Loading...
HomeMy WebLinkAbout61-98 - Res. County Road Project 1585 MASON COUNTY COMMISSIONERS RESOLUTION NO.: 61-98 COUNTY ROAD PROJECT NO.: 1585 WHEREAS,on Mason County Road No. 76690,known locally as the Dewatto-Holly Road,and more specifically located in Section 12,Township 23 North,Range 3, West,W.M. ,M.P. 4.58,work defined as 1°construction"in the BARS Manual,Page 11-63,et seq,is determined to be necessary and proper;and, WHEREAS,this project is identified as#5 on the officially adopted County Annual Road Program. THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Oak Lake Creek Perform preliminary engineering,right of way acquisition,replace existing 58"Dia x 3 8"H x 651 culvert with a 14'Dia'x 9'H x 80'L multi-plate culvert,and armor channel.. SAID WORK is to be performed by Contract in accordance with the Washington State Standard (day labor/contract) Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper,and the estimated costs of said project are herewith set out as follows: Engineering $— 3,000.00 Right-of-Way $ 2,500.00 Road Construction $ 100,000.00 The County Road Project herein described is HEREBY DECLARED to be a public necessity,and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in accordance with WAC 136-18, ADOPTED this 16th day of June ' 1998 BOARD OF COUNTY COMMISSIONERS MASON COUNTY,WASHINGTON JOiFN A.BOLENDER,Chai 7'T I A CMYNTHIA . OLSEN,Commissioner ATTEST: MARY,--i'Pi-C Commissioner LIZ' Clerk of the Board cc: Co. Commissioners Engineer JOURNAL: Publ. lt.: 6/25Z98 /Bill Rd. Dept.) scv h:\wp\crp\CRP-oak.crk