HomeMy WebLinkAbout39-98 - Res. County Road Project 1583 MASON COUNTY
COMMISSIONERS RESOLUTION NO.: 3 9—9 8
COUNTY ROAD PROJECT NO.: 1583
WHEREAS,on Mason County Road No. 06250 ,known locally as the Deegan Road East,and more
specifically located in Section 24,Township 20 North,Range 4 West,W.M. ,M.P. 0.15 ,work defined as
"construction"in the BARS Manual,Page II-63,et seq,is determined to be necessary and proper,and,
WHEREAS,this project is identified as#5 on the officially adopted County Annual Road Program.
THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their
intention to:
Perform preliminary engineering,right of way acquisition,replace existing culvert with an open
bottomed structure and armor channel.
SAID WORK is to be performed by contract in accordance with the Washington State Standard Specifications
for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper,and the
estimated costs of said project are herewith set out as follows:
Engineering $ 11,600.00
Right-of-Way $ 3,500.00
Road Construction $ 100 000.00
The County Road Project herein described is HEREBY DECLARED to be a public necessity,and the County Road
Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in
accordance with WAC 136-18.
ADOPTED this 14th day of April , 19 98 .
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
JOHN A.BOLENDER,C ers
C D.OLSEN,Commissioner
ATTEST: ;r'✓/ �' / ' i
MARY JO;CADT,Commissi ner
Clerk of the Board
cc: Co. Commissioners
Engineer
JOURNAL: Publ. lt.: 04-16-98 (Bill Rd. Dept.)
scv h:\wp\crp\1583-CRP.RES