I91720 JOHNS PRAIRIE ROAD - SR # 3 SIGNALIZATION I IPI 201 1401 I I 1601 1601 I I PE I I 13.80 TO 3.90 I I MJR CLASS of WK: 6 IR/W I I (INSTALL TRAFFIC SIGNAL AT JUNCTION WITH SR 3 I I WORK CODES: I ICON I I I(ID 13) I I TOTAL LENGTH: .10 F.A. PROJ NO. I _I I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 16I08I20900 CRESTVIEW DRIVE I IPI 801 8001 I I 8801 8801 I I PE I I 10.00 TO 2.02 I I MJR CLASS of WK: 4 IR/W I I (Agate Store to Hillcrest Drive I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROJ NO. I -I I I(ID-59 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 17I07I97500 BELFAIR TAHUYA RD -2 I IFI 1451 4301 I I 5751 4511 I 1241 PE 1241 I 16.40 TO 7.26 I I MJR CLASS of WK: 4 IR/W I I ICOIIinS Lake Rd to New ACP I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .86 F.A. PROJ NO. I _I I(ID-8) I I UTILITY CODES: - - ITOT 1241 0 ------------------------------------------------------------------------------------------------------------------------------------ 18I08I79800 BEAR CREEK - DEWATTO ROAD - 2 I IPI 401 4001 I I 4401 4401 I I PE I I 17.45 TO 8.45 I I MJR CLASS of WK: 4 IR/W I I 10.16 E. Gold Creek Road to 0.37 W. Tiger Mission Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROD NO. I _I - I I(ID-40 RAP-57) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 19I09I39630 NORTH ISLAND DRIVE 1 I IUI I 451 4501 I 4951 4951 I I PE I I IMP 0.31 TO 1.31 I I MJR CLASS of WK: 4 IR/W I I (End of AC north 1 mile I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.00 F.A. PROJ NO. I I I I(ID-68) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 20I07I96140 GRAPEVIEW LOOP ROAD - 3 I IUI I 371 3721 I 4091 1261 2831 I PE I I 13.50 TO 4.43 I I MJR CLASS of WK: 4 RAP IR/W I ILombard Road to Store I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROD NO. I _I - I I(ID-62 RAP-73) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 4 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 21I07I96140 GRAPEVIEW LOOP ROAD - 4 I IUI I 581 5801 I 6381 2311 4071 I PE I I 14.43 TO 5.90 I I MJR CLASS of WK: 4 RAP IR/W I I IGrapeview Store to Cronquest Road I I WORK CODES: ABD ICON I IRealign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROD NO. I -I I I(ID-63 RAP-61) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 22I09I86070 SAND HILL ROAD - 2 I IUI I 511 5121 I 5631 5631 I I PE I I 12.66 To 3.94 I I MJR CLASS of WK: 4 IR/W I I (Transfer Station to Delmore Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.28 F.A. PROJ NO. I -I - I I(ID-89) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 23I09I10290-0.35 HLIBOKI BRIDGE I IUI I 331 1501 I 1831 1831 I I PE I I 10.30 TO 0.40 (BULB FARM ROAD) I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-14) I I TOTAL LENGTH: .10 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 24I09I14010 OLD OLYMPIC HWY I IUI I 321 3281 I 3601 3601 I I PE I I 10.00 TO 1.50 I I MJR CLASS of WK: 4 IR/W I I ISR 101 to Bloomfield Road I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.50 F.A. PROJ NO. I -1 - I I(ID-96) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 25I08I62310 TRAILS ROAD - 2 I IUI I 351 3501 I 3851 3851 I I PE I I 10.80 TO 1.59 I I MJR CLASS of WK: 4 IR/W I I IMile post 0.80 to Trails End Drive I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .79 F.A. PROJ NO. I I - I I(ID-34 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 26I07INEW ROAD "WT-BUDDING ROAD" - PHASE 1 I IPI 251 221 10001 I 10471 10471 I I PE I I (APPROXIMATELY 2.5 MILES I I MJR CLASS of WK: 45 IR/W I I INew road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I I (Phase 1: From Trails Rd out 2.5 miles of proposed I I TOTAL LENGTH: 4.00 F.A. PROD NO. I -1 - I Ialignment. (ID-82) I I UTILITY CODES: PTC - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 27I09I77270 HAVEN WAY - 1 I IUI I I 341 3601 3941 3941 I I PE I I 10.00 TO 0.91 I I MJR CLASS of WK: 4 IR/W I I IMt. View Drive Southwesterly to Haven Lake Drive I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .91 F.A. PROJ NO. I -1 - i I(ID-23) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 5 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 28I07I97500 BELFAIR-TAHUYA ROAD I IUI I I 961 9961 10921 10921 I I PE I I 10.00 TO 1.85 I I MJR CLASS of WK: 15 IR/W I I IKay's Corner northerly 2.00 miles I I WORK CODES: ABD ICON I I IHorizontal and Vertical realignment I I TOTAL LENGTH: 2.00 F.A. PROD NO. I _I I(ID-19 RAP-51) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I09I70950 TAHUYA RIVER ROAD I IUI I I 961 9641 10601 10601 I I PE I I 11.61 TO 4.02 I I MJR CLASS of WK: 45 IR/W I I (Intersection with Belfair-Tahuya Road in Sec. 22 I I WORK CODES: ABC ICON I I (northerly 2.41 miles I I TOTAL LENGTH: 2.41 F.A. PROD NO. I I I I(ID-77 Yr-92) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 30I09I39410 WINGART ROAD I IUI I I 211 2061 2271 2271 I I PE I I 10.00 TO 0.52 I I MJR CLASS of WK: 4 IR/W I I (North Island Drive to Jarrell Cove State Park I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .52 F.A. PROJ NO. I -I - I I(ID-75) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I08I28850 PICKERING ROAD - 4 I IUI I I 501 5001 5501 5501 I I PE I I 14.51 To 5.35 I I MJR CLASS of WK: 4 IR/W I I (Scenic View Road to Schneider Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .84 F.A. PROJ NO. I - I I(ID-84 RAP-30) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I08I10000-5.85 ROCK CREEK NO.1 BRIDGE I IUI I I 221 1001 1221 1221 I I PE I I 15.83 TO 5.87 I I MJR CLASS of WK: 4 IR/W I I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I(ID-10) I I TOTAL LENGTH: .04 F.A. PROJ NO. I _I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33I09I77270 HAVEN WAY - 2 I IUI I I 551 5501 6051 6051 I I PE I I 10.91 TO 2.30 I I MJR CLASS of WK: 4 IR/W I I (HAVEN LAKE DRIVE TO END OF AC 1993 PROJECT I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I _I I I(ID-7 Yr-94) I I UTILITY CODES: PT - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 34I07I96140-2.45 MCLANE COVE BRIDGE I IFI I I I 6751 6751 5551 I 1201 PE I 120 I 12.15 TO 2.55 I I MJR CLASS of WK: 4 IR/W I I IReplacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I I(ID-15) I I TOTAL LENGTH: .40 F.A. PROJ NO. I _I I I I I UTILITY CODES: - - ITOT OI 120 ------------------------------------------------------------------------------------------------------------------------------------- SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 6 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRIDI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 35I07I96140 GRAPEVIEW LOOP ROAD - 1 I IUI I I I 5221 5221 5221 I I PE I I 11.62 TO 2.78 I I MJR CLASS of WK: 4 IR/W I (Stadium Beach Road to Murray Road South I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.16 F.A. PROJ NO. I -1 I I(ID-60 RAP-40) I I UTILITY CODES: - - ITOT OI 0 —---------------------------------------------------------------------------------------------------------------------------------- 36I08I79800 BEAR CREEK - DEWATTO ROAD - 3 I IUI I I I 5061 5061 5061 I I PE I I 18.45 TO 9.60 I I MJR CLASS of WK: 4 IR/W I I 10.37 W. of Tiger Mission Road to start of Chip Seal I I WORK CODES: ABC ICON I I IReatign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROJ NO. I -1 - I I(ID-38 RAP-54) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 37I09I67580 LAKELAND DRIVE I IUI I I I 901 901 901 I I PE I I 10.15 TO 0.22 CROWN OF HILL I I MJR CLASS of WK: 4 IR/W I I (Reconstruct Vertical Curve to Improve Sight Distance I I WORK CODES: ABC ICON I I I(ID-74) I I TOTAL LENGTH: .07 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 38I09I39630 NORTH ISLAND DRIVE - 2 I IUI I I I 7701 7701 7701 I I PE I I 11.31 TO 3.09 I I MJR CLASS of WK: 45 IR/W I I IReatign and Regrade I I WORK CODES: ABD ICON I I ((ID-48) I I TOTAL LENGTH: 1.78 F.A. PROJ NO. I I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 39I07INEW ROAD "WT-BUDDING ROAD" - PHASE 2 I IUI 151 201 I 6991 7341 7341 I I PE I I (APPROXIMATELY 1.5 MILES I I MJR CLASS of WK: 45 IR/W I I (New road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I I IPhase 2: From end of Phase 1 to SR 3 south of I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I -1 - I (SR 106 (ID-20) I I UTILITY CODES: PTC - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 40I09I28240 SPENCER LAKE ROAD - 1 I IUI I I I 6571 6571 6571 I I PE I I 10.00 TO 1.88 I I MJR CLASS of WK: 4 IR/W I I (Agate Road north to 1987 project I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.88 F.A. PROJ NO. 1 -1 - I I(ID-28) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 41I07I96140 GRAPEVIEW LOOP ROAD - 5 I IUI I I I 3751 3751 3751 I I PE I I 16.10 TO 6.93 I I MJR CLASS of WK: 4 IR/W I I (Cronquist Road to Nelson Road I I WORK CODES: ABD ICON I I IReatign and Regrade I I TOTAL LENGTH: .83 F.A. PROJ NO. I -I - I ((ID-64 RAP-39) I I UTILITY CODES: - - (TOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 7 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRINI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 42I09I11200 HURLEY-WALDRIP ROAD I IUI I I I 2251 2251 2251 I I PE I I 10.00 TO 0.25 I I MJR CLASS of WK: 4 IR/W I I (intersection With SR #108 Realign and Regrade I I WORK CODES: ABC ICON I I I(ID-24 Yr-92) I I TOTAL LENGTH: .25 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 43I09I02750 STAR LAKE ROAD I IUI I I I 5501 5501 5501 I I PE I I 10.00 TO 1.10 I I MJR CLASS of WK: 3 IR/W I I ICLoquaLLum Road north 1.10 miles to Country Club I I WORK CODES: ABC ICON I I IRegrade, drain and surface I I TOTAL LENGTH: 1.10 F.A. PROD NO. I -I I I (ID-71) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 44I09I47100 TERRACE ROAD I IUI I I I 1541 1541 1541 I I PE I I I I I MJR CLASS of WK: 1 IR/W I I Ilntersection Project with U.S. #101 from plats of I I WORK CODES: ABC ICON I I ICanaL View Terrace and White Star. I I TOTAL LENGTH: .07 F.A. PROJ NO. I -I - I I(ID-76) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 45I09I64500 ECKERT ROAD I IUI I I I 1851 1851 1851 I I PE I I i0.00 TO 0.84 I I MJR CLASS of WK: 4 IR/W I I (Minor widening and surfacing I I WORK CODES: ABC ICON I I I(ID-26 Yr-92) I I TOTAL LENGTH: .84 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 46I14I90100 SHELTON - MATLOCK ROAD I IUI I I I 8151 8151 8151 I I PE I I 10.91 TO 1.38 I I MJR CLASS of WK: 3 IR/W I I (City Limits to Goldsborough Bridge I I WORK CODES: ABD ICON I I (Minor Widening I I TOTAL LENGTH: .47 F.A. PROJ NO. I -I - I I(ID-42 RAP-48) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 47I09I51930 JENSEN ROAD I IUI I I I 2201 2201 2201 I I PE I I 10.00 TO 0.48 I I MJR CLASS of WK: 4 IR/W I I IBROCKDALE ROAD TO END OF COUNTY ROAD I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: .48 F.A. PROJ NO. I -I - I(ID-87) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 48I08I79800 BEAR CREEK - DEWATTO ROAD - 4 I IUI I I I 4401 4401 4401 I I PE I I 19.75 TO 10.68 I I MJR CLASS of WK: 4 IR/W I I (West end of Chip Seal to OLd BeLfair Highway I I WORK CODES: ABC ICON I I IReaLign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I -I I I(ID-41 RAP-49) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 8 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R IU I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I (YEAR I L I L ITIA I L I YEAR (YEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 49I09I64330 STRETCH ISLAND ROAD SOUTH i IUI I I I 3301 3301 3301 I I PE I I 10.00 TO 0.74 I I MJR CLASS of WK: 4 IR/W I I (Minor Widening and surfacing I I WORK CODES: ABC ICON I I(ID-25 Yr-92) I I TOTAL LENGTH: .74 F.A. PROJ NO. I -I - I I I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 50I09I23600 SUNSET ROAD I IUI I I I 3051 3051 3051 I I PE I I 10.00 TO 1.39 I I MJR CLASS of WK: 4 IR/W I I (Minor Widening and BST surfacing I I WORK CODES: ABC ICON I I I(ID-27 Yr-92) I I TOTAL LENGTH: 1.39 F.A. PROJ NO. I -I - I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 51I07I96140 GRAPEVIEW LOOP ROAD - 2 I IUI I I I 3161 3161 3161 I I PE I I 12.78 TO 3.50 I I MJR CLASS of WK: 4 IR/W I I IMurray Road South to Lombard Road I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .72 F.A. PROJ NO. I -I - I I(ID-61 RAP-58) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 52I00INEW FRONTAGE ROADS FOR NEW STATE BELFAIR BY-PASS ROUTE I IUI I I I 431 431 431 I I PE I I (APPROXIMATELY 3 MILES OF NEW ROADS I I MJR CLASS of WK: 1 IR/W I I (STUDY TO DETERMINE LOCATIONS FOR NEW FRONTAGE ROAD I I WORK CODES: U ICON I I (REQUIREMENTS FOR A NEW STATE ROUTE BY-PASSING BELFAIR I I TOTAL LENGTH: 3.00 F.A. PROJ NO. I -I - I ION THE EAST (ID-17) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1997 TO 2002 Page 9 MASON COUNTY-AMENDED TIP ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ I I I SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN I I I ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ FUNDED PROJECTS I 1st Year 3631 I Local 8880 I Years 1-3 Years 4-6 Totals 2nd Year 2273 I RAP 0 I P E 127 120 247 3rd Year 1043 I CAPP 1458 I R/W 0 0 0 4-6 Year 3804 I TIA 0 I CONST 122 0 122 I I UATA 0 I I Fed. 413 I I I Totals ... 10751 10751 249 120 369 ------------------------------------------------------------------------------------------------------------------------------------ UNFUNDED PROJECTS I 1st Year 543 I Local 17156 I Years 1-3 Years 4-6 Totals (Proposed and Unknown) I 2nd Year 2309 I RAP 690 I P E 0 0 0 3rd Year 4116 I CAPP 0 I R/W 0 0 0 4-6 Year 10878 I TIA 0 I CONST 0 0 0 UATA 0 Fed. 0 I I I Totals ... 17846 17846 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS I 1st Year 4174 I Local 26036 I Years 1-3 Years 4-6 Totals 2nd Year 4582 I RAP 690 I P E 127 120 247 3rd Year 5159 I CAPP 1458 I R/W 0 0 0 4-6 Year 14682 I TIA 0 I CONST 122 0 122 UATA 0 I I Fed. 413 I I I Totals .., 28597 28597 249 120 369 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------