Loading...
HomeMy WebLinkAboutFPA2006-00026 SEP2006-00128 - FPA Permit / Conditions - 6/6/2010 (2) ESA LISTED SALMONIDS CHECKLIST Applicant Information Project Information Name RE D Fl Lfl SToc. q N C- Name N A Phone 3 GO -3 3 9- Z?O$ Location P,S I GL K 3 LoT 1.3 LY- Gu:5141AN Description TrLE F 2EM auk At JL (`uA- A CA+?itJ i ic- SY-- =m r WFLi-, /A D DR.iye W A y This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES NO Please describe. 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES NO N Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. RECEIVED A § 6 AEA April 2003 - 1 - FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: a. Surface water? YES NO Amount Name of surface water body b. Ground water? YES NO Amount From where Depth of well 2. Will any water be rerouted: YES NO If yes,will this require a channel change? 3. Will there be retention or detention ponds? YES NO If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface water discharge, please give the name of the waterbody. 4. Will this project require the building of new roads?. YES NO Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES NO 6. Will topography changes affect the duration/direction of runoff flows? YES NO If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? YES NO If yes, how will the loss of flood storage be mitigated by your project? -3 - VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation, thereby, adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks: YES NO If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If any vegetation is removed, do you plan to re-plant? YES NO If yes,what types of plants will you use? -5 - Zf3 l,c T - SCALE-IN,-?-Od ............ ,K7 1-1 jF, Fs �;Oo Rv,\ 70 Pow SCALE 1 01-200! 'WAN@=# It je"v-,cu jo�amr USE fivy ARM A(4W# zr it 4) -W-AV AW L-AtE: Cu-,�PA-MAJ j::J,-'t,lAi,UT8-AjAPCtS F FACE TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 Mason County DCD Planning Division PO Box 279 Shelton, WA 98584 Redfield Stocking 9805 Whitecap Drive NW Olympia, WA 98502 (360) 339-2705 RE: Geotechnical Report Case No. Parcel No. 42333-51-03013 Cushman Eastside 1, Blk 3, Lot 13 Forest Service Road No. 2300 Hoodsport, WA 98548 INTRODUCTION I was contacted by Redfield"Red" Stocking early this year and was requested to investigate and document slope stability and landslide hazard issues relating to the residential development of Mason County Property Tax Parcel Number 42333-51-03013, otherwise know as the assessor's plat of Lake Cushman—Eastside No.1, Block 3, Lot 13 located on Forest Service Road 2300. The property is located approximately 1-1/4 miles up the Dow Mountain Road behind the Lake Cushman Maintenance Office which is located approximately 4 miles west of Hoodsport on the Cushman Road (SR-119). The property is a five acre parcel measuring roughly 930'+along its long/north-south axis, and roughly 240' along its east-west axis. Property dimensions are shown on the attached site plan. The Stockings wish to develop the property with a three bedroom residence. A three bedroom On-site Septic System(OSS) design is being developed. The following ten elements are required by Mason County to be addressed in geotechnical reports prepared to comply with Mason County's Critical Resource Ordinance Sections 17.01.100 through 17.01.104 1. SURFACE AND GEOLOGIC CONDITIONS: The property has been logged in the past, and has medium aged second growth fir, hemlock, and cedar tress growing evenly throughout the property. Besides the conifers, File:C:IProjectslStockinglGeolGeo-Rpt.doc 1 of 5 5/11/2006 A a I TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 the property has Maple, Alder, Vine Maple, and a moderate covering of Salal, Oregon grape, ferns, and other vegetation. The Series 1950,No. 9 SOIL SURVEY of Mason County indicates the site soils are Classified as Rc which is described as "rough mountainous land, Hoodsport soil material". These soils typically result from the weathering of the glacial till soils found underlying much of the area. Fractured and solid basalt rock is typically found from depths of a few feet to 30 to 50' beneath the till layer(s). The Hoodsport soil types are prone to neither erosion, or liquefaction, and are not listed in Mason County's Resource Ordinance as an erodible soil or an erosion hazard. The Hoodsport soils are typically describes as excessively drained, and typically are composed of a fairly high percentage of cobbles or gravels. The soil is also comprised of varying ratios of fines, including silts and clays, which may comprise as high as 12 or 15% of the soil volume. The soils on the Stocking site contain a moderate amount of fines, along with a random mixture of sand, gravels and cobbles, and are generally the weathered surface of the glacial till soils underlying the whole region. The soil provides good foundation support in its undisturbed state, but must be properly placed and compacted if fill sections are expected to provide reliable bearing. The northerly third of the property contains slopes ranging from 20 to 30%. The southerly two-thirds of the property lies on slopes generally averaging 30 to 45% slopes. The main property development is planned on the northerly portion of the property. Development on the southerly part of the property is not planned at this time other than pioneering in a short road and flat area to accommodate a water well. If this is pursued, the road and landing would be located not far south from the Forest Service Road. A conjectural well location is shown on the plan sheet. The well may also be placed somewhere in the northerly area of the property, but this decision is still being made. Further consideration of the soils found on site lead to describing the soils in terms of the Unified Soil Classification System(USCS) criteria, and describing the soils as a GP (gap-graded gravels or uniform gravels, sandy gravels), or even more likely as GM (silty gravels, silty sandy gravels). These soil designations were used in characterizing the soil for stability analysis. 2. DEVELOPMENT AND GEOLOGIC FEATURES: A site plan has been developed for this property and is attached in the appendixes. The final location and size of the planned residence is still being finalized. Though the property contains slopes in the 40%+range, they roughly represent the underlying glacial till surface, and may be considered very stable. 3. LOCATIONS OF LOGS OF EXPLORATORY HOLES OR PROBES: An inspection of the slopes and cuts in the subject property's vicinity was performed and compared with the Mason County Soil Survey soil descriptions. The cuts and soil layers observed around the area confirm the soils as generally being medium dense soil horizons of weathered Vashon glacial till to a depth around 3-feet where it becomes more dense and can File:C:IProjectslStockinglGeolGeo-Rpt.doc 2 of 5 5/11/2006 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 be characterized as hardpan. The soil logs dug for designing the On-Site Septic System design found permeable soils to depths of 60 plus inches in the primary drainfield area, and a minimum 36 inches in the proposed reserve drainfield(DF) area. 4. CROSS SECTION WITH PROPOSED GRADE CHANGES: A cross section is included in the appendix. Grade changes will mainly be for the purpose of constructing an access driveway from the Forest Service Road to the proposed building area, and the leveling of the building area itself. The proposed residence will be excavated into the hillside, with the entire foundation sited on undisturbed native soil, mainly the till layer. The yard area in front (to the south) of the residence may be enlarged by wasting the soils produced from excavating the structures' basement or foundations. Any fill placed on the property will be placed in compliance with the County's grading ordinance requirements, which require fill placed on slopes steeper than 20% , to be place on a level bench excavated for the purpose of providing a stable area to construct the engineered fill slope on. Fill receiving areas will be cleared of vegetation, and a level bench, a minimum of 6-feet wide, will be excavated so that the fill slope may be constructed in uniform 6 to 12"thick"lifts" of fill soil, compacted to 90+% compaction before subsequent lifts of fill are placed. Fill slopes constructed in this manner, may be constructed to the County's standard 2:1 (H:V 50%) fill slope geometry. Excavation on the uphill side of the road, and for the building foundation is expected to be dug out of the hardpan layer, and may be excavated at a maximum 1:1 slope (H:V). 5. SLOPE STABILITY ANALYSIS: The steepest slopes on the property in its present condition contain no obvious recent mass landslides or stability problem indicators. The proposed building area in the central area of the northerly portion of the property has no discernible irregularities, settlements, fissures, or evidence of consolidation problems. Unified Soil Classification System typing laces the soils in a coarse rained soil GM Y Yp g P g ( ) classification with a dry density between 120-135 lbm/ft3 and a typical effective stress friction angle (0)>340. The surface soil layers appear to be a relatively dirty gravel, so a GP soil classification may also be appropriate with the same dry density and phi angle. A soil density of 130 Ibs/ft3 will be used in the stability analysis. Slope stability calculations are addressed on an Excel spreadsheet following the plans.A phi angle of 36' for the soil internal friction angle was used along with a cohesion value of 300 lbs per W. The glacial till soils can be modeled with cohesion values as high as 1000 lbs per ft2, and with internal friction angles above 40°, so the analysis is based on conservative assumptions.Foundations bearing on the medium dense and dense Hoodsport gravelly sandy loams can expect to realize bearing capacities of the natural soil in the 1000 to 2000 pounds per square foot range, with settlement for residential foundations within half an inch overall. File:C:IProjectslStockinglGeolGeo-Rpt.doc 3 of 5 5/11/2006 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 6. RECOMMENDED SETBACKS & DRAINAGE: The property contains only isolated areas of relatively level ground, and will require construction on what may be classified as potentially unstable ground.No structures should be planned to be placed on fill material,unless the fill is placed as structural fill under the supervision of an engineer, or an engineering geologist. So long as the residences' footings are constructed on the natural glacial till, a building setback from the crest of the slope is not needed. Footings should be buried on their downslope side enough to protect them from freeze-thaw actions. For this area(Cushman/Olympic foothills), a minimum 18" of soil cover should be placed above all footings. Drainage from the developed property should be directed into the naturally vegetated areas of the property. Concentrated discharges of collected stormwater runoff should be avoided. Collected stormwater runoff should be dispersed as close to its source as practical and allowed to seep into the ground. Sensitive areas like the septic drainfield area should be protected from the delivery of any stormwater flows in its vicinity. Driveway runoff should be dispersed as frequently as possible into the surrounding vegetation. Water bars, and driveway cross culverts on no greater than 200' intervals should be planned as part of the property development. Roof runoff may be dispersed at downspout splash blocks, and directed away from the foundation into the yard area. 7. CLEARING, GRADING, AND VEGETATION MANAGEMENT: Clearing for the residence, a driveway, and a possible well location will be necessary for development of the property. Besides removing trees for the building and driveway footprints, danger trees (potentially threatening to the residence)may be planned to be removed.Aside from clearing and grading the property for the residence and driveway, no clearing or grading on other parts of the property is planned. Once a residence is constructed on the property, bare areas will be planted with grass and landscape plantings. Overall, it appears the development of the property will have a minor impact on the property itself, and little or no impact to surrounding properties. 8. EROSION AND SEDIMENT CONTROL: As indicated earlier in this report,the site's soils are not considered erodible, and minimal Erosion and Sediment(E&S) Control measures should be adequate to protect neighboring properties and State waters. Access to the site will be developed off of the Forest Service Road (private), roughly a mile away from any public roads. Construction of the proposed driveway will include a driving surface of clean gravel or crushed rock. The major earthwork will be leveling the house's building location, excavating the footing trenches, and constructing the driveway. These development areas drain mainly to the owner's property, and will have approximately 20+-feet of vegetative to pass through before any runoff exits the property at its normal discharge locations. File:C:IProjectslStockinglGeolGeo-Rpt.doc 4 of 5 5/11/2006 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 The existing and proposed features should provide adequate protection against adverse stormwater runoff impacts. 9. ON-SITE AND OFF-SITE IMPACTS: Construction and completion of the proposed improvements are not expected to result in any adverse on-site, or off-site impacts. The proposed residential development of the property will not result in adverse impacts to either the subject property or to neighboring properties. 10 SPECIFICATIONS OF FINAL DEVELOPMENT CONDITIONS: The completed site will be allowed to return, for the most part, to a naturally vegetated state. The main ground cover will be lawn and medium height shrubbery. In the future development of the property, discharging concentrations of collected Stormwater runoff within 20 feet of a property boundary should be avoided. Conclusions and Summary; The residential development of the Stocking property located in the Dow Mountain area of Lake Cushman does not appear to present any stability problems that cannot be overcome, and will not result in any undesirable impacts. The property itself provides an adequate vegetated buffer area to protect neighboring properties and State Waters from adverse stormwater runoff impacts. The stormwater related recommendations made in this report should be adequate for both temporary and permanent stormwater runoff management and concerns. I hope this report meets the needs of the Stockings, and Mason County in planning the property's development. WAS Sincerely, Alan A. Tahja, P.E. 07g'% Attached: Site Plan (Plan Sheets I & 2) MtC3NA1. Cross Section (Plan Sheet 3) Stability Analysis (Excel Spreadsheet) File:C:IProjectslStockinglGeolGeo-Rpt.doc 5 of 5 5/11/2006 Revision# Description Date TAHJA ENGINEERING,Inc. STOCKIIVG SITE PLAN "'`"'` Alan Tahja,P.E. Redfield Stocking Stocking PO Box 235 9805 Whitecap Drive NW Hoodspo4 WA 98548 Olympia, WA 98502 1 of 3 County Prcl No. 42333 5103013 (360)877-9512 (360) 339-2705 o Co • ��i I M " ca C f g � L o - / I ` S°o 9 'Z€6 o 0 61 Qt9 m7� S o \ ,l offV o0 L (("`` cl ` �■ �.. ■ ■.�. r. IP QCA Q ;K dD QQ Revision# Description Date TAHJA ENGINEERING,Inc. STOCKING SITE PLAN Froj.Fffe Alan Tahja,P.E. Redfield Stocking Stocking PO Box 235 9805 Whitecap Drive NW HoodspoA WA 98548 Olympia, WA 98502 360 877-9512 360 339-2705 2 of 3 CountyPrcl No. 42333 5103013 ( ) � ) 1 1 O �9L'Z£6 'Id ifs � x I O 'ch \ aa0 o6I M �\ F N s 'Id �`��\ rd� � aQ•o f I ° OF S'e N 1 1 � Revision# Description Date TAHJA ENGINEERING,Inc. STOCKING SITE PLAN N4.F& Alan Tahja,P.E. Redfield Stocking Stocking PO Box 235 9805 Whitecap Drive NW s Hoodspoi t, WA 98548 Olympia, WA 98502 3 of 3 CountyPrcl No. 42333 5103013 (360)877-9512 (360) 339-2705 d � � m N A'08 a0r a r" S�saro�� voTI aa�nzaS�sazo3 L o •L ¢ ' N V N I I a Cn M V] 3 � I � o f CD U / b N LLU U I \ I Stocking Stability Analysis Mason County Parcel Number 42333-51-03013 Slope Stability Analysis Section A-A Weight Slip Plane Angle: 452 kip 200 3470 SF Slip Plane Length=260' t170 Normal Force 1120 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 Factor of Safety (FS) is to be calculated against sliding -Static Conditions FS = Resisting force/ Driving force _ [c'L + N'x Tan(9)]/[W x sin(a)] _ [c'L + (W x cos(a) - U x L) x tan(6)]/[W x sin(a)] _ where; FS = Factor of Safety against sliding t 1/7/2Ep� c' = drained shear strength of the slide plane (c' - 300 psf for med dense glacial till 6= angle of internal friction (360 used) L = Length of slip plane surface (260') N = normal force : perpendicular to slip plane (N =W x cos(a)) W= total weight of failure wedge (130 pcf x 3470') = 451,100 Ibs=452 kip) u= average pore water pressure along the slip surface (psf) = 0 for gravelly loam sands a= Slope/Slip Plane Angle (110) FS = [(.3 x 260)+[452 x cos(11°)-(0 x 260)] x tan(36)]/ [452 x sin(11°)] _ [(78+(443.7)(0.9816)]/86.2 = 400/86.2 =4.64 4.64 > 1.5 OK Factor of Safety(FS) against sliding - Dynamic Conditions (Seismic Factor b = 0.3) FS = [c'L + (W x cos(a) - b x W x sin(a) - U x L) x tan(6)]/[W x sin(a) + b x W x cos(a)] "=[(.3x260+(452xcos(11°)-.3x452xsin(11 0)-Ox260)xtan(36)]/(452xsin(11)+.3x452xcos11° _ (78 + (443.7-25.9 -0) x .7265)/[86.2 + 133.1] = 381.5/219.4 = 1.74 > 1 OK TAHJA ENGINEERING, Inc. 5/11/2006 o� STATE O� Y N Y M V SEP 1 3 2006 0 by lass� STATE OF WASHINGTON MIMN CCU,' P u,J"rMG RED, DEPARTMENT OF ECOLOGY PO Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 September 12,2006 Ms. Tammi Clark Department of Community Development Mason County Planning Division PO BOX 279 Shelton, WA 98584 Dear Ms. Clark: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Stocking Clearing for a Cabin(SEP2006-00128), located at Lake Cushman Eastside#1 Block 3,Lot 13, as proposed by Redfield Stocking. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Roberta Woods(360) 407-6269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW,Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or storm drains that lead to waters of the state. Sand, silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants. Proper disposal of construction debris must be on land in such a manner that debris cannot enter the natural stormwater drainage system or cause water quality degradation of state waters. During construction,all releases of oils, hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over other work on the site. Clearing limits and/or any easements or required buffers should be identified and marked in the field, prior to the start of any clearing, grading, or construction. Some suggested methods are staking and flagging or high visibility fencing. Provision should be made to minimize the tracking of sediment by construction vehicles onto paved public roads. If sediment is deposited, it should be cleaned every day by shoveling or sweeping. Water cleaning should only be done after the area has been shoveled out or swept. «1 September 12,2006 Page 2 Ecology's comments are based upon the information provided with the SEPA checklist. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (DN: 06-7372) cc: Roberta.Woods, WQ Redfield Stocking(Proponent) SEP-12-2006 TUE 12:54 PM DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 01 t FAX NUMBER_ FAX COVER SHEET DATE: TIME: # OF PAGES L z m 0 O z m c� c� r m 0 D m SEP-12-2006 TUE 12:54 PM DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 02 t , 6TAT�,A r d13 STATE OF WASHINGTON DEPARTMENT OF EC PD Box 47775. O/YmP'a' W-7-'hingt0n 98504-777 sO 1 Y (360)407-6300 September 12,2006 Ms. Tammi Clark Depaftent of Community Mason County Planning Division °pment PO Box 279 Shelton, WA 98584 Dear Ms. Clark: Thank you for the o Stockingpporturuty to comment on the mitigated determination ofnonsignificance fo Clearing fora Cabin(SEP2006-00128), located at Lake Cushman as proposed by Redfeld Stockin r the checklist and has the followin co The Department ofEcolo Eastside#1 Block 3, Lot 13, g mment(s): g3'(Ecology)reviewed the environmental WATER QUALITY:Roberta Woods(360)407-6269 Any discharge of sediment-laden di de n runoff or other pollutants Chapter 90.48 RC WWater to waters of the state is in violation of Surface Waters of the State ofoW soh nCn, I and WAC 173-201A and is subject to enforcement actter tiion Quality Standards for Erosion control measures must be in place prior to any clearing,grading,control measures must be effective to prevent stormwater runoff from carrying pollutants into surface water or storm drains that lead at waters of g, °r construction. These and soil will damage aquatic habitat and are considered to be of f t ate. soil and other the state. Sand, silt, clay particles, Proper disposal of construction debris must be on land in such ants. natural stormwater drainage system or cause water quality g y a manner that debris cannot enter the During construction, all releases of oils h q degradation of state waters. solvents,and other deleterious materials must be contained and removed in hydraulic fluids,fuels, other petroleum products,paints, their discharge to waters and soils of the state. The cleanup of spills should other work on the site, a manner that will prevent take precedence over Clearing limits and/or any easements or required buffers should be identified Prior to the start of any clearing, grading, or construction. Some suggest and marked in the field, flagging or high visibility fencing. ggested methods are staking and Provision should be made to minimize the tracking of sediment by construction public roads, If sediment is deposited, it should be cleaned every day b sho Water cleaning should only be done after the area has been shoveled taon vehicles onto paved Y veIing or sweeping out or swept. SEP-12-2006 TUE 12:55 PM DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 03 September 12,2006 Page 2 Ecology's'comments are based upon the information provided with the SEPA checklist. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (DN: 06-7372) cc:. Roberta Woods,WQ Redfield Stocking(Proponent) s' a 4 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 Mason County DCD Planning Division PO Box 279 Shelton, WA 98584 Redfield Stocking 9805 Whitecap Drive NW Olympia, WA 98502 (360) 339-2705 RE: Geotechnical Report Case No. Parcel No. 42333-51-03013 Cushman Eastside 1, Blk 3, Lot 13 Forest Service Road No. 2300 Hoodsport, WA 98548 INTRODUCTION I was contacted by Redfield"Red" Stocking early this year and was requested to investigate and document slope stability and landslide hazard issues relating to the residential development of Mason County Property Tax Parcel Number 42333-51-03013, otherwise know as the assessor's plat of Lake Cushman—Eastside No.1, Block 3, Lot 13 located on Forest Service Road 2300. The property is located approximately 1-'/a miles up the Dow Mountain Road behind the Lake Cushman Maintenance Office which is located approximately 4 miles west of Hoodsport on the Cushman Road (SR-119). The property is a five acre parcel measuring roughly 930'+along its long/north-south axis, and roughly 240' along its east-west axis. Property dimensions are shown on the attached site plan. The Stockings wish to develop the property with a three bedroom residence. A three bedroom On-site Septic System(OSS)design is being developed. The following ten elements are required by Mason County to be addressed in geotechnical reports prepared to comply with Mason County's Critical Resource Ordinance Sections 17.01.100 through 17.01.104 1. SURFACE AND GEOLOGIC CONDITIONS: The property has been logged in the past, and has medium aged second growth fir, hemlock, and cedar tress growing evenly throughout the property. Besides the conifers, File: C:IProjectslStockinglGeolGeo-Rpt.doc I of 5 5/11/2006 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 the property has Maple, Alder, Vine Maple, and a moderate covering of Salal, Oregon grape, ferns, and other vegetation. The Series 1950, No. 9 SOIL SURVEY of Mason County indicates the site soils are Classified as Rc which is described as "rough mountainous land, Hoodsport soil material". These soils typically result from the weathering of the glacial till soils found underlying much of the area. Fractured and solid basalt rock is typically found from depths of a few feet to 30 to 50' beneath the till layer(s). The Hoodsport soil types are prone to neither erosion, or liquefaction, and are not listed in Mason County's Resource Ordinance as an erodible soil or an erosion hazard. The Hoodsport soils are typically describes as excessively drained, and typically are composed of a fairly high percentage of cobbles or gravels. The soil is also comprised of varying ratios of fines, including silts and clays, which may comprise as high as 12 or 15% of the soil volume. The soils on the Stocking site contain a moderate amount of fines, along with a random mixture of sand, gravels and cobbles, and are generally the weathered surface of the glacial till soils underlying the whole region. The soil provides good foundation support in its undisturbed state, but must be properly placed and compacted if fill sections are expected to provide reliable bearing. The northerly third of the property contains slopes ranging from 20 to 30%. The southerly two-thirds of the property lies on slopes generally averaging 30 to 45% slopes. The main property development is planned on the northerly portion of the property. Development on the southerly part of the property is not planned at this time other than pioneering in a short road and flat area to accommodate a water well. If this is pursued, the road and landing would be located not far south from the Forest Service Road. A conjectural well location is shown on the plan sheet. The well may also be placed somewhere in the northerly area of the property, but this decision is still being made. Further consideration of the soils found on site lead to describing the soils in terms of the Unified Soil Classification System (USCS) criteria, and describing the soils as a GP (gap-graded gravels or uniform gravels, sandy gravels), or even more likely as GM (silty gravels, silty sandy gravels). These soil designations were used in characterizing the soil for stability analysis. 2. DEVELOPMENT AND GEOLOGIC FEATURES: A site plan has been developed for this property and is attached in the appendixes. The final location and size of the planned residence is still being finalized. Though the property contains slopes in the 40%+range,they roughly represent the underlying glacial till surface, and may be considered very stable. 3. LOCATIONS OF LOGS OF EXPLORATORY HOLES OR PROBES: An inspection of the slopes and cuts in the subject property's vicinity was performed and compared with the Mason County Soil Survey soil descriptions. The cuts and soil layers observed around the area confirm the soils as generally being medium dense soil horizons of weathered Vashon glacial till to a depth around 3-feet where it becomes more dense and can File: C:IProjectslStockinglGeolGeo-Rpt.doc 2 of 5 5/11/2006 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 be characterized as hardpan. The soil logs dug for designing the On-Site Septic System design found permeable soils to depths of 60 plus inches in the primary drainfield area, and a minimum 36 inches in the proposed reserve drainfield(DF) area. 4. CROSS SECTION WITH PROPOSED GRADE CHANGES: A cross section is included in the appendix. Grade changes will mainly be for the purpose of constructing an access driveway from the Forest Service Road to the proposed building area, and the leveling of the building area itself. The proposed residence will be excavated into the hillside, with the entire foundation sited on undisturbed native soil, mainly the till layer. The yard area in front (to the south) of the residence may be enlarged by wasting the soils produced from excavating the structures' basement or foundations. Any fill placed on the property will be placed in compliance with the County's grading ordinance requirements, which require fill placed on slopes steeper than 20% , to be place on a level bench excavated for the purpose of providing a stable area to construct the engineered fill slope on. Fill receiving areas will be cleared of vegetation, and a level bench, a minimum of 6-feet wide,will be excavated so that the fill slope may be constructed in uniform 6 to 12"thick"lifts" of fill soil, compacted to 90+% compaction before subsequent lifts of fill are placed. Fill slopes constructed in this manner, may be constructed to the County's standard 2:1 (H:V 50%) fill slope geometry. Excavation on the uphill side of the road, and for the building foundation is expected to be dug out of the hardpan layer, and may be excavated at a maximum 1:1 slope (H:V). 5. SLOPE STABILITY ANALYSIS: The steepest slopes on the property in its present condition contain no obvious recent mass landslides or stability problem indicators. The proposed building area in the central area of the northerly portion of the property has no discernible irregularities, settlements, fissures, or evidence of consolidation problems. Unified Soil Classification System typing places the soils in a coarse grained soil (GM) classification with a dry density between 120-135 lbm/ft3 and a typical effective stress friction angle (0)> 34°. The surface soil layers appear to be a relatively dirty gravel, so a GP soil classification may also be appropriate with the same dry density and phi angle. A soil density of 130 lbs/ft3 will be used in the stability analysis. Slope stability calculations are addressed on an Excel spreadsheet following the plans. A phi angle of 360 for the soil internal friction angle was used along with a cohesion value of 300 lbs per ft2. The glacial till soils can be modeled with cohesion values as high as 1000 lbs per ft2, and with internal friction angles above 40°, so the analysis is based on conservative assumptions. Foundations bearing on the medium dense and dense Hoodsport gravelly sandy loams can expect to realize bearing capacities of the natural soil in the 1000 to 2000 pounds per square foot range, with settlement for residential foundations within half an inch overall. File:C:IProjectslStockinglGeolGeo-Rpt.doc 3 of 5 5/11/2006 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 6. RECOMMENDED SETBACKS & DRAINAGE: The property contains only isolated areas of relatively level ground, and will require construction on what may be classified as potentially unstable ground. No structures should be planned to be placed on fill material, unless the fill is placed as structural fill under the supervision of an engineer, or an engineering geologist. So long as the residences' footings are constructed on the natural glacial till, a building setback from the crest of the slope is not needed. Footings should be buried on their downslope side enough to protect them from freeze-thaw actions. For this area (Cushman/Olympic foothills), a minimum 18" of soil cover should be placed above all footings. Drainage from the developed property should be directed into the naturally vegetated areas of the property. Concentrated discharges of collected stormwater runoff should be avoided. Collected stormwater runoff should be dispersed as close to its source as practical and allowed to seep into the ground. Sensitive areas like the septic drainfield area should be protected from the delivery of any stormwater flows in its vicinity. Driveway runoff should be dispersed as frequently as possible into the surrounding vegetation. Water bars, and driveway cross culverts on no greater than 200' intervals should be planned as part of the property development. Roof runoff may be dispersed at downspout splash blocks, and directed away from the foundation into the yard area. 7. CLEARING, GRADING,AND VEGETATION MANAGEMENT: Clearing for the residence, a driveway, and a possible well location will be necessary for development of the property. Besides removing trees for the building and driveway footprints, danger trees (potentially threatening to the residence)may be planned to be removed. Aside from clearing and grading the property for the residence and driveway,no clearing or grading on other parts of the property is planned. Once a residence is constructed on the property, bare areas will be planted with grass and landscape plantings. Overall, it appears the development of the property will have a minor impact on the property itself, and little or no impact to surrounding properties. 8. EROSION AND SEDIMENT CONTROL: As indicated earlier in this report,the site's soils are not considered erodible, and minimal Erosion and Sediment(E&S) Control measures should be adequate to protect neighboring properties and State waters. Access to the site will be developed off of the Forest Service Road(private), roughly a mile away from any public roads. Construction of the proposed driveway will include a driving surface of clean gravel or crushed rock. The major earthwork will be leveling the house's building location, excavating the footing trenches, and constructing the driveway. These development areas drain mainly to the owner's property, and will have approximately 20+-feet of vegetative to pass through before any runoff exits the property at its normal discharge locations. File:C:IProjectslStockinglGeolGeo-Rpt.doc 4 of 5 5/11/2006 1 TAHJA ENGINEERING, Inc. PO Box 235, Hoodsport, WA 98548 (360) 877-9512 The existing and proposed features should provide adequate protection against adverse stormwater runoff impacts. 9. ON-SITE AND OFF-SITE IMPACTS: Construction and completion of the proposed improvements are not expected to result in any adverse on-site, or off-site impacts. The proposed residential development of the property will not result in adverse impacts to either the subject property or to neighboring properties. 10 SPECIFICATIONS OF FINAL DEVELOPMENT CONDITIONS: The completed site will be allowed to return, for the most part,to a naturally vegetated state. The main ground cover will be lawn and medium height shrubbery. In the future development of the property, discharging concentrations of collected Stormwater runoff within 20 feet of a property boundary should be avoided. Conclusions and Summary; The residential development of the Stocking property located in the Dow Mountain area of Lake Cushman does not appear to present any stability problems that cannot be overcome, and will not result in any undesirable impacts. The property itself provides an adequate vegetated buffer area to protect neighboring properties and State Waters from adverse stormwater runoff impacts. The stormwater related recommendations made in this report should be adequate for both temporary and permanent stormwater runoff management and concerns. I hope this report meets the needs of the Stockings, and Mason County in planning the property's development. A P Sincerely, ='4 . WAS fY Alan A. Tahja, P.E. �✓' Attached: Site Plan(Plan Sheets 1 & 2) oNnL ' Cross Section(Plan Sheet 3) Stability Analysis (Excel Spreadsheet) MMM 11171 File: C:IProjectslStockinglGeolGeo-Rpt.doc 5 of 5 5/11/2006 Revision# Description Date TAHJA ENGINEERING,Inc. STOCKING SITE PLAN Alan Tabja,P.E. Redfield Stocking Stocking PO Box 235 9805 Wlritecap Drive NW Hoodspor4 WA 98548 Olympia, WA 98502 2 of 3 CountyPrcl No. 42333 5103013 (360)877-9512 (360) 339-2705 COO 00 Vol do Cd o. o 0 o � C1 o � 0 o 61, Ao ass 86'ti 'Id a V a r I O O M N Revision# Description Date TAHJA ENGINEERING,Inc. STOCKING SITE PLAN ft.F& Alan Tabia,P.E. Redfield Stocking Stocking PO Box 235 9805 Whitecap Drive NW Hoodspor[; WA 98548 Olympia, WA 98502 County Prcl No. 42333 5103013 (360)877-9512 (360) 339-2705 3 of 3 _ 1 UIIIJ O N _ I Peo?f aor i to S 1sa1p� pro a zocnzaS�sazo3 O N N l O N •� lr nox w - I p $ o N 0 Stocking Stability Analysis Mason County Parcel Number 42333-51-03013 Slope Stability Analysis Section A-A Weight Slip Plane Angle: 452 kip 1200 IF 3470 SF Slip Plane Length=260' 1170 Normal Force 1120 Fri 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 A. Factor of Safety(FS) is to be calculated against sliding -Static Conditions FS = Resisting force/Driving force _ [c'L+ N'x Tan(())]/[W x sin(a)] _ [c'L+ (W x cos(a) - U x L)x tan(8)]/[W x sin(a)] 78� where; c � 'IpNAi. FS= Factor of Safety against sliding 14XPws: 11/7/2 c' = drained shear strength of the slide plane(c' —300 psf for med dense glacial till 6= angle of internal friction (360 used) L = Length of slip plane surface (260') N = normal force : perpendicular to slip plane (N =W x cos(a)) W= total weight of failure wedge (130 pcf x 3470') =451,100 Ibs=452 kip) u= average pore water pressure along the slip surface (psf) = 0 for gravelly loam sands a= Slope/Slip Plane Angle (110) FS = [(.3 x 260)+[452 x cos(11 0)-(0 x 260)]x tan(36)]/[452 x sin(11°)] _ [(78+(443.7)(0.9816)]/86.2 = 400/86.2 =4.64 4.64 > 1.5 OK Factor of Safety (FS) against sliding - Dynamic Conditions(Seismic Factor b= 0.3) FS = [c'L+ (W x cos(a) - b x W x sin(a) - U x L)x tan(6)]/[W x sin(a) + b x W x cos(a)] "=[(.3x260+(452xcos(1 1°)-.3x452xsin(11 0)-Ox260)xtan(36)]/(452xsin(11)+.3x452xcos11° _ (78+ (443.7-25.9 -0)x .7265)/[86.2 + 133.1] = 381.51219.4= 1.74 > 1 OK TAHJA ENGINEERING, Inc. 5/11/2006 °%.SrATF MASON COUNTY o°y A o N DEPARTMENT OF COMMUNITY DEVELOPMENT s N X Planning Division N Y ti P O Box 279, Shelton, WA 98584 (360)427-9670 1864 REQUEST FOR ADDITIONAL INFORMATION August 22, 2006 REDFIELD STOCKING 9805 WHITECAP DR NW OLYM[PIA WA 98502 Parcel No.: 423335103013 Project Description: Redfield Stocking: Approx. 1/2 acres Dear Applicant: You have submitted a permit application (case no. FPA2006-00026) for proposed construction or development in the county. Upon review of your application, I require additional information to complete the permit review process. Therefore, review of your application will not proceed until the necessary information is provided (see the comment section of this letter for details.) Once the information is submitted and the application is complete, I will continue to process your application accordingly. If the additional information is not provided to the County within 180 days of this request, the application shall expire and no further action on the proposed development shall take place. Please contact me at (360) 427-9670, ext. 295 if you have questions. Sinc rely, Tammi Clark Land Use Planner Mason County Planning Department 8/22/2006 Page 1 of 2 FPA2006-00026 REQUEST FOR ADDITIONAL INFORMATION 8/22/2006 Case No.: FPA2006-00026 Comments: I recently received your application for your forest practices application (FPA). Unfortunately it is incomplete and can not be processed in its current condition. Below is a list of the item(s) that need more attention before the application can be deemed complete: (1) 1 need a site map consistent with the requirements of 11.05.120.A (enclosed). If you have not done so already please be sure that the requirements of 11.05.120.13 are also established on the ground. (2) Please find enclosed a copy of the ESA Listed Salmonids Checklist. Every SEPA I review must have one of these attached, even if the conditions it is concerned with don't exist on the site. In order to keep your case open, please respond within 180-days. If you have any questions, please contact me at extension 295. Thank you. 8/22/2006 Page 2 of 2 FPA2006-00026 �oN_srgrFo MASON COUNTY UP M o y DEPARTMENT OF PUBLIC WORKS O SU = r O T a BUILDING 8 415 NORTH SIXTH STREET P.O. BOX 1850 2� NY Y SHELTON, WASHINGTON 98584 OJ �O Phone(360)427-9670 x450 1864 Fax(360)427-7783 September 5, 2006 MASON COUNTY MISSION RE: SEP2006-00128 The mission of Mason County Government is to provide essential& Community Development mandated services which 426 W Cedar will preserve & benefit the P.O. Box 279 health,safety,&welfare of Shelton,WA 98584 the general public in a professional and courteous manner through the effective Dear Bob, and equitable management of available public Road Operations and Maintenance does not have any comments on this proposed resources. action. This doesn't impact any County maintained road. Mason County recognizes Thank you, that its employees& volunteers are the foundation upon which Allan Eaton these services are provided. Assistant Road Operations and Maintenance Manager J:\AmyB\Setbacks from planning\SEP's from plan ning\SEP2006-00128.doc # ES1 BLK 3 LOT 13 TREES TO BE REMOVED 240 108 24 135 ® 60 18 11 ® ® ® 281 312 60 ® ® ® ® ® ® 28 :// FUTURE CABIN ® LEVEL AREA DRAIN FIELD EASEMENT 50 WELL SITE T❑ LOT 14 ---30--� EXISTING DRIVEWAY EXISTING LEVEL AREA �:ro at•a�evm E�Y tOB Es l33 • • e • • e • • •e u • s • • • e e ae1 3�E � ® • ® • • e to • e ° • ° • ° s e• • runnc cAw1 ° 1cve�,AFEA e • s e • • • • e • s e e • • s MOO M-9 EASENEIlf • x • wi me TTM IRMWAY L01 14 30 O([STNG LEVEI. AAG 973 Storm water Issues.txt Storm water runoff issues for ES1, Block 3, Lot 13 Lake Cushman Dow Mountain Area During and after the togging and clearing of the above property I will be using straw bale barriers and or silt fences at any areas that could allow storm water into ditches or onto access roads. The area being partially cleared is on the upper portion of the five acre lot which is 240 ft x 935 ft deep. Any storm water runoff will first have to pass thru the undisturbed upper portion of the property then would have to go down slope onto the undisturbed 600 ft. of the lower section of the property. That area is heavily forrested and covered with thick vegetation, and will not be developed in any way. There will be minimum 15 ft. wide, with most areas 30 to 40 ft. , (from property line) undisturbed buffer areas on both sides of the project as well . Any cleared areas except the driveway will be replanted with grass as soon as possible after clearing. The driveway will be covered with crushed rock with small cross ditches to divert water to the sides and into the vegetation areas. Redfield Stocking 9805 whitecap Dr. NW Olympia, wa. 98502 360-339-2705 EC dV ® gob �� 205 �D #- 4?-33S 51 b 3 G/ 426 \q. CEDO- ST:' Page 1 Storm water Issues.txt Storm water runoff issues for Es1, Block 3, Lot 13 Lake Cushman Dow Mountain Area During and after the logging and clearing of the above property I will be using straw bale barriers and or silt fences at any areas that could allow storm water into ditches or onto access roads. The area being partially cleared is on the upper portion of the five acre lot which is 240 f t deep.eep. Any storm water runoff will first have to pass thru the undisturbed upper portion of the property then would have to go down slope onto the undisturbed 600 ft. of the lower section of the property. That area is heavily forrested and covered with thick vegetation, and will not be developed in any way. There will be minimum 15 ft. wide, with most areas 30 to 40 ft. , (from property line) undisturbed buffer areas on both sides of the project as well . Any cleared areas except the driveway will be replanted with grass as soon as possible after clearing. The driveway will be covered with crushed rock with small cross ditches to divert water to the sides and into the vegetation areas. Redfield stocking 9805 whitecap Dr. NW Olympia, Wa. 98502 360-339-2705 RECEIVED r C t9N — �2333 "1 03 G/ 3 426 ��. C AR sr! Page 1 4 240 108 24- LOGGING LANDING THIS AREA 1190 ALL TREES TO BE REMOVED BPS MARKED W/PINK RIBBON, 1180 ALL ❑UTSIDE AREAS FOR TREE/VEGETATION RETENSION, 135 60 18 1170 11 ® ® ® ® ® ® 1160 935 312 ® ®® ® ® 281 60 ® ® ® 28 ® ® 19% SLOPE ® ® ® ® ® ® ® ® 1150 25-30% SL❑PE FUTURE CABIN I v ® LEVEL AREA ® ® 1140 ® ® ® ® ® ® ® ® ® ® ® ® ® ® 1130 CULVERT " DRAIN FIELD (FORREST SERVICE ROAD 2300) EASEMENT 1120 ® 1110 50 1100 WELL SITE EXISTING DRIVEWAY EXISTING LEVEL 30--- TO LOT 14 AREA 3 42% SLOPE 0% SL❑PE I ES1 BLK 3 LOT 13 LALEt 1' = 50' SITE PLAN 50