Loading...
HomeMy WebLinkAboutCOM2021-00017 Special Inspection - BLD Engineering / Geo-tech Reports - 5/2/2022 azan: A CIATES INC. & SSO , GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION May 2,2022 KA Project No.: 10621094 Mr.Joshua Luck Email: jluck@co.mason.wa.us Mason County(Lead Building Inspector) 615 W Alder Street Shelton,Washington 98584 Project: North Mason RFA Fire Station 490 NE Old Belfair HWY Belfair,WA 98528 Subject: Final Special Inspection Letter Mason County BLDG Permit No.: COM2021-00017 Dear Mr. Luck, In response to the request and authorization of Ms. Renee Wassenaar representing North Mason Regional Fire Authority,Krazan &Associates has provided special inspection and related construction materials testing services for the North Mason RFA Fire Station project located at 490 NE Old Belfair HWY in Belfair,Washington.Our services were performed by our staff from April 28,2022 through May 2,2022, under the supervision of a State of Washington registered engineer. Our observations were documented in our inspector's daily field reports which have been submitted the owner,structural engineer of record,contractor and Mason County building department. Krazan provided special.inspection for the following type of construction at the project site: Soils and Foundations Reinforced Concrete Reinforced Concrete Masonry Units Structural Steel Welding including NDT(UT) Structural Wood(Shearwall Nailing) In accordance with Chapter 17 of the 2018 International Building Code,the work requiring special inspection was performed in conformance with approved plans and applicable standards of workmanship at the time of completion. LIMITATIONS We have performed our services in a manner consistent with the standard of care and skill ordinarily exercised by forms of our type practicing under similar conditions at the time and locality our inspection was performed. Please recognize that construction monitoring is a technique employed to reduce the risk of problems arising during construction. Provision of construction monitoring by Krazan& Associates personnel is not insurance, nor does it guarantee the construction of any type. In all cases the contractor shall retain sole responsibility for the quality of there work,adhering to the approved project plans and specifications and for repairing any defects, deficiencies or omissions, regardless of when they are found. Our services were limited to the work documented in our reports.We do not With Offices Serving The Western United States _ 1230 Finn Hill Road NW,Suite A•Poulsbo,WA 98370•(360)598-2126•Fax:(360)598-2127 A b KA No. 10621094 Page No.2 undertake the guarantee of construction or completion of a completed project conforming to the plans and specifications. No warranty expressed or implied. CLOSING a We trust that this report is sufficient to meet your needs and appreciate the opportunity of working with you on this project.Should you have any questions, comments or if we may be of additional service to you, please feel free to contact us at your convenience. Respectfully Submitted, Krazan&Associates,INC. Lt//�N.?,`L Wes A. Mahan Operations Manager Peninsula Division Krazan&Associates,Inc. Offices Serving The Western United States