HomeMy WebLinkAboutHYDRAULIC PROJECT APPROVAL FPA2411378 Fish Passage Project Tributary Decker Creek - FPA Permit / Conditions - 6/23/2006 wasnington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 DevonsNre Road
FISH and RCW 77.55,021-Appeal pursuant to Chapter 34.05 RCW Montesano,WA%663
WILDUFE — (360)249.4628
RECEIVED JUN 2 3 2W
Issue Date:June 21,2006 Control Number: 104503-2
Project Expiration Date:August 31, 2007 FPA/Public Notice#: 2411378
PERMITTEE AUTHORIZED AGENT OR CONTRACTOR
Lusignan Forestry
ATTENTION:Jim Frost
P.O.Box 1007
Shelton,WA 98584
360-426-1140
Project Name: Tributary to Decker Creek Fish Passage Project
Project Description: At the request of the landowner, this project has been revised, and now
involves the installation of new bridge crossing designed and installed to
facilitate unimpeded fish passage, while attempting to retain functional
wetland habitat that has developed over many years upstream of the project
site.
PROVISIONS
1. TIMING LIMITATIONS: The project may begirt Immediately and shall be completed by August
31, 2007, provided:
a.Work below the ordinary high water line shall only occur between July 15th and August 31st of
calendar years 2006 through 2007.
2. The temporary culvert shall only remain in place between July 16th and August 31st of calendar
years 2006 and 2007, and the culvert shall be installed and maintained to pass all anticipated flows
with consideration of the debris likely to be encountered.
3. Work shall conform to revised plans and specifications received by the Washington Department
of Fish and Wildlife on June 16, 2006, associated with Forest Practices Application
(FPA#2411378), except as modified by this Hydraulic Project Approval.
TEMPORARY CULVERT
4. The temporary culvert shall consist of a single barrel
5. Imported fill which will remain in the stream after temporary culvert removal shall consist of
clean, rounded, uniformly-graded gravel ranging in size from 1/4 to three inches in diameter.
6. The temporary culvert shall be installed in the dry or in isolation from stream flow by the
installation of a bypass to divert the stream flow around the work area.
Page 1 of 6
U Washington HYDRAULIC PROJECT APPROVAL Coastal
Departrnent of 48 Devonshire Road
FISH and RCW 77,55,021-Appeal pursuant to Chapter 34.05 RCW Montesano,WA 98563
WILDLIFE PM)249-4628
issue Date:June 21,2006 Control Number: 104503-2
Project Expiration Date:August 31,2007 FPNPublic Notice#: 2411378
7. Wastewater from project activities and de-watering shall be routed to an area outside the
ordinary high water line to allow removal of fine sediment and other contaminants prior to being
discharged to state waters.
8. Disturbance of the streambed and banks shall be limited to that necessary to place the
temporary culvert and any required channel modification associated with it.
BRIDGE INSTALLATION/CHANNEL RESTORATION
9. Excavation for the footings shall be completely separated from the stream by placing the footings
landward of the top of the bank.
10. The streambed width re-established at the crossing ]ocaiton shall be a minimum of 12 feet in
width.
11. The re-established channel at the crossing location shall, at a minimum, be similar in width,
depth, floodplain configuration, and gradient, as the projected, historic channel which existed prior
to installation of the existing road grade.
12. The re-established channel shall incorporate fish habitat components, streambed materials,
and/or native or other approved vegetation equivalent to or of greater habitat value than that which
previously existed.
13, The bridge shall be a minimum of 24 feet in length and shall be a maximum of 16 feet in overall
width.
14. The bridge structure shall be placed in a manner to minimize damage to the streambed and
banks.
15. The bridge shall be constructed to pass the 100-year peak flow with consideration of debris
likely to be encountered.
16. Abutments, piers, piling, sills, approach fills, etc., shall not constrict the now and cause any
appreciable increase (not to exceed 0.2 feet)in backwater elevation (calculated at the 100-year
flood)or channel-wide scour, and shall be aligned to cause the least effect on the hydraulics of the
stream.
17. Riprap materials used for structure protection shall be clean, angular rock, which shall be
installed to withstand the 1 00-year peak flow.
18. Structures containing concrete shall be sufficiently cured prior to contact with water to avoid
leaching. Fresh concrete shall not be allowed to come into contact with state waters.
Page 2 of 6
Washington HYDRAULIC PROJECT APPROVAL coastal
Department of 48 Devonshire Road
FISH and RCW 77 55 C't-Appeal pursuant to Chapter 34.05 RCW Montesano,WA 98563
WILDLIFE (360)249-4628
Issue Date-June 21, 2006 Control Number: 104503-2
Project Expiration Date:August 31, 2007 FPA/Public Notice#: 2411378
19. Where aggregate or earth type material is used for paving or accumulates on the bridge, curbs,
or wheel guards shall be installed and maintained to prevent the loss of this material into the
stream.
20. Approach material shall be structurally stable and shall be composed of material that if eroded
into the water shall not be detrimental to fish life.
21. The installation and removal of the temporary culvert for installation of the the bridge stringers
and decking shall be conducted in the dry or in isolation from the stream flow by the installation of a
bypass flume or diversion pipe, or by pumping the flow around the work area.
22. A sandbag revetment or similar device shall be installed at the bypass inlet to divert the entire
flow through the bypass.
23. A sandbag revetment or similar device shall be installed at the downstream end of the bypass
to prevent backwater from entering the work area.
24. If a bypass culvert or flume is used, it shall be of sufficient size to pass all flows and debris for
the duration of the project.
25, If a pump is used for diverting water from the fish-bearing stream, it shall be equipped with a
fish guard to prevent passage of fish into the diversion device pursuant to RCW 77.040 and 77,220.
The pump intake shall be screened with 118-inch mesh to prevent fish from entering the system.
The screened intake shall consist of a facility with enough surface area to ensure that the velocity
through the screen is less than 0A feet per second. Screen water is withdrawn from the stream
through the pump intake. The pump shall be large enough to pump the entire stream around the
work areas. Once the pump is started, it shall run continuously until the streambed and banks in the
work areas are restored. The pump discharge shall be placed downstream of the sandbag dam into
an area that will not create erosion.
26, Upon completion of the project, all material used in the temporary bypass shall be removed
from the site and the site returned to pre-project or improved conditions.
27. Extreme care shall be taken to ensure that no petroleum products, hydraulic fluid, roadbed fill
material, dirt, mud, chemicals, or any other toxic or deleterious materials are allowed to enter or
leach into the stream.
28. Fresh concrete or concrete by-products shall not be allowed to enter the stream at any time
during this project. All forms used for concrete shall be completely sealed to prevent the possibility
of fresh concrete from getting into the stream.
29. If high flow conditions that may cause siltation are encountered during the project, work shall
stop until the flow subsides.
Page 3 of 6
Washington HYDRAULIC PROJECT APPROVAL Coastai
Department of 48 Devonshire Road
FISH and RCW 77.55 021 -Appeal pursuant to Chapter 34.05 RCW Montesano,WA 98563
WILDLIFE (360)249.4628
Issue Date.June 21, 2006 Control Number 104503-2
Project Expiration Date:August 31, 2007 FPA/Public Notice#: 2411378
30. All waste material such as excess dirt or spoils resulting from the project shaft be deposited in
an approved upland disposal site so that it will not re-enter the stream or any other surface waters.
31. Equipment used for the project may operate below the ordinary high water line (OHWL),
provided the drive mechanisms (wheels, tracks, tires, etc.) shall not enter or operate below the
OHWL.
32. Disturbance of the streambed and banks shall be limited to that necessary to place the culvert,
and any required channel modification associated with it. Affected streambed and bank areas
outside the culvert and associated fill shall be restored to pre-project configuration following
installation of the culvert. Within seven calendar days of project completion, all disturbed areas
shall be protected from erosion using hay mulch, grass seed, or other effective means.
33. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or
water quality problems develop (including equipment leaks or spills), immediate notification shall be
made to the Washington Department of Ecology at 1-800-258-5990, and to the Area Habitat
Biologist listed below.
PROJECT LOCATIONS
Location #1 Unnamed Trib To Decker Creek
WORK START: July 15, 2006 ORK
W END; August 31. 2Q07
WRIA. Watertwdy: Tributary tc
22.0445 Decker Creek Satsop River
114 SEC Section: Township, Range Latitude: Longitude. (County
i
NW 1/4 18 20 N �06 W (N 47.22611 iW 123.48610 Mason
Location 01 Dn Ling DKRCt!ons
Actual Stream= Unnamed to Decker Cr. (No WRIA#)From Matlock General Store, go west on Deckerville Rd,
approximately 4 miles. Project located on property to SE of owner's residence of 3671 Deckerville Rd.on an old I
}grade,which can be accessed from the main county road.
NOTES
At the request of Jim Frost, on June 16, 2006, this Hydraulic Project Approval (HPA) is a provision
change of the original HPA to allow for the installation of a bridge rather than a culvert. This HPA
supersedes all previous HPAs issued for this project.
APPLY TO ALL HYDRAULIC PROJECT APPROVALS
This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code,
specifically Chapter 77.55 RCW(formerly RCW 77,20). Additional authorization from other public agencies may be
necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying
for and obtaining any additional authorization from other public agencies(local, state and/or federal)that may be
necessary for this project.
Page 4 of 6
Washington HYDRAULIC PROJECT APPROVAL coastal
Department of 48 Devonshire Road
FISH and RCW 77.55.021-Appeal pursuant to Chapter 34 05 RC`N Montesano.WA 98563
WILDLIFE (360)249-4628
Issue Date: June 21, 2006 Control Number: 104503-2
Project Expiration Date:August 31, 2007 FPA/Public Notice#: 2411378
This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the
person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work.
This Hydraulic Project Approval does not authorize trespass.
The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held
liable for any toss or damage to fish life or fish habitat that results from failure to comply with the provisions of this
Hydraulic Project Approval.
Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one
hundred dollars per day and/or a gross misdemeanor charge. possibly punishable by fine and%or imprisonment.
All Hydraulic Project Approvals issued pursuant to RCW 77.55.021 (EXCEPT agricultural irrigation, stock watering or
bank stabilization projects)or 77.55,141 are subject to additional restrictions,conditions or revocation if the Department
of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The
person(s)to whom this Hydraulic Project Approval is issued has the right pursuant to Chapter 34.04 RCW to appeal
such decisions. All agricultural irrigation, stock watering or bank stabilization Hydraulic Project Approvals issued
pursuant to RCW 77.55.021 may be modified by the Department of Fish and Wildlife due to changed conditions after
consultation with the person(s)to whom this Hydraulic Project Approval is issued: PROVIDED HOWEVER, that such
modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.301.
APPEALS INFORMATION
If you wish to appeal the issuance or denial of,or conditions provided in a Hydraulic Project Approval,there are
informal and formal appeal processes available.
A. INFORMAL APPEALS(WAC 220-110-340)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021,
77.55.141, 77.55,181,and 77.55.291. A person who is aggrieved or adversely affected by the following Department
actions may request an informal review of:
(A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic
Project Approval;or
(8)An order imposing civil penalties. A request for an INFORMAL REVIEW shall be in WRITING to the Department
of Fish and Wildlife HPA Appeals Coordinator, 600 Capitol Way North, Olympia, Washington 98501-1091 and shall be
RECEIVED by the Department within 30 days of the denial or issuance of a Hydraulic Project Approval or receipt of an
order imposing civil penalties. If agreed to by the aggrieved party, and the aggrieved party is the Hydraulic Project
Approval applicant, resolution of the concerns will be facilitated through discussions with the Area Habitat Biologist and
his/her supervisor. If resolution is not reached, or the aggrieved party is not the Hydraulic Project Approval applicant,
the Habitat Technical Services Division Manager or his/her designee shall conduct a review and recommend a decision
to the Director or his/her designee. If you are not satisfied with the results of this informal appeal, a formal appeal may
be filed.
B FORMAL APPEALS(WAC 220-110-350)OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021
(EXCEPT agricultural irrigation, stock watering or bank stabilization projects)or 77.55.291:
A person who is aggrieved or adversely affected by the following Department actions may request a formal review of:
(A)The denial or issuance of a Hydraulic Project Approval,or the conditions or provisions made part of a Hydraulic
Project Approval;
(B)An order imposing civil penalties; or
(C)Any other'agency action'for which an adjudicative proceeding is required under the Administrative Procedure
Act,Chapter 34.05 RCW.
A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife HPA Appeals
Coordinator, shall be plainly labeled as'REQUEST FOR FORMAL APPEAL'and shall be RECEIVED DURING
OFFICE HOURS by the Department at 600 Capitol Way North, Olympia, Washington 98501-1091,within 30-days of
the Department action that is being challenged. The time period for requesting a formal appeal is suspended during
Page 5 of 6
z
Washington HYDRAULIC PROJECT APPROVAL Coastal
Department of 48 Devonshire Road
FISH and RCW 77 55 021-Appeai pursuant to Chapter 34 05 RCW Montesano,WA 98563
1�c WILDLIFE (360)249-4628
Issue Date: June 21, 2006 Control Number: 104503-2
Project Expiration Date:August 31,2007 FPA/Public Notice#. 2411378
consideration of a timely informal appeal. If there has been an informat appeat,the deadline for requesting a format
appeal shall be within 30-days of the date of the Department's written decision in response to the informal appeal.
C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (agricultural irrigation,
stock watering or bank stabilization only), 77.55.141, 77.55.181. or 77.55.241: A person who is aggrieved or adversely
affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a
Hydraulic Project Approval may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to
the Hydraulic Appeals Board per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE, Building Two-
Rowe Six, Lacey,Washington 98504, telephone 3601459-6327.
D. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO CHAPTER 43.21 L RCW. A person
who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval,or the conditions or
provisions made part of a Hydraulic Project Approval may request a formal appeal. The FORMAL APPEAL shall be in
accordance with the provisions of Chapter 43.21 L RCW and Chapter 199-08 WAC. The request for FORMAL APPEAL
shall be in WRITING to the Environmental and Land Use Hearings Board at Environmental Hearings Office,
Environmental and Land Use Hearings Board, 4224 Sixth Avenue SE, Building Two- Rowe Six, P.O. Box 40903.
Lacey,Washington 98504: telephone 360l459-6327.
E. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS results in forfeiture of all appeal rights. If there is
no timely request for an appeal,the department action shall be final and unappealable.
ENFORCEMENT: Sergeant Makoviney (31) P1
Habitat Biologist for Director
Gary Bell 360-249-1228 WDFW
CC:WRIA File, Olympia
Jerry Johnson, DNR South Puget Sound
Joel Green, Quinault Indian Nation
Page 6 of 6