Loading...
HomeMy WebLinkAbout2023-022 - Res. Replacing Res. 43-19 County Road Project 2020 MASON COUNTY COMMISSIONERS RESOLUTION NO: 2-01 -022 REPLACING RESOLUTION NO.43-19 COUNTY ROAD PROJECT NO. 2020 WHEREAS,on Mason County Road No.98250 known locally as the Old Belfair Highway and more specifically located in Sec. 16, 17&29,T 23N.R1 W,WM,at approximately mile post 1.200 to mile post 2.600;work defined as"construction"in the BARS Manual,Page 11-63,et seq,is determined to be necessary and proper; and, THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Widenin¢and realigning a portion of Old Belfair Highway and extension of an existinp_ arch culvert,as well as improving the roadway geometries to a 50-mph design standard. SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. (RCW 36.77.060 and/or RCW 26.77.065) BE IT FURTHER RESOLVED that the described County Road Project is necessary and proper,and the estimated costs of said project are herewith set out as follows: Engineering: $ 120,000 Right of Way $ 100,000 Construction $ 1,200,000 The County Road project herein described is HEREBY DECLARED to be a public necessity,and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in accordance with RCW 36.77.070 et.seq. ADOPTED this kk*^�day of �2023. BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON Sharon Trask,Chair ATTEST: Ran y Aiderlin,Vice Chair McKenzie S ith,C rk of the Board Kevin Shutty,Commissioner APPROVED AS TO FORM: Tim Whitehea . cc: Co.Commissioners Engineer JOURNAL: Publ. lt: