HomeMy WebLinkAboutBLD93-0318 Dock - BLD Application - 3/1/1993 BUILDING PERMIT APPLICATION
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
426 W.CEDAR/P.O. BOX 186 SHELTON,WASHINGTON 98584
427-9670 DATE ISSUED r
PERMIT NO. V f - -e
OWNER &tc7w
/� MAILADDRESS CITY&STATE ZIP PHONEDc.et/ �-3 3 ? l� ���!c �-✓i�} `t�12Z ?-F�3-/
DIRECTIONS
TO JOB SITE L ti"r-6 C vs 14 M/'W �{j{C �O t nl ►�►Lt
L�
L ,12 PARC LEGAL t-oT5 Z z. - -L "r-K IIF So 5 L+r c.4K,; H.nw -&vfs-r5I'04ri�
NUMBER La'r 22- Z 3 DESCR. 1/ac.vm c q u,, P«'-t5 10, &C, S g9 -r,, GS A Q�E� yL331 ll'vo OI,oLt
CONTRACTOR
NAME 01A MAIL ADDRESS CITY&STATE ZIP PHONE LICENSE 140.
USE OF
BUILDING A/14
CLASS OF NEW �- ADDITION ALTERATION REPAIR MOVE REMOVE
WORK - I I
DESCRIBE
WORK S(//[.,O/A✓lr FZ6�t-T/A/fr
AREA: NUMBER OF: PLEASE INDICATE: NOTICE
SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR
RESIDENCE SgFt STORIES SHORELINE a---' CONDITIONING.
BASEMENT SgFt BEDROOMS PRIMARY RES.❑ THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT
DECKS S Ft BATHROOMS SEASONAL RES.❑ COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
g ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
CARPO . SgFt FIREPLACE IS CARPORT/GARAGE
GAR OE SgFt ATTACHED Q DETACHED❑
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF
REGISTRATION LAW RCW 18.27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE
REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
IN CONFORMANCE THEREWITH. NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING
OBTAINING APPROVAL FROM THE BUILDING DEPARTMENT. C p APPROVAL FROM THE BUILDING DEPARTMENT.
XWWNER /j�DATE / `�C-il XBY DATE
FOR OFFICE USE ONLY
DEPARTMENT YEAPPROVENo DEPARTMENT YES NO
BUILDING VALUATION
HEALTH PUBLIC WORKS FEE
PLANNING �I. FIRE MARSHAL BUILDING PERMIT
D.O.T. BUILDING PLAN CHECK e F'
SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION
SHORELINE
WOODSTOVE
PLUMBING
MECHANICAL
STATE BUILDING FEE
APPLICATION ACCEPTED BY PLANS CHECK BY APPROVED FOR ISSUANCE PERMIT VALIDATION
TOTAL
BY CASH CK MO
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning-Landfill-Utilities
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
Description of Proposal :
FLOATING DOCK: 24 feet long by 8 feet wide with "L" section 4 feet by 4
feet. BULKHEAD: Emplace 4 by 4 ' s in several sections to hold logs for
erosion control.
Proponent : ANDREW BLAIZE
Location of Proposal : N 1110 CUSHMAN RIDGE DR HOODSPORT
PARCEL#:423315001023
LAKE CUSHMAN - WESTSIDE #1 BLK: 1 LOT: 23 PP #50 01265
Lead Agency: MASON COUNTY
The Lead Agency for this proposal has determined that it does not have a
probable significant adverse impact on the environment . An Environmental
Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This
decision was made after review of a completed Environmental Checklist and
other information on file with the Lead Agency. This information is
available to the public upon request .
This DNS is issued under 197-11-340 (2) , the Lead Agency will not act on
this proposal for 15 days from the date below. Comments must be
submitted by 05/15/93 .
DATE: 04/30/93
aj:— ; �- I
SignatZreoV responsible official Date
Responsible Official : Gary Yando
Director of Community Development
426 W. Cedar,
PO BOX 578
Shelton, WA 98584
(206) 427-9670
NON_SIG, rev: 10/30/92
US�ILr��
���i cam,✓•/
BUILDING PERMIT PLOT PLAN
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
P.O. Box 186 SHELTON, WASHINGTON 98584
427-9670
DATE ISSUED
AC.1E AIL AODRESS !TY 3 ST:,Tc PEn��11T NO.
FNUMSER
ER j' N
I NOQee w re�e�e sa �3ta�, ZI P
Ib23 3Y�- � PHONE
��✓1.1L c.lS/� lJ IiLC 44 SC`TlTL1� O3'/000
TIONS
B SITE
L
�-GT 3 7� ` �., 3 LEGAL LOTS Sao 51.3
✓3�oc�c s
SSr'SSOe'6 c� of
DEER t �ICC GvSt�Ms1�/ - �^'ESr5roF �� (JOGVMF q of �cr�T$ pa4C3
Indicate below. Property lines and dimensions. PAecEL &I Qs.
C �Easements and roads 1{Z33( St) oloi2 �8 ro `Tsa
N(`k<O Septic, drainfield and reserve area, or sewer. yZ I oroz3
a0 peptic tank and drainfield setback distances from foundations.
Location of proposed construction on property.
0 Building & septic system setback distances from all prop rty lines & easem
eents.
Indicate North �d Well and water line.
In Circle O Saltwater, lakes, rivers, streams, wetlands, drainage.
O Attach copy of septic system "as built, or septic permit approval.
O Indicate topography profile of property and structure on reverse side.
t✓�
I
C
� S
)13
LoT 23 p
h
w?4
I g I
V I
N
I I
v
�' ct
I,. � f I I G S •� ,,,
I I I
G NS
o
'/"* _ i I I f l I I I I I
cer:'y"lat the zrc;ase,"cons,.%ctiOn-di con!grm to the dimens-ons and uses shown
ao0ve and that.^0 C!tanS?5 wilt Ce naGe wit'Jut first CCta,ni,g 3CGrova;,
GARY YANDO,DIRECTOR
STA
o a Ouu N DEPARTMENT OF COMMUNITY DEVELOPMENT
i o T z PLANNING- SOLID WASTE -UTILITIES
�o 'N Y oy BLDG. III • 426 W. CEDAR • P.O. BOX 578
rasa SHELTON, WA 98584 • (206) 427-9670
March 19, 1993
Andy Blaize
1623 - 34th Ave.
Seattle, Wa. 98122
Re: Submitted Building Permit application.
Dear Mr. Blaize:
Your application has been received by Mason County. Before we may
begin processing your permit, the following items will have to be
addressed.
Dock: Detailed plans of the dock configuration will be required. .
What is its length? Width? You note it will be 2800 square feet.
Any dock exceeding $2500 . 00 (valuation: $8 . 50 per square foot) will
require a shoreline Substantial Development Permit. No more than
16 feet of dock may parallel the shoreline (in a "T" or "L") and
the straight section of dock cannot exceed 8 feet in width. Total
length for a joint use dock cannot exceed 65 feet. Your site plan
should show how far from the side property line the dock is
located.
The building department will require a detailed drawing of the dock
showing your method of construction. Direct any questions on this
to that department at 427-9670 x359 .
Bulkhead: A bulkhead of this type will not require a building
permit. Certain other restrictions apply, however. The posts
would have to be placed within one foot of the toe of the bank.
Also, it will be necessary for you to "flag" the locations in which
these will be placed. Bulkheads on lots which do not have a
residence also require a Substantial Development Permit unless the
value is under the $2500.00 . As your bulkhead design will most
likely be under this value, it is exempt from that permitting
requirement. Nonetheless we will need to know in advance where you
are planning to plant the 4 x 41s. (Your idea is interesting - -
although it will require annual maintenance it may slow erosion
without the expense of a "structural" bulkhead) .
Fees: Since you received our application packet our fees have
increased (effective 2/1/93) . Processing of the environmental
checklist isnow $100. 00 . Since the building permit fee amount
will depend on what size dock you decide to build, you should plan
to pay that fee when the permit is ready to be picked up. The
check you submitted for $49 . 00 could be applied to the checklist
fee. We would then need an additional check for $51. 00 to begin
processing.
If you decide to apply for the Substantial Development Permit fore
the dock, let me know and I will send the necessary form. That
permit costs an additional $320. 00 and permit approval must be
granted by the County Commissioners in a public hearing. A legal
advertisement must also be run in the newspaper, the cost of which
you would have to bear.
I am returning the Hydraulic Project Application form. This should
be sent directly to the Department of Wildlife. They will also
need a set of your plans, including an accurate site plan.
I have enclosed the chapter from the Master Program which is
applicable to the development of docks. Keep in mind the $2500 . 00
limitation If I can answer any questions give me a call and also,
please let me know when the location(s) of the bulkhead have been
marked. Thank you very much.
Respectfully,
Aonrush, Planner
Department of Community Development
R .Fit
APR p 1993
MASON CO. PLANNING DEpT.
March 29 , 1993
Department of Community Dev.
426 W. Cedar
P. O. Box 578
Shelton, Wa. 98584
Attn: Don Brush
Dear Don,
Thank you for your quick response to our permit submission we really
appreciate your help. Enclosed are answers to your questions and a couple
of drawings that hopefully satisfy your needs.
I made a mistake on my calculations as the total square footage of the dock
is 208 not 2800 (whats a zero amongst friends) . I have a couple of comments
on the dock. We propose to build out of steel pipe and angles a frame so
that in the winter the dock will sit on the frame instead of the ground.
The steel pipe are bolted to a footing and the angle is welded to the pipe.
I tried to draw this but I am not sure it shows well enough.
The Permit Plot Plan was traced off of our title paperwork and should be
very accurate. The closest dock is at least 600 ft. away and around a point
of land. To the other side our neighbor is at least 900. ft and inside a
cove so we cannot see them without going out into the lake a ways .
The bulkheads are shown on the Plot Plan as heavy dots and lines. The area
shown is closest to the cabin and has the the heaviest traffic (both people
and because of the dock, boat traffic) . We have spotted a few other sites,
primarily where trees are being undercut and the tree is still healthy
looking. These areas are hard to identify on the plan because they may be
a small as a 8 foot area. We definitely are keeping the verticals as close
to the shoreline as possible. In a couple of instance we plan to throw
rocks up under the undercut root system to hold as much of the dirt that
will naturally fall as possible. The rocks will also help keep the
"bulkhead" tight to the verticals as the water pressure and floatation will
try to move the logs. We did place about 50 ' of bulkhead last year (before
we knew we needed a permit) and it has worked perfectly. It does not deter
from the primitive look of our side of the lake, it is easier on the feet
than concrete and other than the verticals we have not introduced any
additional foriegn substances into the lake. All of the logs were found
either washed up on the shore during the winter or were fallen logs we found
on our property. Most of the logs are about 6 inches in diameter.
Enclosed is the balance of the permit fee and please call or write if you
need any additional information. Thanks again for your prompt response and
help.
Regards,
r
i
CURT S ITCH n
Director yy' Hy
STATE OF W.ASHINGTON
DEPARTMENT OF WILDLIFE
905 E. Heron. Aberdeen, WA 98520 Tel. (206) �33-9335
`!arch 3v. 1, -;
i•lr . !=ndrew nia-ze
34th E-1ve .
Seattle, WA 98122
RE : Hydraulic Project Application (HPA) , Project - Floating
Dock and Bulkheads , Lake Cushman , WRIA 16, Control Number 01-
86032-81
Dear ;,!r. Blaize:
The Department of Wildlife has received your application , but has
been unable to complete the processing in the normal time frame
for the following reasons :
Compliance with the State Environmental Policy Act ( SEPA ) is
required prior to the issuance of the HPA. In speaking with the
Mason County Planning Department , a Shorelines Permit will also
be required . Please send us a copy of the SEPA documents and
Shoreline Permit when final . Your HPA will be processed when the
SEPA is finalized .
Also, a Reservoir Structure Permit may be required by the City of
'Tacoma , Department of Public Utilities. 'The City of Tacoma owns
the above named reservoir as part of a federally licensed
hydroelectric project . Please contact Karen Carroll at ( 206 )
:38"T)-2471 for information .
In order to evaluate the project , additional information is
needed . Please provide us with detailed plans which include
clearer drawings with dimensions , descriptions of materials and
methods of constructuion of the dock , dock footings or piles , and
bulkhead . Also include a list of the types of preservatives , it
any , that are to be used for the beams , decking and bulkhead .
Creosote and pentachlorophhenol ( penta) cannot be used as a
preservative on wood which will be in contact with or near the
water . Untreated wood is recommended .
Also, tioatation material for the dock shall be enclosed and
contained to permanently prevent the breakup or loss of the
tioatation material into the water .
The proposed start and finish dates were not completed on the
application . Please provide us with dates within which you
propose to do the work .
Our oftice location has recently changed. The new address is 488
Devonshire Rd , Montesano, WA, 98563. Please call me at (206 )
753-2600 should you have any questions.
Sincerely,
Gloria Mitchell
Habitat Biologist
cc : Dave Gufler, WDW