HomeMy WebLinkAboutHPA - PLN General - 12/14/2020 ( �•, �� l.0 i� vt�Ol.� �i�fa
toA
MASON COUNTY >cvd
<Cente
COMMUNITY SERVICES
Building,Planning,Environmental Health,Community Health
615 W.Alder Street—Bldg.8,Shelton,Wa 98584
Phone:(360)427-9670 Ext.352♦Fax:(360)427-7798
Mason County Flood Damage Prevention Ordinance #41-17
FDPO Development Permit Application
The undersigned hereby makes application for a permit to develop in a designated floodplain area. The work to
be performed is described below and in attachments hereto. The undersigned agrees that all such work shall
be done in accordance with the requirements of the County Floodplain Ordinance and with all other applicable
Local, State and Federal Regulations. This application does not create liability on the part of the County or any
officer or employee thereof for any flood damage that results from reliance on this application or any
administrative decision made lawfully thereunder.
Applicant: Contractor:
, , , �0 SO t-e--Fa SIGs
ailing Addres : Mailing Address:
. 0. Y_ 2 0
City, State, Zip City, State. Zip
a ROSo1+
Phon : ( ) 402--0G 3o Phone: ( )
Email:Iq . 0102 M 0 rt/ eV--.V)A . ✓ Email:
Parcel Number: j I Property Address:
A. Description of Work(complete for all work):
1. Proposed Development Description:
❑ New building ❑ Improvement to existing building ❑ Manufactured home
❑ Filling ,K-Other fL�2D��1leCMQ�('�
2. Size and location of proposed develo nt(attach site plan):
SSDt� fU12
,2,m � v o a o6f
3. Is the proposed devefbpmentin a Special Flood Hazard Area(Zones A,AE,Al-A30,AH�or AO)? LA)Aj
XYes ❑ No
4. Per the floodplain map, what is the zone and panel number of the area of the proposed development?
Flood Zone Designation A Community Panel Number
5. Are other Federal, State or local permits obtained?
❑ Yes ❑ No
6. Is the proposed development in an identified floodway?
VYes ❑ No
7. If yes to#6, is a "No Rise Certification"with supporting data attached?
❑ Yes ❑ No
B. Complete for New Structures and Building Sites:
r l
1. Base Flood Elevation at the site: feet NGVD
2. Required lowest floor elevation (including basement): feet NGVD
3. Elevation to which all attendant utilities, including all heating and electrical equipment, will be protected
from flood damage: feet NGVD
C. Complete for Alterations, Additions, or Improvements to Existing Structures:
1. What is the estimated market value of the existing structure? $
2. What is the cost of the proposed construction? $
3. If the cost of the proposed construction equals or exceeds 50 percent of the market value of the
structure, then the substantial improvement provisions shall apply.
D. Complete for Non-Residential Floodproofed Construction:
1. Type of floodproofing method:
2. The required floodproofing elevation is: feet NGVD
3. F000dproofing certification by a registered engineer is attached:
❑ Yes ❑ No
E. Complete for Subdivisions and Planned Unit Developments:
1. Will the subdivision or other development contain 50 lots or 5 acres?
❑ Yes ❑ No
2. If yes, does the plat or proposal clearly identify base flood elevations?
❑ Yes ❑ No
3. Are the 100 Year Floodplain and Floodway delineated on the site plan?
❑ Yes ❑ No
Applicants Signature: Date:
Administrative
1. Permit APPROVED: DENIED statement attached
2. Elevation Certificate attached: ❑ Yes ❑ No
3. As-built lowest floor elevation: feet NGVD
4. Work inspected by:
5. Local Administrator Signature: Date: laze /Z
CONDITIONS: 00to, TYVC+-V►-2, — V CWC—Zo5
ED MCCARTHY, P.E., P.S. 9957171 AVENUE SE
Hydrology - Hydraulics - Engineering Renton, WA 98059
(425) 271-5734
December 14, 2020 R E
CEIV
Mr. Michael Hankinson
State of Washington Parks and Recreation FEB 0 3 2021
P.O. Box 42650 615
Olympia,WA 98504 W. Adder Sfreet
Re: Schafer State Park—Project Phase 1 Campground Relocation
East Fork Satsop River—F000dplain Analysis
Mr. Michael Hankinson: PLANNING
This report describes efforts used to assess the hydraulic characteristics of a reach of the East
Fork Satsop River that flows along Schafer State Park in southwest Mason County(Figure 1).
The report describes the methods and results from applying the hydraulic model HEC-RAS in
evaluating the floodplain on the project site(U.S. Army Corps of Engineers, 2002;U.S. Army
Corps of Engineers, 2016). The proposed plan for Schafer State Park Project Phase 1 (J.A.
Brennan Associates,December 2020) includes a Welcome center, new parking lots,pavement
restoration and grading for relocated campsites.A portion of proposed site improvements are
within the floodplain of the East Fork Satsop River. The hydraulic modeling presented in this
report was used to prepare a floodplain map of the site and to evaluate zero-rise requirements for
proposed site improvements.
Zero-Rise Modeling Methodology
Basin Characteristics
The study reach is along the East Fork Satsop River,upstream from its confluence with Decker
Creek(Figure 2). The study reach is mapped as a Zone A Special Flood Hazard Area(SFHA) on
the Flood Insurance Rate Map (FIRM)(FEMA, June 20,2019). The tributary basin draining to
the study reach has an area of 78 square miles (USGS,April 2020). Schafer State Park is an
existing park with site improvements including roads,buildings and camp sites (Attachment A).
Channel Geometry
The hydraulic model HEC-RAS (Version 5.0.3)was used to evaluate the hydraulics of the river
and its floodplain(Figure 2). The HEC-RAS model used in developing the Effective FIRM for
the study reach was obtained from FEMA. FEMA used this model to develop the Zone A SFHA
for the study reach shown on the effective FIRM (Attachment B). The channel and overbank
geometry for the FEMA HEC-RAS model was based on LiDAR data(STARR, November 15,
2013; STARR,March 19,2014).Hydraulic structures such as the Schafer State Park bridge on
the East Fork Satsop River,were not modeled in the HEC-RAS model obtained from FEMA.
Mr. Michael Hankinson
Page 2
December 14,2020
For the Schafer Park project,the cross sections for the portion of HEC-RAS model passing
through the area of proposed improvements were updated with field topography from the
project's base map (Berglund, Schmidt and Associates, January 2020). The Schafer State Park
bridge, located at the downstream end of the proposed site improvements,was included in the
updated HEC-RAS model. The geometry of the bridge was based on engineering plans for the
structure(Sargent Engineers, Inc. and Mason County Department of Public Works. June 15,
1992).
Post-project conditions for the park were based on the site plan for the project(J.A. Brennan
Associates,December 2020;Attachment Q. The proposed Welcome Center's grading and
structure is included the in HEC-RAS model at cross section RS 8849. Light thinning of
vegetation surrounding the Welcome Center is likely to occur during construction,therefore
offsetting some of the effects of proposed fill. Other scattered areas of shallow fill are proposed
on the site at locations upstream from the Welcome Center. This includes the placement of fill at
cross sections RS 9887 and RS 9671.9. The cross-sectional fill area at these cross sections was
measured in CAD and represented in HEC-RAS as a channel blockage with an equivalent fill
area. These areas of fill at sections RS 8849 and RS 9671.9 will not have material effect on flood
conveyance because they are in an area of ineffective flow.
Flood Flow Rates
FEMA's HEC-RAS model included base flow rates developed using a gauge analysis of flows
for the East Fork Satsop River. Flows for tributary Decker Creek in FEMA's model were based
on USGS regression equations (November 15, 2013). Flows for the 2-year, 5-year, 10-year, 50-
year, 200-year and 500-year storms were added to the HEC-RAS model for the project based on
a combination of USGS gauge data and Streamstats USGS regression equations (USGS,April
10,2020) (Attachment D).
Hydraulic Modeling Results
Predicted Flow Rates
The predicted flood flow rates in the East Fork Satsop River for the study reach are as follows:
Return Period Flood Flow Rate
(Years) CFS)
10 5,995
50 7,725
100 7,954
Mr. Michael Hankinson
Page 3
December 14,2020
The 100-year flood flow rate was used to map the floodplain on the site and to conduct a zero-
rise analysis for proposed site improvements. Floodplain maps for the site, for both existing and
post-project conditions, are provided in Attachment E.
Zero-Rise Analysis
For the 100-year flood flow,water surface elevations under existing conditions were predicted to
range from 125.01 feet NAVD 88 at the downstream end of the project site(RS 8047)to 130.40
feet NAVD 88 feet at the upstream end(RS 10084) (Attachment E). A comparison of HEC-
RAS modeling results between the Post-project Model and the Existing Conditions Model
indicates that zero-rise criteria are met(Attachment F).No increase in the predicted BFEs or
energy grade elevations is predicted as a result of the project.
Recommendations
The BFE at the Welcome Center(RS 8849)is predicted to be 125.67 feet NAVD 88. A finished
floor elevation of 127.67 feet NAVD is recommended to provide 2 feet of freeboard above the
flood elevation.
War t
�O 576
12-24-2S,SOIST
NALR �ti
Edward McCarthy,Ph.D. P.E.
Hydrologist
References
Berglund, Schmidt and Associates,January, 2020. Topographic Survey of Schafer State Park.
Hoquiam,Wash.
J.A. Brennan Associates, December 2020. Schafer State Park—Campground Relocation Project
Phase 1—Site Plan. Seattle.
Federal Emergency Management Agency, June 20, 2019.Flood Insurance Rate Map, Mason
County, Washington and Incorporated Areas. Panel 700 of 775. Map Number
530345C0700E.
Sargent Engineers, Inc. and Mason County Department of Public Works,June 15, 1992. Schafer
State Park Bridge—Bridge Replacement. Sheet 1 of 9—Layout. Olympia.
STARR, March 19, 2014.Hydraulic Analyses Report—Mason County, Washington—Mason
County Study. Contract No.HSFEHQ-09-D-0370, Task Order No. HSFE10-12-J-0120.
Laurel, MR.
STARR,November 15, 2013.Hydrologic Analyses Report—Mason County, Washington—
Unincorporated Areas—CID 53015 -Mason County Study. Contract No. HSFEHQ-09-D-
0370, Task Order No. HSFE10-124-0120. Laurel,MR.
U.S. Army Corps of Engineers, Hydrologic Engineering Center. 2002.HEC-RAS, River Analysis
System User's Manual,Version 3.1. Davis, California.
U.S. Army Corps of Engineers, September 2016. HECRAS 5.0.3 Computer Software.
Hydrologic Engineering Center,Davis, CA.
USGS, April 10, 2020. Streamstats Reportfor Upper Reach East Fork Satsop River. Web-based
application.
3
rs�r
7 � n
�t
Figure • • Brennan Associates)
CAD NO.
1 e �
♦ � tlGLGHED
11/1Bl]Ot0
EM 1T/IB/1D30
PHASE
PROJECT
AREA
WASHINGTON
x,
STATE
9D7O,2 PARKS
AND
' R" ° RECREATION
^ ♦ COMMISSION
,
1 �N
`' ! f ` Kist" *} SCRAPER
STATE PARK
Al
CAMPGROUND
RELOCATION
LEGEND PROJECT PHASE i
FEMA HEC RAS CROSS-SECTION
---� ADDED HEC-RAS CROSS-SECTION FIGURE 2.
STUDY REACH
SCALE
NTS
PARKS FILE#
Attachments
Attachment A. Photos of Site and River
Attachment B. Effective FIRM
Attachment C. Site Plan
Attachment D. Streamstats Data
Attachment E. Site Floodplain Maps
Attachment F. East Fork Satsop River-HEC-RAS Input/Output
Attachment A. Photos of Site and River
Appendix A. Photos of the Project Site
♦ Photo Number 1 ♦ Photo Number 2
Date of Photo: 11-26-2018 Date of Photo: 11-26-2018
Location: Schafer State Park,west camp loop looking Location: Schafer State Park shelter, east
west arkin lot, looking east
Description: The campsites and facilities west of W Description: The day use pavilion is located on
Schafer Park Road are the areas most slightly higher ground. The day use
negatively affected by flooding(Taken by park is under water(Taken by WA
WA State Parks staff) State Parks staff)
_c,
Appendix A. Photos of the Project Site
♦ Photo Number 3 ♦ Photo Number 4
Date of Photo: 11-26-2018 Date of Photo: 11-26-2018
Location: Schafer State Park,west RV loop, Location: Schafer State Park, left bank of
looking west the E Fork Satsop, looking
downstream(west) across W
Schafer Park Rd
This photo shows horse hitching Description: This drive is part of the existing
Description: locations underwater(Taken by WA river access and day use area
State Parks staff) (Taken by WA State Parks staff)
,Y
I � n
Appendix A. Photos of the Project Site and River
♦ Photo Number 5 ♦ Photo Number 6
Date of Photo: 10-26-2018 Date of Photo: August 2013
Location: East Fork Satsop River looking Location: Schafer State Park bridge looking
downstream towards Schafer State Park upstream.
bridge.
Description: The reach depicted in the photo is adjacent Description: Schafer State Park bridge crosses the East
to the proposed site improvements. (Taken Fork Satsop River at the downstream
by LJM) extent of proposed site improvements.
(Google Maps Street View)
i
f
.rw -
7
♦ r•0 EXISTING COUNTY ROAD
ONE-WAY ROAD ATTACHMENT A
'������ ��`�F�■�■� '�
PROPOSED HISTORIC '
AM—per TWO-WAY ROAD MONUMENT PLAZA ` - ^ ,, _``` ■■
Photo Point
TRAILS FER ' -'-�"' r�+ � ENHANCEDTRAIL
S�HA Rp NETW R �I
PEDESTRIAN BRIDGE w RIVERBANK
® CAMPSITE WELCOME CENTER _ - LOG AND ROOT WAD
- DAY USE AREA AND
BUILDING - GATHERING SPACE _ DAY USE AREA WITH
RIVER RESTORE PARK OFFICE -`��., y —— MEADOW AND BEACH -
,,...,�,,,, RELIC CHANNEL TO PICNIC SHELTER + 'A e — ■
r
� _ EXISTING KITCF{EtJ
------ SHORELINE BUFFER DISCOVERY —"` +T-� � .�� \� ''NEUTERS
WETLAND BUFFER LANDSCAPE
------------ 100-YEAR FLOODPLAIN ■ ) 1/' - —�' _.r uC-, �- RDWALK
SAVE 26 EXISTING 1w
�••�••�• PROPERTY BOUNDARY �.'.
CAMPSITES .� ✓'o — �`,, � �� ,. ,T-- —
EXISTING BACO ATION
K CHANNE
HABITAT EgsTFO _ .. - ■
R
Syr
jq
■ i� w '�` r` i ! '�� •,� � '}„'\I%C�'`. SHOP, Al
RENOVATED CAMP LOOP
PROPOSED COMFORT STATION
I fi4 — EXISTING RESTROOM
WEL PROPOSED PLAY AREA
UNPLUMBED CABIN,TYP.
��`�'���'■.�� , �'' !✓ q!I �� EXISTING CAMPSITES 41
CLOCKWISE ONE-WAY
DAY USE AREA WITH HAND r- ■ LOOP ROAD EXISTING CAMPSITES
CARRY BOAT LAUNCH& EXISTING GROUP TO BE SAVED 26
ACCESSIBLE RIVER ACCESS CAMP WITH PICNIC NEW GROUP ` NEW CAMPSITES 15
NEW GROUP CAMP SHELTER AND CXT CAMP V
TOILETS EXISTING DUMP �� REALIGNED TOTAL SITES 41
NEW COMFORT STATION Q °t:_--- ENTRY
_._ NEW CABINS 9
STATION �h
s-[ya—ems,- ,ar
Photo Locations Washington State Parks and Recreation Commission M-.0 5i1/2019
I.a.►r.rnan._L.[..,PE2
te,h dCmr w h j.a.brennan
O,Nm con[uaing Gra,R aalw.Ar[nwns me wateRned comwm.
La=Assocutes,Berglund Schmidt&Associate;and Stantec a.L L t
Attachment B. Effective FIRM
. nr _ F,amnFr .,S��Fr ex�aoF.
I ♦ ,
y i
�y
� r
it
eeaaoa Fr ��= b g�Y�D
ssseeo rr /' t 1
Sn
ebaxDFr
•ta�N
u5ooaiT
•sYM
YeeaR f ♦ ♦ f ♦ ♦ _.1s4
•fa•'ws
•IPE•M
OOOeeR ♦ ♦ f ♦ ♦ ♦ YM
xIFmM
aEYiR ♦ ♦ ♦ ♦ ♦ ♦
ViE
VC'E u�^E win¢ -
w`E M°r! ♦2� n xz xr
"'"� Yrt 5o•'c 7x�e E
FLOOD HAZARD INFORMATION NOTES TO USERS SCALE
E.m.�.rrw....���.......•..�,..®.•.+rrr r.. ,�x,,,F,,,,,,,,,,,,,,,swuw.oxNs �E NATIONAL ROOD INSURANCE PROGRAM
EEERSEMATION EIDMEDON EIS ANDSUIDF)IMN ,•,q+��� ill BUD INSCR,1111 RIT[M.1P
TiE INFORMATION DEPICTED ONTRIS MAP AND SDPPORrING ^rwissi�w�i..•M•fin+Erirw�r,��rTv�ran•
DOCIIMENTAi10N ME ALSO AVAIIABIE IN DIGITAL FORMATAT E~`a�.ErPbrw •r aw•r x.♦w�
HTTP: MSC.FEMA.GOV bA MASONS.WASNINGTON,y;,
// ��v,,..•�"iau"+r E..e�:...d.sw e..w.�:`.nrwr 141cR•2.000Mt LMA00 � O
NEW wnnmeese Fwod EL.uF.Ierq wnre Pml w � wm700a775
wu BR VDepM%:,,::AF.AV.Au.r_Ap rwVr�q+E�r.r.v.rr i.,m ry,wbrr prw•. D 500 1— 2,000 U
MOYIDAEFAS �Regulamry Fleodnwy T rxm n..v •, wa...M.r,yE�.�,Fnwrr�.
NOW
O.z%Mnual cnanx no.a NMaN.AredF .,,, ':. ^� '�"�'�"•'^�"r:•'r"r�'a W PANEL LOCATOR
MI%annual tAame Rood wlM awdg! C CC.ILIIlIE1Y Nm. PMEL SUFM
deem lag Dun me root.,Wo drainage
aedsm Mss mon one xGGare Mle.: 'O
NPW�#Fmure conaromre 1%Amoai �s O
V CM—Fl000.... r O
Area 00—M Flood RisM due lP-oo LL
See N—..... ,
NOSGIEEM'AreasDneminedmoe oamde be Q
O R D.I%Mnual CRance Fbodgain
MEM Areaol DndelermineEFloo—
R
Z
GENERAL ------C.....CUMrt,b Smrm Sewer
STRUCNRES ::•.:+,..^:••^^: Ievee.Dike.or Floodwll �E ,
o-E=Crou SecWns witA 1%Morel CAanu
Winer Surha DaaGon(BFq
a----Cbslal T.,-
---GaGal Y. tBaseline
-P,ox'a Baseline VFAGMIMHIMBFP
xrdme,aemc Feaw,e D3]1
aDr-Eau Flood El—oo Lo,(BFE) E3W500TOp OOOE
E
G ER `��"pink of Smq
R4ARARFS ARiWkUm BeuWrT fE20,29
lUME 0,901
Attachment C. Site Plan
CAD NO. PIAI(m0EPR0ECIC)DEMR+LDM11E
IE
' S
1 I
1 1 NEW CAMPSITE,TYP.• WETIANC E13 WETLAND A
1
� RIVER EDGE
WERANDF
111I i 111 I FRIDGE .1C/ _ _� •/
EXISTING RESnE00M 00 S \
1 I 1 EXISTING DAY USE DRIVE WILL BE
ADDRESSED IN FUTURE MUSE VAORK,
1 I ♦ L �y LIMIT OF CONSTRURION,TYP. _
G —�PO MTE ry 1 15 20
DRnwR 12 15 zo
I I 1 1 L 1 ( C /✓ i=-1 eED tv�Rnl 1z 1 z
1z 15 20
I
I / O
l
<- /
NEWWALKA31KEAN
S(P
I I ./ /(`) ' / � /� o •O // ' �. // / ° y// / �MRNE SITES(P1-P2) °cmmm sn.+
WASHINGTON
STATE
PARKS
AND
la
ROADEDGE RECREATION
PROPERTY LINE COMMISSION
STATION
DUMP
STATION /
11 of
SCHAEER
STATE PARK
HEI-RAS CROSS SECTIONS.1.
RELOCATE
CAMPGROUND
j '�I -,` •\ ' \ \ SITE PLAN
7� EXISTING WELL HOUSE
PROPOSED RESERVOIR
I ,% /-
WELL SCALE
FUTURE NEW DRIVES THROUGH PARK,TYP. 0 �•
PHASE WORK
r PARKS FILER
Attachment D. Streamstats Data
4/10/2020 StreamStats
StreamStats Report - E. Fork Satsop above Decker Creek
Region ID: WA
Workspace ID: WA20200410223614043000
Clicked Point (Latitude, Longitude): 47.09649, -123.47142
Time: 2020-04-10 15:36:31 -0700
m
m ar•-� 289 rp
SANDEPSON}
'ZEY .w ..,, . .. Aa
Shelton
�'
1 , j�.A ' ,.
�K N /� C
C. L ,
East Fork Satsop-from Schafer Park upstream of bridge
Basin Characteristics
Parameter
Code Parameter Description Value Unit
BSLDEM30M Mean basin slope computed from 30 m DEM 7.05 percent
CANOPY_PCT Percentage of drainage area covered by canopy as 54.3 percent
described in OK SIR 2009_5267
DRNAREA Area that drains to a point on a stream 77.94 square
miles
ELEV Mean Basin Elevation 452 feet
https://streamstats.usgs.gov/ss/ 1/3
4/10/2020 StreannStats
Parameter
Code Parameter Description Value Unit
ELEVMAX Maximum basin elevation 2890 feet
MINBELEV Minimum basin elevation 109 feet
NFSL30 North-Facing Slopes Greater Than 30 Percent 0.56 percent
PRECIP Mean Annual Precipitation 97.9 inches
PRECPRIS10 Basin average mean annual precipitation for 1981 to 2010 92.1 inches
from PRISM
RELIEF Maximum - minimum elevation 2780 feet
SLOP30_30M Percent area with slopes greater than 30 percent from 30- 4.17 percent
meter DEM.
Peak-Flow Statistics Parameters[Peak Region 4 2016 51181
Parameter Min Max
Code Parameter Name Value Units Limit Limit
DRNAREA Drainage Area 77.94 square 0.18 2230
miles
PRECPRIS10 Mean Annual Precip PRISM 1981 92.1 inches 11 .9 187
2010
Peak-Flow Statistics Flow Report[Peak Region 4 2016 51181
PII: Prediction Interval-Lower, Plu: Prediction Interval-Upper, SEp: Standard Error of Prediction, SE:
Standard Error (other -- see report)
Statistic Value Unit PII Plu SEp
2 Year Peak Flood 3820 ft^3/s 534 27300 52.5
5 Year Peak Flood 5670 ft^3/s 814 39500 50.6
10 Year Peak Flood 7120 ft^3/s 991 51100 50.5
25 Year Peak Flood 8880 ft^3/s 1140 69400 51 .7
50 Year Peak Flood 10300 ft^3/s 1220 86500 52.9
100 Year Peak Flood 11800 ft^3/s 1310 106000 54.2
200 Year Peak Flood 13000 ft^3/s 1350 126000 55.5
500 Year Peak Flood 15300 ft^3/s 1420 165000 58
https://streamstats.usgs.gov/ss/ 2/3
4/10/2020 StreamStats
Peak-Flow Statistics Citations
Mastin, M.C., Konrad, C.P., Veilleux, A.G., and Tecca, A.E.,2016, Magnitude, frequency, and
trends of floods at gaged and ungaged sites in Washington, based on data through water
year 2014 (ver 1.1, October 2016): U.S. Geological Survey Scientific Investigations Report
2016-5118, 70 p. (http://dx.doi.org/10.3133/sir20l65118)
USGS Data Disclaimer:Unless otherwise stated,all data,metadata and related materials are considered to satisfy the quality
standards relative to the purpose for which the data were collected.Although these data and associated meta data have
been reviewed for accuracy and completeness and approved for release by the U.S.Geological Survey(USGS),no warranty
expressed or implied is made regarding the display or utility of the data for other purposes,nor on all computer systems,
nor shall the act of distribution constitute any such warranty.
USGS Software Disclaimer:This software has been approved for release by the U.S.Geological Survey(USGS).Although the
software has been subjected to rigorous review,the USGS reserves the right to update the software as needed pursuant to
further analysis and review. No warranty,expressed or implied,is made by the USGS or the U.S.Government as to the
functionality of the software and related material nor shall the fact of release constitute any such warranty.Furthermore,
the software is released on condition that neither the USGS nor the U.S.Government shall be held liable for any damages
resulting from its authorized or unauthorized use.
USGS Product Names Disclaimer:Any use of trade,firm,or product names is for descriptive purposes only and does not
imply endorsement by the U.S.Government.
Application Version:4.3.11
https://streamstats.usgs.gov/ss/ 3/3
4/10/2020 StreamStats
StreamStats Report - Decker Creek
Region ID: WA
Workspace ID: WA20200410225615343000
Clicked Point (Latitude, Longitude): 47.09674, -123,47461
Time: 2020-04-10 15:56:33 -0700
f
fwr- Air
ti
SKOX0 MIS
10 s R_Ss_ A710N
�1 Q1..
289 rp ^''
�ZLy SANDERSON+-
�0
Sheltor
- .. _-
Decker Creek
Basin Characteristics
Parameter
Code Parameter Description Value Unit
DRNAREA Area that drains to a point on a stream 45.95 square
miles
PRECPRIS10 Basin average mean annual precipitation for 1981 to 2010 106 inches
from PRISM
BSLDEM30M Mean basin slope computed from 30 m DEM 10.7 percent
CANOPY_PCT Percentage of drainage area covered by canopy as 51 .8 percent
described in OK SIR 2009 5267
https://streamstats.usgs.gov/ss/ 1/3
4/10/2020 StreamStats
Parameter
Code Parameter Description Value Unit
ELEV Mean Basin Elevation 573 feet
ELEVMAX Maximum basin elevation 3030 feet
MINBELEV Minimum basin elevation 111 feet
NFSL30 North-Facing Slopes Greater Than 30 Percent 1.12 percent
PRECIP Mean Annual Precipitation ill inches
RELIEF Maximum - minimum elevation 2920 feet
SLOP30_30M Percent area with slopes greater than 30 percent from 30- 12.8 percent
meter DEM.
Peak-Flow Statistics Parameters[Peak Region 4 2016 51181
Parameter Min Max
Code Parameter Name Value Units Limit Limit
DRNAREA Drainage Area 45.95 square 0.18 2230
miles
PRECPRISI0 Mean Annual Precip PRISM 1981 106 inches 11 .9 187
2010
Peak-Flow Statistics Flow Report[Peak Region 42016 51181
PII: Prediction Interval-Lower, Plu: Prediction Interval-Upper, SEp: Standard Error of Prediction, SE:
Standard Error (other -- see report)
Statistic Value Unit PII Plu SEp
2 Year Peak Flood 2980 ft^3/s 315 28100 52.5
5 Year Peak Flood 4240 ft^3/s 461 39100 50.6
10 Year Peak Flood 5220 ft^3/s 546 49800 50.5
25 Year Peak Flood 6360 ft^3/s 602 67100 51 .7
50 Year Peak Flood 7260 ft^3/s 633 83400 52.9
100 Year Peak Flood 8240 ft^3/s 661 103000 54.2
200 Year Peak Flood 8970 ft^3/s 665 121000 55.5
500 Year Peak Flood 10400 ft^3/s 678 159000 58
Peak-Flow Statistics Citations
https://streamstats.usgs.gov/ss/ 2/3
4/10/2020 StreamStats
Mastin, M.C., Konrad, C.P., Veilleux, A.G., and Tecca, A.E.,2016, Magnitude, frequency, and
trends of floods at gaged and ungaged sites in Washington, based on data through water
year 2014 (ver 1.1, October 2016): U.S. Geological Survey Scientific Investigations Report
2016-5118, 70 p. (http://dx.doi.org/10.3133/sir20l65118)
USGS Data Disclaimer: Unless otherwise stated,all data,metadata and related materials are considered to satisfy the quality
standards relative to the purpose for which the data were collected.Although these data and associated metadata have
been reviewed for accuracy and completeness and approved for release by the U.S.Geological Survey(USGS),no warranty
expressed or implied is made regarding the display or utility of the data for other purposes,nor on all computer systems,
nor shall the act of distribution constitute any such warranty.
USGS Software Disclaimer:This software has been approved for release by the U.S.Geological Survey(USGS).Although the
software has been subjected to rigorous review,the USGS reserves the right to update the software as needed pursuant to
further analysis and review. No warranty,expressed or implied,is made by the USGS or the U.S.Government as to the
functionality of the software and related material nor shall the fact of release constitute any such warranty.Furthermore,
the software is released on condition that neither the USGS nor the U.S.Government shall be held liable for any damages
resulting from its authorized or unauthorized use.
USGS Product Names Disclaimer:Any use of trade,firm,or product names is for descriptive purposes only and does not
imply endorsement by the U.S.Government.
Application Version:4.3.11
https://streamstats.usgs.gov/ss/ 3/3
Attachment E. Site Floodplain Maps
CAD NO.
s
H T FoRkSATS�AR/�F
g ZONE AE
/ a. a E
/ n r � aaaEo EM ,v,vmvo
ZONE XIt
r \\
\ i ZONE
WASHINGTON
STATE
PARKS
` ZONE x i /// AND
RECREATION
COMMISSION
�a Fr
LEGEND
PHASE I PROJECT AREA
\
-- FEMA ZONEAI%FLOOD—_—_ SCRAPER
MODELED I%FLOOD STATE PARK
MEGRAS CROSSSEC710N
CAMPGROUND
RELOCATION
o /
NOTES PROJECT PHASE I
VERTICAL DATUM:NAVD 1998
PHASE I AREA SURVEY PROVIDED JANUAW2020 BY
/ J� BERGLUND.SCHIMDT d ASSOC..INC.(360)532-7630. lOO-YEAR
W
FLOOD MAP:
EXISTING
W yg CONDITIONS
4�
SCALE
r
' PARKS FIIE9
� wFgg FORKSgTs .. r � W
+ T �
A v ZONE AE
/
y r.,
m
WELCOME CENTER
PLACED ON FILL -C - Q n �� ag \\ BY
// I � - -_ �' D�FC✓ID eN 12nVJON
ZONE — —
ZONE X /
WASHINGTON
r STATE
PARKS
ZONE O��//I AND
�/ RECREATION
LEGEND COMMISSION
PHASE I PROJECT AREA
T� >.
—————— FEMAZONEAI%FLOOD SCHAFER
MODELED I%FLOOD STATE PARK
�•r� ❑ / HEGRAS CROSSSECTION
o _ i CAMPGROUND
r I
RELOCATION
NOTES PROJECT PHASE I
VERTICAL DATUM:NAVD 198E
\ n- PHASE I AREA SURVEY PROVIDED JANUARY 2020 BY
BERGLUND,SCHIMDT B ASSOC..INC.(360)532-7630. I00-YEAR
FLOOD MAP:
qye /I s PROPOSED
wu
CONDITIONS
\ � SCALE 60,
--— - _ 0 120'
° PARKS FILE"
Attachment F. East Fork Satsop River - HEC-RAS Input/Output
HEC-RAS Model SchaferStPark_EF_Satsop.prj
Filename
HEC-RAS Plan ID Description
Existing East Fork Satsop River under existing site conditions.
Post-project East Fork Satsop River under post-project site conditions.
Note: All elevations are referenced to NAVD 88 datum.
The following are provided in this attachment:
- HEC-RAS water surface profiles of East Fork Satsop River(both existing and post-
project conditions for 100-year flow).
- HEC-RAS cross sections of East Fork Satsop River showing 100-year water surfaces
(both existing and post-project conditions).
- HEC-RAS tabular output for the 100-year flow rate (existing conditions versus post-
project) for all cross sections.
Schafer State Park Floodplain Study Plan: 1) Existing 12/14/2020 2) Post-Project 12/14/2020
150 Legend
j
WS 100-Yr-Existing
WS 100-Yr-Post-Project
Ground
-- -- - - --
140 — —�
- -- ---
Welcome Center
130
76
i
---- ------- .__
w
120 —— —
. i-
110
rn v (D w rn N -_
V C.
i
(D N
N M N
- 0O N 04 1 (D 00 O
(DO00
CO i
N. N
CO M 0)j a) M
0 2000 4000 6000 8000 10000
Main Channel Distance(ft)
1 in Horiz. = 1300 ft 1 in Vert.=8 ft
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=14622.04
260 5
Legend- -`
- --
-- -- -
240 - - -- ----- -- ----- -- ---. ... _.._ _ WS 100 Yr-Existing
- - -- -- -
- - - -- - - - - ----
220 - - : - � - -
WS 1 00 Yr Post Project
- '
_. -... ------ --•
- - ■
- - - ---------------------
Ground
__ Ground
- -- -- --- - ---
0 200 --- --- ---. -- -- --- Bank Sta
- - - -
-- --
- -
s
180 -
----- --- ---------- _.. _...
160 - ---
140 - --
120
0 500 1000 1500 2000 2500
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=14126.17
11 .L 11
260 _-- - - - --:_ � _� Legend
- 5 -
-- b -
240 WS 100-Yr-Existing
- ---
- -- -- - -- --- - -
= WS 100-Yr Post Project
220 —
- - -- - --- -- Ground
0 200 Bank Sta
180 - +
w
160
140
120 -
0 500 1000 1500 2000 2500
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=13044.84
400 11 0I
--- --- -- 5 Legend
5
- --- -- ---- •-- - --- -.- ;
WS 100-Yr-Existing
350
- - , --. ------ - -- - a
- -
- ---_. -' WS 100 Yr-Post-Project
- ------ --_ ------ -----: _;.. - - - -- - ---
300 -- - d
-- Groun
- - . ---. - - ---- --- - . .
- - _..- - - - _ - •
_-. _... - Bank Sta
250 — - -- -
m
---- --- - - - -
w _..__
------ - - -
200 --T T �- - --- __
_ ---- -----..-
150 ----
100
0 500 1000 1500 2000 2500 3000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=12541.27
280 —
ge 0
260 -- --' --=- - Le.nd
5
5
WS 100-Yr-Post-Project
240 — - -- - ---- - WS 100-Yr-Existing
220 Ground
•
� _ --- ----------+----------- - i -- ----- ------ - -- --- - ; -- - E- - - Bank Sta
200 —
N ---------i-------------------------------------------'---------------------------------------------_------ ----------.-.-...
w 180
160
140 — — --
t
120 - - -
0 500 1000 1500 2000 2500
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
IRS=11297.9
11 .11
200 0 —7-_ -___
Legend
5 - --
190 5 - -- --
WS 100-Yr-Existing
•
180 WS 100-Yr-Post-Project
170 _ Ground
•
Sta
- -- - -� - -- ------ --
c -
160 Bank-
m
w 150 �
140 --
130
120
0 200 460 600 800 1000 1200 1400 1600
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=10084.29
.1 _ .055 � .11
170 Legend
--- -- -
-- ---- - - ----- -
. _ .
- ---- -
,---- F , _ -- WS 100-Yr-Existing
160 - -- -- - - - •
_ . __ _. _
- - - -- --- -- T -- - -P -
T T WS 100 Yr Post-Project
- Ground
o - - - - - Bank Sta
w 140
130
120 --�— -
0 200 400 600 800 1000 1200 1400
Station(ft)
Schafer State Park F|oodp|ainStudy Plan: 1) Existng 12/18/2020 2) Pust-Pnoject 12/18/2028
ne~ouo7
Legend
150-
1*oArea of Fill-
See Enlargement
Ui
130
1 �—�---- ------�
O 200 400 mm mm 1000 1200 1400
stauon(ft)
Schafer State Park F|oodp|ain Study Plan: 1) Existing 12Y18/2020 2) Post-Project 12/18/2020
Ra~oer1.eou
Legend
18O
180
Ground
Z� 1m
> --------- T Bank Sta
m 150--- —See Enlargement
140-
130-
120
0 200 400 600 800 1000 1200 1400 1600 1800
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2)Post-Project 12/18/2020
RS=9360
.09 .055 .11
180 _ — -
Legend
- --- -- --- --
170 t ---_— WS 100.Yr-Existing
- - -
---- --
- --._.
160 -... _ _ - - -
WS 100 Yr Post Project
-- - - --
- -::_
., _ y :_ `- Ground
- -- - - -- -- -
- - - - - ---
- -
150 ._
c _.. -- -- -'- - --
..... ._;. ._.__ .....;-- .---. .i-- ---- -- ._ -. ;--- -----
Ineff
o - ----._ _
m 140 - !::. - - Bank Sta
- _. -
w -,- - - - r-- - - - �
- - ----------------------------------i---------------
130
F _.
120
- .
— —
110 - -
0 200 400 600 800 1000 1200 1400 1600 1800
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=9070.206
170
T— .09 055 11
- -
- ---
- -. -- -
egen
160 WS 100-Yr-Existing
---- -
-T-- - ------. - -
_:.. WS 100-Yr-Post-Project
- _. -
150 -
Ground
c _
--
i
Ineff
j= 140 — ---- =— -- - — -- •
Bank Sta
w
130 —
120 - 1
110 -
0 500 1000 1500 2000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=8972
----,-- ---+-- - - ---- - _ _.... ------ -!
Legend
-- - - _.. --• ---- --.. --
- -- - -------
WS 100-Yr-Existing
160
::: --- --- - -- --- + -- --- -- -- - --- ----
WS 100-Yr-Post-Project
- --
-. - -
L150 - 4 _ Ground nd
--. ---- i ----- --- ;--- -- - .
---•- - - - - - ---- ------------
Ineff
_ -
140 - -
1 Bank Sta
-- - - - y j - -- -
- ---
130 _ T i
120 - .....
110 - - --
0 S00 1000 1500 2000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2)Post-Project 12/18/2020
RS=8849.33*
< .055 .11
170 —_
Legend
160 - — -- - __�_ �— — - -'Post-Project
- _ _. _ ----
-- -
WS 100- r
_ ---- __-- WS 100 Yr-Existing
150 Ground
c - Ineff
140 — — Welcome Center- Baneksta
---- --- -- See Enlargement
w
130 --
I
120 -
•
110 -T�
0 500 1000 1500 2000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=8604
< 11 055+ .11
170 -
--- -- __ - Legend
--- ---- - --- ------ ---- - ------
WS 100-Yr-Existing
160
-:.._ . . - ---- ----- - ------ ---
-- - - -
.
_ ,--_ WS 100 Yr Post Project
- ------
Ground
- Ineff
------
140 -T •
- -- , - Bank Sta
-- ---- __ ._.
w --- -.
130 ----
120 _._ __
i
110 -
0 500 1000 1500 2000 2500 3000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
IRS=8587 copied from 8559
11 .055- < 11 a
170 - —- - - ---- -
1, Legend
WS 10 i 0-Yr-Existing
t 160
-r - +
WS 100-Yr-Post-Project
150 - _
(:
- r+n
140-
-- Glneffd
Bank Sta
w - --
130 — - _.._ -
--
---- -- - , --
120 - -
- - - -------------------------------- ----
110 -
0 500 1000 1500 2000 2500 3000
Station(ft)
Schafer State Park FloodplainStudy Plan: 1) ExiuUng 12h8/2020 2) Pout-Pnoject 12Y18/2020
Ro~usse an vx Schafer Park RuBridge
160
150-- Ground
Iteff
1
'^"
110+---`----
o noo 1000 1e00 u000 2n00 0000
mtauonV0
Schafer State Park F|oodp|ainStudy Plan: 1) Ex|mUng 12/18/2020 2\ Poat-Pnojeot 12/18/2020
na u*so BR vv.Schafer Park auBridge
1ru
Legend
18O
150-
CU
Bank Sta
�*0
LLJ
1aw
1
11
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=8531 copied from 8559
.11- � .055- .11
170
Legend
160 -- - 1----- WS100-Yr-Existing
- - Yr Post-Project
-r --- - -
150 - I._ - - - - 00 Ground
- j- - { - - --- . - - i
- - - . -.
- - ---- - Ineff
140
m -- --- Bank Sta
w1 _.._ _
130 - — - — -
120
i
110 �
0 500 1000 1500 2000 2500 3000
Station(ft)
Schafer State Park Floodplain Study Plan: 1)Existing 12/18/2020 2) Post-Project 12/18/2020
RS=8512
11 '4059� .11
- f - - Legend
t
160
- - ---- __. ��._ _ - ----- WS 100-Yr-Existing
}}t
WS 100-Yr-Post-Project
---- ■
150 --
_ Ground
Ineff
140 - - = - -- ----- - - •
-- -
Bank Sta
w ---._ -
130MON
---j— `
120
0 500 1000 1500 2000 2500 3000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
IRS=8047.474
170 �-- - 0 --- -- Legend---- ---- -- -
5- - - - -
--- ---- _ --- _ . ;
5
160
' WS 100-Yr-Existing
--
-- -- - ---- -- - - -- - --
__ __ .__ _ _. WS 1 Yr Post Project
-- -------. ... ---- - --- ... _.-- .-
150 - Ground
- -- - -- - - -- -- --- --
�i
` - - - ; Bank Sta
140
@ -- - __ ----------- -------> - -- - -- - --- - -- - --- --
uJ __. .. .____ _______ ___. _____ _ ___ _
1
-(
120
110 -
500 1000 1500 2000 2500 3000 3500
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=7822.369
190 -- —
-
5 Legend
180 --- ? - --
-- -- - WS 100 Yr Existing
----
170 - - � r -- � -� - - ' ---- -- — -- WS 100-Yr Post-Project
-- -- ------ --
160 Ground
�. - -
° 150 Bank Sta
.. ------- ---- ---- --- -------
a� (
w
120
110
500 1000 1500 2000 2500 3000 3500 4000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=6391.458
.07 �-
- _ ..
200 S, Legend
_ ._- -Yr-Existing
f S - WS 100
-- f
180 -- ---C --- — — f -- •
1 _ - t WS 100-Yr-Post-Project
+ ---
Ground
— _-
c 160 _ - --- Bank Sta
w 140
120 �— -- —
i
i I
r
100
0 1000 2000 3000 4000 5000
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=9887
.095 �—.055 11
160 - -
end
WS 100-Yr-Existing
->- WS 100-Yr-Post-Project
Ground
•
Ineff
•
Bank Sta
c
140 — --�
100-Year Water
130 -- Surface
Ineffective Equivalent Area of
Flow Area Fill
120
0 200 400 600 800 1000 1200 1400
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=9671.908
.09 "� .055 �" 11
-- d
' ( en
- - -; - ( - ' WS 100 Yr-Existing
WS 100-Yr-Post-Project
190
Ground
Ineff
•
i ! Bank Sta
180
170
C
160 —
78
W
150
Equivalent Area of
Fill
140 Ineffective Flow Area
130 -- 100-Year Water
Surface
120
0 200 460 600 860 1000 1200 1400 1600 1800
Station(ft)
Schafer State Park Floodplain Study Plan: 1) Existing 12/18/2020 2) Post-Project 12/18/2020
RS=8849.33*
11 "�" 055 .11
170
Legend
WS 100-Yr-Post-Project
WS 100-Yr-Existing
Ground
160
•
Ineff
Bank Sta
c
140
w
130 Welcome Center Fill
100-Year Water
Surface
Ineffective
120 Flow Area
110
0 500 1000 1500 2000
Station(ft)
HEC-RAS River:East Fork Satsop Reach:2 Profile:100-Yr
Reach River Ste Profile Plan Q Total Min Ch El W.S.Elev Crit W.S. E.G.Elev E.G.Slope Vel Chnl Flow Area Top Width Froude#Chl
(cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft)
2 14622.04 100-Yr Existing 7885.00 141.22 145.64 145.69 0.002268 3.32 4585.58 1107.47 0.29
2 14622.04 100-Yr Post-Project 7885.00 141.22 145.64 145.69 0.002268 3.32 4585.57 1107.47 0.29
2 14126.17 100-Yr Existing 7885.00 139.751 144.58 144.62 0.002085 3.52 5506.90 1750.66 0.28
2 14126.17 100-Yr Post-Project 7885.00 139.75 144.58 144.62 0.002085 3.52 5506.84 1750.66 0.28
2 13044.84 100-Yr Existing 7885.00 136.73 140.98 141.06 0.005949 5.27 4012.49 1661.22 0.46
2 13044.84 100-Yr Post-Project 7885.00 136.73 140.98 141.06 0.005949 5.27 4012.47 1661.22 0.46
2 12541.27 100-Yr Existing 7885.00 134.89 137.31 137.39 0.009158 4.42 3542.68 1638.05 0.52
2 12541.27 100-Yr Post-Project 7885.00 134.89 137.31 137.39 0.009157 4.42 3542.701 1638.05 0.52
2 11297.9 100-Yr Existing 7954.00 124.69 133.51 133.59 0.001521 4.41 4887.49 1051.09 0.27
2 11297.9 100-Yr Post-Project 7954.00 124.69 133.51 133.59 0.001521 4.41 4887.44 1051.09 0.27
2 10084.29 100-Yr Existing 7954.00 121.00 130.40 130.98 0.003103 6.51 1593.76 363.17 0.38
2 10084.29 100-Yr Post-Project 7954.00 121.00 130.40 130.98 0.003103 6.51 1593.69 363.15 0.38
2 9887 100-Yr Existing 7954.00 120.98 129.64 130.29 0.003770 6.93 1559.07 469.16 0.42
2 9887 100-Yr Post-Project 7954.00 120.98 129.64 130.291 0.003770 6.94 1558.98 469.15 0.42
2 9671.908 100-Yr Existing 7954.00 120.00 128.83 129.46 0.004022 6.78 1499.42 560.95 0.42
2 9671.908 100-Yr Post-Project 7954.00 120.00 128.83 129.46 0.004023 6.78 1499.27 560.89 0.42
2 9360 100-Yr Existing 7954.00 119.97 127.39 128.02 0.005415 7.47 1699.78 614.50 0.49
2 9360 100-Yr Post-Project 7954.00 119.97 127.39 128.011 0.005421 7.47 1699.06 614.35 0.49
2 9070.206 100-Yr Existing 7954.00 118.00 126.49 126.80 0.002888 5.69 2512.27 800.58 0.36
2 9070.206 100-Yr Post-Project 7954.00 118.00 126.48 126.80 0.002896 5.70 2509.68 800.15 0.36
2 8972 100-Yr Existing 7954.00 116.98 125.91 126.13 0.001897 5.01 3526.75 1089.81 0.30
2 8972 100-Yr Post-Project 7954.00 116.98 125.91 126.12 0.001905 5.01 3520.53 1088.53 0.30
2 8849.33" 100-Yr Existing 7954.00 116.65 125.67 Welcome 125.99 0.002741 5.74 3341.03 1358.87 0.35
2 8849.33" 100-Yr Post-Project 7954.00 116.65 125.67 Center 125.99 0.002691 5.69 3210.34 1299.34 0.35
2 8604 100-Yr Existing 7954.00 116.00 125.47 125.71 0.002084 4.86 3833.78 1490.26 0.30
2 8604 1 100-Yr Post-Project 7954.00 116.001 125.471 125.71 0.0020841 4.86 3833.78 1490.26 0.30
HEC-RAS River:East Fork Satsop Reach:2 Profile:100-Yr(Continued)
Reach River Sta Profile Plan Q Total Min Ch El W.S.Elev Crit W.S. E.G.Elev E.G.Slope Vel Chnl Flow Area Top Width Froude#Chi
(cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft)
2 8587 100-Yr Existing 7954.00 116.00 125.47 122.98 125.66 0.002056 4.49 3800.72 1323.82 0.30
2 8587 100-Yr Post-Project 7954.00 116.00 125.47 122.98 125.66 0.002056 4.49 3800.72 1323.82 0.30
2 8559 Bridge
2 8531 100-Yr Existing 7954.00 116.00 125.30 125.52 0.002339 4.72 3593.10 1291.88 0.31
2 8531 100-Yr Post-Project 7954.001 116.00 125.301 125.52 0.002339 4.72 3593.10 1291.88 0.31
2 8512 100-Yr Existing 7954.00 116.00 125.26 125.46 0.001875 4.84 4189.41 1512.20 0.29
2 8512 100-Yr Post-Project 7954.00 116.00 125.26 125.46 0.001875 4.84 4189.41 1512.20 0.29
2 8047.474 100-Yr Existing 7954.00 115.00 125.01 125.041 0.000407 2.47 8590.85 1934.49 0.14
2 8047.474 100-Yr Post-Project 7954.00 115.00 125.01 125.04 0.000407 2.47 8590.85 1934.49 0.14
2 7822.369 100-Yr Existing 7954.00 115.00 124.80 124.90 0.000949 3.73 14432.93 2377.63 0.21
2 7822.369 100-Yr Post-Project 7954.00 115.00 124.80 124.90 0.000949 3.73 14432.93 2377.63 0.21
2 6391.458 100-Yr Existing 8146.001 108.87 124.82 124.82 0.000012 0.59 29021.95 3555.31 0.03
2 16391.458 100-Yr Post-Project 8146.001 108.871 124.82 1 124.82 0.000012 0.59 29021.95 3555.31 0.03