HomeMy WebLinkAboutFPA2016-00007 SEP2016-00056 W.T. Timber - FPA Permit / Conditions - 6/20/2016 t
�, sOzz COD'
" f�� MASON COUNTY
COMMUNITY SERVICES FPA.
Mason County Bldg. 8, 615 W. Alder Street, Shelton, WA 98584
- _= www.co_masonma.us (360)427-9670 Belfair(360)275-4467 Elma(360)482-5269
1854 s�-g
FOREST PRACTICES APPLICATION/NOTIFICATION JUN 2 U 2016
Type IV General 61 L, t,<, F-, -i er Street
This application should be accompanied with an Environmental Checklist(SEPA) as well as an activity map/site plan which addresses
items listed below.
TYPE OR PRINT IN INK:
1. Landowner,Timber Owner and Operator information.
�L�ezaall Name of LANDOWNER Legal Name of TIMBER OWNER Legal Name of OPERATOR
vvr i•—r"'JW- ` kLe— C-S C.v. �7x?l�o� w►.e (vS
Mailing Address: Mailing Address: Mailing Address:
C IK 2d
City, State,Zip City, State,Zip City, State,Zip
Mb �e WA s
Phone 66) r ,_ 37Sq Phone( ) Phone( )
Email. iva..�Q &pwAj '-,c, Email: Email:
2. Contact person information.
Contact Person Phone&.6)
Email:
3. If you are harvesting timber, enter the Forest Tax Reporting Account Number of the Timber Owner:86o-t�66"2S L,
For tax reporting information or to receive a tax number,call the Department of Revenue at(800)548-8829.
4. Legal description where the forest practices will occur.
Parcel Number Sub Division(1/4 1/4) Section Township Range E/W
1&21-0 i0_7 o W
5. Answer each question as it applies to your proposed forest practice.
a. bQ No. [] Yes. Is the activity within an urban growth area?
b. [A No. [] Yes. Is the activity within a public park?
C. [y]No. [] Yes. Is the activity within 500 feet of a public park? Park name:
d. []No. b4 Yes. Is the activity located on lands platted after January 1, 1960?
e. No. [] Yes. Is the activity within 200 feet of saltwater lake river/creek/stream pond
wetland seasonal runoff slopes which exceed 15%?
f. What is the expected duration of FPA? 1 V r
Pagel of 4
I:\Community DevelopmentTLANNINGTAC 2016-Permit Assistance Center-Torest Practice
>w
Proposed start date: �i, ��, Z it. Proposed end date:
0
6. Are you cutting or removing timber?
-'No. 14 Yes. Complete the table below and identify all timber harvest and salvage activity boundaries on the
activity map.
Acres Volume to be Steepest Slope in
Unit# Harvest Type Yarding Method (net) Harvested(mbf) Harvest Unit(%)
Ga SiQJ.Li 75 M tpf 1
7. Are you constructing or abandoning roads?
[]No. i]Yes. Complete the table below. Show locations and identify all road activities on the activity map.
Total Length Steepest Side Slope Abandonment Date
Type of Activity (feet) (%) (Mo/Yr
Road Construction 160 o Does Not Apply
Temp o Road Construction
Road Abandonment
Work in or over typed water may require a Hydraulic Project Approval(HPA)from the Washington Department of Fish and Wildlife
(WDFW). If you have questions concerning the HPA,visit the WDFW website at www.wdfw.wa.sov/habitat.htm.
8. Are you installing or replacing water-crossings?
fJ No. []Yes. Complete the table below. Show locations and identify all proposed water-crossings on the activity map.
Crossing Crossing Dimensions Crossing Crossing Dimensions
Identifier Type (width x length) Identifier Type (width x length
9. Mark the following activities that will be done in or over typed water.
Activity in or over: Type I Stream Type 11 Stream Type III Stream Type IV Stream Type V Stream
Removing culverts of bridges
Equipment crossing
Ground skidding
Suspending cables
Cable yarding
Falling and bucking
Other
10. Is any activity in a wetland or wetland buffer?
to No. []Yes. Complete the table below. Show locations and identify all wetlands and buffers on the activity map.
Wetland Wetland Type Activity Type in Activity Type in Total Wetland Total Area Total Area
Identifier (I,U,III,IV, Wetland Buffer Area(acres) Drained(acres) Filled(acres)
other
11. Describe how the following are identified on the ground.
• Harvest boundaries/unit corners: Pl n k F la AA i t,.4
• Right-of-way limits and centerlines for road work,Mvertf and bridges:
• Critical areas and critical area buffer boundaries:
Page 2 of 4
IACommunity DevelopmentTLANNINGTAC 2016-Permit Assistance CenterTorest Practice
s
12. Have you reviewed this forest practices activity area to determine whether it may involve historic sites and/or Native American
cultural resources? X No. [] Yes.
13. We affirm that the information contained herein is true,and understand that this proposed forest practice is subject to the Forest
Practices Act and Rules and Mason County Forest Practices Conversion Ordinance as well as all other federal,state or local
regulations. Compliance with the Forest Practices Act and Rules and the Mason County Forest Practices Conversion Ordinance
does not ensure compliance with the Endangered Species Act or other federal state or local laws.
Signature of LANDOWNER Signature of TIMBER OWNER Signature of OPERATOR
W1 (if different than landowner) (If different that landowner)
Cja+v�e "s y..�J t7 t^ r j e.r'-'e "
Print name: � -� �'���'� Print name: Print name:
Date: L Date: Date:
Additional information: (Optional)
if
---�'d �w'cs 1(Ey- -j'b �e �Y...pv t� .►aw� Cd.�1D'
Per Mason County Ordinance 11.05, Section 11.05.120, a site map shall accompany this application which includes the
following information.
I Harvest boundaries and tree retention areas.
II The approximate location of any structures.
III The location of all existing and proposed streets, right-of-ways, easements, skid roads, haul roads,and landings
within the proposal.
IV The location of future land development including stormwater management facilities and vegetation to be retained
for site landscaping, open space,wildlife habitat, screening, and/or buffers.
V Site topography at contour intervals of 40 feet.
VI Critical areas and critical area buffers regulated pursuant to the Critical Areas Ordinance.
VII Drainage ways and culverts.
VIII Site area targeted for further harvest including proposed timing.
IX North arrow and scale shall be shown on all site plans. The scale shall be no smaller than one inch to 200 feet.
Staff asks that, at a minimum,the corners of the harvest unit(s)be flagged for clear identification.
Page 3 of 4
L\Community Development\PLANNING\PAC 2016-Permit Assistance CenterTorest Practice
NOTE: Copies of all FPA Applications will be forwarded to Mason County Public Works for stormwater and erosion
control review.Projects which disturb more than one acre(regardless of total lot size)will require an engineered
stormwater plan consistent with the Mason County Stormwater Ordinance(Chapter 14.48.)and the 1992 WSDOE
Stormwater Manual(2005 in Belfair&Allyn UGA's).Applicants will be charged for Public Works staff time to review
these plans and applications.
Property owners should also be aware that the Washington State Department of Ecology(WSDOE)might ask for a
NPDES (National Pollution Discharge Elimination System)Permit.The threshold for such a permit is equivalent to
Mason County's threshold.WSDOE will notify applicants through SEPA review if a NPDES is required.An NPDES is
not a perquisite for FPA approval. It is the responsibility of the applicant to obtain this permit when required.
FPA FEE: $240.00 with SEPA SEPA FEE: 0-9.99 Acres$590
$350.00 without SEPA 10 to 20 Acres$705
Over 20 Acres$885
EIS(DS)$2,360+65/hr
Departmental Review
(For Office Use Only)
Site visit:
Date approved:
Mason County Community Services
2/182016
Page 4 of 4
BCommunity DevelopmentTLANNINGTAC 2016-Permit Assistance CenterTorest Practice
FINDINGS OF FACT
FPA Case#2016-00007
APPLICANT: WT Timber LLC
APPLICATION DATE: June 20, 2016
Mason County has reviewed the above referenced application for Class IV General Forest
Practices and finds it in conformance with all applicable County land use regulations in
effect at the time of application.
FINDINGS
The proposed FPA is compliant with the following conditions:
The proponent has paid the prescribed fees.
The proponent has filed a complete, signed application.
A map has been received that complies with the requirements of 11.05.120:
(I) Harvest boundaries and tree retention areas.
(II) The approximate location of any structures.
(III) The location of all existing and proposed streets, right-of-ways, easements, skid
roads,haul roads, and landings within the proposal.
(IV) The location of future land development including stormwater management
facilities and vegetation to be retained for site landscaping, open space, wildlife
habitat, screening, and/or buffers.
(V) Site topography at contour intervals of 40 feet.
(VI) Critical areas and critical area buffers regulated pursuant to the Critical Areas
Ordinance.
(VII) Drainage ways and culverts.
(VIII) Site area targeted for further harvest including proposed timing.
(IX) North arrow and scale shall be shown on all site plans. The scale shall be no
smaller than one inch to 200 feet.
That this FPA is in conformance with the following Mason County ordinances:
11.05
That the proposed FPA involves 5 acres encompassing one parcel.
That the notifications required by 11.05.060 have been made if applicable.
N/A
Mason County Resource Ordinance
1 ,
A
_X_That at the issuance of this permit will not result in a violation of the Mason
County Resource Lands and Critical Areas Ordinance. The site was inspected by
Michael MacSems of the Mason County Planning Department who determined
that any critical area buffer and/or steep slope issues have been resolved.
150'buffer from Dry Bed Creek flagged infield.
Geo-Technical Report/Assessment Review
A Geo-Technical _ Assessment Report(check one)was written by
and a submittal checklist was approved by Michael MacSems of
Mason County DCD on
N/A
Washington State Department of Transportation
_X_A DOT Access Permit is not required for this proposal.
_A DOT Access Permit is required for this proposal.
Date Approved by DOT:
Mason County Road Access Permit
Road Access Permits were issued by Mason County Public Works on
Private Road
Shoreline Master Program
That, if applicable, all activity under this application are in conformance with the
Mason County Shoreline Master Program and has a shore line designation of
Conservancy.
State Environmental Policy Act
This application for FPA# 2016-00007:
X_Has been reviewed for SEPA compliance under case#: SEP 2016-00056.
_Is SEPA exempt.
_DNS
X MDNS
Stormwater Management
2
A 12-Point BMP narrative written by Robert Whannell plan written to the
specifications of the 2005 WSDOE Stormwater Manual was provided and
accepted Michael MacSems of DCD.
Permission from Underlying Property Owners:
Same as applicant
CONCLUSION
In conclusion,this application for Class IV General Forest Practices is consistent with the
above criteria and that the public uses and Mason County has fulfilled its statutory
obligations.
RECOMMENDATIONS
I, being the Manager of the Mason County Planning Department,hereby attest to and
certify that appropriate provisions have been made for this Class IV General Forest
Practices Application and hereby recommend approval. In addition these facts evidenced
by the contents of the file for this Forest Practice Application.
Signed,
David Windom, Director Community Services Dept. Date
7 /Z811f
ichael MacSems, FPA Reviewer Date
3
s�
Y
4
ai-cr W-
�: z ..Y:• t is_ -� �" ,� �750
Aw�;
0,O-A-Irn
€'�����*����.y.,4 sib' ��?�.r+ *o,h^ a .,t' y�. �� y������.� Q 0 � O `! •
All
All
- r
._{ �i �� �L ,fit,., yi � '•� •��'�R' �ty�T,,,.,.•
W
i
"4
_
+i
jN, I i� rn�P� �l�� l�o' C✓�1%
S� P �} Ib S6 CISQ b ff1ev �
.,ly �q..- T sew...:t• { H Z fi
•
1
620107500020
620107500300
620107500030
620107500290
6 20101 0000
,o 14Vz
Q b n�do r.o d �'re.:���. �� bc►`e•�n�e d � r/1
620107500040
M 620107500280
r
o
W
� .
<- 6 Go '
620107500050
- 620107500270
620101000000
June 20,2016
WT Timber LLC
Timberland Management Mason County Community Services Department
Cruising&Appraisals Attention Michael MacSems
OFFICE Tax Parcel Five Acre 'At �,ZV J 67 942)�ZC3�
625 Monte Elma Road �y;�,, i (?II ut
Montesano,WA 98563 +- ��l/J rn "}CP W I ,✓��� C lti� b v�
PHONE �IUG
Richard Tagman
(360)249-4583(home)
(360)580-2904(cell) Project plan---Log and reforest-develop site for resale for one family unit
Unit consists of five acres,95%to be logged,leave trees will be scattered over entire unit
Robert Whannell
(360)262-9929(home) Logging spur marked with blue and white with blue dots flagging,clearing limits marked with blue
((360)581-3759(cell) A} 2
paint,200 feet in length and 10 feet on each side of center line for total area of 4000 square feet
FAX of cleared ground. Prospective purchasers will have the option of clearing on either side or off the
(360)249-0096 end logging spur for future home site.
whannell0pacifiercom LLogging access off harvest spur will come onto Maple Rock Lane witch is a private road.Crushed
rock will be used to protect existing road shoulders and to minimize tracking dirt or logging
debris onto existing road.
Topography is flat and do not visualize water or sediment running off the property onto road or
adjacent properties.If a low area develops wheat straw will used to filter run off.
-1 Cj Logger will keep logging site clean and protect the machinery site clear of any pollutants.
Projected start of operations mid July,completion by September 1 2016.
This schedule will allow this operation to be completed during dry soil period.
Robert Whannell
04-d 4-�}
racYQd,,- g5
-41 6 OUa s)op S
-4 �j�,l -- Via c., 00K .
# to /V /A
-kl 11 Lose— Ce..�,�lec�
Inspection Line (360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County
615 W Alder St
lotShelton, WA 98584
lot FPA PERMIT FPA2016-00007
OWNER: W T TIMBER LLC RECEIVED: 6/20/2016
CONTRACTOR: LICENSE: EXP: ISSUED: 8/1/2016
SITE ADDRESS:
EXPIRES: 8/1/2018
PARCEL NUMBER: 620107500280
LEGAL DESCRIPTION: TR 28 OF SURVEY VOL 1 PG 7
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
W MAPLE ROCK
PERMIT INFORMATION FEES
Type By Date Amount Receipt
NUMBER: CLASS: FPA Plan Check Fee with SEF JBN 6/20/2016 $255.00 S2201600000000000582
FPA 16-07 IV
Total $255.00
MORITORIUM: BOARD FEET:
N 75
TOTAL AREA: CUT AREA:
5.00 4.80
CONVERSION TO: SHORELINE DESIG.
RES C
WATER BODY: WATER TYPE:
Dry Bed Creek
SHORELINE OF SIG.: SEPA:
Y
TYPE: ZONING:
Clear Cut RR5
FPA2016-00007 Please refer to the following pages for conditions of this permit. Page 1 of 3
WISA� i2�
Department of Archaeology and Historic Preservation
620033400000
620033000000 — y-
620040QQ3000 r _62Q030002000 620033400030 \\620(030003000
62 OO 43 40001 Or
620033400000 620033400020 620034300000 62003006000062002400000
620040003000
620033000000 6200300030000�
62 0033 400010
620029999999
620107500010620107500310 62011000000 `
6I20107500020620107500300
620101200000
620107500030620107500290
M as�r�
620107500040620107500280
62011000000
620090000000 620100004000 62010750005C620107500270
620101000000
I I
6 2010750006 C620107500260
620107 50007062 0107 5002 50 62011006000
ZV
620107500080620107 500240 5` 620101000000
620ii3�0000
620100060000
620103200010 620107500090620107500230 6201040000Mt" � f
11 a 620104000000
62 O 107 50.0100 � � I
July 12, 2016 1:11,868
0 0.1 0.2 0.4 mi
J Determined Eligible Heritage Barns Register Properties(Polygons)
0 0.15 0.3 0.6 km
Determined Not Eligible Register Properties (Points) ® Register Districts Sources: Esri, HERE, DeLorrne, Intermap, ncrement P Corp., GEBCO,
USGS,FAO,NPS,NRCAN,GeoBase,IGN,Kadaster NL,Ordnance Survey,
No Determination — Register Properties (Lines) F—] Parcels
620033400030
620033400020
620033000000 620033400000
620034300000
620033400010
620107500010 � -
620107500310
•
AI
620107500020 ' ';""
62010750030I
Ak
620101200000
620107500030
620107500290
620107500040
IQ-
620107500280
620100004000
620107500050
` 620107500270
0
Y
U
O
w
J
d
620107500060 � 620107500260
620101000000
620107500070
620107500250
620107500080 620107500240
Sour-e: Esri.nuftw9ft Geoft i cubed.Lew,,.USES. M smtm @ping,
rC-grid. IGN. IW,swimo*@. and 4he an u@wcmmmft
�11. '1. %�rye ✓ S e e A- l 6 --S-6
Ss
,
620107500020 620107500300 !
f
r
— i
Su~
620107500030
-�J 620107500290 --------- ------------ -- - -- — -
�' 620101200000
T20NR6W Mb
620107500040
o � �
` Gh
Q
X
ui
620107500050
� 620107500270 —"
620101000000 �=
620107500060 \ o r e: E ri, i i I b .GeoEye, i-cubed, USDA, USGS.AEX,Getmapping.Aerogrid, IGN, IGR
620107500260 i` I User Community
CASE NOTES FOR
FPA2016-00007
CONDITIONS FOR
FPA2016-00007
1) ARCHAEOLOGICAL RESOURCES
Archaeological or historical resources, such as ruins, sites, buildings, artifacts, fossils, or other objects of antiquity that may have significance from an
historical or scientific standpoint, which may be encountered by the developer/contractor, shall not be further disturbed. If the developer/contractor
encounters any such artifacts, he/she shall immediately stop work and notify Mason County and the Washington State Department of Archaeology and
Historic Preservation. Failure to do so may result in civil penalties.
X -T> L,:)
2) STORM WATER & EROSION CONTROL
Escape of silty water or mud from this property shall be considered a violation of County and State storm water management regulations, and could
subject the applicant(s)to civil fines or penalties. This project is represented as disturbing less than one-acre of ground and creating less than 5,000 sq ft
of new impervious surfaces. The contractor shall comply with the 2005 WSDOE Stormwater Manual compliant best management checklist written by Bob
Whannell for this project.
X ZL,1
3) SLASH ABATEMENT
This Forest Practice Application indicates that forest debris resulting from the proposed logging operation may create an extreme fire hazard under RCW
76.04.600 and WAC 332-24-650. An extreme fire hazard could be created if one or more of the conditions found in WAC 332-24-650 is located within 100
feet of the running surface of a public road; or is within 500 of an existing structure and/or designated public use area, which is not owned by the owner of
the fire hazard area.
The land owner is fully liable in the event of fire, if he or she fails to appropriately abate the hazard. Extreme fire hazards shall be abated by removing the
forest debris, or by other means approved by the Washington State Department of Natural Resources (DNR).
X —Ir L_J
4) HOURS OF OPERATION
Noise associated with this application shall not exceed what is allowed under Mason County Code 9.36. Harvest operations shall start no earlier than 7:00
AM and shall end before 8:00 PM on a daily basis.
X
FPA2016-00007 Please refer to the following pages for conditions of this permit. Page 2 of 3
5) FISH &WILDLIFE HABITAT BUFFER
This site is subject to a 150' habitat buffer from Dry Bed Creek which comes closest to the parcel's SE corner. The buffer as been flagged with double
pink ribbon. Future development is subject to an additional 15' setback from the 150' buffer.
X �J
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate
and grants employees of Mason Count access to the above described property and structures for review and inspection.
OWNER OR AGENT: l 1/ DATE: P�— 1 — ( 6
FPA2016-00007 Please refer to the following pages for conditions of this permit. Page 3 of 3