11 for W shington Relay Service •Persons with a speech disability can call 877-833-6341
February
3 2017
Kell McAb Seni r Planner y, a er
Mason Cou ty
Department of Coff munity Development
Planning Division
PO Box 27
Shelton, WA 9858
Dear Ms. Aboy:
Thank you I br the opportunity to comment on the determination of nonsignificance for the
Colgan-Roc Oulld ead, Dock Repair and after-the-fact Buoy Project(SEP2016-00054 &
SHX2016- 043) located at 110 North Discovery Drive in Hoodsport as proposed by Steve
Colgan. Th Depar ment of Ecology(Ecology)reviewed the environmental checklist and has
the followin comyr ent(s):
WATE QUA] ITY: Chris Montague-Breakwell (360)407-6364
The foil wjing c nstruction activities require coverage under the Construction Stormwater
General ekrmit:
1. Clearing grading and/or excavation that results in the disturbance of one or more
res an discharges stormwater to surface waters of the State; and
2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a
1 irger cc mmon plan of development or sale, if the common plan of development or
Ede will ultimately disturb one acre or more and discharge stormwater to surface
aters o the State.
This ncludes forest practices (including,but not limited to, class IV conversions)
that e part of a construction activity that will result in the disturbance of one or
more acres, and discharge to surface waters of the State; and
3. Any size construction activity discharging stormwater to waters of the State that
c logy
Detehnines to be a significant contributor of pollutants to waters of the State of
Was ington.
Reas nably expects to cause a violation of any water quality standard.
I
Kell McAboy, Senior Planner
February 3, 2017
Page 2
If there are known soil/ground water contaminants present on-site, additional information
(including, but not limited to: temporary erosion and sediment control plans; stormwater
pollution prevention plan; list of known contaminants with concentrations and depths found;
a site map depicting the sample location(s); and additional studies/reports regarding
contaminant(s))will be required to be submitted.
You may apply online or obtain an application from Ecology's website at:
http://www.ecy.wa.yov/programs/wq/stormwater/construction/-Application. Construction
site operators must apply for a permit at least 60 days prior to discharging stormwater from
construction activities and must submit it on or before the date of the first public notice.
Ecology's comments are based upon information provided by the lead agency. As such,they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments,please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(SM:17-0363)
cc: Chris Montague-Breakwell, WQ
Steven Colgan (Proponent)
.�, 11 3628 South 35"Street
Tacoma,Washington 98409-3192
TACOMA POWERT
TAGOMA PUBLIC UTILITIES ACOMA PUBLIC UTILITIES
Sent via Certified Ma I
June 27, 2016'
Steven and Brq nda Colgan
502 Sumner A e
Sumner, WA 9$390-036
Subject: Notif 1cstionjof Shoreline Use Permit Requirement: Division 3 Lots 35 & 36
Mr. and Mrs. C Igan,
Tacoma Powerj has be *me aware of a bulkhead project that you are planning on Tacoma Power
Project Lands d i Lake ushman. Please note that written permission is required from Tacoma
Powerinthefoi,nofa 3horeline Use Permit. The permit must be issued for the structure before any
work occurs wit iin the roject Area (lands below 742' elevation)or within the 10-foot lateral strip
(see enclosed hems c). As of the date of this mailing,Tacoma Power has not been contacted or
received an apr licationli regarding this potential project and use.
On the JARPA pplica n you submitted to the permitting agencies you marked in Section 4,
"Property Owne' that ou are the landowner and in Section 5, "Project Location,"that this project
p Y
will be located On privy 9 property. This is not the case. Your entire project is planned within Tacoma
Power's fee-ow ed Cu hman Hydroelectric Project Area and requires Tacoma's written permission.
Tacoma Power does nc t prefer the placement of structural bulkheads within the Project Area, but with
proper
Guidelines justification they may be authorized. Please refer to Tacoma's Shoreline Use Specifications and
ro er
Permitting lines d cument at(hfti)s://www.mvtpu.or-q/file viewer aspx?id=3533)for requirements
for applying of aj bulkhe d permit, specifically Appendix B Section 4.
Please submit al,Shoreli a Use Permit application (attached)to Tacoma as soon as possible so we
can evaluate yo r requ st before you move further through the regulatory agencies permitting
processes.
Feel free to call r lemai me at 253-441-4180 or wwright _cityoftacoma.org with any questions.
Thank you in ad alhce f r your prompt attention to this matter.
Sincerely,
WnneWri ht
Y �l 9
Shoreline and Lends C rdinator
cc: B. Forreter, Wil flife& Recreation Lands Manager
Lake Cushman I laintenance Company
Mason C Onty C 9partment of Community Development
Washing n Dep 3rtment of Fish and Wildlife
US Army',Corps of Engineers
Enclosure: SUP ppiicat on
Lake Cu hman horeline Lot Boundary Schematic