Loading...
HomeMy WebLinkAboutSHX2010-00025 SEP2010-00027 SPI2000-00048 - SHX Permit / Conditions - 5/17/2010 MASON COUNTY oN"sTArFo� DEPARTMENT OF COMMUNITY DEVELOPMENT Qy Planning Division o n° �= P O Box 279, Shelton,WA 98584 r o T Z (360)427-9670 27 N y O~ OJ 1864 Exemption from Shoreline Management Act Substantial Development Permit Requirement Case No.: SHX2010-00025 The Proposal By: JAPHET BULKHEADINO INC SUMMIT LAKE SHORE RD NW OLYMPIA,WA 98502 To undertake the following development: tin failing concrete bulkhead with new concrete bulkhead in same location. Replacement of existing NAL and/or its associated wetlands is exempt from s requirecategment f substantial development Within HOOD CA orized under WAC 173-27 040(2) a being 9 because the development is categ B-normal maintenance Please contact Grace Miller at ext 360 if you have any questions. Issued: 5/17/2010 Authorized Local Government Official Expires: 5/17/2012 cc: APPLICANT WD FW USACOE WDOE TRIBAL COUNCIL_5k'o)6c "`'' T'"' E 8" #4 Gr.60 12" OC Horiz. #4 Gr. 60 8" OC Vert. 6'-0" 11.5' Tidal level Beach matt. r 2" Drain 8' OC sand & gravel 1'-0" Property owner: Notes: Henry Fertitta Concrete:15 Cys 6 sack to the yard mix Reinforcement: All #4 Gr.60 , 2.5 min. coverage Shelton WA 9h Rd 11 Wall: 8" OC vert. 12 OC horiz. 48 Footing: 8" OC cross12" OC run Par# 422235000064 Drains: 2 drain 8 OC entire length q licant/Contractor: Top of footing min. 18" below beach grade PP Japhet Bulkheading Inc. All work to be done at periods of Idw tide 1407 Summit Lake Shore Rd. Nw. No construction debris will be left n beach Olympia, Wa. 98502 Ph. (360) 866-0377 Fax (360)866-7702 Lic.# JAPHEBI168LH MASON COUNTY N.STATF PENT OF COMMUNITY DEVELOPMENT �PyO c ° �Ep E Planning Division 4 M o �N TO BE KEPT I Shelton,WA 98584 o s N z ILL E p O Box 279, 427-9670 ~z� Y oy PARCEL I (360, OJ � 186A MITIGATED DETERMINATION OF NON350 NIFICANCE (WAC 197 SEP2010-00027 Description of Proposal Rep�aCe1°pent of existing failing concrete bulkhead with new con rete bulkhead in same location. Proponent: JA HET BULKHEADING INC Site Address (If Assigned): 31 N POTLATCH RD STHLTON R ON POTLATCH RD TO SITE IGHWAY 101 AD Directions to Site: US DRESS ON THE RIGHT SIDE Parcel Number: 4� 235000064 TRACTS TR 64 & TL Legal Description: P TLATCH BEACH Lead Agency: Mason County probable significant proposal has determined that it does not have a p is not required The Lead Agency for this prop act Statement (EIS) completed adverse impact on the environme i An on was made after review of ea complety. information is under RCW 43.21 C.030(2)(c). TLead ntal Checklist and othe information onDf1MEASURES ARE ATTACHED. Environme public upon request MITIGATE available to the p under 360 with any questions. This DNS ' lfromdthe date vsh shown Please contact Grace Miller end will not act on this proposal for 14 clays of Community 197-11-340(2). The Lead Ag determination i final. Comments must 131/20110 itAppeal o Dept.to his determination ted below, when the d per Mason County Development, P.O. Box 279, Shelton WA g$this final determination date, p must be filed within a 14-day per od following Code Chapter 15.11 Appeals. Date Authorized Loc Government Official fir._ �Z� T gut 1,L 5 A�E MITIGATED DETERMIN�TION OF NONSIGNIFICANCE I(WAC 197-11-350) SEP2010-00027 CONDITIONS OF THIS DETERMINATION 1) Residential developers and individuals shall be required zed and anconoly areas disturbed should erosion during construction. Removal of vegetation should be minimibe restored to prevent erosion and other environmental impacts. 2 Water quality is not to be degraded to the detriment of the aquatic environment as a result W of this project. 3 Debris or deleterious material resulting from construction shall waters b the State. e from the beach area and project site and shall not be allowed to enter Ovate A� 232010 426 W. CEDAR MASON CO. ENVIROMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Fertitta Bulkhead replacement 2. Name of applicant: Jim Japhet, Japhet Bulkheading Inc 3. Address and phone number of applicant and contact person: 1407 Summit Lake Shore Rd NW Olympia, WA 98502 360-866-0377 (0) 360-490-1369 (C) 4. Date checklist prepared: 4-25-10 5. Agency requesting checklist Mason County 6. Proposed timing or schedule (including phasing, if applicable): Summer 2010 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explain. No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. HPA , Building permit, Shoreline exemption Mason County Environmental Checklist Page 2 11. Give a brief, complete description of your proposal,including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) Family residence with a failing concrete bulkhead Propose to replace failing concrete bulkhead with a new concrete bulkhead in same location 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 310N Potlatch Rd, Shelton WA . Sec, 22 Twp 22 Rg 4W B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one). Flat, rolling, hilly, steep slopes, mountainous, other Flat b. What is the steepest slope on the site (approximate percent slope)? 10% c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? if you know the classification of agricultural soils, specify them and note any prime farmland. sand, gravel d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. NO Mason County Environmental Checklist Page 3 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. No additional fill f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. No g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? No additional h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any Replace failing bulkhead 2. AIR a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. None b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. No Mason County Environmental Checklist Page 4 c. Proposed measures to reduce or control emissions or other impacts to air, if any: NIA 3 WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Yes Hood Canal 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes, See Plans 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. No additional 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No Mason County Environmental Checklist Page 5 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals.... systems,agricultural, the number of houses to beneral served e of the system, the number of suchy (if applicable), or the number of animals or humans the system(s) are expected to serve. None c. Water runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. The runoff will not change 2) Could waste materials enter ground or surface waters: if so, generally describe. No Mason County Environmental Checklist Page 6 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: NIA 4. PLANTS: a. Check or circle types of vegetation found on the site: X_deciduous tree: alder, maple, aspen, other X_evergreen tree: fir, cedar, pine, other shrubs _X_grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? None c. List threatened or endangered species known to be on or near the site. None d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: There is lawn behind the bulkhead a the present time , will be returned to lawn after compleation Mason County Environmental Checklist Page 7 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: b. Birds: hawk, heron, eagle, songbirds, other Ducks and Gulls_. Mammals: deer, bear, elk, beaver, other Pets and other small mammals Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. Chum Salmon c. Is the site part of a migration route? If so, explain. Don't think so d. Proposed measures to preserve or enhance wildlife, if any: None 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any d. Mason County Environmental Checklist Page 8 7. ENVIRONMENTAL HEALTH: a. Are there any environment I health hazards, including exposure to toxic chemicals, risk of fire and ex losion, spill, or hazardous waste, that could occur as a result of this proposal? I so, describe. None 1) Describe special emergency services that might be required. None 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise. None 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example. traffic, construction, operation, other)? Indicate hat hour's noise would come from the site. Construction noise only :OOAM- 6:OOPM 3) Proposed measures to reduce or control noise impacts, if any: None 8. LAND AND SHORELINI� USE: a. What is the current use f the site and adjacent properties? Family residence Mason County Environmental Checklist Page 9 b. Has the site been used for agriculture? If so, describe. No c. Describe any structures on the site. House and failing Bulkhead d. Will any structures be demolished? if so, what? Failing Bulkhead e. What is the current zoning classification of the site? Rural f. What is the current comprehensive plan designation of the site? Don't Know g. If applicable, what is the current Shoreline Master Program designation of the site? Rural h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. Possibly the shoreline i. Approximately how many people would reside or work in the completed project? Just the family that owns it j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None Mason County Environmental Checklist Page 10 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The project is compatible 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None c. Proposed measures to reduce or control housing impacts, if any: None 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 4'-6" on beach side Ground level on upland side b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: None Mason County Environmental Checklist Page I 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? No c. What existing off-site sources of light or glare may affect your proposal: None d. Proposed measures to reduce or control light and glare impacts, if any: None 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? All types of water sports b. Would the proposed project displace any existing recreational uses? If so, describe. None c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: None Mason County Environmental Checklist Page 12 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects to be on or next to the site? If so, generally lfl state, local preservation registers know describe. None b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None c. Proposed measures to reduce or control impacts, if any: None 14. TRANSPORTATION a. Identify public streets and highways serving sthe ite s plans,eand describe proposed access to the existing street system. Show o State Hwy 101 and Potlatch Rd. approximate b. Is site currently served by public transit? If not, what is the distance to the existing street system? Show on site plans, if any. No c. How many parking spaces would the completed project have? How many would the project eliminate? None d. Will the proposal require any new roads if so,rfind Cate ets, or improvements to existing roads or streets, not including driveway , generally describe ( whether public or private). No Mason County Environmental Checklist Page 13 e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. None f. How many vehicular trips per day would be generated by the completed project: If known, indicate when peak volumes would occur. None g. Proposed measures to reduce or control transportation impacts, if any: None 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No b. Proposed measures to reduce or control direct impacts on public services, if any: None Mason County Environmental Checklist Page 14 16. UTILITIES: a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signa Dates mi ed: / I Mason County Environmental Check i st Page 15 ESA LISTED SALM NIDS CHECKLIST Applicant Information Project Information Name_Japhet Bulkheading I c _Name Henry Fertitta Bulkhead replacement Phone_360-866-0377 Location310 N Potlatch Rd Shelton WA Description Replace 45' of existing , failing Concrete bulkhead with new concrete bulkhead in the same location This worksheet was designed help project proponents,and government agencies, identify when a project needs f iirther analysis regarding adverse effects on ESA (Endangered Species Act)listed salmonids. Salmonids bare salmon,trout and chars, e.g. SA Listed Salmonids"is defined as fish species bull trout. For our purposes,` listed as endangered,threaten d or being considered for listing. If ESA listed species are prescont or ever were present in the water shed where your project will be located,your project has the potential for affecting them, and you need to comply with the ESA. The q stions in this section will help determine if the ESA listings will impact your proj t. The Fish Program Manager at the a ropriate Department of Fish and Wildlife(DFW)regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES X NO Pleas describe.Chinook and Chum Salmon 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES X NO Un- rtain Please describe. If you answered "yes" to either of the above questions,you should complete the remainder of this checklist. April 2003 Mason County Environmental Checkli Page 16 PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. 1.Name of watershed: Hood C al_ 2.Name of nearest waterbody: Hooe Canal o he nearest body of water: 3. What is the distance from thi project j Waters edge at high tide_. often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use t etween the project and the potentially affected water body (parking lots,farmland,etc.)? Residence 5. Is the project above a: NO _X_ * natural permanent barrier(w erfall)YES * man-made barrier(culvert, d am)YES NO X_ * other(explain): 6. If yes, are there any residen salmonid populations above the blockage? YES NO X`Don't know 7. What percent of the project will be impervious surface (including pavement&roof area)? None Mason County Environmental C1 cklist Page 17 FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water 11 ws can affect fish migration. 1. Does the project require the withdrawal of: a. Surface water? YES X— Amount Name of surface water body b. Ground water? YES O X____ Amount From where Depth of well 2. Will any water be rerouted S NO X_ If yes,will this require a channel change? 3. Will there be retention or tention ponds? YES NO X_ If yes,will this be an infiltrat n pond or a surface discharge to either a municipal storm water system or a surface wa r body? If to a surface water discharge,please give the name of the waterbody. 4. Will this project require tba building of new roads? YES NO_X_ Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES NO X____ 6. Will topography changes fect the duration/direction of runoff flows? YES NO X_ _If y e s, describe the changes. ve reduction of the floodway or floodplain by filling or other 7. Will the project invol NO X_If yes,how will the loss of flood partial blockage of flows? S storage be mitigated by yo project? Mason County Environmental Checkl t Page 18 WATER QUALITY: The following questions will help determine if this project could Adversely impact water quality. Such impacts can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging contaminants,etc. 1. Do you know of any problen is with water quality, in any of the streams, within this watershed? YES NO —If yes, describe. 2. Will your project either reduce or increase shade along or over a waterbody? YES NO X_ Removal of shading vegetation or the bu il ding of structures such as docks or floats often results in a change in shade. 3. Will the project increase nu .ent loading or have the potential to increase nutrient loading or contaminants (fertilizers, other waste discharges, or runoff)to the waterbody? YES NO X_ 4. Will turbidity be increased because of construction of the project or during operation of the project? YES NO X_ In-water or near water work will often increase turbidity. 5. Will your project require 1611g,term maintenance, i.e.bridge cleaning,highway salting, and chemical sprays for vegetation management, clearing of parking lots? YES NO X_If yes,please describe. Mason County Environmental Checklist Page 19 VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation,thereby, adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks: YES NO_X_ sting conditions, and the amount and type of vegetation to If yes,please describe the exi be removed. 2. If any vegetation is removed, do you plan to re-plant? YES NO If yes, what types of plants will you use? tt may- { tI t �. ��:t: ♦ p J � i f 4 �i♦ •i 4.i P x t• tr �,..r. i i r_r L ♦ •.-�. a.. •• • i♦i r a .L.t "r"�"'.f ttt-yM� i i. �� � ♦* t�i- i�ty -y{a f ram•*+..1 t-{ -i...-a. t^� �,t±.`+-"''""'rw��-+. ♦.r-.f r s-. .-s y r i f s s!t f's.q �-a J.-t. j 4 i �4-►...I..-t-+..f-���+" t,^-+'..r s..� 1.4_..+-�:..a • Syy r++��♦.w...a f^�M1 .�.1 t .-•ti-4..�f 3 e..4:_i. .r. .,i..M1_..--4.r. .._. +..t.. Sk.oko ash Indian Tribe Natural Mesa rces Department (360) 877-5213 � Faix(360) 877-5148 Skokomish Nation,WA 98584 N. 541 Tribal Center Road May 2010 Environmental Review Applicai ion No.: SEP2010-00027 Project Narne: Fertitta 13ulkhea replacement Description of Proposal: Remove existing failing concrete bulkhead and replace with new concrete bulkhead in same location. Location: 310 N Potlatch RD Shelton WA,98f 84 Proponent: Japhet Bulkheadin Dear Grace, It has been determined that the above project will have negative environmental impacts to the Skokomish Tribe and/or their resources. As such the Skokornish Tribe disagrees with your mitigated etenmination of non-significance. In recent years, scientists and resource manag rs have expressed concerns about the impact of traditional erosion control measures suc s bulkheads on nearshore environments(Canning and Shipman, 1995). Armoring d rives beaches of their natural sources of sediment and can degrade the ecological functi s of the shoreline. Which include but are not limited to impacts to salmonids(i.e. lossf shading,places to hide from predators),as well as impacts to slrelifish,hearing, ind surf smelt from beach scouring and erosion. The cumulative impacts of numerous bulkheads along;a reach of shoreline may be Tong term (i.e. irreversible loss of habitat and increased erosion on the property of others). One result of this is that resource agencies are carefully scrutinizing erosion control proposals in order to evaluate their pott Atial environmental impacts;however Mason County currently does no do this at a level that is satisfactory to protect and sustain environmental processes. be aware there Property owners nee to other structural alternatives that can address erosion that might be more economical, aesthetically pleasing;and environmentally sound. Hyl ill, id structures are another alternative that works in most cases. [-Hybrid structures coribine vegetative plantings and hard structural control. More specifically, a rock bulkheaU would be constructed at or above ordinary high water mark and would be partially buriec and further protected by the SEP2010-00027 Skokornish comments 1 Created by Randy bumper Environmental Planner for the Skokomish Tribe addition of anchored beach logs i and, gravel and cobbles placed as beach nourishment. The benefits of a hybrid system are that they partially mimic natural coastal processes while providing a high level of cronion control due to the rock structure, The Skokornish Tribe requests that Mason County require the proponent to use a hybrid alternative to hard armoring such as concrete. We also request that the Skokornish Tribe be madc, aware Of any decision that you -,ikeregir(iiiig this permit(SEP2010-00027) and any other PC,-,,,it which may affect t e tribe. officer may be providing Tile SkokomishTrIbes Tribal Historic Preservation corrunclit as to the potential cul bral impacts of this SEPA and you should not move those comments. Thank you for forward with the above project Unt'I l you receive i process, if including the Skokornish Tribe ,n the planning you have any questions about Pniper(Envirorimental Planner) the comments provided herein please contact Randy N. Lu at 1-360-877-5213 ext# 508 or ernail them to dumper @skokornish-Org. Sincerely, /Joseph Director Skokornish Natural Resource; Department SEP2010-00027 Skokorni h comments 2 Created by Randy Lumpet Environmental Planner for the Skokornisb Tribe AGENC--------------------------------------"EC - �,ta 2009 1 Y �-- 1 WASH 1 N G TO N STATE US Army Corps Date receiv of of Engineers• 1 Seattle Distract , APR 2 3 2010 I Joint Aquatic Resources Permit I Application (DARPA) Form helz6 W. CEDAR ST. Agency reference#. 6+i x m I d Tax Parcel#(s): LYY rI I , USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. 1 -- t 1 I ' ' 1 I Part 1—Project Identification ' --------------------------------------- 1. Project Name (A unique name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) hel Fertitta Bulkhead replacement Part 2—Applicant The person or organization responsible for the project. heel 2a. Name (Last, First, Middle) and Organization (if applicable) Jim Japhet, Japhet Bulkheading Inc. 2b. Mailing Address (Street or Po Box) 1407 Summit Lake Shore Rd NW 2c. City, State, Zip Olympia, WA 98502 2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail (360) 866-0377 ( 360) 490-1369 ( 360 ) 866-7702 jjaphet@comcast.net Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this application.) h[ elp] 3a. Name (Last, First, Middle) and Organization (if applicable) Jim Japhet, Japhet Bulkheading Inc. 3b. Mailing Address (Street or Po Box) 1407 Summit Lake Shore Rd NW 3c. City, State, Zip Olympia, WA 98502 3d. Phone(1) 3e. Phone(2) X Fax 3 . E-mail ( 360) 866-0377 (360) 490-1369 (360) 866-7702 jjaphet@comcast.net JARPA 2009 Page 1 of 11 Part 4—Property Owner(s) h( ei Contact information for people or organizations owning the property(ies) where the project will occur. heI ❑ Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple property owners. Complete the section below and use JARPA Attachment A for each additional property owner. 4a. Name (Last, First, Middle)and Organization (if applicable) Henry Fertitta 4b. Mailing Address (street or PO Box) 4119 Montrose Blvd. 5th Floor 4C. City, State, Zip Houston, Texas 77006 4d. Phone(1) 4e. Phone(2) 4f. Fax 49 E-mail (713)622.3100 (713)899-1592 ( ) Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. [held ❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and use JARPA Attachment B for each additional property. 5a. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5n.) hf epl 310 N Potlatch Rd 5b. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel Shelton WA 98584-6442 5c. County h[�] Mason 5d. Provide the section, township, and range for the project location. h[ m '/4 Section Section Township Range 23 22 4W 5e. Provide the latitude and longitude of the project location. hf pid • Example:47.03922 N lat./-122.89142 W long 47.37635 N Lat/123.15234 W Long 5f. List the tax parcel number(s) for the project location. Lkm • The local county assessor's office can provide this information. 422235000064 5g. Indicate the type of ownership of the property. (Check all that apply.) h[ele] ❑ State Owned Aquatic Land ❑ Tribal ® Private ❑ Other publicly owned (federal,state,county, city, special districts like schools, ports,etc.) JARPA 2009 Page 2 of 11 5h. Contact information for all adjoining property owners, lessees, etc. (if you need more space, use JARPA Attachment 0 [heU Name Mailing Address Tax Parcel #(if known) 0...........B 9t ............ .............----- .................P.0 I..............Rd............................................... . .......... ............. ................................. ........................--- ..............- ................................................. ..........................................................I................................ ............... 5i. Is any part of the project area within a 1 00-year flood plain? MU ❑ Yes E No El Don't know 5j. Briefly describe the vegetation and habitat conditions on the property. [Leip] Family Residence Lawn and shrubs Sk. Describe how the property is currently used. MU Family vacation Home 51. Describe how the adjacent properties are currently used. [heM Family residence JARPA 2009 Page 3 of 11 - ------ I 5m. Describe the structures (above and below ground) on the property, including their purpose(s). hei House and Garage i 5n. Provide driving directions from the I sest highway to the project location, and attach a map. hel State Hwy 101 N to Potlatch Rd. ( Near Potlatch WA ) Potlatch Rd to 310 Part 6—Project Description 6a. Summarize the overall project. You can provide more detail in 6d. h( lgiw The existing concrete bulkhead is failing and is due for replacement 6b. Indicate the project category. (Check all that apply.) hel ❑ Commercial ® Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6c. Indicate the major elements of your project. (Check all that apply.) [help] ❑ Aquaculture ❑ Culvert ❑ Float ❑ Road ❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey El Scientific Measurement ❑ Boat House ❑ Dike / L vee /Jetty ❑ Land Clearing Device ❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs ❑ Boat Lift ❑ Dock/ P er ElMining ❑ Stormwater facility ❑ Bridge ❑ Dredgin ❑ Outfall Structure ❑ Swimming Pool ® Bulkhead ❑ Fence ❑ Piling ❑ Utility Line ❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall (upland) ❑ Channel Modification ❑ Fishway ❑ Other: JARPA 2009 Page 4 of 11 6d. Describe how you plan to construct each project element checked in 6c. Include specific construction methods and equipment to be used.) hf eM • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100'-year flood plain. Remove existing , failing concrete bulkhead and replace with a new concrete bulkhead in the same locagtion Equipment to be used will be a backhoe or excavator and hand tools 6e. What are the start and end dates for project construction? (month/year) [Lem • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start date: Aug or Sept 2001 End date: _Sept 2010 ❑ See JARPA Attachment D ISE Describe the purpose of the work and why you want or need to perform it. heI The existing concrete bulkhead is failing and needs to be replaced 6g. Fair market value of the project, including materials, labor, machine rentals, etc. hf eM $23,000.00 6h. Will any portion of the project receive federal funding? heI • If yes, list each agency providing funds. ❑ Yes ® No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. heI ® Not applicable JARPA 2009 Page 5 of 11 7b. Will the project impact wetlands? h ❑ Yes ❑ No ❑ Don't know 7c. Will the project impact wetland buffers? hl eli ❑ Yes ❑ No ❑ Don't know 7d. Has a wetland delineation report been prepared? h[ elp] • If yes, submit the report, including data sheets,with the JARPA package. ❑ Yes ❑ No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? hel • If yes, submit the wetland rating forms and figures with the JARPA package. ❑ Yes ❑ No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hel • If yes,submit the plan with the JARPA package. ❑ Yes ❑ No ❑ Not applicable 7g. Use the table below to list the type and rating of each wetland that will be impacted; the extent and duration of the impact; and the type and amount of compensatory mitigation proposed. If you are submitting a compensatory mitigation plan with a similar table, you may simply state (below) where we can find this information in the mitigation plan. hel Activity causing Wetland type Impact area Duration Proposed Wetland impact(fill, and rating (sq. ft. or acres) of impact2 mitigation mitigation area drain, excavate, category' type (sq. ft. or acres) flood, etc.) Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland rating forms with the JARPA package. 2 Indicate the time(in months or years,as appropriate)the wetland will be measurably impacted by the activity. Enter"permanent"if applicable. 3 Creation(C), Re-establishment/Rehabilitation (R), Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B) Page number(s) for similar information in the mitigation plan, if available: 7h. For all filling activities identified in 7g., describe the source and nature of the fill material, the amount in cubic yards that will be used, and haw and where it will be placed into the wetland. [help] 7i. For all excavating activities identified In 7g., describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. hel JARPA 2009 Page 6 of 11 7j. Summarize what the compensatory mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. hl eM Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) hf elpl ® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. h[ OO ❑ Not applicable The project will have no impact on the aquatic enviroment 8b. Will your project impact a waterbody or the area around a waterbody? h�eM ❑ Yes ® No 8c. Summarize impact(s) to each waterbody in the table below. hel Activity causing Waterbody Impact Duration Amount of material Area (sq. ft. or impact(clear, name location' of impact2 to be placed in or linear ft.) of dredge, fill, pile removed from waterbody drive, etc.) waterbody directly affected Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. z Indicate the time(in months or years,as appropriate)the waterbody will be measurably impacted by the work. Enter"permanent'if applicable. 8d. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? hl eiA • If yes, submit the plan with the JARPA package. ❑ Yes ❑ No ® Not applicable 8e. Summarize what the compensatory mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7j.,you do not need to restate your answer here. hl elp] JARPA 2009 Page 7 of 11 8f. For all activities identified in 8c., describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. hl eipl There will be no additional fill as the replacement bulkhead will be in the same location as the existing failing bulkhead 8g. For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. heI Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. 9a. If you have already worked with any government agencies on this project, list them below. hel Agency Name Contact'Name Phone Most Recent Date of Contact 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of Ecology's 303(d) List? teipl • If yes, list the parameter(s) below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: hft ://www.ec .wa. ov/ ro rams/w /303 . ❑ Yes ® No 9C. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? [hpipj • Go to htt ://cf ub.e a. ov/surf/locate/ind .cfm to help identify the HUC. 17110018 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? hf eipl • I a Go to htt ://www.ec .wa. ov/services/ i Iaps/wria/Wria.htm to find the WRIA#. 16 JARPA 2009 Page 8 of 11 9e. Will the in-water construction work Amply with the State of Washington water quality standards for turbidity? hel • Go to http://www.ecy.Ag.gov/Droarams4 /swas/criteria.html for the standards. ❑ Yes ❑ No ® Not applicable 91f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? hf eid • If you don't know, contact the local planning department. • For more information, go to: htt ://www� cy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html. ® Rural Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other 9g. What is the Washington Department' of Natural Resources Water Type? hC gm • Go to http://www.dnr.wa.gov/BusinessP mits/Tor)ics/ForestPracticesApplications/Pages/f`p watertyping.aspx for the Forest Practices Water Typing System. ® Shorelines ❑ Fish ❑ Non-Fish perennial ❑ Non-Fish seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? hf eid • If no, provide the name of the manual your project is designed to meet. ® Yes ❑ No Name of manual: 9L If you know what the property was used for in the past, describe below. hf elp] Family Residence 9j. Has a cultural resource (archaeological) survey been performed on the project area? hf elp_1 • If yes, attach it to your JARPA package. ❑ Yes ® No 91k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. h[ eid Chum Salmon 91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. h( piA None JARPA 2009 Page 9 of 11 Part 10—Identify the Permits You Are Applying For Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office of Regulatory Assistance at (800) 917-0043 or help(b_ora.wa.gov. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hel • For more information about SEPA, go tole ww.ecy.wa.gov/programs/sea/sepa/e-review.htmi. ❑ A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with m (lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.) • Submit the Fish Habitat Enhancement Project form with this application. The form can be found at: http://www.epermitting.wa.gov/site/alias_resourcenter/jarpa_jarpa_form/9984/jarpa_form.aspx. ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. hf eip] 10b. Indicate the permits you are applying for. (Check all that apply.) Lhgm LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance ® Shoreline Exemption Type (explain): Other city/county permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: ® Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption Washington Department of Ecology: ❑ Section 401 Water Quality Certification Washington Department of Natural Resources: ❑ Aquatic Resources Use Authorization FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) JARPA 2009 Page 10 of 11 Part I I—Authorizing Signatures Signatures required before submitting the JARPA package. 11a. Applicant Signature (required) hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related t the project. (initial) -- oI v �- Apprant Date 11 b. Authorized Agent Signature hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work o ly after all nece sa7 permits have been issued. dAut t ate 11 c. Property Owner Signature (if not applicant) hel I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. roperty Owner Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format, contact The Governor's Office of Regulatory Assistance(ORA). People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call (877)833-6341. ORA publication number: ENV-019-09 JARPA 2009 Page 11 of 11 CERTIFICATION AND TRANSFER OF APPLICATION STATUS Tax Parcel No.422235000064 I, Henry Fertitta, hereby certify that I am an/the owner of the property located at 310 Potlatch Rd. which is the subject of this application for permit or approval. If I am not the sole owner of the property, 1 certify that I am authorized by any and all other owners of the property, to make this certification and transfer any and all rights I/we have to apply for this permit or approval to Japhet Bulkheading Inc. (JAPHEB1168LH) -therefore certify that Japhet Bulkheading Inc. is the "applicant" for this permit or approval and shall remain the "applicant" for the duration of this permit or approval unless "applicant' status is terminated in writing by the property owner. I certify under penalty of perjury under the laws of the State of Washington that the foregoin is true and correct. Signa of Owner Date I Jim Japhet, hereby certify that I am an authorized agent of Japhet Bulkheading Inc. (JAPHEB1168LH) 1407 Summit Lake Shore Rd. NW Olympia, WA. 98502 , a corporation authorized to do business in the State of Washington and that this business association is the "applicant" for this permit or approval. This association shall remain the applicant for the duration of this permit or approval unless "applicant' status is transferred in writing. I certify under penalty of perjury under the laws of the State of Washington that the foregoi rig is tT Td correct. z) na re of Applicant Date � 1 ¢TAT,, ,t r 1FR9 ' STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 -Olympia; Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Parsons with a speech disability cat)call 877-833-6341 May 28, 2010 Ms. Grace Miller \ ' 4 Your address Mason County is in the Department of Community Development l Kennedy- Planning Division Goldsborough Watershed PO Box 279 Shelton, WA 98584 Dear Ms. Miller: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Fertitta Bulkhead Replacement project(SEP2010-00027) located at 310 North Potlatch Road in Shelton as proposed by Jim Japhet,Japhet Bulkeading Inc. The Department of Ecology (Ecology) reviewed the environmental checklist and has the following comment(s): WASTE 2 RESOURCES: Mike Drumright(360)407-6397 All removed debris resulting from this project must be disposed of at an approved site. Property owners,developers, and contractors are encouraged to recycle all possible leftover construction, demolition,and land clearing(CDL) materials and reduce waste generated. Recycling construction debris is often less expensive than landfill disposal. Please visit http://1800regcle.wa.gov to find facilities that recycle construction,demolition, and land clearing materials in your area. Please call Ecology's 1-800-RECYCLE hotline for facilities in the area that will accept your CDL materials for reuse or recycling. WATER QUALITY: Roberta Woods(360)407-6269 Erosion control measures must be in place prior to any clearing,grading, or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand,silt,clay particles,and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48,Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington,and is subject to enforcement action. During construction,all releases of oils, hydraulic fluids,fuels,other petroleum products, paints, solvents,and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter Hood Canal or cause water quality degradation of state waters. � a May 28, 2010 Page 2 All trenches, depressions, or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. Fresh uncured concrete in direct contact with the water is toxic to aquatic life. All concrete shall be poured in the dry and allowed to cure a minimum of seven (7)days before contact with water. Shoreline armoring(e.g., hardening with concrete)can have adverse impacts on the natural character of the shoreline. Ecology recommends that the applicant use appropriate plantings of native vegetation to stabilize shorelines, rather than hardening them with rock or concrete. Ecology can provide further information on request. Applicants should consider that putting in a bulkhead may, in some cases, accelerate erosion of the beach. Bulkheads are not truly permanent and may require expensive maintenance, especially after storms. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments, please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:10-2575) cc: Mike Drumright,W211 Roberta Woods,WQ Jim Japhet,Japhet Bulkeading Inc. (Applicant) ON-STATF MASON COUNTY o� A, N Planning Department o N z T P O Box 578, Shelton, WA 98584 Z�OJ N Y aoy (360)427-9670 1864 Shoreline Inspection July 24, 2000 HENRY FERTITTA N 5120 WOODWAY DR #10010 HOUSTON TX 77056 Case No.: SP12000+ 0048 Parcel No... 4222350 0064, ` Project Description. Determire setbacks for a new single family residence from Hood Canal. Dear Applicant: As part of this department's review of your permit application, a Shoreline Inspection (SPI) was performed on your property. Below you will find comments made regarding the proposed development and is critical values. In some cases, setbacks for dei elopment from shorelines, steep slopes, streams, and wetlands must be included in yQ r specific proposal; these setbacks area included as part of the comments listed bell This information is based on Co my and State regulations as they exist to date. These regulations may change and may affect the requirements for development of the subject property. Please contact me at (360) 427 70, ext. 360 if you have questions. Sincerely, W Grace Miller Land Use Planner Mason County Planning Department 7/24/00 1 of 2 SP12000-00048 Shoreline Inspection 7/24/00 Case No.: SP12000-00048 Comments: Property was inspected by Planner, Grace Miller, with applicants and Grant Foster on 7/17/00. The site is currently vacant and there are adjacent residences on either side. The shoreline setback was determined by drawing an imaginary line between the furthest projecting rooflines (toward the water) of the adjacent residences. This line is the shoreline setback for any portion of the proposed residence that is over 30" in height above average grade. This setback also applies to all structures that are over 30" in height such as decks, fences, outbuildings, etc.. The measurements from this setback to the face of the bulkhead are 39' near the south property line (measured 35' into the lot from the south property line) and 35' from the bulkhead near the north property line (measured 27' into the lot from the north property line). The minimum sideyard setback is 5' from all property lines, easements and right-of-ways, for any portion of a structure that is over 30" in height above average grade. Please contact the Washington State Dept. of Natural Resources for information regarding cutting the trees on the property that are located toward the access road. Their phone number is (206) 825-1631 or 1-800-527-3305. Enclosed is the Residential Development Chapter of the Mason County Shoreline Master Program for further information regarding Policies and Use Regulations.Your property is located within an Urban Residential Shoreline Environment. Thank you. CC: Grant Foster, Foster & Williams Architects 7/24/00 2 of 2 SP12000-00048 06i23/00 FRI 07:22 FAX 3604277798 MASON COL= BLD 3 ` MASON COUNTY SHORELINE PRE-INSPECTION APPLICATIOk PLEASE PRINT ( / — VyLt4 4.00 Fee Re 'red owner: Henry & Kathy Fert i tta Applicant: Foster & W i I I i ams Architects Site Address: next to 300 N Pot I atch Rd Applicant Address: P.O. Box 102 Owner Address: N 5120 Woodway Dr #10010 City: Shelton St WA zip 98584-0102 City: Houston SAP 77056 Phone: (360) 426-0511 Phone: (713) 622-3100 2. Parcel No. 42223 '50 _ 00064 Legal Description: Lot 64 of Potlatch Beach Tracts, Volume 4 of Plats, Page 28 Records of Mason County 3. Purpose of Pre-Inspection: To determine setbacks and other site rear i ct„_,i ons. 4. Use of Building: Residence 5. Is there any,type of water on or adjacent to property?: saltwater X _ lake diver pond wetland seasonal runoff other stream seasonal creek Directions to Site:— Highway 101 north to Potlatch Road, Turn right onto Potlatch Road and go to site. Site is to the north of 300 N Potlatch Road. If the information is incomplete, then Mason County must disclaim any errors resulting from deficiencies in the original application. Pre-inspection reports remain valid only Until development changes occur in the vicinitv which affect the lot evaluated in this Inspection. Applicant Signature: Date: June 23, 2000 Return application to: Department of Community Development,Planning Division P.O. Box 578 Shelton, WA 98584 (360) 427-9270 Please include a7D.(Ja check or money order payable to Mason Coun reyff firer 2000 FOR OFFICE USE ONLY: Accepted by: PE IJ:)at STANCE CE NTER R po��atc •S '�.•'�� .t� �dP�oy3° j TF.5T HalFS 0 66 TyPF 1A 4� t -r 1 n 1 3 0 —l- I 0 5 �2 y/�� elf FQj, J p qf' C, All -jr � � a v O SE 'rb �� RECEIVED �.. JUN 13 2000 FOSTER&WILLIAMS ARCHITECTS 5CALE P',30' P L J1___..___ C : NEB - T ITt A El E :i.73 Joyc"yn Johnson Certified Designer Septic Systems MASON COUNTY BLD 3 10002 Please Illustrate below the proposed building site in relation to water & property.,tines: ok Dever^^y L _ - - R O_ �!n Departmental Review (Far.. Office Use Only) • 1 Planning Department Findings: i . CO uj o 2 > o �� uj ui J ZD z W�it � ' y �� y 1 ; 4 "all� A IIVVVr//JJJ11 Q 730tiG(P N �■"i,I< V ASM OD ° cu ° $t ZD � s Iwo I r� th S tt �a e ■ o • ! NL '�\' 3 I�� l b Q gaff ae C Q T 'd 91pZ£-229-ETL. WO3 'J>IddOiDd83 gSE : T T 00 22 unr 06/30/2000 09:38 FAX 360 4262926 FOSTER WILLIAMS [Rol FAX TRANSMITTAL FORM (360)426-0511 FAX (360) 426-2926 Foster and Williams A r c h i t e c t s To: Henry and Kathy Fertitta Dick Shrum Joyce Johnson Grace Miller From: Grant Foster Date: June 30, 2000 Number of Pages: (including this cover sheet) 1 Project: Fertitta Residence Message: An appointment has been ade with a representative from the Mason County Planning Department (Graiequirements Miller) to visit the site to determine setbacks and other planning department on Monday, July 17, 2000 at 2,00 PM. Please be at the site at that t me so that we can discuss site considerations with the County representative a d among ourselves. Please get back to me and let me know if you will be able , attend this meeting_ (Also pray for good weather on that day). Original to be mailed: No 0 p°��aic��3 dam/ 'P(Z)t L-P -C_j-� e� 15 v10* 0 — — 1 TEST HoIES to 1, 9g,. ,ypF/A 1 k ). (N t 1 n a 3 �V � �5"' CA) zz,0 c ko� Flo RECEIVED �.- JUN 13 2000 —' FOSTER&WILLIAMS ARCHITECTS _ SCALE 1",30' OWNER: PAR('E 4a.t.73 Snr�nnr u Joycelyn Johnson Certified Designer Septic Systems Shoreline Inspection 7/24/00 Case No.: SP12000-00048 Comments: Property was inspected by Planner, Grace Miller, with applicants and Grant Foster on 7/17/00. The site is currently vacant and there are adjacent residences on either side. The shoreline setback was determined by drawing an imaginary line between the furthest projecting rooflines (toward the water) of the adjacent residences. This line is the shoreline setback for any portion of the proposed residence that is over 30" in height above average grade. This setback also applies to all structures that are over 30" in height such as decks, fences, outbuildings, etc.. The measurements from this setback to the face of the bulkhead are 39' near the south property line (measured 35' into the lot from the south property line) and 35' from the bulkhead near the north property line (measured 27' into the lot from the north property line). The minimum sideyard setback is 5' from all property lines, easements and right-of-ways, for any portion of a structure that is over 30" in height above average grade. Please contact the Washington State Dept. of Natural Resources for information regarding cutting the trees on the property that are located toward the access road. Their phone number is (206) 825-1631 or 1-800-527-3305. Enclosed is the Residential Development Chapter of the Mason County Shoreline Master Program for further information regarding Policies and Use Regulations.Your property is located within an Urban Residential Shoreline Environment. Thank you. CC: Grant Foster, Foster & Williams Architects 7/24/00 2 of 2 SP12000-00048