Loading...
HomeMy WebLinkAbout111-98 - Res. Six-Year Transportation Improvement Program RESOLUTION NO. _111-98 Six Year Transportation Improvement Program WHEREAS, in compliance with W.A.C. 136-15 Mason County has prepared the attached Six Year Transportation Improvement Program for the period January 1, 1999,through December 31,2004;and, WHEREAS,in compliance with R.C.W. 36.81.121 and W.A.C. 136-14,the Board of Mason County Commissioners hereby certifies that the priority array of potential projects on this County's road system, including bridges, was prepared by the County Commissioners during the preparation of the said Six Year Transportation Improvement Program;and WHEREAS, in further compliance with said law, the Board of County Commissioners has held a public hearing on this 29th day of September, 1998; NOW, THEREFORE, BE IT RESOLVED by the Board of Mason County Commissioners, in regular session assembled, that the attached Six Year Transportation Improvement Program for 1999 through 2004, be adopted, for the period mentioned, consisting of pages numbered 1 through 6, which are hereby incorporated and made part of this Resolution. BE IT FURTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six Year Transportation Improvement Program for 1999-2004 to all required agencies. ADOPTED this day of§,pptanbEer, 1998. % c-fe1 r° BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON J N A. BOLENDE , Chairperson MA Y "CAD ', Commis 'oiier ATTEST: CYNTIf D. OLSEN, Commissioner REBECCA S. ROGERS Clerk of the Board APPROVED AS TO FORM: MW4L EL 4 - FyT Depitty-Prosecuting Attorney cc: Cmmr. Public Works General Services County Road Admin.Board WSDOT/TransAid C:\WPWIN\FILES\RESOLLM6YEAR-99.res 'EAR - 9/28/98 PRIORI ID- Project BMP EMP Year 1 1 AC on AC 1-6 2 2 AC on BST 1-6 3 3 BST on GRAV 1-6 4 4 SAFTEY 1-6 5 5 MINOR CONST 1-6 6 6 LARGE CULV 1-6 7 97 "101 Connector" Study 1 8 59 CRESTVIEW DR 0.00 2.02 1 9 51 CLOQUALLUM - 1 11.75 12.47 1 10 8 BELFAIR-TAHUYA-2 6.40 7.26 1 11 96 OLD OLYMPIC HWY 0.00 1.50 2 12 34 TRAILS ROAD -2 0.40 1.59 2 13 40 BEAR CR-DEW- 2 7.59 9.00 2 14 10 ROCK CR BR-1 5.83 5.87 2 15 62 GRAPEVIEW LOOP - 3 3.50 4.43 2 16 63 GRAPEVIEW LOOP - 4 4.43 5.90 2 17 47 DICKERING-3 3.35 4.45 3 18 15 MCLANE COVE BR 2.15 2.55 3 19 61 GRAPEVIEW- 2 2.55 3.50 3 20 101 BELFAIR BYPASS - - 3-4 21 42 SHELTON-MATLOCK 0.91 1.38 4 22 38 BEAR CR-DEW-3 9.00 10.44 4 23 98 JOHN'S PRAIRIE RD 2.52 3.45 4 24 19 BELFAIR-TAHUYA -1 0.00 1.15 25 68 NORTH ISLAND-1 0.31 1.31 5 26 20 WT BUDING ROAD - 2 - - 5 27 7 HAVEN WAY-2 0.91 2.30 28 64 G RAP EVIE -5 6.10 6.93 29 99 HIGHLAND RD 4.65 6.43 6 30 23 WT BUDING ROAD - 1 - - 6 31 89 SAND HILL -2 2.66 4.30 6 32 90 SAND HILL -3 4.30 5.82 6 33 84 DICKERING -4 4.45 5.35 6 34 66 GRAPEVIEW LOOP CONCTR 6 Page 1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1999 TO 2004 MASON COUNTY HEARING DATE : 09/29/98 ADOPTION DATE: COUNTY NO: 23 RESOLUTION NO: P IF I - I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R III I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN O ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH 1 0 1 0 TRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR IYEAR I STH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 11 ]COUNTY WIDE AC PAVEMENT ON AC PAVEMENT I IFI 1991 2081 2171 7121 13361 5101 8261 I PE I MJR CLASS of WK: 5 CAPP IR/W I I (ID-1) I I WORK CODES: BD ICON I 1 1 I I TOTAL LENGTH: F.A. PROD NO. 1 I I I 1 I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 2I ICOUNTY WIDE AC PAVEMENT ON BST PAVEMENT I IFI 2431 2541 2651 8701 16321 8061 8261 I PE I I I I I NJR CLASS of WK: 5 CAPP IR/W I I I (ID-2) I I WORK CODES: ICON I I I TOTAL LENGTH: F.A. PROJ NO. I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 31 (COUNTY WIDE BST PAVEMENT ON GRAVEL I IFI 2501 1521 158I 5191 1079I 1079I I I PE I I I I I MJR CLASS of WK: 4 IR/W I I I (ID-3) I I WORK CODES: ABC ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I I I I I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 41 ICOUNTY WIDE SAFETY PROJECTS I IFI 3201 3161 330I 1081I 2047I 2047I I I PE I MJR CLASS of WK: IR/W I (Includes traffic control, drainage, walks, I I WORK CODES: ABHKO ICON I I (bikeways and guardrails I I TOTAL LENGTH: F.A. PROJ NO. 1 I - I IProjects off roadway surfaces (ID-4) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 51 ICOUNTY WIDE MINOR CONSTRUCTION I IFI 1651 1721 1801 5911 11081 1108I 1 1 PE I I I I I MJR CLASS of WK: IR/W I I IReconstruction of sub-base and resurfacing I I WORK CODES: ABC ICON I Ilntersections - sight distance improvements I I TOTAL LENGTH: F.A. PROJ NO. I 1 I I(ID-5) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 61 ICOUNTY WIDE BRIDGE & LARGE CULVERT CONSTRUCTION I IFI 320I 3661 3821 12521 23201 2320I I 1 PE I I I I I MJR CLASS of WK: 4 IR/W I I ( (ID-6) (CRP 1575-1/2) I I WORK CODES: L ICON I I I I I TOTAL LENGTH: F.R. PROD NO. 1 -1 - UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1999 TO 2004 Page 2 MASON COUNTY P IF I 1 I i ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R III I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IA1UI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN O ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR (YEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD 16TH Y I sI I IGI I I IYEAR I L I L ITIA I L I YEAR (YEAR 71071•101 CONNECTOR• STUDY I IFI 8001 1 1 1 8001 8001 1 1 PE I IBROCKDALE RD TO SR 3 (VICINITY OF E MASON/KITSAP LINE) 1 1 MJR CLASS of WK: 1 IR/W I I IEIS and feasibility study for an overland route along I 1 WORK CODES: U ICON I I Ithe north ridge paralleling SR 106. Approx 25 miles 1 1 TOTAL LENGTH: 25.00 F.A. PROD NO. 1 -1 I (ID-97) (CRP 1577) 1 I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 8108120900 CRESTVIEW DRIVE I IFI 19171 1 1 1 19171 11971 7201 1 PE I 1 10.00 To 2.02 1 1 MJR CLASS of WK: 4 RAP IR/W I (Agate Store to Hillcrest Drive I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 2.02 F.A. PROD NO. 1 1 I ((ID-59 RAP-48) (CRP 1235) 1 1 UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 9108110000 CLOQUALLUM ROAD - 1 I IFI 9911 1 1 1 9911 8911 1 1001 PE I 1 111.75 TO 12.47 1 1 MJR CLASS of WK: 4 IR/W I I (Rock Bluff Curve (1 mile west of Bulb Farm Road) 1 I WORK CODES: ABD ICON 1001 I (Realign (Relax Curve) 1 1 TOTAL LENGTH: .72 F.A. PROD NO. 1 1 I I(ID-51 RAP-41) (CRP 1471) 1 ( UTILITY CODES: - - ITOT 1001 0 ------------------------------------------------------------------------------------------------------------------------------------ 10107197500 BELFAIR TAHUYA RD -2 1 IFI 11721 1 1 1 11721 10481 1 1241 PE 1241 1 16.40 TO 7.26 1 1 MJR CLASS of WK: 4 IR/W I I (Collins Lake Rd to New ACP I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .86 F.A. PROJ NO. 1 1 I I (ID-8) (CRP 1522) 1 1 UTILITY CODES: - - (TOT 1241 0 ------------------------------------------------------------------------------------------------------------------------------------ 11109114010 OLD OLYMPIC HWY I IF1 821 7431 1 1 8251 8251 1 1 PE I 1 10.00 TO 1.50 1 1 MJR CLASS of WK: 4 IR/W I I ISR 101 to Bloomfield Road I I WORK CODES: A3D ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.50 F.A. PROD NO. 1 -1 - I I (ID-96) (CRP n/a) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 12108162310 TRAILS ROAD - 2 1 IFI 431 3921 1 1 4351 4351 1 1 PE I I IMP 0.40 TO 1.55 1 1 MJR CLASS of WK: 4 IR/W I I IMile post 0.40 to Trails End Drive I I WORK CODES: ABC ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.15 F.A. PROJ NO. 1 -1 I I(ID-34 RAP-49) (CRP 1375 C) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 13108179800 BEAR CREEK - DEWATTO ROAD - 2 I IPI 631 5701 1 1 6331 2701 3631 1 PE I I IMP 7.59 TO 9.00 1 1 MJR CLASS of WK: 4 RAP IR/W I I IBegining at the end of 1996 Constr to 0.31 miles east I I WORK CODES: ABC ICON I I lof Tiger Mission Road.- Realign and Regrade I I TOTAL LENGTH: 1.41 F.A. PROJ NO. 1 1 I I (ID-40) (CRP 1563) 1 1 UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1999 TO 2004 Page 3 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R III I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIDI ---EXPENDITURE PLAN--- -----SOURCE----- ( PLAN O ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I O I O IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR I STE I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 14108110000-5.85 ROCK CREEK NO.1 BRIDGE I IFI 331 1561 I I 1891 1891 I I PE 1 I 15.83 TO 5.87 I 1 MJR CLASS of WK: 4 IR/W l I IReplacement of Bridge plus new approaches I I WORK CODES: L ICON I I I (ID-10) (CRP n/a) I l TOTAL LENGTH: .04 F.A. PROJ NO. 1 I I I I I UTILITY CODES: - - ITOT 01 0 ------------—---------------------------------------------------------------------------------------------------------------------- 15107I96140 GRAPEVIEW LOOP ROAD - 3 I IFI 251 5861 1 I 6111 3281 2831 I PE I I IMP 3.50 TO 4.43 1 1 MJR CLASS of WK: 4 RAP IR/W I ILombard Road to Store I I WORK CODES: ABD ICON I I IRealign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. I I I I (ID-62 RAP-73) (CRP 1380) I I UTILITY CODES: - - ITOT 01 0 ----------------------------------------------------------------------------------------------------------—------------------------ 16107196140 GRAPEVIEW LOOP ROAD - 4 I IFI 251 7651 I 1 7901 3831 4071 1 PE I I 14.43 TO 5.90 1 1 MJR CLASS of WK: 4 IR/W I I lGrapeview Store to Cronquest Road I I WORK CODES: A3D ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.47 F.A. PROJ NO. I I I I(ID-63 RAP-61) (CRP 1381) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 17I08128850 PICKERING ROAD - 3 I IPI 251 251 9411 I 9911 9911 1 1 PE I IMP 3.41 TO 4.45 1 1 MJR CLASS of WK: 4 IR/W I I IHartstene Bridge Rd to 0.13 mi south of Scenic View Rd I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.04 F.A. PROJ NO. I -1 I I(ID-47 RAP-42) (CRP 1487) I 1 UTILITY CODES: - - ITOT 01 0 ---------------------------------------------------------------------------------------------------------—------------------------- 18I07196140-2.45 MCLANE COVE BRIDGE i IF1 1 671 608I 1 6751 5551 1 1201 PE 1 120 1 12.15 TO 2.55 I I MJR CLASS of WK: 4 IR/W I (Replacement of bridge plus new approaches (Realign) I I WORK CODES: L ICON I I ( (ID-15) (CRP n/a) I I TOTAL LENGTH: .40 F.A. PROD NO. I -1 I I I I UTILITY CODES: - - ITOT 01 120 ------------------------------------------------------------------------------------------------------------------------------------ 19107I96140 GRAPEVIEW LOOP ROAD - 2 1 IPI I 50I 5001 I 5501 550I 1 1 PE I I IMP 2.55 TO 3.50 I 1 MJR CLASS of WK: 1 IR/W I 1 10.12 miles East of McClane Cove Bridge to Lombard Road I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .95 F.A. PROD NO. I -1 I I (ID-61) (CRP 1379) 1 1 UTILITY CODES: - - (TOT O1 0 ------------------------------------------------------------------------------------------------------------------------------------ 20107IBELFAIR BYPASS I IUI I 1501 1450I 4700I 63001 63001 1 1 PE I I I I I MJR CLASS of WK: 1 IR/W I I INew Road from SR 3 north of the Belfair vicinity south I I WORK CODES: ABC ICON I I Ito SR 3 south of the rail road tracks I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I _1 - I I (ID-101) (CRP n/a) 1 I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX. YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1999 TO 2004 Page 4 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R III I ICIFI I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN O ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 12ND 13RD 14TH 1 O I O (RAP I E I 1ST 14TH I I Al IYIIIYEAR (YEAR IYEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A IUATA I R I 3RD 16TH Y I SI 1 IGI 1 1 IYEAR I L I L ITIA I L I YEAR (YEAR ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ 21114190100 SHELTON - MATLOCK ROAD I (III 1 1 851 8631 9481 9481 1 1 PE I 1 10.91 TO 1.38 1 1 MJR CLASS of WK: 3 IR/W I I (City Limits to Goldsborough Bridge 1 1 WORK CODES: ABD ICON I I (Minor Widening 1 1 TOTAL LENGTH: .47 F.A. PROD NO. 1 1 I I (ID-42) (CRP n/a) I 1 UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 22108179800 BEAR CREEK-DEWATTO ROAD - 3 1 IUI 1 1 841 7801 8641 8641 1 1 PE I I IMP 9.00 TO 10.44 ( I MJR CLASS of WK: 4 IR/W I 1 10.31 miles east of Tiger Mission Rd to Old Belfair Hwy 1 I WORK CODES: ABC ICON I I ]Realign and Regrade 1 ( TOTAL LENGTH: 1.44 F.A. PROD NO. 1 1 i I (ID-38) (CRP n/a) ] 1 UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 23107191720 JOHN-S PRAIRIE RD I IFI 1 1 511 4611 5121 01 3621 1501 PE I I IMP 2.52 TO 3.45 1 1 MJR CLASS of WK: 1 RAP IR/W I I (RR crossing to County Shop I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .93 F.A. PROJ NO. 1 1 I I (ID-98) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 24107197500 BELFAIR-TAHUYA ROAD - 1 1 IUI I 1 1 10401 10401 10401 1 1 PE I 1 10.00 TO 1.15 ( I MJR CLASS of WK: 15 IR/W I I IKay-s Corner northerly 1.15 miles 1 1 WORK CODES: ABD ICON I I (Horizontal and Vertical realignment 1 1 TOTAL LENGTH: 1.15 F.A. PROD NO. 1 1 _ I I(ID-19 RAP-51) (CRP 1522) 1 1 UTILITY CODES: - - (TOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 25109139630 NORTH ISLAND DRIVE - 1 1 IFI I 1 1 5831 5831 01 2831 3001 PE I I IMP 0.31 TO 1.31 I 1 MJR CLASS of WK: 4 RAP IR/W I I (End of AC north 1 mile ] I WORK CODES: A3D ICON I I (Realign and Regrade ( 1 TOTAL LENGTH: 1.00 F.A. PROD NO. 1 1 _ I I(ID-68) (CRP 1544) ] I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 26107INEW ROAD "WT-BUDING ROAD• - PHASE 2 1 IUI I I 1 11901 11901 11901 1 1 PE I I IAPPROX.IMATELY 1.5 MILES 1 1 MJR CLASS of WK: 45 IR/W I I INew road from Trails Rd to SR 3 south of SR 106 ( 1 WORK CODES: ABD ICON I I IPhase 2: From end of Phase 1 to SR 3 south of 1 I TOTAL LENGTH: 4.00 F.A. PROD NO. 1 1 _ ISR 106 (ID-20) (CRP 777T) 1 ( UTILITY CODES: PTC - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 27109177270 HAVEN WAY - 2 1 IUI I 1 1 7281 7281 7281 1 1 PE I I IMP 0.91 TO 2.30 1 1 MJR CLASS of WK: 4 IR/W I I MAVEN LAKE DRIVE TO END OF AC 1993 PROJECT 1 1 WORK CODES: ABD ICON I I (Realign and Regrade 1 1 TOTAL LENGTH: 1.39 F.A. PROJ NO. 1 1 _ I I (ID-7) (CRP 1444) - 1 1 UTILITY CODES: PT - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1999 TO 2004 Page 5 MASON COUNTY P IF I I I I ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- I FEDERAL R III I ICIFI I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIDI ---EXPENDITURE PLAN--- -----SOURCE----- I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 12ND 13RD 14TH I 0 I O IRAP I E I 1ST I4TH I I Al IYIIIYEAR IYEAR (YEAR 15TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 16TH I A I A (DATA I R I 3RD I6TH Y I SI I IGI I I IYEAR I L I L ITIA I L I YEAR IYEAR 28I07I96140 GRAPEVIEW LOOP ROAD - 5 I III) I I I 4561 4561 4561 I I PE I I IMP 6.10 TO 6.93 I I MJR CLASS of WK: 4 IR/W I I ICronquist Road to Nelson Road I I WORK CODES: ABD ICON I I (Realign and Regrade I I TOTAL LENGTH: .83 F.A. PROJ NO. I -1 I I (ID-64 RAP-39) (CRP n/a) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 29I08I04450 HIGHLAND RD I IOI I I I 880I 880I 880I I I PE I I IMP 4.65 TO 6.43 I I MJR CLASS of WK: 1 IR/W I I (Realign and Regrade I I WORK CODES: ABD ICON I I 1.72 mi S of Panhandle Lake to 1.5 mi N of Cloquallum I I TOTAL LENGTH: 1.78 F.A. PROD NO. I -1 I (ID-99) (CRP n/a) I I UTILITY CODES: - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 30I07INEW ROAD "WT-BUDING ROAD• - PHASE 1 I III( I I 11356I 13561 13561 I I PE I I (APPROXIMATELY 1.5 MILES I I MJR CLASS of WY: 45 IR/W I INew road from Trails Rd to SR 3 south of SR 106 I I WORK CODES: ABD ICON I I I I I TOTAL LENGTH: 4.00 F.A. PROJ NO. I I ISR 106 (ID-20) (CRP ????) I I UTILITY CODES: PTC - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 31I08I86070 SAND HILL RD - 2 I IDI I I I 8691 8691 8691 I I PE I I IMP 2.66 TO 4.30 I I MJR CLASS of WK: 4 IR/W I I 10.1 mi N of Trans Station to 0.39 mi S of Delmore Rd I I WORK CODES: ICON I I (Realign and Regrade I I TOTAL LENGTH: 1.64 F.A. PROJ NO. I I I (ID-89) (CRP n/a) I I UTILITY CODES: ABD - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ 32I08I86070 SAND HILL RD - 3 I IDI I I I 70I 70I 70I I I PE I I IMP 4.30 TO 5.82 I I MJR CLASS of WK: 2 IR/W I I 10.36 miles south of Delmore Rd to Bear Creek-Dewatto I I WORK CODES: ICON I I IRealign and Regrade I I TOTAL LENGTH: 1.52 F.A. PROJ NO. I ( I I (ID-90) (CRP n/a) I I UTILITY CODES: ABD - - ITOT OI 0 ------------------------------------------------------------------------------------------------------------------------------------ 33I08I28850 PICKERING ROAD - 4 I IDI I I I 80I 80I 80I I I PE I I IMP 4.45 TO 5.35 I I MJR CLASS of WK: 4 IR/W I I 1.13 mi S of Scenic View Rd to .11 mi N of Schneider Rd I I WORK CODES: ABC ICON I I IRealign and Regrade I I TOTAL LENGTH: .90 F.A. PROJ NO. ( I I (ID-84) (CRP n/a) I I UTILITY CODES: - - (TOT OI 0 ------------------------------------------------------------------------------------- 34I07INEW ROAD FROM SR 3 TO GRAPEVIEW LOOP ROAD I IUI I I I 40I 40I 40I I I PE I I I I I MJR CLASS of WK: 1 IR/W I I (From SR 3 East to Grapeview Loop Rd I I WORK CODES: ABD ICON I I Inear the Cronquist Rd I I TOTAL LENGTH: 1.50 F.A. PROJ NO. I -1 I I (ID-66) (CRP 1545) I I UTILITY CODES: - - ITOT 01 0 ------------------------------------------------------------------------------------------------------------------------------------ SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1999 TO 2004 Page 6 MASON COUNTY SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN FUNDED PROJECTS lot Year 6585 ( Local 14521 Years 1-3 Years 4-6 Totals 2nd Year 4177 RAP 1648 P E 124 120 244 3rd Year 2191 CAPP 1652 I R/W 0 0 0 4-6 Year 6069 TIA 0 CONST 100 0 100 DATA 0 Fed. 794 Totals ... 19022 18615 224 120 344 ------------------------------------------------------------------------------------------------------------------------------------ UNFUNDED PROJECTS 1st Year 88 Local 16632 Years 1-3 Years 4-6 _ Totals (Proposed and Unknown) 2nd Year 795 I RAP 363 P E 0 0 0 3rd Year 3060 I CAPP 0 I R/W 0 0 0 4-6 Year 13052 I TIA 0 CONST 0 0 0 ' I DATA 0 Fed. 0 Totals ... 16995 16995 0 0 0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS lot Year 6673 Local 31153 Years 1-3 Years 4-6 Totals 2nd Year 4972 RAP 2011 P E 124 120 244 3rd Year 5251 CAPP 1652 R/W 0 0 0 4-6 Year 19121 TIA 0 ( CONST 100 0 100 DATA 0 Fed. 794 Totals ... 36017 35610 224 120 344