Loading...
HomeMy WebLinkAboutSEP2016-00100 - SEP Determinations - 11/30/2016 STATy O STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 December 14, 2 16 Kell McAboy, Senior Planner Mason County Department of Community Development Planning Division PO BOX 279 Shelton, WA 9 584 Dear Ms.McA oy: Thank you for t ie opportunity to comment on the determination of nonsignificance for the PerryCook Doc c Replacement Project(SEP2016-00100 & SHX2016-00067) located at 2850 West Cushman Ridge Drive in Shelton as proposed by Jay PerryCook. The Department of Ecology(Ecolo y)reviewed the environmental checklist and has the following comment(s): SHOREL NDS & ENVIRONMENTAL ASSISTANCE: Helen Pressley (360) 407-6076 The applicant should contact the U.S.Army Corps of Engineers (Corps) in Seattle at (206) 764-3 495 for additional permit information. A water quality certification may be required from Ecology in conjunction with the U.S. Army Corps,of Engineers (Corps)permit for this project. WATER UALITY: Chris Montague-Breakwell(360) 407-6364 The following construction activities require coverage under the Construction Stormwater General Permit: 1. Clearing, grading and/or excavation that results in the disturbance of one or more acres and discharges stormwater to surface waters of the State; and 2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more and discharge stormwater to surface wat rs of the State. Kell McAboy, Senior Planner December 14, 2016 Page 2 a) This includes forest practices(including, but not limited to, class IV conversions) that are part of a construction activity that will result in the disturbance of one or more acres, and discharge to surface waters of the State; and 3. Any size construction activity discharging stormwater to waters of the State that Ecology: a) Determines to be a significant contributor of pollutants to waters of the State of Washington. b) Reasonably expects to cause a violation of any water quality standard. If there are known soil/ground water contaminants present on-site, additional information (including, but not limited to: temporary erosion and sediment control plans; stormwater pollution prevention plan; list of known contaminants with concentrations and depths found; a site map depicting the sample location(s); and additional studies/reports regarding contaminant(s))will be required to be submitted. You may apply online or obtain an application from Ecology's website at: http://www.ecy.wa.aov/programs/wq/stormwater/construction/ Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater from construction activities and must submit it on or before the date of the first public notice. Ecology's comments are based upon information provided by the lead agency. As such, they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (CA/SM:16-6448) cc: Chris Montague-Breakwell, WQ Helen Pressley, SEA Jay PerryCook(Proponent)