Loading...
HomeMy WebLinkAboutSHX2007-00075 MEP2007-00095 SEP2007-00147 - SHX Permit / Conditions - 10/25/2007 ON_STA MASON COUNTY C ° DEPARTMENT OF COMMUNITY DEVELOPMENT o n o = Planning Division Y o T z P O Box 279, Shelton, WA 98584 N Y Y (360)427-9670 OJ �O 1864 Exemption from Shoreline Management Act Case No.: SHX2007-00075 Substantial Development Permit Requirement The Proposal By: SCOTT DAVIS P O BOX "sit"i h&k 1�lavid, L'L,!A Cl S33 To undertake the following development: Remove approximately 55 feet of existing bulkhead that is forward of mean higher high water. Construct new bulkhead (apprx. 45 feet) just behind mean high water mark. Construct retaining wall behind new bulkhead to help support the bank. Within LOST LAKE and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2) as being category C-normal protective bulkhead Please contact Tammi Wright at ext 295 if you have any questions. 1.CL'1'�IYt,t Wi'LL V Issued: 10/25/2007 k L Expires: 10/25/2009 Authorized Local Government Official cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL � �: ; Park- kokbl� l f • P�°!� STATFo� MASON COUNTY o A o N DEPARTMENT OF COMMUNITY DEVELOPMENT > S N Planning Division °Y ti P O Box 279, Shelton,WA 98584 (360)427-9670 1864 NOTIFICATION OF INCOMPLETE APPLICATION September 27, 2007 SCOTT J DAVIS P O BOX 347 FOX ISLAND WA 98333 Parcel No.: 519014400067 Project Description: RETURN SHORELINE TO NATURAL STATE Dear Applicant: You have submitted a permit application (case no. MEP2007-00095) for proposed construction or development in the county. Upon review of your application, I have determined that the contents of the application are incomplete or do not provide enough detail for review. Therefore, review of your application will not proceed until the necessary information is provided (see the comment section of this letter for details.) Once the information is submitted and the application is complete, I will continue to process your application accordingly. If the additional information is not provided to the County within 180 days of this request, the application shall expire and no further action on the proposed development shall take place. Please contact me at (360) 427-9670, ext. 295 if you have questions. Sincer ly, C�,WYU,YI,�, WIU Tammi Wright Land Use Planner Mason County Planning Department 9/27/2007 Page 1 of 2 MEP2007-00095 NOTIFICATION OF INCOMPLETE APPLICATION 9/27/2007 Case No.: MEP2007-00095 Comments: A review of you application indicates that there was no site plan submitted. Please submit a site plan showing lot dimensions, existing structures, structure setbacks, well location, names of streets, driveways, shorelines, topography, easements, septic systems, etc. Please indicate the dimensions (length, width and height of the proposed retaining walls and their distances to the ordinary high water mark). Enclosed are site plan instructions to assist you in preparing an acceptable site plan. 9/27/2007 Page 2 of 2 MEP2007-00095 t ON.STATE MASON COUNTY C 4- DEPARTMENT OF COMMUNITY DEVELOPMENT M o s° �= Planning Division °v y P O Box 279, Shelton, WA 98584 (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICAN% BE KEPT IN THE (WAC 197-11-350) PARCEL FILE SEP2007-00147 Description of Proposal: Remove approximately 55 feet of existing bulkhead that is forward of mean higher high water. Construct new bulkhead (apprx. 45 feet)just behind mean high water mark. Construct retaining wall behind new bulkhead to help support the bank. Proponent: SCOTT J DAVIS Site Address (if Assigned): 13 W FROSTY LN NORTH SHELTON Directions to Site: CLOQUALLUM RD, R ON LOST LAKE RD, L ON FROSTY LANE , R ON FROSTY LANE NORTH TO 1 ST DRIVEWAY ON THE LEFT Parcel Number: 519014400067 Legal Description: TR 6-G OF GOVT LOT 10 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Tammi Wright at ext. 295 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 10/24/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. lei 1. le���i )y 19/01 Au orized Local Government Official Oate r MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00147 CONDITIONS OF THIS DETERMINATION 1) The existing unpermitted bulkhead that is placed approximately 10 feet forward of mean high water mark is to be removed and the shoreline returned to its natural state. 2) Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. 3) Debris or deleterious material resulting from construction shall be removed from the beach area and project site and shall not be allowed to enter waters of the State. 4) Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. 5) During construction, all releases of oils, hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. 6) All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. �oN.srgrj o MASON COUNTY o P A o N DEPARTMENT OF COMMUNITY DEVELOPMENT " Planning Division Y S N z� Y y P O Box 279, Shelton, WA 98584 of �� (360)427-9670 1864 MASON ENVIRONMENTAL PERMIT October 25, 2007 SCOTT J DAVIS P O BOX 347 FOX ISLAND WA 98333 Parcel No.: 519014400067 Issued: 10/25/2007 Case No.: MEP2007-00095 Project Description: Remove approximately 55 feet of existing bulkhead that is forward of mean higher high water. Construct new bulkhead (apprx. 45 feet)just behind mean high water mark. Construct retaining wall behind new bulkhead to help support the bank. The following critical areas are present on this property: Long-Term Commercial Forest X FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104. This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. aftt � Cwt CL t loI�s1 �� Authorized Local Government Official Date Mason Environmental Permit 10/25/2007 Case No.: MEP2007-00095 Conditions: 1.) All upland reas disturbed or newly created by construction activities shall be seeded, vege r given an equivalent type of erosion protection (silt fencing or straw matting). X 2.) AIf co struction and demolition debris must be removed from the beach after project com etion. Proper disposal of construction debris must be on land in such a manner that deb nnot enter or cause water quality degredation of State waters. X 3.) MoWmust be done in the dry to het ent disturbance of unstable soil layers and uncontrollable mass wasting. X 4.) Temporary erosion control measur ust be implemented to prevent water quality degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained until I d vegetation has become established. X 5.) Ap er dimensions and setbacks on submitted site plan. X 6.) DurW g construction, all releases of oils, hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of s hould take precedence over all other work on the site. X 7.) W must be done in the dry to heI event disturbance of unstable soil layers and uncontrollable mass wasting. X 10/25/2007 Page 2 of 2 MEP2007-00095 t MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Bldg. III, 426 West Cedar Street PO Box 186, Shelton, WA 98584 N. www.co.mason.wa.us (360)427=9670 Belfair(360)275-4467 Elma(360)482-5269 UPLAND • SHORELINE BULKHEAD Prescriptive Design and Installation Standard Blacktop or impervious soil for rIr)Wlvd I surface drainage. s o - Maximum Rockery Height 6'0" r: Max rise m 8 '+e• Em 0.0 fi nshad grade N Washed granular drainage material on`— 1y co n��� 7°� 1s°min Undisturbed soil 't. (not fill) Min.12"layer of drainage material Specify rock sizes tt ranging from t coarse(1-1/2")to fine(3/8"). 1 ' =' Approved filter fabric O o N O 2'0" E o v" Y.N Mason County Dept.of Community o S f S Development may require that any rockery designed by a licensed soil engineer, LD m � especially in soil-sensitive areas. 1'0" J Ground level ( 4 ` Min.4"diameter perforated drain 12 ;; the to an approved discharge ,gland wall only Permits Required A building permit is require for all uplansrockeries over four feet in height. Rockeries less than four feet in height do not require a permit unless: 1) Located on a site containing an Environmentally Critical Area(See Mason County Critical Area Ordinance. 2)There is a surcharge such as a driveway, building footing, etc,3) impoundment of Class I, 11,or III-A liquids (IBC 105.2) OR #4) Possible failure that could cause damage to adjoining properties or structures. Even when rockeries do not require a permit, rockery installers are advised to follow the rockery design principles outlined in this publication. Permit applications for rockeries must include a site plan showing the location of the rockery and a cross section of the rockery showing the proposed design details. Rockery designs must either be prepared by a Washington State licensed engineer or comply with the Prescriptive Rockery Installation Design. Rockeries over 6-feet in height must be designed by a Washington State licensed engineer or architect to ensure stability against overturning, sliding, excessive foundation pressure and water uplift. Upland rockery retaining walls shall be designed for a safety factor of 1.5 against lateral sliding and overturning IBC 1806. PERMIT NO..— MASON COUNTY DATE RECEIVED: DEPARTMENT OF COMMUNITY DEVELOPMENT RESOURCE ORDINANCE (Chapter 17.01 MCC) 411 N. 5TH Street/P.O. Box 279, Shelton, WA 98584 ENVIRONMENTAL PERMIT APPLICATION MASON ENVIRONMENTAL PERMITS CONDITIONAL USE ❑ The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1. Owner: Owner Mailing Address: Site Address: 13 W Fes,& A) City:FK State: zip: ,- city: i ,; State Vj:& Zip:_" Lien/Title Holder Phone: Daytime(Ac3 Address: Pp, 7 Fire District#: i City:�s-,►'� �s�cat,_�1 State:Mks h. Zip:—` 3� �/, _ Signature: , 2. Parcel Number: S'19of - 14q -__ _ Legal description: _'1`i ci t icy Parcel Size: 53 X t% a its •S— t ,/ j,� 1 gr ., (ate ire 3. Directions to site: t a 3 _Zhi TFf IZ+ h. ai State what sections require a permit: In-Holding Lands, Chapter 17.01.062 ❑ 4' Long-Term Commercial Forest, Chapter 17.10.060 ❑ Wetlands, Chapter 17.01.070 ❑ Mineral Resource Lands, Chapter 17.01.066 ❑ Frequently Flooded Areas, Chapter 17.01.090 ❑ Aquifer Recharge Areas, Chapter 17.01.080 ❑ Landslide Hazard Areas,Chapter 17.01.100 ❑ Erosion Hazard Areas, Chapter 17.01.104 ❑ Seismic Hazard Areas, Chapter 17.01.102 ❑ Fish and Wildlife Habitat Conservation Areas, Chapter 17.01.110 v 5. Identify current use of property with existing improvements: 6. Identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions and other pertinent information(Attach additional sheets if needed): 6 c , 7. Will there be an alteration of a wetland and/or wetland vegetation area? Yes ❑ No 8. Any water on or adjacent to property: Saltwater ❑ Lake K River ❑ Pond ❑ Wetland ❑ Seasonal Runoff 0 Other 9. If septic is located on project site,include records. Connect to septic? 0 Community Septic? ❑ Public Water Supply? ❑ Well? O 10. Type of Job: New X Add ❑ Alt ❑ Repair X Demolition ❑ Other Thispermit is grantedpursuant to the Resource Ordinance (Chapter 17.01 MCC) and nothing in thispermit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project, but not inconsistent with the Resource Ordinance. The permit may be rescinded pursuant to the event the permittee fails to comply with the conditions of this ordinance. MASON ENVIRONMENTAL PERMIT: $510.0 305.00( another permit) MASON CONDITIONAL USE ENV IT: 0 HABITAT MANAGEMENT PLA $360.00 I:\PLANNING\C&R\ENVIRONMENTAL REVISED 09-14-05 Show the following on the site plan Lot Dimensions Flood Zones Existing Structures Fences Water Lines Driveways Drainage Plans Shorelines Septic System Topography Indicate Directional by(N,S,E,W,etc.) Proposed Improvements Easements In relation to plot plan Name if Flanking Street APPLICANT TO DRAW iSITE PLAN BELOW: APPLICANT TO DRAW TOPOGRAPHY BEILOW: DEPARTMENTAL REVIEW FOR OFFICE USE ONLY COMMENTS Planning: Environmental Health: Building Plan Review: Occupancy Group: Fire Marshal: Other: Conditions: FEES Total fees: Accepted by: Date: MASON COUNTY RESOURCE ORDINANCE July 2003 Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant. The Shelton-Mason County Journal will bill the applicant directly. I /WE understand that I /WE must sign and date the attached acknowledgment indicating and that I / WE understand that is MY/ OUR responsibility. I /WE must submit the signed page as part of application in order for it to be considered as complete. ' s51c 1 DATE OWNER APPLI T MASON COUNTY RESOURCE ORDINANCE July 2003 LIST OF ADJACENT PROPERTY OWNERS WITHIN 300 FEET Of:YOUR PROPERTY BOUNDARIES FOR CONDITIONAL USE AND VARIANCE Addresses are to be obtained from the Mason County Assessor's Office, Bldg. 1, Second Floor. 4 JARPA 7A) Demolition of existing rock bulkhead to return beach area back to natural state. This work will not take place until lake level is below existing rock wall No work will take place in the water or if lake level is too high. Equipment used will be an excavator track machine. This equipment will remain on dry land at all times and will remain behind high water mark never getting any closer than 10' to the lake shore line edge. 7B) We have had this lot in our family for over 40 years. During this time many things have happened,mostly about 30-35 years ago,by previous owners. They filled the slope adjacent to the lake and also created an 8' approximately wide area from the mean high water work out towards the lake with a rock retaining wall. I would like to remove this retaining wall and return the beach back to its normal condition. There are too many of these bulkheads on the lake and they are causing the lake to become excessively rough, due to the fact of that the waves are bouncing off the bulkheads instead of naturally dispersing on the shore line. I would then like to build a rock retaining wall just behind the mean high water mark. This wall would help support the slope and armor the mean high water mark area. I would also like to build a second wall behind the first creating a level pad area. These walls have been designed and engineered by a licensed PE. 7C)There will be only positive impacts to the lake. The reason being,we will be removing a bulk head which is now located below the mean high water mark into the lake,therefore returning the beach back to its natural state. We also will be supporting the existing slopes with retaining walls. 7D) The construction will take place in September/October when the water table is below the invert of the bottom base rock of the bulk head being removed. AGENCY USE ONLY. Agency Reference# Date Received: Citculatedby: (local govt.or agency) JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (JARPA) (for use in Washington State) PLEASE TYPE OR PRINT IN BLACK INK. R _ TO FELL IN ELECTRONICALLY USE F11 TO MOVE THROUGH THE FORM O ❑ Application for a Fish Habitat Enhancement Project per requirements of RCW 77.55.290. You must submit a copy of this completed JARPA application form and the (Fish Habitat Enhancement JARPA Addition)to your local Government Planning Department and Washington Department of Fish &Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working days. Based on the instructions provided, I am sending copies of this application to the following: (check all that apply) Local Government for shoreline: ❑Substantial Development ❑Conditional Use ❑Variance [DEI'e"mption []Revision ❑Floodplain Management ❑Critical Areas Ordinance d Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region) ❑ Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal Permit Unit) ❑ Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification ❑ Corps of Engineers for: ❑ Section 404 ❑ Section 10 permit ❑ Coast Guard for: ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) ❑ For Department of Transportation projects only: This project will be designed to meet conditions of the most current Ecology/Department of Transportation Water Quality Implementing Agreement SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# If an agent is acting for the applicant during the permit process, complete#2. Be sure agent signs Section C(Signature Block) for all permit applications 2.AUTHORIZED AGENT MAILING ADDRESS WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# 3. Relationship of applicant to property: ; OWNER ❑ PURCHASER ❑ LESSEE ❑ 4. Name, address and phone number of property owner(s)if other than applicant: � r ' - 5. Location(street address,including city,county and zip code,where proposed activity exists or will occur) Local government Zith jurisdiction(city or county) a Waterbody you are working in "�—t-' �_3 kr Tributa4 of WRIA# Is this waterbody on the 303(d)List— YES ❑ NO If YES,what parameter(s)? "For 303d List, Shoreline designation htti):/Iwww.ecy-wa.gov/programs/Wq/303d/index.htmI Zoning designation '/,Section Section Township Range Government Lot + S C DNR stream type if known la ILatitude and Longitude: Tax Parcel Number, • O 06 7 ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 1 6. 'Describe the current use of the property, and structures existing on the property. Have you completed any portion of the proposed activity on this property? ❑ YES IS NO For any portion of the proposed activity already completed on this property, indicate month and year of completion. Is the property agricultural land? ❑ YES CS NO Are you a USDA program participant? ❑ YES ® NO 7a. Describe the proposed work that needs aquatic permits: Complete plans and specifications should be provided for all work waterward of the ordinary high water mark or line,including types of equipment to be used. If applying for a shoreline permit,describe all work within and beyond 200 feet of the ordinary high water mark. If you have provided attached materials to describe your project,you still must summarize the proposed work here. Attach a separate sheet if additional space is needed. � 1 a``{ta`c.�„��L — I Y►� -� fi�c�� li h.� �O ✓'2w��. �cj5�'i`� ��t��e"�j ICxAi�d ,, ��`� ° t� Ttl b ► ��,�. �.SZ., c� J ..� .sue PREPARATION OF DRAWINGS: See sample drawings and guidance for completing the drawings. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE DRAWINGS MUST BE ATTACHED. NOTE: Applicants are encouraged to submit photographs of the project site,but these DO NOT substitute for drawings. THE CORPS OF ENGINEERS AND COAST GUARD REQUIRE DRAWINGS ON 8-112 X 11 INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES. 7b. Describe the purpose of the proposed work and why you want or need to perform it at the site. Please explain any specific needs that have influenced the design. ( . dH-�l c�y ) .I` f.x•�.,,(� �a�.� �� r e��:Z �.� ex�s�f'� � �;�.� 7c. Describe the potential impacts to characteristic uses of the water body. These uses may include fish and aquatic life,water quality, water supply, recreation and aesthetics. Identify proposed actions to avoid,minimize,and mitigate detrimental impacts and provide proper protection of fish and aquatic life. Identify which guidance documents you have used. Attach a separate sheet if additional space is needed. N UG\ -t- 7d. For in water construction work,will your project be in compliance with the State of Washington water quality standards for turbidity WAC 173.201A-110? Eg YES ❑ NO (See USEFUL DEFINITIONS AND INSTRUCTIONS) 8. Will the project be constructed in stages? YES ❑ NO Proposed starting date: /�1 ?. Lc0'7 Estimated duration of activity: — 9. Check if any temporary or permanent structures will be placed: ❑ Waterward of the ordinary high water mark or line for fresh or tidal waters AND/OR ❑ Waterward of the mean higher high water for tidal waters? 10.Will fill material (rock,fill,bulkhead,or other material)be placed: N ❑ Waterward of the ordinary high water mark or line for fresh waters? If YES,VOLUME(cubic yards) /AREA (acres) ❑ Waterward of the mean higher high water for tidal waters? If YES,VOLUME(cubic yards) /AREA (acres) ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 2 11. Will material be placed in wetlands? ❑ YES ® NO If YES: A. Impacted area in acres: B. Has a delineation been completed? If YES, please submit with application. ❑ YES ❑ NO C. Has a wetland report been prepared? If YES, please submit with application ❑ YES ❑ NO D. Type and composition of fill material(e.g.,sand,etc.) E. Material source: F. List all soil series(type of soil)located at the project site, and indicate if they are on the county's list of hydric soils. Soils information can be obtained from the natural Resources Conservation Service(NRCS). G. WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑ YES ❑ NO If YES, IMPACTED AREA IS ACRES OF DRAINED WETLANDS. NOTE:If your project will impact greater than''/:of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form. NOTE:A 401 water quality certification will be required from Ecology in addition to an approved mitigation plan if your project impacts wetlands that are: a)greater than Y:acre in size, or b)tidal wetlands or wetlands adjacent to tidal water. Please submit the JARPA form and mitigation plan to Ecology for an individual 401 certification if a)or b)applies. 12. Stormwater Compliance for Nationwide Permits Only: This project is(or will be)designed to meet ecology's most current stormwater manual,or an Ecology approved local stormwater manual. ❑ YES ❑ NO If YES—Which manual will your project be designed to meet? If NO—For clean water act Section 401 and 404 permits only—Please submit to Ecology for approval, along with this JARPA application, documentation that demonstrates the stormwater runoff from your project or activity will comply with the water quality standards,WAC 173.201(A) 13.Will excavation or dredging be required in water or wetlands? ❑ YES RJ NO If YES: A. Volume: (cubic yards)/area (acre) B. Composition of material to be removed: C. Disposal site for excavated material: D. Method of dredging: 14. Has the State Environmental Policy Act(SEPA)been completed J@ YES ❑ NO SEPA Lead Agency:Hotso' , cw,-r SEPA Decision: DNS, MDNS, EIS,Adoption, Exemption Decision Date(end of comment period) SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDFW AS REQUIRED FOR A COMPLETE APPLICATION 15. List other Applications,approvals or certifications from other federal,state or local agencies for any structures,construction discharges or other activities described in the application(i.e.preliminary plat approval, health district approval,building permit,SEPA review, federal energy regulatory commission license(FERC), Forest practices application,etc.). Also,indicate whether work has been completed and indicate all existing work on drawings. NOTE: For use with Corps Nationwide Permits,identify whether your project has or will need an NPDES permit for discharging wastewater and/or stormwater. TYPE OF APPROVAL ISSUING AGENCY IDENTIFICATION DATE OF APPLICATION DATE APPROVED COMPLETED? ° NO. 16. Has any agency denied approval for the activity you're applying for or for any activity directly related to the activity described herein? ❑ YES NO If YES,explain: ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 3 SECTION B - Use for Shoreline and Corps of Engineers permits only: 17a.Total cost of project This means the fair market value of the project,including materials, labor, machine rentals,etc. R 17b. If a project or any portion of a project receives funding from a federal agency,that agency is responsible for ESA consultation. Please indicate if you will receive federal funds and what federal agency is providing those funds. See instructions for information on ESA.* FEDERAL FUNDING ❑ YES M NO If YES, please list the federal agency. 18. Local government with jurisdiction: — - 19. For Corps,Coast Guard and DNR permits, provide nam s,addresses and telephone numbers of adjoining property owners,lessees, etc. - Please note: Shoreline Management Compliance may require additional notice—consult your local government. NAME ADDRESS PHONE NUMBER SECTION C-This section MUST be completed for any permit covered by this application 0. Application is hereby made for a permit or permits to authorize the activities described herein. I certify that I am familiar with the information contained in this application,and that to the best of my knowledge and belief,such information is true,complete,and accurate. I further certify that I possess the authority to undertake the proposed activities. I hereby grant to the agencies to which this application is made,the right to enter the above-described location to inspect the proposed,in-progress or completed work. I agree to start work ONLY after all necessary permits have been received. DATE SIGNIAAJIRE OF APPLICANT 10-7 DATE SIGNATURE OF AUTHORIZED AGENT I HEREBY DESIGNATE TO ACT AS MY AGENT IN MATTERS RELATED TO THIS APPLICATION FOR PERMIT(S). I UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED, I MUST SIGN THE PERMIT. SIGNATUR OF APPLICANT DATE SIGNAky,iRE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS, E.G. DNR) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED. 18 U.S.0§1001 provides that: Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies, conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. COMPLETED, BY l OGI�L OFFICIAL A: Nature ofthe existing shoreline (Descnbe type of shoreline such as marine,stream,lak`e lagoon;marsh both; warrip flood plain,flaodway;de�ta;type of beach, uch.as;accretion,erasan;High batik, low bank,or ciike,.rrlaterial such;as sand,gravel; mud,clay, rock,riprap;andetetdty lkheax ding,if any) . In the event,that any ofth`e proposed builcltngs or structures will exceed a height ofthirtyAN6 feet above the average grade Ibvel, indicate the approximate 1ocat►on ofrand n't er of residential units;,,existing an"d'potent al,that will have an.labsfructed view: C. 1f the application involves a conditional use or variance,set forth in full that portion of the master;program which provides that the proposed use may be,a conditional use,or, in the case of a variance;from which the variance is being.sought: .... These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions ECY 070-15(Rev. 11/04) JARPA Contact the State of Washington Office of Regulatory Assistance for latest version or call 360/407-7037 or 800/917-0043 4 oN.STATF MASON COUNTY M �P5 O DEPARTMENT OF COMMUNITY DEVELOPMENT S H° �= Planning Division °Y y P O Box 279, Shelton, WA 98584 (360)427-9670 1864 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00147 Description of Proposal: Remove approximately 55 feet of existing bulkhead that is forward of mean higher high water. Construct new bulkhead (apprx. 45 feet)just behind mean high water mark. Construct retaining wall behind new bulkhead to help support the bank. Proponent: SCOTT J DAVIS Site Address (if Assigned): 13 W FROSTY LN NORTH SHELTON Directions to Site: CLOQUALLUM RD, R ON LOST LAKE RD, L ON FROSTY LANE , R ON FROSTY LANE NORTH TO 1ST DRIVEWAY ON THE LEFT Parcel Number: 519014400067 Legal Description: TR 6-G OF GOUT LOT 10 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Tammi Wright at ext. 295 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 10/24/2007. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Oate MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2007-00147 CONDITIONS OF THIS DETERMINATION 1) The existing unpermitted bulkhead that is placed approximately 10 feet forward of mean high water mark is to be removed and the shoreline returned to its natural state. 2) Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. 3) Debris or deleterious material resulting from construction shall be removed from the beach area and project site and shall not be allowed to enter waters of the State. 4) Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. 5) During construction, all releases of oils, hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. 6) All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. • MASON COUNTY Single Family $305 Non-Single ENVIRONMENTAL CHECKLIST 10 to 20 Acres$610 .Over 20 Acres$765 Purpose of Checklist: EIS PS)$2040+55/hr The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or"does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of Checklist for Non-project Proposals: Complete this checklist for non-project proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL ACTIONS (part D). There is a fee required, for the processing of the checklist, see above for the appropriate fee. Please make your check payable to "Mason County Treasurer'. For non-project actions, the references in the checklist to the works "project", "applicant", and "property or site" should be read as "proposal", "proposer", and "affected geographic area", respectively. ,t MASON CO. ENVIROMENTAL CHECKLIST A. BACKGROUND PARCEL NUMBER : .S� �� 1. Name of proposed project, if applicable: crCf yy 67 t"'T Cyr�y 2. Name of applicant: 3. Address and phone number of applicant and contact person,, !� .jo' '�G a /��Cf's# 4- {j ��jCcy'� 1 4. Date checklist prepared: ��t9J�7 5. Agency requesting checklist: M� ' C 6. Proposed timing or schedule (including phasing, if applicable): c6Y't' ! lqpfy�OA' 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explain. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. M 10. List any government approvals or permits that will be needed for your proposal, if known. 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) uj"k��WX -4 tAJ ,1- - 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. B. ENVIRONMENTAL ELEMENTS: Avea 1. EARTH: a. General description of the site (circle one): Flat, rolling hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? /O— f5x'7b C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classific tion of agricul ural soils, specify them and note any prime farmland. y d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. ` Mason County Environmental Checklist Page 2 f e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. S L-,, g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? I h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. N&,.,e- Mason County Environmental Checklist Page 3 r . C. Proposed measures to reduce or control emissions or other impacts to air, if any: 3 WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. ",-t L.k:e- (0' 4" " , -+) 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yetis, please describe ajn,d attach availablenplans. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. 'tea` C,,I ✓1C�RSl Joe r 4 Will the proposal require surface t ?water withdrawals or diversions? Give p p q e general description, purpose, and approximate quantities if known. Mason County Environmental Checklist Page 4 f 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. � 0 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. K)6 b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. K3a'vp- c. Water runoff(including storm wa+.cr): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. 2) Could waste materials enter ground or surface waters: If so, generally describe. Mason County Environmental Checklist Page 5 t , d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 3��t' �� �,1���-�.. � [� �`ti��, �}��, ��l�s � fit►� ��s 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other evergreen tree: fir ,edar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? C. List threatened or endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Mason County Environmental Checklist Page 6 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle song d_ jother Mammals: deer, bear, elk, beaver, other Fish: bass, salmon, trout herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. C. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. - v,--kte,� f°c %--Ict, b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe., C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Mason County Environmental Checklist Page 7 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. K)C 1) Describe special emergency services that might be required. 2) Proposed measures to reduce or control environmental health hazards, if any: �ctv.e_ eX isT s 1 b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? , 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. 3) Proposedmeasures to reduce or r control no`iiTse impacts, if any: 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Mason County Environmental Checklist Page 8 b. Has the site been used for agriculture? If so, describe. C. Describe any structures on the site. IGIK, (61 SL,(.-k d. Will any structures be demolished? If so, what? e. What is the current zoning classification ofof the site? f. What is the current comprehensive plan designation of the site? g. If applicable, what is the current Shoreline Master Program designation of the site? h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. ) C,3 i. Approximately how many people would reside or work in the completed project? j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: pot y Mason County Environmental Checklist Page 9 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: '��tl,��ti�Ate) 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. K &V�- C. Proposed measures to reduce or control housing impacts, if any: 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? L16-Viz.- b. What views in the immediate vicinity would be altered or obstructed? C. Proposed measures to reduce or control aesthetic impacts, if any: Mason County Environmental Checklist Page 10 l 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? 06 C. What existing off-site sources of light or glare may affect your proposal: d. Proposed measures to reduce or control light and glare impacts, if any: 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so, describe. K)o C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Mason County Environmental Checklist Page 11 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally�describe. me b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. cu-"ti C. Proposed measures to reduce or control impacts, if any: 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, f any. t (� b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. rS114 -�- C. How many parking spaces would the completed project have? How many would the project eliminate? -49— C4"'A d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). Mason County Environmental Checklist Page 12 e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. N f. How many vehicular trips per day would be generated by the completed project: If known, indicate when peak volumes would occur. g. Proposed measures to reduce or control transportation impacts, if any: cre 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? � If so, generally describe: b. Proposed measures to reduce or control direct impacts on public services, if any: Mason County Environmental Checklist Page 13 16. UTILITIES: a. Circle utilities currently available at the site: electri t ater,�Qs�seatural gas, w �e,­ teleplhone, sanitary sewer, septic system, ther: b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: �Vol ` IJ Date submitted: iq )0""7 Mason County Environmental Checklist Page 14 ESA LISTED SALMONIDS CHECKLIST Applicant Information Project Information Name d s, 7t f), % Names C1'v'4 } S woc,� � �►,'t Phone —a) a-49- IS$ Location rf `t -;,•� �b �lc►,, a 98S 8`1 Description Six w This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. 1. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES NO . X Please describe. 7v,.,T �f,,, A LY 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES NO X _ Uncertain Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. April 2003 - 1 - PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. 1. Name of watershed: 2. Name of nearest waterbody: 3. What is the distance from this project to the nearest body of water: Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use between the project and the potentially affected water body (parking lots,farmland,etc.)? 5. Is the project above a: * natural permanent barrier(waterfall) YES NO * natural temporary barrier(beaver pond) YES NO * man-made barrier(culvert, dam) YES NO * other(explain): 6. If yes, are there any resident salmonid populations above the blockage? YES NO Don't know 7. What percent of the project will be impervious surface(including pavement&roof area)? -2- FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of a. Surface water? YES NO Amount Name of surface water body b. Ground water? YES NO Amount From where Depth of well 2. Will any water be rerouted: YES NO If yes,will this require a channel change? 3. Will there be retention or detention.ponds? YES NO If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface water discharge,please give the name of the waterbody. 4. Will this project require the building of new roads? YES NO Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES NO 6. Will topography changes affect the duration/direction of runoff flows? YES NO If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? YES NO If yes, how will the loss of flood storage be mitigated by your project? -3 - WATER QUALITY: The following questions will help determine if this project could Adversely impact water quality. Such impacts can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging contaminants,etc. 1. Do you know of any problems with water quality, in any of the streams, within this watershed? YES NO If yes, describe. 2. Will your project either reduce or increase shade along or over a waterbody? YES NO Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade. 3. Will the project increase nutrient loading or have the potential to increase nutrient loading or contaminants (fertilizers, other waste discharges, or runoff) to the waterbody? YES NO 4. Will turbidity be increased because of construction of the project or during operation of the project? YES NO In-water or near water work will often increase turbidity. 5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting, and chemical sprays for vegetation management, clearing of parking lots? YES NO If yes,please describe. -4- VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation, thereby, adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks: YES NO If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If any vegetation is removed, do you plan to re-plant? YES NO If yes, what types of plants will you use? - 5 - g, �11 �f P¢R � a i� x ` 1 d To" f d� LI} > z III I STATE a 6e��` FE 7y^y STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 • Olympia, Washington 98504-7775 • (360) 407-6300 October 24, 2007 Ms. Tammi Wright Your address Mason County is in the Department of Community Development tA Ke nnedy-Planning Division ht p PO Box 279 watershed Shelton,WA 98584 Dear Ms. Wright: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Davis Bulkhead Removal/Construction project(SEP2007-00147) located at 13 West Frosty Lane North in Shelton as proposed by Scott Davis. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Roberta Woods(360)407-6269 Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Proper disposal of construction debris must be on land in such a manner that debris cannot enter Lost Lake or cause water quality degradation of state waters. Shoreline armoring(for example, hardening with rock or concrete)can result in adverse impacts to the natural character of the shoreline,but these impacts can be avoided. Ecology recommends that the applicant use appropriate plantings of native vegetation to stabilize shorelines,rather than hardening them with rock or concrete. Ecology can provide further information upon request. Applicants should consider that placement of a bulkhead may in some cases accelerate erosion of the beach. Bulkheads are not truly permanent, and may require expensive maintenance, especially after storm events. Ecology's comments are based upon information provided by the lead agency. As such,they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (AW: 07-8256) cc: Roberta.Woods, WQ Scott and Janet Davis(Applicant/Contact) Z O ro rn z 3 D ro ro r h 0 z -i m A p x m y m p z O 20 !m 0 CD < 0 3 to t7 <r pX M T tJ.i t7 S �Vl S C m m H r D 3 z 0 mZ N D m b m (n 7J CJ m fl $ m p D X �- (Am r d C Z m z 3 o � f1S �pX - v r. r p m D -U a) CD 70 0� D p C ppp �S6 r<r 3�m g, M71� p£d 104.00 a = a r ti a: D CC7-I t7 3 x r p C7%17 Ot ty r-M7\ ppp O CDr-r = 3 T 0 OO gOt O r m 00Ott (JJ'I II D O D d p2tt d 0 it N �rD D r .o u! r r*i r 0o.9a mCD n 9 :> n 'I co CD� N z z 4 co o N r-I I--i N X y7 x f'F r*i x z D OD N c) -X o H Cl) rp -4 O T� N I nD C W Z -r� ` � o ;A Z D f--' I O f 70 " a D -- 9 z e CD T z V) _ Y V' 3 m z '° � � x r -ndOM V) � �rnx_ � m rD�V1 z D dz.-,� c1 .-, p n z c1 r m O a d o n m 3 z z -i —————————— — w C D cf- 3 0 Iz z .. z N00°24'20'E -' cn m 50,00' r -I O o D M � l 1 O 0 _ ® o CD = Qt C O �► N O