Loading...
HomeMy WebLinkAboutMEP2017-00004 - MEP Permit / Conditions - 3/9/2017 MASON ENVIRONMENTAL PERMIT($630 or C38Ow/ ther permit) Mason County Permit Center Use: 0° CONDITIONAL USE($1520) MEP Q1 - -ao 4. HABITAT MANAGEMENT PLAN REVIEW($445) Date Revd MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT DECEIVED Macon County Resource Ordinance(Chapter 17.01 MCC) MAR _ 9 2017 ENVIRONMENTAL PERMIT APPLICATION 515 W Alder Street The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A,39:34,58.17,76.09,84.33,84.34 and 90.59 RCW. PLEASE PRINT 1.PROPERTY OWNER Name: Randy and Barbara Sandoval Mailing Address: 7302 278th Place NW,Stanwood,WA 98292 Work Phone: Email Address: RandySandovalI@yahoo.com Home/Cell Phone: 425-359-5051 Pax#: N/A 360-961-4776 Jf an agent is acting for the property owner during the permit process,complete Q. 2.AUTHORIZED AGENT Name: Caralyn Valdeman o.b.o.Integrated NW Construction,LLC Mailing Address: PO Box 1008,Hoodsport,WA 98548 Work Phonc: Email Address:Caralyn(c�integratedNWconstruction.com Home/Cell Phone: 206-310-4234 Fax# 3.PROJECT SITE Site Address: 311 Marine View Dr N,Hoodsport,WA 98548 Parcel M 42332- 50 - 00002 Legal Description: Lake Cushman#1 1 TR 2 Directions to Site:From Shelton, lake 10IN to N Lake Cushman Rd/SR-119 and turn left Proceed up hill to Marine View Drive and turn left Proceed around until Marine Vip-LVJ nnp glul till-l-k left'bn1j5e;S Lill ri 91 it And Project rate is On Attach a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography, Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. k: 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ® Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 ® Fish lit Wildlife Habitat Conservation Areas,Chapter ❑ in-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: SFR with stairs used for shoreline access and one stationary pier and two floating docks 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): Demo remove and dispose of existing shoreline structures.Construct new staircase,bulkhead,retaining wall, stationary pier,and floating dock using Alaskan Yellow cedar and all galvanized or stainless steel hardware 7. Describe why the action requiring this permit carmot be avoided. The existing shoreline structures are out of compliance and must be brought to code to meet Tacoma Power regulations 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records. Connected�Septi�cConnected to Community Septic 11. identify existing water supply(circle one): Public Water Supply Well 11. Type of Job(circle one): New Add Alteration Repair Demolition Other::� Randy and Barbara Sandoval 9161-1-7 Print Name Sign re Date �pN-STATRO MASON COUNTY o P A o N DEPARTMENT OF COMMUNITY DEVELOPMENT r o NUZ IP Y Planning Division z N 615 W Alder St, Shelton, WA 98584 (360)427-9670 1864 MASON COUNTY ENVIRONMENTAL PERMIT March 21, 2017 BARBARA& RANDOLPH SANDOVAL 7302 278TH PL NE STANWOOD WA 98292 , Parcel Number(s): 423325000002 Expiration Date: 3/21/2019 12:00:OOA Date Issued: 3/21/2017 Case Number: MEP2017-00004 Project Description: DEMO: remove & dispose of existing shoreline structures. CONSTRUCT NEW: staircase, bulkhead, retaining wall, floating dock, and pier per engineered drawings The following critical areas are present on this property: Long-Term Commercial Forest XX FWHCA Ch. 17.10.060; Ch. 17.01.110; Mineral Resource Lands Frequently Flooded Areas Ch. 17.01.066; Ch. 17.01.090; Inholding Lands Landslide Hazard Areas Ch. 17.01.062; Ch. 17.01.100; Wetlands Seismic Hazard Areas Ch. 17.01.070; Ch. 17.01.102; Critical Aquifer Recharge Erosion Hazard Areas Ch. 17.01.080; Ch. 17.01.104, This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance (Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with any other federal, state, or local statutes, ordinances, or regulations applicable to this project. This permit may be rescinded if the permitee fails to complete the project as proposed or fails to comply with the standards of this ordinance. Authorized Local Go rn ent Official Date Conditions: 3/21/2017 Page 1 of 2 MEP2017-00004 MASON COUNTY ENVIRONMENTAL PERMIT 3/21/2017 Case No.: MEP2017-00004 No permit or exemption authorizing construction shall extend for a term of more than five years. If actual construction of a development for which a permit has been granted has not begun within two years after approval, the Review Authority, the Mason County Planning Department, shall review the Mason Environmental Permit(MEP)and upon showing good cause, may extend the initial two year period by one year. No permit shall be extended unless the applicant has requested such review and extension prior to the exporation date. 06 Signature � Date ji4/e OWNER - REPRESENTATIVE - CONTRACTOR Print Name (Circle one to indicate } 3/21/2017 Page 2 of 2 MEP2017-00004 a STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 April 5, 2017 Ms.Kell McAboy Mason County Department of Community Development Planning Division PO Box 279 Shelton, WA 98584 Dear Ms.McAboy: Thank you for the opportunity to comment on the determination of nonsignificance for the Sandoval Bulkhead Repair/Pier and Replacement Project(SEP2017-00017& SHX2017-00014) located at 311 North Marine View Drive in Hoodsport as proposed by Barbara and Randolph Sandoval. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Chris Montague-Breakwell (360)407-6364 The following construction activities require coverage under the Construction Stormwater General Permit: 1. Clearing, grading and/or excavation that results in the disturbance of one or more acres and discharges stormwater to surface waters of the State; and 2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a larger common plan of development or sale, if the common plan of development or sale will ultimately disturb one acre or more and discharge stormwater to surface waters of the State. a) This includes forest practices(including, but not limited to, class IV conversions) that are part of a construction activity that will result in the disturbance of one or more acres, and discharge to surface waters of the State; and 3. Any size construction activity discharging stormwater to waters of the State that Ecology: a) Determines to be a significant contributor of pollutants to waters of the State of Washington. b) Reasonably expects to cause a violation of any water quality standard. Ms. Kell McAboy April 5, 2017 Page 2 If there are known soil/ground water contaminants present on-site, additional information (including,but not limited to: temporary erosion and sediment control plans; stormwater pollution prevention plan; list of known contaminants with concentrations and depths found; a site map depicting the sample location(s); and additional studies/reports regarding contaminant(s))will be required to be submitted. You may apply online or obtain an application from Ecology's website at: http://www.ecy.wa.gov/programs/wq/stormwater/construction/-Application. Construction site operators must apply for a permit at least 60 days prior to discharging stormwater from construction activities and must submit it on or before the date of the first public notice. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments, please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:17-1483) cc: Chris Montague-Breakwell, WQ Barbara&Randolph Sandoval (Proponent) Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 D p r en,q Olympia,WA 98504-3234 FISH.d HUDLIFE (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ..,..................................................... PERMITTEE AUTHORIZED AGENT OR CONTRACTOR jlntegrated NW Construction, LLC Randy Sandoval (ATTENTION: Caralyn Valdeman E 7302 278th PI NE PO Box 1008 Stanwood,WA 98292 rHoodsport,WA 98548-1008 _...,..111-,,,,,,,,,,,,,,,,,,,,,,,,",..,...,................................,..,.,,,,,,,,,,,,..,.,..,.,......,......,.,,,.,,.............,_...............,.,,.....................,.....,,,,,,.,,,,,,,,,..............,..................,...,,.,.,.,.,,,,,,...................................................... Project Name: Sandoval Bulkhead Repair and Pier& Float Replacement Project Description: The proposed action is the repair of an existing wood bulkhead and the installation of a replacement pier and float. New shoreline access stairs and an upland shoreline retaining wall will also be installed, and an existing shoreline shed and shoreline access stairs with associated landings will be removed. Overwater coverage at the site will be reduced by approximately(approx.)290 square feet(sf), and the number of piling posts will be reduced from approx. sixteen (16)to ten (10). PROVISIONS TIMING - PLANS- INVASIVE SPECIES CONTROL 1. TIMING LIMITATION: During any calendar year during the life of the permit: a)work may be begin once the lake draw-down has begun and the work area is at least 5 feet from the water. b) For the protection of fish life, all work must be completed by April 1. This is due to the seasonal variations and unpredictability of the increasing lake level. 2.APPROVED PLANS: You must accomplish the work per plans and specifications submitted with the application and approved by the Washington Department of Fish and Wildlife, entitled "Sandoval Drawings_01.13.2017", submitted 03/22/2017, except as modified by this Hydraulic Project Approval.You must have a copy of these plans available on site during all phases of the project construction. 3. INVASIVE SPECIES CONTROL: Thoroughly clean all equipment and gear before arriving and leaving the job site to prevent the transport and introduction of aquatic invasive species. Properly dispose of any water and chemicals used to clean gear and equipment. You can find additional information in the Washington Department of Fish and Wildlife's Invasive Species Management Protocols (November 2012), available online at hftp://wdfw.wa.gov/publications/01490/wdfwOl 490.pdf. NOTIFICATION REQUIREMENTS 4. PRE-AND POST-CONSTRUCTION NOTIFICATION: You, your agent, or contractor must contact the Washington Department of Fish and Wildlife by e-mail at HPAapplications@dfw.wa.gov; mail to Post Office Box 43234, Olympia, Washington 98504-3234; or fax to (360)902-2946 at least three business days before starting work, and again within seven days after completing the work. The notification must include the permittee's name, project location, starting date for work or date the work was completed, and the permit number. The Washington Department of Fish and Wildlife may conduct inspections during and after construction; however, the Washington Department of Fish and Wildlife will notify you or your agent before conducting the inspection. 5. PHOTOGRAPHS:You,your agent, or contractor must take photographs of the job site before the work begins and Page 1 of 7 w ' W Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 Olympia,WA 98504-3234 (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 after the work is completed. You must upload the photographs to the post-permit requirement page in the Aquatic Protection Permitting System (APPS)or mail them to Washington Department of Fish and Wildlife at Post Office Box 43234, Olympia, Washington 98504-3234 within 30-days after the work is completed. 6. FISH KILL/WATER QUALITY PROBLEM NOTIFICATION: If a fish kill occurs or fish are observed in distress at the job site, immediately stop all activities causing harm. Immediately notify the Washington Department of Fish and Wildlife of the problem. If the likely cause of the fish kill or fish distress is related to water quality, also notify the Washington Military Department Emergency Management Division at 1-800-258-5990.Activities related to the fish kill or fish distress must not resume until the Washington Department of Fish and Wildlife gives approval. The Washington Department of Fish and Wildlife may require additional measures to mitigate impacts. STAGING, JOB SITE ACCESS, AND EQUIPMENT 7. Establish staging areas(used for equipment storage, vehicle storage, fueling, servicing, and hazardous material storage) in a location and er that will prevent contaminants such as petroleum products, hydraulic fluid,fresh concrete, sediments, sedirn nt-laden water, chemicals, or any other toxic or harmful materials from entering waters of the state. 8. Use existing roadways t, 'vel paths. 9. This Hydraulic Project p oval does not authorize the removal of riparian zone vegetation. 10. Retain all natural ha' ita eatures on the bed or banks including large woody material and boulders. You may move these natural habitat fe tu_u s during construction but you must place them near the preproject location before leaving the job site. 11. Limit the use of equipment waterward of the ordinary high water line to hand tools only. 12. Remove soil or debris from the drive mechanisms (wheels,tires,tracks, etc.)and undercarriage of equipment prior to operating the equipment waterward of the ordinary high water line. 13. If wet or muddy conditions exist, in or near a riparian zone or wetland area, use equipment that reduces ground pressure. 14. Check equipment daily for leaks and complete any required repairs in an upland location before using the equipment in or near the water. 15. Use environmentally acceptable lubricants composed of biodegradable base oils such as vegetable oils, synthetic esters, and polyalkylene glycols in equipment operated in or near the water. CONSTRUCTION-RELATED SEDIMENT, EROSION AND POLLUTION CONTAINMENT 16. Work in the dry. 17. Protect all disturbed areas from erosion. Maintain erosion and sediment control until all work and cleanup of the job site is complete. 18.All erosion control materials that will remain onsite must be composed of 100% biodegradable materials. 19. Stop all hydraulic project activities except those needed to control erosion and siltation, if flow conditions arise that will result in erosion or siltation of waters of the state. 20. Prevent project contaminants, such as petroleum products, hydraulic fluid, fresh concrete, sediments, sediment- laden water, chemicals, or any other toxic or harmful materials, from entering or leaching into waters of the state. 21. Use tarps or other methods to prevent treated wood, sawdust, trimmings, drill shavings and other debris from contacting the bed or waters of the state. 22. Deposit waste material from the project, such as construction debris, silt, excess dirt, or overburden, in an upland area above the limits of anticipated floodwater unless the material is approved by the Washington Department of Fish and Wildlife for reuse in the project. Page 2 of 7 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 Olympia,WA 98504-3234 FISHY WEDLTFE (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 23. Do not burn wood treated with preservatives,trash, waste, or other deleterious materials waterward of the ordinary high water line. 24. Deposit all trash from the project at an appropriate upland disposal location. CONSTRUCTION MATERIALS 25. Store all construction and deconstruction material in a location and manner that will prevent contaminants such as petroleum products, hydraulic fluid, fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or harmful materials from entering waters of the state. 26. Do not stockpile construction material waterward of the ordinary high water line. 27. During construction you may stockpile construction material, except fresh concrete and petroleum products, waterward of the OWHL provided you place the construction material no more than ADD TEXT HERE feet waterward of the ordinary high water line. 28. Use only clean, suitable material as fill material (no trash, debris, car bodies, tires, asphalt, concrete, etc.). 29. Angular rock,the rock must be large enough and installed to withstand the 100-year peak flow. OR Angular rock, the rock must be large enough and installed to withstand the ADD TEXT HERE-year peak flow. 30. To prevent leaching, construct forms to contain any wet concrete. Place impervious material over wet concrete that will come in contact with waters of the state. Forms and impervious materials must remain in place until the concrete is cured. 31. Do not use wood treated with oil-type preservatives (creosote, pentachlorophenol)in any hydraulic project. You may use wood treated with waterborne preservatives (ACZA,ACQ)provided the wood is approved by the Western Wood Preservers Institute for use in the aquatic environment.Any use of treated wood in the aquatic environment must follow guidelines and best management practices available at www.wwpinstitute.org. PIER, RAMP,AND FLOAT 32. Remove the existing pier, ramp and float and associated materials from waters of the state. Do not relocate the structure within waters of the state without written authorization from Washington Department of Fish and Wildlife. 33. The structure must include functional grating. The grating material's open area must be at least sixty percent. a. Grating installed parallel to the length of the pier must extend the length of the pier and cover at least thirty percent of the deck area. b. The ramp must have one hundred percent of the entire deck surface covered in functional grating. C. The float must have at least thirty percent of the entire deck surface covered in functional grating. Orient grating so the lengthwise opening maximizes the amount of light penetration.Any objects that are not part of the structure on, above, or below the grating should not block light penetration. Flotation must be located under the solid decked area only. 34. Fully enclose and contain flotation for the structure in a shell (tub)or 20-25 mm polyethylene or polyurethane wrap. The shell or wrap must prevent breakup or loss of the flotation material into the water. The shell or wrap must not be readily subject to damage by ultraviolet radiation and abrasion. 35. Do not construct skirting, including batter fencing, around piers, docks or floats. 36. Use of treated wood for decking is not authorized, but may be used for structural elements. Treated wood subject to abrasion by vessels,floats, or other objects must incorporate approved design features such as rub strips to minimize abrasion of the wood. DEMOBILIZATION AND CLEANUP 37. Do not relocate removed or replaced structures within waters of the state. Remove and dispose of these structures in an upland area above the limits of anticipated floodwater. 38. Before the end of the in-water work period specified in the"timing limitations" provision, remove all temporary Page 3 of 7 Washington Department of 01r,a Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 ftsli )'11,, 1,1� Olympia,WA 98504-3234 (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 stream crossings and restore the bed and banks to preproject condition. 39. Upon completion of the project, restore the disturbed bed, banks, and riparian zone to preproject condition to the extent possible. 40. Completely remove any temporary fill before the end of the in-water timing window if the fill material could erode and deliver sediment-laden water into waters of the state. 41. Restore bed and bank elevations and contours to preproject condition. 42. To prevent fish from stranding, backfill trenches, depressions, and holes in the bed that may entrain fish during high water or wave action. 43. Upon completion of the project, remove all materials or equipment from the site and dispose of all excess spoils and waste materials in an upland area above the limits of anticipated floodwater. 44. Remove temporary erosion and sediment control methods after job site is stabilized or within three months of project completion, whichever is sooner. ................................ .... ..... :LOCATION #1 _._...... _ _._._ Site Name: Sandoval Site 1311 Marine View Dr N, Hoodsport, WA 98548 iWORK START: November 1, 2017 1 WORK END:I December 31, 2017 ........._........................................................................................................................................................_................................i.............. WRIA 'Waterbody: ;Tributary to: 16-Skokomish - Dosewallips ;Lake Cushman I Skokomish River NF ............................................................................................................._..................................................... m............._,.,_.. ._�._ ,_,.............,..........e....eeq..... ...............................,.._..................................... 1/4 SEC: ;Section: ;Township: lRanoe: ILatitude: 1 Longitude: I County ............................................t......__...................................................,..;................................................................. ._......__._,,Ill"I'll" 32 23 N 104 W 147.43564 123.21898Mason Location#1 Driving Directions From Olympia,take 101 N toward Shelton; Proceed to WA119/Lake Cushman Rd and turn L; Continue up hill and turn L and immediate R on Marine View Drive (adjacent to LC Resort), parallel to the 119; Proceed down that hill and turn L on Marine View Loop (there will be a small storage building on the right). Proceed to bottom of the hill, and the shoreline ;project will be on the left(house on right, up hill). APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW. Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies (local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person (s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. Page 4 of 7 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 �,,,UPmrtmeu, Olympia,WA 98504-3234 FISH-d 4H7LI ME (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions, conditions, or revocation if the Department of Fish and Wildlife determines that changed conditions require such action. The person(s) to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals are listed below. MINOR MODIFICATIONS TO THIS HPA: You may request approval of minor modifications to the required work timing or to the plans and specifications approved in this HPA unless this is a General HPA. If this is a General HPA you must use the Major Modification process described below. Any approved minor modification will require issuance of a letter documenting the approval. A minor modification to the required work timing means any change to the work start or end dates of the current work season to enable project or work phase completion. Minor modifications will be approved only if spawning or incubating fish are not present within the vicinity of the project. You may request subsequent minor modifications to the required work timing. A minor modification of the plans and specifications means any changes in the materials, characteristics or construction of your project that does not alter the project's impact to fish life or habitat and does not require a change in the provisions of the HPA to mitigate the impacts of the modification. Minor modifications do not require you to pay additional application fees or be issued a new HPA. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a minor modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must submit a written request that clearly indicates you are seeking a minor modification to an existing HPA. Written requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant, the APP ID number of the HPA, the date issued,the permitting biologist, the requested changes to the HPA, the reason for the requested change, the date of the request, and the requestor's signature. Send by mail to: Washington Department of Fish and Wildlife, PO Box 43234, Olympia,Washington 98504-3234, or by email to HPAapplications@dfw.wa.gov. Do not include payment with your request. You should allow up to 45 days for the department to process your request. MAJOR MODIFICATIONS TO THIS HPA: You may request approval of major modifications to any aspect of your HPA. Any approved change other than a minor modification to your HPA will require issuance of a new HPA. If you paid an application fee for your original HPA you must pay an additional $150 for the major modification. If you did not pay an application fee for the original HPA, no fee is required for a change to it. If you originally applied for your HPA through the online Aquatic Protection Permitting System (APPS), you may request a major modification through APPS. A link to APPS is at http://wdfw.wa.gov/licensing/hpa/. If you did not use APPS you must submit a written request that clearly indicates you are requesting a major modification to an existing HPA. Written requests must include the name of the applicant, the name of the authorized agent if one is acting for the applicant,the APP ID number of the HPA, the date issued, the permitting biologist,the requested changes to the HPA,the reason for the requested change, the date of the request, payment if the original application was subject to an application fee, and the requestor's signature. Send your written request and payment, if applicable, by mail to: Washington Department of Fish and Wildlife, PO Box 43234, Olympia, Washington 98504-3234. You may email your request for a major modification to HPAapplications@dfw.wa.gov, but must send a check or money order for payment by surface mail. You should allow up to 45 days for the department to process your request. Page 5 of 7 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box 43234 FfBH e+�TLI?LLIfE Olympia,WA 98504-3234 (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 APPEALS INFORMATION If you wish to appeal the issuance, denial, conditioning, or modification of a Hydraulic Project Approval (HPA), Washington Department of Fish and Wildlife (WDFW)recommends that you first contact the department employee who issued or denied the HPA to discuss your concerns. Such a discussion may resolve your concerns without the need for further appeal action. If you proceed with an appeal, you may request an informal or formal appeal. WDFW encourages you to take advantage of the informal appeal process before initiating a formal appeal. The informal appeal process includes a review by department management of the HPA or denial and often resolves issues faster and with less legal complexity than the formal appeal process. If the informal appeal process does not resolve your concerns, you may advance your appeal to the formal process. You may contact the HPA Appeals Coordinator at(360)902-2534 for more information. A. INFORMAL APPEALS: WAC 220-660-460 is the rule describing how to request an informal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete informal appeal procedures. The following information summarizes that rule. A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request an informal appeal of that action. You must send your request to WDFW by mail to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, 600 Capitol Way North, Olympia, Washington 98501-1091; e-mail to HPAapplications@dfw.wa.gov; fax to (360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. WDFW must receive your request within 30 days from the date you receive notice of the decision. If you agree, and you applied for the HPA, resolution of the appeal may be facilitated through an informal conference with the WDFW employee responsible for the decision and a supervisor. If a resolution is not reached through the informal conference, or you are not the person who applied for the HPA,the HPA Appeals Coordinator or designee will conduct an informal hearing and recommend a decision to the Director or designee. If you are not satisfied with the results of the informal appeal, you may file a request for a formal appeal. B. FORMAL APPEALS: WAC 220-660-470 is the rule describing how to request a formal appeal of WDFW actions taken under Chapter 77.55 RCW. Please refer to that rule for complete formal appeal procedures. The following information summarizes that rule. A person who is aggrieved by the issuance, denial, conditioning, or modification of an HPA may request a formal appeal of that action. You must send your request for a formal appeal to the clerk of the Pollution Control Hearings Boards and serve a copy on WDFW within 30 days from the date you receive notice of the decision. You may serve WDFW by mail to the HPA Appeals Coordinator, Department of Fish and Wildlife, Habitat Program, 600 Capitol Way North, Olympia, Washington 98501-1091; e-mail to HPAapplications@dfw.wa.gov; fax to(360)902-2946; or hand-delivery to the Natural Resources Building, 1111 Washington St SE, Habitat Program, Fifth floor. The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, you may request a formal appeal within 30 days from the date you receive the Director's or designee's written decision in response to the informal appeal. C. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS: If there is no timely request for an appeal,the WDFW action shall be final and unappealable. Page 6 of 7 Washington Department of Fish&Wildlife HYDRAULIC PROJECT APPROVAL PO Box43234 q Olympia,WA 98504-3234 F1SH.a HUDLFFE (360)902-2200 Issued Date: May 08, 2017 Permit Number: 2017-6-175+01 Project End Date: May 05, 2021 FPA/Public Notice Number: N/A Application ID: 10641 Habitat Biologist joshua.benton@dfw.wa.gov for Director Joshua Benton 360-602-0364 `�`� WDFW Page 7of7