Loading...
HomeMy WebLinkAboutSHX2009-00058 200 ft Bank Repair - SHX Permit / Conditions - 12/7/2009 PyoN-STA MASON COUNTY C DEPARTMENT OF COMMUNITY DEVELOPMENT o n U w► Planning Division s o T z P O Box 279, Shelton,WA 98584 1P x Y o~ (360)427-9670 J � 186A Exemption from Shoreline Management Act Case No.: SHX2009-00058 Substantial Development Permit Requirement The Proposal By: WASHINGTON STATE DEPT. OF FISH+WILDLIFE 600 CAPITOL WAY N OLYMPIA,WA 98501-1091 To undertake the following development: Repair 200 ft of flood damaged bank incurred in January 2008 at Bingham Creek Hatchery. The top of the bank downstream from the flood diversion will be repaired by placing I I I cy of rip-rap on the top section of the bank all above OHWM. The access road's broken edge to be repaired. Within BINGHAM CREEK and/or its associated wetlands is exempt from the requirement of substantial development because,the development is categorized under WAC 173-27-040(2) as being category B-normal maintenance Please contact Grace Miller at ext 360 if you have any questions. Issued: 12/7/2009 Expires: 12/7/2011 Authorized Local Government Official cc: APPLICANT-- WDFW_- USACOE WDOE— TRIBAL COUNCIL— MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Building III-426 west Cedar Street P.O.Box 186, Shelton,WA 98584 (360)427-9670-Ext. 352 SHORELINE PERMIT APPLICATION PERMIT NO. WX�I 1-ao1i9' SHORELINE SUBSTANTIAL DEVELOPMENT SHORELINE VARIANCE DATE RECEIVED _ SHORELINE CONDITIONAL USE_ - SHORELINE EXEMPTION The Washington State Shoreline.Management Act (RCW 90.58) requires that substantial developments within designated shorelines of the state comply with its administrative procedures(WAC 173-14)and the provisions of the Mason County Shoreline Management Master Program. The purpose of this Act and local program is to protect the state's shoreline resources. The program requires that substantial development(any development of which the total cost.or fair market value exceeds $5,000.00 or materially interferes with the normal public use of the water or shorelines of the State be reviewed with the goals, polices, and performance standards established in the Master Program. Answer all questions completely. Attach any additional information that my further describe the proposed development. Incomplete applications will be returned. APPLICANT: M cl, W''O IF W ADDRESS: Goo O (street) W Q 8 S o l (city) J— (state) (zip) TELEPHONE: S6 O -g O 2- g 42(,o (home) (business) AUTHORIZED REPRESENTATIVE: 1Sww\42_ OAS agave- ADDRESS: (street) (city) (state) (zip) TELEPHONE: PROPERTY DESCRIPTION: General location(include property address,water body and associated wetlands—identify the name of the shoreline): t�, (� p hiS Rrorp2r � �5 �yCo.�'e� o r. + CkS O} S OA-S o p n tct'r- +k&Q- C0 c\J�k,e,rC_e. o j� (91 roc I\c yr Cr e e 1c: i-�.Q r� \, �� Nn k o c� t2A. . P_kVV\0, 1 W,A Legal description (include section, township, and range to the nearest quarter, quarter section or latitude and` longitude to the mearest minute. Projects located in open water areas away from land shall provide a longitude location)-include all.parcel numbers: R A. NE SW fTR 2 NE SW/�R3 NW Sw / Cz 4- N�V 5w Z—ra S SW i otins1x;.t? lc N c�v�cJe. to W es�' 47. 14S.19 �j �23 PC.r °\ . 3 o G 0oo0 OWNERSHIP: Contract Applicant Owner x Lessee Purchaser (Identify) Other Owner: G02 CC, N k-01 Wo. O k „�. (street) 1:1k FS Sy 1 (city) (state) (zip) DEVELOPMENT DESCRIPTON Development(identify and describe the proposed project,including the type of materials to be used,construction methods,principle dimensions,and other pertinent information): \\ 1 j�k o-JE r1oo� UCMnno.� �u�n�c '�'r C.�.,r-ram� �� Ja,v\�o.o�.., ZUo�S 0.-� 43�Inc�no•�nn Cr. \=�v��c1�r`'\.�1�.- cep oX -1`\� Ir�c�r.� cow r� �rec�w� �c'� o m -4\.sL a:v-e r n,\or &c-w^ w'j A b� P GEC%y" \\\ Gu c"7f q"R c'a P o v. Use(identify current use of property with exist improvements: 1 1 r-cn 02 c- .S lJ SC-N' CI-S Cl.- S-�a�T C- C L. � 1n.�S w..,.,\�'. o\� corcce_�� �a►���.s 3 ceS�c��.v�ce.S � � 1�.��c\,.�,Y-� Reason for requesting development: c--e-PC, C- 1-2 V-00A o.�•``c� U ACKOWLEDGEMENT I hereby declare,to the best of my knowledge and belief,the forgoing information and all attached information is true and correct. (ap licant or authorized rep sentative) (date) I:WLANNINGICHARELL&RENEFISHORELINEPERMIT.APP REVISED: 01-05-2005 r-------------------------------- • 2009 i i is AGENCY USE ONLY _— it 9 WAS H I NGTO N STATE `s"'°'y °'� Date"received: of Englnmere�� See le MUM � •1 �1 Joint Aquatic Resources Permit Application (DARPA) Form hf elal c Agency reference USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. Part 1—Project Identification - Unique project information that makes it easy to identify. hLp] --------___-____ la. Unique Project Identifier Number(UPI#) , hel = • . • Don't have one yet?Get one at htto://w Av.eoermitting.wa.00v or call the Washington Govemoes Ofrice of Regulatory Assistance at(800)917-0043. 309093-09-01 1 b Project Name (Examples:Smith's Dock or Seabrook Lane Development) h( elp] Bingham Creek Hatchery Access Flood Repair Part 2—Applicant The person or organization responsible for the project. hf eM 2,1. Name (Last,First,Middle)and Organization(if applicable) Washington Department of Fish and Wildlife, Engineering Division ,2b: 'Mailing Address(Street or Po Box) 600 Capitol Way North . .c. City, State, Zip Olympia, WA 98501 2d. 'Phone-(1)_- --- � :2e. 'Phone-{Z)--- 2f.=Fax- -- - -.- __ _2 ;_E-mail _ (360) 902-8300 ( ) (360) 902-8367 Marty.Peop/es@dfvv.wa.gov Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this application.) h[ eM 3a. Name (Last,First, Middle)and Organization (If applicable) _ Peoples, Marty, Dan WDFW 3b. Maiilind Address(Street or PO Box) , 600 Capitol Way North Olympia, WA 98501 - - -- _- ---- 3d: Phone(f ?'3e. 'Phone(2) - 3f. -Fax_ _ 3 Email _ (360) 902-8426 ( ) 1 (360) 902-8367 Marty.Peop/es@dfimwa.gov JARPA 2009 Page 1 of 11 Part 4—Property Owner(s) hel Contact information for people or organizations owning the property(ies)where the project will occur. hel ® Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part.5.) ❑ There are multiple property owners. Complete the section below and use JARPA Attachment A for each additional property owner. 4a: Name(Last,First,Middle)and Organization (if applicable) 4b_Mailing Address(Street or PO Box) 4c. Ci State Zip - V - 4d. Phone 4e.. Phone(2) 4f._Fax " "- "4 . E-mail _ Part 5—Project Location(s) Identifying information about the property or properties where the project will occur. LeM ❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and'use DARPA Attachment 13-for each additional property. 5a.'Zireet Address(Cannot be a PO Box,ff theire is no 'address,provide other location u►fomiation in 5n.) help] 3914 Fish Hatchery Road 56 . City,`State, Zip(If the project is not in a city or town,provide the name of the nearest city or town.) heel Elma, WA 98541 C.5 County [ etp]h --- ._ Mason County 5d. Provide the section,-township, and range for the project location. hf elcl '/4 Section " ' Section — Township ',Range . See drawings -- -----_ ----- - Se.-Provide the latitude and longitude of the project location. el • Example:47.03922-N.lat./-122.89142 W long 47.14508 N lat/-123.39864 .W long 5f. List the tax parcel numbers)for the project location. hew • The_local-county asaessoi' office can provide this.information. _ Parcel #619113060000 _5 .-Indic- ate the typ of own_e_r_s—h�ip o=f th_ epperty. c- 'all that aply.p ) _ -- —- ❑ State Owned Aquatic Land ❑ Tribal ❑ Private ® Other publicly owned (federal, state,county,city,special districts like schools,ports,etc.) JARPA 2009 Page 2 of 11 ;Sh. Contact information for all,adjoining property owners, lessees,`etc. �(Ifyou,need more space,use JARPA ' Attachment C.). el Name, Mailing Address , . y Tax Parcel#(if known) 'Green Diamond Resource PO Box 90001 ;619110000000 Company Shelton, WA 98584 Port Blakely Tree Farms 8133 River Dr. SE 619112300000 Tumwater, WA 98501 Jacob & Shawna Kiliz 3461 Fish Hatchery Rd 619113290090 Elma, WA 98541 fames Kiliz PO Box 20005 619113290080 Owensboro, KY 42304 Susan Patnude 3831 W Fish Hatchery Rd 619113200020 Elma, WA 98541 Si. 'Is any part of the project area within a 100-year flood plain? " ei ® Yes ❑ No ❑ Don't know - - -- - - - - - -- 5j. Briefly.describe the vegetation and habitat conditions on-the property. of The Bingham Creek Hatchery is.located on the East Fork Satsop River. This site is mostly developed with hatchery buildings and rearing ponds. On the opposite bank red alder and mixed conifers occur next to the river. 5k. _Describe how the property is currently used. eieipj This property is used as a state fish hatchery. 51. Describe how the adjacent properties are currently.used I'm ei Adjacent properties contain undeveloped wooded lots and home sites. JARPA 2009 Page 3 of 11 5m. -Describe the structures (above and below ground) on the property, including their purpose(s). het Structures include a hatchery building, spawning shed, storage shed, three residences and multiple rearing ponds. 5n. Provide driving directions from the closest highway to the project location, and attach a map. hetM The proposed project site is within the Bingham Creek Hatchery Complex. The site is reached by turning east off of the Matlock-Brady Road (approximately 4.5 miles south of Matlock) onto Fish Hatchery Road and proceeding approximately 3.8 miles to the end of the road and the salmon hatchery. The physical address is West 3914 Fish Hatchery Road, Elma, WA; 98541. Part 6—Project Description 6a. Summarize the overall project. You can provide more detail in 6d., net ! This project will repair 200 feet of flood damaged bank incurred in January 2008 at Bingham Creek Hatchery. The top of the bank below the diversion dam will be repaired by placing 111 cubic yards of rip rap on the upper section of the bank and next to the access road. The access road will.also be repaired by cutting off 1 foot of damaged edge and replacing the edge with new paving material. All work will be done above Ordinary High Water. 6b_. Indicate the project category. (check all that apply.) her ❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational ® Maintenance ❑ Environmental Enhancement 6c: Indicate the major elements of your project. (check all that apply.) hel ❑ Aquaculture ❑ Culvert ❑ Float ® Road ® Bank Stabilization ❑ Dam/Weir ❑ Geotechnical Survey ❑ Scientific Measurement ❑ Boat House ❑ Dike/ Levee /Jetty ❑ Land Clearing Device ❑ Boat Launch ❑ Ditch ElMarina / Moorage El Stairs ❑ Boat Lift ❑ Dock/ Pier ❑ Mining ❑ Stormwater facility ❑ Bridge ❑ Dredging ❑ Outfall Structure ❑ Swimming Pool ❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line ❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall (upland) ❑ Channel Modification ❑ Fishway ❑ Other: --- JARPA 2009 Page 4 of 11 6d ;Describe.how,you plan.to�nsttuct each project element checked in.6c. .lnclude specifcconsfruction methods and'equipinent'to Abe,used: `ielp� •.: Identify where'each element WI occur in.relafion,to`the nearest waterbody. r• lndkate which activities are vi ffiiin the.100-year,flood plain: A dump truck and excavator will be used to place new rock in damaged areas. A paving machine will operate on the road to fix the road edge. 6e. What-are the start and end dates for:project construction? (month/year) rheu,, • If the project will be constructed in phases or stages,.use JARPA Attachment D to list the start and end'dates of each phase or .- --._. _ Start date: December 1, 2009 End date: February 28, 2010 ❑ See JARPA Attachment D 6f Describe the purpose of the work and why you want or need to perform_it. nelpt This work is necessary to protect the access road and rearing ponds next to the river. 6g. Fair:market value of the.project;including materials, labor, machine rentals, etc ' hel : 20,000 dollars. J 6h. Will any portion of the project receive federal funding_? he�il I • 1f yes,list each agency providing funds. .x ® Yes ❑ No ❑'Don't know FEMA Part 7—Wetlands: Impacts and Mitigation 0 Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) .7a Describe how the project.has been tlesigned,to.av6ld and mirnmize adyersetimpacts to we_tland_s e_I_� ® Not applicable JARPA 2009 Page 5 of 11 ------------- 7b. Will the project impact wetlands. . el ❑ Yes- _❑ No ❑ Don't know -- -- - ---_-- - 7c. Will the project impact wetland buffers? ,held - ❑ Yes ❑ No [:] Don't know 7d..Has a wetland delineation report been:prepared? .h IJ w - If yea,submit th'e report_including data sheets,with the JARPA package. El Yes El No -- -- - -- -- - - -- - 7e. .Have the wetlands been rated us ingtfie.Vlfestem Washington or gastem Washington Wetland Rating- 1 System? -rhelol • If yes,submit the wetland rating forms and figures with the DARPA package. ❑ Yes ❑ No ❑ Don't know 7f. Have you prepared a mitigatioit,plan to,compens_ ate for any adverse impacts-to wetlands? , - • If yes,submitlhe plan with the JARPA package. ❑ Yes ❑ No ❑ Not applicable 7g. Use the table'below to list the type acid rating of.each wetland that will be impacted;,the extent and duration' of the,impact; and the type and amount'of compensatory' mitigation proposed. If.you-are.submitting a.'' - compensatory mitigation plan with a;sirnilar table, you may simply staW(below)where we can-find this information in the mitigation plan. _nel — Activity causing Wetland type Impact area Durotton.. Proposed Wetland impact(fill, and ratin� (sq. ft. or acres) 'of:impact mitigation' mitigation area I� drain, excavate, category type3 (sq. ft. or acres) flood,:etc.` Ecology we category based on current-We stern Washington or Eastern Washington Wetland Rating System. Provide the wetland rating forms with the JARPA package. 2 Indicate the time(in months or years,as appropriate)the wetland will be measurably impacted by the activity. Enter"permanent"if applicable. a Creation(C), Re-establishment/Rehabilitation(R),Enhancement(E), Preservation(P), Mitigation Bank/In-lieu fee(B) Page number(s)for similar information in the mitigation plan, if available: 7h. ;For all filling activities identified;in 7g.;;describe the source and nature ofahe fll material, the amotant ri. cubic yards that will be used and how,and where'it will be placed into the wetland. ei JARPA 2oog Page 6 of 11 7i.:For all excavating activities identfied-in 7g.; describe the excavation method, type and amount_.of material-in a cubic,`yards you will.remove, and where the material will be disposed: et 7j. Summarize what the compensatory mitigation,plan'is meant to accomplish_ ; and describe"how a watershed approach was used.to design the plan. ,ell - - — - 1 i Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) nel ® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. i _ ❑ Not applicable - - - _- ------ -- — ---- ----- ---- - -- - --- _ '� Equipment will operate above-OHW on established'road surfaces. Best Ma -agement-Practices will be -— - employed including installing silt fences. 8b. Will your project impact a waterbody or the area around a waterbody? fhelDi ' ❑ Yes ® No --- - --- - ---- ---- - -----=� 8c. Summarize irnpact(s)to each waterbody in the table'below._ heel Activity causing `Waterbody Impact i Duration Amount of material Area (sq. ft. or impact(clear, dame location' of impact2 to be placed in or linear ft.) of dredge, fill, pile removed from waterbody driire;::etc. waterbod " direct) _affected Indicate whether the impact will occur in or adjacent to the Waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. z Indicate the time(in months or years,as appropriate)the waterbody will be measurably impacted by the work. Enter"permanent"if ---a Iicable::__ _ 18d. Have.ypi prepared b mitigation.plan to,compensate for the projecft adverse-Impacts to.non-wetland waterbodies?'. Lfele] o..ff yes,�subinit the plan.with the JARRA package. ❑ Yes ❑ No ® Not applicable JARPA 2009 Page 7 of 11 8e. :Summarise what the compensatory-mitigation,plan•is meant o accomplish. Describe how a watershed . approach was used to design'the plan:'` j' • _If you already completed T.,you do not need to restate•your answer here. .el 8f.`,For all activitie-s'identified iri 8c.,;describe the source and nature of the fill material;tamount fin cubic.yards)•" - you will use, and how and_where it will be placed Into the waterbody. j_hel 8g. _For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging, - type and amount of material you will remove, and where the material will be disposed. nel N/A Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. 9a. If you_have already worked with any government agencies on this project, list them below. : nei__ __ Agency Name Contact Name Phone Most Recent, Date of Contact 9b. Are an y of the wetlands orwaterbodies identified in Part Tor Part 8 on the Washington Department of.. Ecology's 303(d) List? M d •"If yes,lisfthe parameter(sy below.: 1 �- If you don't know,,use Washington Department of Ecology's Water Quality Assessment tools at:-_. `httplAm w. ika. _ov/btoarams/wd/303d/. = ! ❑ Yes ® No 9c: What U.S.­'Geological Survey'Hydrological Unit Code (HUC) is the project in? 1elp� 'Go to"64Ldp'66.et)a.gov/surffiocatetihdex.dni to help identify the HUC. 17100104 JARPA 2009 Page 8 of 11 9d. What Water Resource Inventory Area Number(WRIA#) is the project in? hel • Go to http:/Mrww.ecv.wa.aov/servi6es/aistmat)sANda/wda.htm to find the WRIA#. 22 9e—'Will the in=water construction work comply with the State of Washington water quality:standards fog-- - turbidity?. Mei • Go to httn://www.ecv.wa.aovbroaramsMra/swgs/cri_te_da.h_tm_I.for_the standards. ❑ Yes ❑ No ® Not applicable ` 9L If the project is_within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? fhelm • If you don't know,contact the local planning department. • For more information,.go to tttp/Lw�uuir:ecy:wia.siov/onrarams/sea/srna/laws-iGles/1,73=26/211;desianations.htrril.____ _ __ ® Rural ❑ Urban ❑ Natural ❑Aquatic ❑ Conservancy ❑ Other . 9g. What is the Washington Department of Natural Resources Water Type? rhelpi • Goto&:/)Wn m.dnr.wa aov/BusinessPermitslrooicsJFore0raciicesApalications%Paaesffa>.wate ftr ing:asax for the Forest Practices Water Typing System. ® S ❑ F ❑ Np ❑ Ns 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? rhew • If no,provide the name of the manual your project is designed to meet. ® Yes ❑ No - - - - Name of manual: Western Washington Stormwater Manual 9i. If you knowwhat the propertywas used for in the past, describe below. ftel Unknown - ---- -- --- - - -- - - 9j. Has a cultural resource (archaeological) survey been performed on the project area? • If yes,attach it to your.JARPA package. ❑ Yes ® No - 9k.,,Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. rhewl Bull trout are listed as present in Satsop River. 91. -Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species I.ist that might be affected by the proposed work. ;hL elO No Priority Habitats or Species shown in this area. JARPA 2009 Page 9 of 11 Part 10—Identify the Permits You Are Applying For Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.ecy.wa.gov/opas/. • Governor's Office of Regulatory Assistance at (800) 917-0043 or helpcm-ora.wa.Qov. 10a. Compliance with the State'Erivironmental Policy Act'(SEPA). '(Check all that apply.) hLelp] • For more information about SEPA,go to v+ww.ecv.wa:aov/prosrams/sealsepa/e-review.html. ® A copy of the SEPA determination or letter of exemption is included with this application. ❑ A SEPA determination is pending with _ _ _ _ _ _ __(lead agency). The expected decision date is ❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in 10b.) • Submit the Fish Habitat Enhancement Project form with this application. The form can be found at -hfo://"w.er)gMl bgaMoviPortals/ JaruaResourceCenterrimages/deb itlfshenfaancement;doc ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? Emergency ❑ Other; ❑ SEPA is pre-empted by federal law. h[ ela] ,101b, Indicate the permits you are-applying fof._'(Check,all,that apply.) el LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial.Development ❑ Conditional Use ❑ Variance ® Shoreline Exemption Type (explain): Maintenance Other city/county permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance -- = T = - - r--_1 ATE Washington Department of Fish and Wildlife: ® Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption Washington Department of Ecology: ❑ Section 401 Water Quality Certification Washington Department of Natural Resources: ❑Aquatic Resources Use Authorization FEDERAL_GOVERNMENT__ United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: i ❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects) JARPA 2009 Page 10 of 11 Part I I—Authorizing Signatures Signatures required before submitting the JARPA package. 11a. Applicant Signature (required) rheim I certify that to the best of my knowledge and belief, the information-provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part-3 of this application to act on my behalf in matters related to this application., t&P' (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. N -P (initial) Applicant --- Date 11 b. Authorized Agent Signature h[ e I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to cant'out the proposed activities and I agree to start work -only after all necessary permits have been issued. Authorized Agent Date 11C. Property Owner Signature (if not applicant) hei I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Date 18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact The Governor's Office of Regulatory Assistance(ORA). People with hearing loss can call 711 for Washington Relay Service. People with a speech disability dan call(877)833-6341. ORA publication number: ENV-019-09 JARPA 2009 Page 11 of 11 PROJECT LOCATION STATE MAP NOT TO SCALE .NAHWATZEL LAKE MATLOCK N �ly Z ~ P m � � c FISH m HATCHER RD 2 BINGHAM CREEK HATCHERY PROJECT LOCATION yP S SCHAFER STATE PARK MASON CO. GRAYS HARBOR CO. T B PjL ELMA BRADY 12 12 / VICINITY MAP NOT TO SCALE PURPOSE: RESTORE EDGE OF BANK WASHINGTON DEPT. of FISH & WILDLIFE PROPOSED: SHORE UP STREAM BANK AND ROADWAY . 600 CAPITOL WAY N. AND REPAIR ASPHALT ROAD OLYMPIA, WA 98501-1091 DATUM: IN: EAST FORK SATSOP RIVER ADJACENT PROPERTY OWNER: REFERENCE NO. NEAR: ELMA 1• SITE: BINGHAM CREEK HATCHERY COUNTY OF: MASON STATE: WA 2 ADDRESS: 3914 FISH HATCHERY RD PORTION OF. T19N, R6W, SEC 11 ENG. PROJECT NO. MN:H17:09-1 ELMA, WA 98541 DATE)1/24/2009 SHEET 1 OF 3 FgsT FO k \ q fop Ri `` �R � INTAKE •.;�_,., AT BASE OF DAM OHW ELEV.=92.0 \ •• EDGE OF WATER I j 01 PLACE 111ey OF ROUGHNESS'\ / /j' �\\ BOULDERS FROM DAM REPAIR ASPHALT) � DOWN ON EDGE OF ROAD. ••\ ''\ABOVE OHW. }/ y O � /� '�� \ \ •. EDGE OF WATER �F-9,pGlc •\ A 170 9 8 0 � 2 � STIE PLAN SCALE: 1- = 60' » WORK SITE IS IN 100 YEAR FLOOD PLAIN REFERENCE NO. APPLICANT: WASHINGTON DEPT. of FISH & WILDLIFE BINGHAM CREEK HATCHERY STREAM BANK RESTORATION r SITE PLAN AT: ELMA , WASHINGTON ENG. PROJECT NO. MN:H17:O9—'I DATE:'I'I/24/2009 SHEET 2 OF 3 RECEIVED DEC 16 2009 PLANNING: PLANNING 426 W. CEDAR ST• ALL SETBACKS ARE MEASURED PROJECTION OF THE BUILDI G Pi- r?U /:�D MIAS0N COU '41 fy DCD SITE PLAN RLOL" CHANGES SU;' D _O BE ON S E �JE,�J TO APPROVA I. �y egsl — Date - - FORk -.-- jc � INTAKC V A'BASE OF DAM OHW ELEV.=92.0 OF WATER 01 __ , \, PLACE 174cy OF R AV DOOLOERS FROM D / REPAIR ASPHALT J ^\\ \ DOWN ON EDGE ABOVE OHW OF EC OF OF WATER O� 6' Q� S STIE PLAN SCALE: 1' = 60' • WORK SITE IS IN 100 YEAR FLOOD PLAIN REFERENCE NO. APPLICANT- WASHINGTON DEPT. of FISH & WILDLIFE BINGHAM CREEK HATCHERY STREAM BANK RESTORATION SITE PLAN AT: ELMA , WASHINGTON ENG. PROJECT NO, MN:H17:09-1 DATE:11/24/2009 SHEET 2 OF 3 REPAIR ASPHALT 20't TOP OF BANK - TOP OF BANK .EDGE OF ROAD PLACE 111cy ROUGHNESS BOULDERS ABOVE OWH SLOPE �1.5/1 SAW CUT 10 ASPHALT, TO ... ...—..._...—...—...—Q. OHW...—...—...—...—..._...—... REPAIR DAMAGE NORMAL STREAM BED TYPICAL DOWN STREAM CROSS SECTION NOT TO SCALE REFERENCE NO. APPLICANT: WASHINGTON DEPT. of FISH & WILDLIFE BINGHAM CREEK HATCHERY STREAM BANK RESTORATION CROSS SECTION AT: ELMA , WASHINGTON ENG. PROJECT NO. MN:H17:09-1 DATE:11/24/2009 SHEET 3 OF 3 LIST OF ADJACENT PROPERTY OWNERS WITHIN 300 FEET OF YOUR PROPERTY BOUNDARIES Addresses are to be obtained from the Mason County Assessor's Office, Bldg. 1, Second Floor. Col°1 11 Goo 0000 GO( 1t2300000 Greev-, Peso,,V- Pork- 410-Ice l� +'�ee or�S Lox,,pwr� 8l 3 3 R;vve- Oc- SE PU Box 4Oo 1 SV v-AorN � w a�e� \MN Q$So 1 ssa- G1`i 162goo90 S�.o-.,j n e, Wp, F�541 Col9 �13 2°l o v8o po Gox ZooOS 42304- 6200cl2.0 SvLSa.r. g g 3 w F,sln wA 9 8 S4-I