HomeMy WebLinkAboutSHX2018-00037 Stratfold SUP - SHX Application - 5/25/2018 " 3628 South 35'"Street
Tacoma,Washington 98409-3192
POWER TACOMA PUBLIC UTILITIES
TACOMA PUntIC UTIt ITIF%
I
February 14, 2018 VIA EMAIL and USPS
John Stratfold
415 W Mercer St#1101
Seattle, WA 98119
Subject: Tacoma Power Shoreline Use Permit Application Review
Lot 4, Short Plat of Lake Cushman Division 1727
(Tax Parcel No. 42332-12-60032)
Reference: Project No. 2018-013/SUP371
Dear Mr. Stratfold,
Thank you for applying for a Shoreline Use Permit(SUP)for existing shoreline structures and
uses associated with your development lot No. 4, Short Plat of Lake Cushman Division 1727.
As you know, Tacoma Power's Cushman Hydroelectric Project area (Project) includes all lands
located waterward of the 742-foot elevation Project boundary. Tacoma Power also retains a
10-foot lateral easement on your leased development lot adjacent to the Project boundary. All
structures and uses located waterward of 742 feet elevation, and all structures and fill placed
within the 10-foot lateral easement require authorization from Tacoma Power.
i
Tacoma Power has reviewed your SUP application package for conformance with Tacoma
Power's Shoreline Use Specifications and Permitting Guidelines (SUSPG)and has the following
comments:
Items Reviewed:
• SUP application dated January 15, 2018 (received January 31, 2018),
• Drawings (2 pages), hand drawn, dated November 8, 2017,
• Tacoma Power Records.
1. Stairs. Allowed, with conditions. As shown in the above referenced drawings, you have
proposed to retain your stairs leading from your development lot to you fixed pier.
Conditions: The existing stairs will be permitted as a "Prior Existing Use" per Section 4.4 of
the SUSPG and subject to the conditions therein.
2. Bulkhead with decking. Allowed, with conditions. As shown in the above referenced
drawings, you have proposed to retain your existing wood bulkhead with wood decking. You
have already removed non-embedded stairs that led from the bulkhead to the lakebed.
Conditions: The existing wood bulkhead with wood decking will be permitted as a
"Prior Existing Use" per Section 4.4 of the SUSPG and subject to the conditions therein.
I
7
John Stratfold
February 14, 2018
Page 2 of 3
3. Fixed pier. Allowed,with conditions. As shown in the above referenced drawings, you
have proposed to retain your existing wood fixed pier.
Conditions: The existing wood pier will be allowed to remain as a "prior existing use" per
section 4.4 of the SUSPG and subject to the conditions therein.
4. Mooring buoy alternative. Allowed,with conditions. Not shown in the above referenced
drawings, but shown in photos provided in your application package, you have converted
your existing mooring buoy to a"mooring buoy alternative".
Conditions:
a) You must apply for after-the-fact permits for the buoy anchor(along with the other
structures). See "Next Steps#8" below for more information.
b) Your mooring buoy alternative anchor line must be tied to shore when not anchoring a
vessel
c) Mooring line must not float.
5. Ropes tied to vegetation. To be removed.All ropes tied to shoreline trees, stumps or
other vegetation must be removed and disposed of.
i
6. Debris. To be removed.All debris and abandoned materials located on Tacoma Power's
property waterward of 742 feet elevation and on the lakebed fronting your development lot
must be removed and disposed of at an appropriate upland facility.
E
Other Information:
7. Tacoma's 10-foot lateral easement area.Tacoma retains a 10-foot lateral easement on
the development lots adjacent to the 742-foot elevation boundary. Any permanent
structures or fill in this area must be approved by Tacoma. As shown in your drawings, you
have stairs located in the 10-foot lateral easement area.
8. Cultural Resources Survey. Not required at this time. Because you are not proposing
any new ground-disturbing activities and your existing structures were constructed in the !
mid-1980's, a Cultural Resources Survey(CRS)will not be required at this time. Please
note that when your structures are in need of repair that will cause ground disturbance{ then
a CRS will be required before Tacoma Power will issue permission for that work to occur.
Please see section 6.2 of the SUSPG for further details.
9. Trimming of shoreline vegetation. Prior authorization required. Review of our photos i
shows that there has been a series of vegetation cutting incidents over the years within the
Project boundary fronting your development lot. Please be aware that Tacoma Power has
strict vegetation management rules associated with our properties, as described in Appendix
B Section 11 of the SUSPG. No cutting is allowed without first obtaining written permission
from Tacoma Power.
10. Trees felled into Project area. Not allowed. Review of our photos shows that trees from
your development lot have been felled into the Project area in the past. Please be aware
that Tacoma Power does not allow this use of the property.
John Stratfold
February 14, 2018
Page 3 of 3
Next Steps for Applicant:
11. Regulatory Permits. Required. You must obtain after-the-fact regulatory permits from
Mason County and the US Army Corps of Engineers (ACOE)for all of your allowed existing
structures and uses located on Tacoma Power property waterward of 742 feet elevation and
within the 10-foot lateral easement area. Enclosed please find a letter from Tacoma Power,
the land owner, allowing you to proceed with regulatory permitting for your project. Per
Section 1 of the SUSPG, copies of the necessary regulatory permits are required before
Tacoma Power can issue an SUP. Once obtained, please provide copies of the required
permits to Tacoma Power to satisfy this requirement. If necessary, Tacoma's allowable use
requirements will be modified to reflect the most stringent requirement of the other agencies.
Next Steps for Tacoma Power:
12. Shoreline Use Permit. Upon verification that you completed the requirements of the short-
term license, and when you provide a copy of the required after-the-fact Mason County and
ACOE permits, Tacoma Power will issue a 5-year Shoreline Use Permit for the allowed uses
and structures.
If you have questions regarding this review of your application, please contact me at
(253) 441-4180 or via email at wwriqhj@cityoftcgrna.orcl.
Sincerely,
t
Wynnae Wright
Shoreline and Lands Coordinator
Tacoma Power
WW: cb Stratfold_AppReview_021418
cc: Bret Forrester, Wildlife and Lands Manager, Tacoma Power
Kyrra Wilson, Wildlife and Recreation Lands Officer, Tacoma Power
Dori Bishop, Sr. Real Estate Specialist, City of Tacoma
3628 South 35"Street
Tacoma,Washington 98409-3192
AC "" POWER TACOMA PUBLIC UTILITIES
TACOMA PUBLIC UTILITIES
February 14, 2018 VIA EMAIL and USPS
John Stratfold
415 W Mercer St#1101
Seattle, WA 98119
SUBJECT: Stratfold Shoreline Proposal on Tacoma Power Property
r
Dear Mr. Stratfold:
The City of Tacoma, Department of Public Utilities, Light Division (Tacoma Power) was recently
contacted to review drawings dated November 8, 2017, for existing shoreline structures
I located on Tacoma Power property fronting your development lot at 5901 N Lake Cushman
Road, Lake Cushman.
The proposed action will require issuance of a shoreline use permit and short-term license from
Tacoma Power before any work occurs on Tacoma Power property waterward of 742-feet
elevation. Tacoma Power has no obiection to you moving forward with regulatory permitting for
the proposed activities on Tacoma Power property.
Please provide a copy of this letter to the regulatory agencies when you submit your plans to
them. Feel free to contact me at 253-441-4180 or wwright(a-)ci.tacorna.wa.us if you have any
questions.
Sincerely,
WY nnaright
Shoreline and Lands Coordinator
Tacoma Power
WW: cb Statfold OkToProceedWithRegPermitting_021418
cc: Dori Bishop, Sr. Real Estate Specialist, City of Tacoma
C5
0 CD
CID -0
CL
cm
� I
O
tit
4
N
— s
/ I co
164
3 �$
1
o �
0
M � Z
I -0
¢ 0CL0W
z
m !4 .- ffiz
� oao o 8
0mCL
R z
cr
z� $ LO
N EE' .N- oo ffi- cD
=ym �63 u!
N LLI -J M OZ Uo v p ci6
ul q oul lr
zg
s Z
40 �j a
i\i cc ri
`w "' 8 8 3
N
w � U
N 0 CD 0
f
N Lu N N LL
v �
ZLU m
g g o
l"1 Z cr) N w
00
O
® !n
t�
N w
aE N LL V)
{ C
v
C
U• o _
ii'_� O O
Q
` Lf Q
M `- :-
o
O
C C
E
O O
N N
C N
O N N
N � �
C Q CL
3 y X
U 05 H
m
ca
c ® u
3
a
00
L3 M
Okn
O
x o6
04
o
U o
0
� o
N
+
O
..
C9
V'1
a
O $
O _
ti v_;
co
O
v
ai ,ram'
O
3AVo
J C ( v
can 0 E _
v�i U t
Z
LO
O
4—
to Q
V
bA O
a'O
0 O
'O
O V'
b
O
� = Z
co
cn
Co u�
z > LL
o M�;
0
o c,
b O
0
0
W?
--------------
t
AGENCY USE ONLY
US Army Corps Date received: ��S <�1�
of Engineers^ , SS
WASHINGTON STATE . seattle Distnd ;
,
Joint Aquatic Resources Permit ; Agency reference#: t/
Application (DARPA) Form'' [! l
,
-ate�=2 let
oc�3Z
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. Y23 32 —I Z—(o
; Tax parcel#(s): ,
t
,
------------------------'
part 1-Project Identification
i. Project Name (A name for your project that you create.Examples: Smith's Dock or Seabrook Lane Development) [ ]
T� FaL� 5uP - La k157
part 2-Applicant
The person and/or organization responsible for the project. C,- l
Z42. Name(Last, First, Middle)
S?t2A--vFo CD ,
2b. Organization(If applicable)
2.e. Mailing Address (Street or Po Box)415 W Mev'-Cvl c 1
2d. city, state, zip
2e. Phone(1) 2h. E-mail
2f. Phone(2) 2g, Fax
:�'s-rap,-[�C)co��Ar
93b6
1Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps o
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPI or
prepare a Biological Evaluation. Forms can be found at r r,
city or county
land counties accept the DARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate
Not all cities
government to make sure they accept the JARPA.
27o access an online DARPA form with[help]screens,goo ,
For other help,contact the Governor's office for Regulatory Innovation and Assistance at(800)917-0043 or
Page 1 of 14
ORIA-16-011
Wd LS:t`8I0Z/tZ/t,
r t 3o I
Part 3-Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) I. _
3a. Name (Last, First, Middle)
ri R
3b. Organization (If applicable)
3c. Mailing Address (Street or PO Box)
3d. City, State, Zip
3e. Phone(1) A Phone(2) 3 Fax
9• 3h. E-mail
Part 4-Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. Consider both
upland and apua�ownership because the upland owners may not own the adjacent aquatic land. [ )
91'same as applicant. (Skip to Par': 5.)
❑ Repair or maintenance activities on existing rights-cf--way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out
each additional property owner. for
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact
the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete
apply for the Aquatic Use Authorization. : to
4a. Name (Last, First, Middle)
4b. Organization (If applicable)
4c. Mailing Address (street or PO Box)
4d. City, State, Zip
4e. Phone(1) 4f. Phone(2) 4 Fax
J• 4h. E-mail
OR IA-16-011
Pa— of I A
Iop-ooi7e-gSpt-ot£Z-p.T'90POS/[aaLt/SUJMOJNzoo*uozeeue•ainus//:sduu 1
3
tu3
0 umlag auilup-u100 uozeuzV
5
part 5—Project Location(s)
Identifying information about the property or properties where the project will occur.
❑ There are multiple project locations (e.g.
linear projects). Complete the section below and use
aif�r.h!-, F- - for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) I l
O'Private
❑ Federal
❑ Publicly owned (state,county,city,special districts like schools,ports,etc.)
❑ Tribal
[I Department of Natural Reso urces (DNR) —managed aquatic lands (Complete -_._
5b. Street Address (Cannot be a PO Box.If there is no address,provide other location information in 5p.) (+ !€)
50,o\ N Lt'V_E CV S Rwvt� RD
5C. City, State, Zip(if the project is not in a city or town,provide the name of the nearest city or town.) [ j
1A00_D:SfC>9:T
lid. County ( ]
µQcS--DO
5e. Provide the section, township, and range for the project location. (, � l
Township Range
Section
'/4 Section 40
6f. Provide the latitude and longitude of the project location.
• Example:47.03922 N lat.!-122.89142 W long.
Use decimsl degrees-NAD 83)
5g. List the tax parcel number(s) for the project location. U
• The local county assessor's office can provide this information.
5h. Contact information for all adjoining property owners. (If you need more space,use
"tax Parcel #(if known)
Mailing Address
Name -----
M VA I-)v 5�03__N C.W�� c�SttM ►� � 23 1260032
5 4
5 I1 1s UO _ 42332-5IOWto
Page 3 of 14
ORIA-16-011
' r
Si. List all wetlands on or adjacent to the ro'ect location.
pro
Sj. List all waterbodies (other than wetlands) on or adjacent to the project location. t
L.RV-E- CU'SRI�-APv-�
5k. Is any part of the project area within a 100-year floodplain? 1,
❑ Yes ( No p Don't know
51. Briefly describe the vegetation and habitat conditions on the property. L l
`g
SM. Describe how the property is currently used. C
Vs
� � 2ss
5n. Describe how the adjacent properties are currently used. t
50. Describe the structures (above and below ground) on the property, including their and c
condition. l , r purpose urrent
(A30 0
LIC/
5p. Provide driving directions from the closest highway to the project location, and attach a map.
[__ l
5L �CCIA:Secv-t , cell, q �_ ' L,
ORIA-16-011 --- -
Part 6- Project Description
6a. Briefly summarize the overall project.You can provide more detail in 6b.
-Cyr Q�LA
`'n �V
Q�VA Q�f '�Y�
t'd,
01
t C
Y D (33v
6b. Describe the purpose of the project and why you want or need to perform it. [^enl
t w
6e,:31 IQ- 01e S�w'`Q V-
6c. Indicate the project category. (Check all that apply) [
❑ Commercial Z Residential
❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply) ["^`_>]
❑ Float ❑ Retaining Wall
❑ Aquaculture ❑ Culvert (upland)
❑ Bank Stabilization
❑ Dam /Weir ❑ Floating Home ❑ Road
❑ Boat House
❑ Dike/ Levee /Jetty ❑ Geotechnical Survey ❑ Scientific
❑ Ditch ❑ Land Clearing Measurement Device
❑ Boat Launch �f
❑ Boat Lift 46 Dock/Pier ❑ Marina/ Moorage Stairs
❑ Bridge
❑ Dredging ❑ Mining ❑ Stormwater facility
xO Bulkhead ❑ Fence
❑ Outfall Structure ❑ Swimming Pool
❑ Buoy
❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line
❑ Channel Modification ❑ Fishway
❑ Raft
Other: be , ,
Page 5 of 14
ORIA-16-011
6e. Describe how you plan to construct each project element checked in 6d. Includespecific
methods and equipment to be used. �.,- , � construction
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-yearfloodplain.
�►'O C.c�N��i�.l.}C.Z't o�J �'�41V11�-�`� � �QILI�
r pbe(L"
• (See aAt a
(�Om Cacow.a PO�2�.
6f. What are the anticipated start and end dates for project construction? (MonthNear)• If the project will be constructed in phases or stages, use . _n : r „_..,: ,r
or stage, to list the start and end dates of each phase
Start Date: A End Date:
❑ See JARPA Attachment D
69. Fair market value of the project, including materials, labor, machine rentals etc.
N� R 30 - 50!: 2I F Tz) R�e b144 d,
6h. Will any portion of the project receive federal funding?
• If yes, list each agency providing funds.
❑ Yes )KNo ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands.
❑ Not applicable 1
7b. Will the project impact wetlands?
7d. Has a wetland delineation report been prepared? [ l
-
if Yes,submit the report,including data sheets p with the . Aac ag -
❑ Yes ❑ No
7e
Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [; l -
• If Yes,submit the wetland rating farms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands?
7 [ -1
• if Yes,submit the plan with the JARPA package n an plan should not be required.
• if No,or Not applicable,explain below why 9
❑ Yes ❑ No ❑ Don't know -
lg.
a watershed approach was
Summarize what the mitigation plan is meant to accomplish. and describe how
used to design the plan. [ l
7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. [
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. [
Fart 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.)
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
I
❑ Not applicable
8b. Will your project impact a waterbody or the area around a waterbody? [
0 Yes ❑ No
•8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? [ -4, 1
• If Yes,submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
— ❑ Yes ❑ No ❑ Don't know
t8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. [ ]
8e. Summarize impact(s) to each waterbody in the table below. [ ,_]
Activity(clear, Waterbody Impact Duration Amount of material Area (sq.ft. or
dredge, fill, pile name location-' of impact3 (cubic yards) to be linear ft.) of
drive, etc.) placed in or removed waterbody
from waterbody directly affected
If no official name for the waterbody exists,create a unique name(such as"stream 1")The name should be consistent with other documents
provided. dl
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody an
indicate whether the impact will occur within the 100-year flood plain.
'Indicate the days months or years the waterbody will be measurably impactec by the work Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. [_ .. l
Page 9 of 14
OFZ IA-16-011
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. _ _]
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below.
Agency Name Contact Name Phone Most Recent
Date of Contact
91b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List?
If Yes, list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
❑ Yes /No
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in?
Go to nt+ %,-,'n -, , :rF to help identify the HUC.
II- I100I (C) b ?
9d. What Water Resource Inventory Area Number(WRIA#) is the project in? i
• Go to
--
to find the WRIA#.
KJ
OR IA-16-011
Paae 10 of 14
ge. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? I
for the
• Go to
the
standards.
0 Yes 0 No /Not applicable
-------------
Management Act, what is the local shoreline
9f. If the project is within the jurisdiction of the Shoreline
9f- If project
is
environment
nvironment designation?
• if you don't'know,contact the local planning department
• For more information, go to:
tic o Conservancy0 Other:
0 Urban 0 Natural C-1 Aqua
9g. What is the Washington Department of Natural Resources Water Type?
- e Forest Practices Water Typing system
• Go to❑ ..tl for tie
Shoreline 0 Fish 0 Non-Fish Perennial 0 Non-Fish Seasonal
et the Washington Department of Ecology's most current stormwater
r
9h. Will this project be designed to me
manual?U•
If No, provide the name of the manual your project is designed to meet.
0 Yes 0 No
Name of manual:
9L Does the project site have known contaminated sediment?
• If Yes, please describe below.
0 Yes 0 No
9J. if you know what the property was used for in the past, describe below. I
9k. Has I a cultural resource (archaeological) survey been performed on the project area?
• If Yes,attach it to your JARPA package.
❑ Yes 0 No
page 11 of 14
ORIA-16-011
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the
project area or might be affected by the proposed work.
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [_
O R IA-16-011
Page 12 of 14
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at _ =-
• Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or ,:m i u)ui is VJL1 00v.
• For a list of addresses to send your JARPA to, click an
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply) ( )
• For more information about SEPA,go to nrfns lecalnav vra.novl ent�lations-nernisr.,_r - f f =.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date
is
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Checkthe box below in 10b.) [t eiPj
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law.
10b. Indicate the permits you are applying for. (Check all that apply.) [. ]
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development Conditional Use ❑ Variance
❑ Shoreline Exemption Type (explain):
Other City/County permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
0 General Bridge Act Permit 0 Private Aids to Navigation (for non-bridge projects)
Dart II—Authorizing Signatures
Signatures are required before submitting the DARPA package. The JARPA package includes the JARPA form,
project plans, photos, etc, r I
11a. Applicant Signature (required) t_
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies enter he property where the oject is located to inspect the project site or any work
related to the project. (initial)
VZ 4 3 Lg
Applicant Printed Name __ �L - -__/ ---
Applica t Signature Date
11b. Authorized Agent Signature
[ ]
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Printed Name AuthorizedAgent Signature Date
11c. Property Owner Signature (if not applicant) [ I
Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA).
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Ower Signature - --
Date
18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals, or covers up by any trick,scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious,or fraudulent statement or
entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance (ORIA)at(800)
917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call (877)833-
6341. ORIA publication number: ORIA-16-011 rev.07/2017
nRio_ir_ni 1
v
SEPA Environmental Checklist* Mason County Permit Center Use:
SEP 2016 - 00050
❑ Single Family DNS: $600.00
❑ Other DNS: 0 to 9.99 acres: S730 Parcel#:L(233 2-1 Z d32-
l0 to M acres: S880 Date Rcvd
Over20acres: $1100 ?ECEIVED
❑ DS/EIS: $5000+ $90 per hour Y CL,j
MAY 2 5 2018
Purpose of checklist: Met-Street
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants: jtl
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use"not applicable" or
"does not apply"only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
A. BACKGROUND t ei_
1. Name of proposed project, if applicable: Lheipl
s--fZA-r-f--0Q-a> Su>° — I-AVE CUTS 1AA 0 Of-M Copy)
2. Name of applicant: a�E7t
--'310R-'J �C e-k, F.
3. Address and phone number of applicant and contact person: h( eg p
41 E W NkFZCZ'2 '�Z7T> �-I to 1
SeA t"0i-f. ) WA 9 S 11ci 206-Sq5-- 936(
SEPA Environmental checklist(WAC 197-11.960)(Mc version-non project portion omitted): 2016 Pagel of 11
4. Date checklist prepared: (held
5. Agency requesting checklist: jhe1p;
MP-SoPJ C00rJ7%-J -
6. Proposed timing or schedule (including phasing, if applicable): Lip
R &Mll -- c F 013 `f r rD OE-0
7. Do you have any plans for future additions, expansion, or further activity related to or connected with
this proposal? If yes, explain. nej
NI
B. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal. Lypl
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain. Leln1
!V 0M k-
10. List any government approvals or permits that will be needed for your proposal, if known. Lnei�
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include additional specific information on project description.) LLeI
NO 00,J c�sTIQUc.i�e�J
CuSi�Nth 5 2�C�c�Q. m+ (e 'E� , BUt.. V'A-e4� voci' , S-TpCiez
e_r,,Q0L a-Z NL"F�-7 :5 Dg-e-u N F- uS'-
p64t-m-i 0-soto -
12. Location of the proposal, Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist.
Parcel#(s): 4Z'S3Z — M — 600b 2
Address: StA 01 K LNdC�_; CUSAMP'4 (�b , Roo-bS{cam. 27 ) (,JA (iSJ`�4
Legal Description: LoT 4, BZoC_K p-RT of- CUS4MfM1 EASTSYDV_ -t�4
Twp/R nge/S ction annAr PS loca It on:�Q 4 0� 5P l}Z�
G
ZStJ 4 tJ 32 4-4 .445:7 106 N - 123 - 2146_40 W
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion mitted): 2016 Page 2 of 11
5) Proposed measures to reduce or control environmental health hazards, if any:
b. Noise N)O -
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?Lr,ei
N()N'F_
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. LrLeM
WD1JVE,
3) Proposed measures to reduce or control noise impacts, if any: rhelpl
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe. Cfie�?]
fZXtS-r0JCA �f"KuGZo FReAKDE P�ccrSs -lo (.A* c a&ttmw
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
ISO
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any?
00 jz
If resource lands have not been designated, how many acres in farmland or forest land tax
status will be converted to nonfarm or nonforest use? the{
Oo li
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
00 -
c. Describe any structures on the site. rnem
p i'. ) $U UU-lkeA�:V , 'X'C'V_l n1 C� l
Ca'�SrC2U c(I o0 NAiDe i- 12 y V*f-1Q S oc
d. Will any structures be demolished? If so, what? nI ciM.1
K)O
e. What is the current zoning classification of the site? roc
1�6 — i2�'SI-De".iTIIelL
f. What is the current comprehensive plan designation of the site? Irteip]
NvT K niow'-J
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2015 Page 7 of 11
g. If applicable, what is the current shoreline master program designation of the site?[heip,�
NOT V-0000
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
!re'l,? NO
i. Approximately how many people would reside or work in the completed project? ;neii
S lock L_F_ Lo
j. Approximately how many people would the completed project displace? tl
NO NV__
k. Proposed measures to avoid or reduce displacement impacts, if any: Ltl ieii
(�ibfJ�
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: Lijeipl
WOE-
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
NO1��
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing. nei
Flom"
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. ne;
Ooo t
c. Proposed measures to reduce or control housing impacts, if any: r ei
NOI�JE
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?Leis
NoIJV-_
b. What views in the immediate vicinity would be altered or obstructed? neip}
NO(IJ�_
c. Proposed measures L,
I��tasures to reduce or control aesthetic impacts, if any: LE
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?Lneii.21
b. Could light or glare from the finished project be a safety hazard or interfere with views?fteM
00
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11
c. What existing off-site sources of light or•glare may affect your proposal? hel
d. Proposed measures to reduce or control light and glare impacts, if any: [help]
0%-E
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? rhel'4
goAil N G ON) C-RV,5F- CJS1A t o A-►J
b. Would the proposed project displace any existing recreational uses? If so, describe. Ltg!Pj
90
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: nl e
1 00E
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers located on or near
the site? If so, specifically describe. [help
b. Are there any landmarks,features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries.Are there any material evidence, artifacts, or
areas of cultural importance on or near the site? Please list any professional studies conducted
at the site to identify such resources. in, ,:ir;
Kcw-
c. Describe the methods used to assess the potential impacts to cultural and historic resources on
or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. fnel_e',
N()lijf—
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
NOt'�E
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any. t
G N cc)&,s s QmND F�-o M KJ (-A-WE- CA-)S R t k Pi-tJ 127b
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 11
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?fbg _
NO
c. How many additional parking spaces would the completed project or non-project proposal have?
How many would the project or proposal eliminate?LeIpJ
No1A,
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private). L4ipJ
WME,
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. nel
pI
No
f. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles). What data or transportation models
were used to make these estimates? ne{J
None..
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
NO
h. Proposed measures to reduce or control transportation impacts, if any: znelpJ
N%)L
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe.JtLeM
No
b. Proposed measures to reduce or control direct impacts on public services, if any. (nelpl
�JoNE
16. Utilities
a. Circle utilities currently available at the site: f,elpi
electricity, natural gas, water, refuse service, telephone,
sanitary sewer, septic system, other Pe,0?A-OE. JAL)I(
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might
be needed. jhc�l
N 00E
C. SIGNATURES
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature: 4�
Date Signed:
Print Name of Signee: �C� ►.1 L' l ��C�
If applicable, Position and Agency/Organization: --
Date Submitted: 5/c, Zol
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11
+
N
I � ,
�� li Ii ilE o i
I I II
i
I r
Emil
4t Ii li sm it -It
4
Ln
5-92t� 6'_1" I 7'-7' o O
I Z _
T� z
! ffi - = m
41� 0 D
n
m. g = D O
�\ y z r-
� � Z o Q
=O
N i+O
�m II I 4 0DW
°o>p r li I v z C
Zz
ZD X D y O
ip
Zs I Do A
00
NORTHWEST
ENLARGED PLAN AND DETAILS LINE
D' o I AS BUILT STAIRS,LANDINGS,DOCK,BULKHEAD u
b WOR
o 10HN STRATFOLD v v ,
415 W.MER�R 94 p1101 35f}951-]C99•www.norchwrstlineworx rwn
SFA WA98119
O
c z
r
L 0
t_0CD
,
z D
C
tP m
n
o _
0 D 0
3ga r
o �
r
D D
J Do z
Ln
0 0
a T z
F=a
V)
D
yy z
D
/ V)
ENLARGED EAST ELEVATION
AS-BUILT STAIRS,LANDINGS,DOCK,BULKHEAD WORX
J JOHN STRATFOLD `__L.c_
415 W.MERE 9,K101 ......... • orthwPsflinrwornrnny
s'- o"
-4"
g�
O
z^
O T1
D
T
ti O
o
L I
n1 O
C) LA
I
C
m
m
I N Q
� n
„ D
o _
Z 0 m
o �
0 D
1! g
00z
Lno
.A
W
z
r �
D
� z
V
f
�;g D
3 Y f SMt cm�"�b 1�05-Yt wu`I xe/69u NONTHWt ST
NORTH ELEVATION ENLARGED LINE
N o AS-BUILT STAIRS,LANDINGS,DOCK,BULKHEAD 'n/O Q u
o 10HN STRATFOLD Y V ' "`,-L :
415 W—UR Sr.,p1101 36 951- 9•www.—h—th.eworn<�ni
SWT WA98319