HomeMy WebLinkAboutHPA Bank Stabilization WDFW - SHX Permit / Conditions - 1/6/1995 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Planning-Landfill-Utilities EXEMPTION FROM SHORELINE MANAGEMENT ACT SUBSTANTIAL DEVELOPMENT PERMIT REQUIRED The Proposal by: HERB BAZE W. 5101 SKOKOMISH VALLEY RD SHELTON WA 98584 To undertake the following development: Stabilize bank in area eroded by river in storm. Length of project site allowed under this exemption approximately 50 feet. Broken concrete in small, angular pieces allowed. No asphalt allowed. Rock preferred. Use of large woody debris allowed. SEPA Exempt pursuant to WAC 197-11:-880 (See Conditions) . within SKOKOMISH RIVER W. 5101 Skokomish Valley Road; Tr. 24 of NE, SW. and/or its associated wetlands is exempt from the requirement of substantial development because the develpment is Emergency construction WAC 173-14-040- (D) . Corps Public Notice Reference NA ISSUED: 01/06/95 EXPIRE: 01/06/97 This exemption authorization construction shall be valid for two (2) years provided construction has begun within two (2) years of approval date. This exemption may be extended to five (5) years upon request prior to expiration. ld AutJTrWed Local Government Official cc: APPLICANT WDF USACOE WDOE - --, CMMRS/DIRECTOR OF DCD TRIBAL COUNCIL SHX_FORM, rev: 03/24/92 BANK STABILIZATION - CONDITIONS All bank stabilization work completed on an emergency basis is subject to the following conditions : 1. The applicant must obtain emergency authorization from the Washington State Department of Fisheries & Wildlife. In accordance with the provisions of Chapter 75 .20 . 100 and 75 .20 . 103 , Fisheries & Wildlife must reduce the conditions of an oral emergency approval to writing within 30 days. The applicant must provide these written conditions to the Mason County Planning Department within 15 days of receiving them from Fisheries & Wildlife. 2 . . Mason. County will not authorize any streambank stabilization work that is not in compliance with the written conditions issued by Fisheries & Wildlife under Chapter 75 .20 . 100 & 75 .20 . 103 . Any repair work that violates these conditions shall be modified and brought into compliance at the expense of the applicant. 3 . Actions to stabilize streambanks that are issued emergency exemptions are still subject to the permitting standards of Mason County' s Shoreline Master Program. Following construction, emergency projects must provide a report from a licensed engineer with an expertise in hydraulics . The report must certify that the project meets the standards of Mason- County' s Shoreline Master Program (Chapter 7. 16 . 150) and must specifically address the following topics : A. Whether the project does or does not adversely affect river channel hydraulics and floodway characteristics up and downstream from the project area. B. Whether the project as constructed is structurally sound. C. What types of nonstructural alternatives would make the project unnecessary. D. A plan for revegetation along the length of the project that includes removal of as much riprap as is necessary to restore the vegetative integrity of the streambank. 4 . Under the terms of this emergency exemption the applicant accepts his or her responsibility for any and all later work that may be necessary to bring the stabilization project into compliance with the Mason County Shoreline Master Program and Shoreline Master Act. : ... GARY YANDO,DIRECTOR $TAT F c DEPARTMENT OF COMMUNITY-DEVELOPMENT. z o. z PLANNING- SOLID WASTE-.UTILITIES ?o BLDG: III • 426 W.CEDAR • P.O. BOX 578 SHELTONj WA 98584 • (206)427-9670 1995 Herb° Baze . W: 5101'..Skokomish Valley Road --Sh-61ton*. ,Wa. -98584 Re:;<:::.•Skokomish River Bank Stabilization This_;department is in receipt of an -issued WDFW Hydraulic Project Approval for further -bank stabilization work on your property'. A St.at-e_ment ..of Exemption or :shoreline permit will be required for :triis.- work by• Mason County: Please -provide us with a site plan of the. area previously stabilized and indicating where the new work will-.: be. . taking place. Fdilure 'to respond may result in the issuance of a "stop-work" on, - e `project. We would prefer to work with you to the extent possible.: Thank you in advance. for. your cooperation. Respectfully, Dori Brush., Planner Department of Community Development `tegcled HYDRAULIC 'PROJECT APPROVAL R.C.W. 7 5.2 0 . 10 0 - DEPARTMENT OF FISHERIES R.C.W. 75.20. 103 General Administration Bldg. Olympia, Washington 98504 April 3 , 1995 (206) 753-6650 DEPARTMENT OF FISHERIES (applicant should refer to this date in all correspondence) PAGE 1 OF 2 PAGES 10 LAST NAME FIRST 18 CONTACT PHONE(S) CONTROL NUMBER Baze, Herb (360) 427-1063 00-A5286-03 19 STREET OR RURAL ROUTE ❑ ❑ West I 5101 Skokomish Valley Road 7 s 9 16.0001 Shelton WATE 98584ZIP 14 17 ]WATER TRIBUT RY TQ 11 TYPE OF PROJECT South Fork Skokomish Rivo omish River Bank Protection 13 ARTER SECTION TOWNSHIP RANGE(E-W) COUNTY —————————— SECTION SE 12 21N 05W Mason ----------------------------- —————————— THIS PROJECT MAY BEGIN 6 AND MUST BE COMPLETED BY TIME LIMITATIONS: 5 March 24, 1995 April 30, - 1995 THIS APPROVAL IS TO BE AVAILABLE ON THE JOB SITE AT ALL TIMES AND ITS PROVISIONS FOLLOWED BY THE PERMITTEE AND OPERATOR PERFORMING THE WORK. SEE IMPORTANT GENERAL PROVISIONS ON RMRSE SIDE OF APPROVAL NOTE: This Hydraulic Project Approval HPA is the written - to the emergency verbal HPA issued. b)y Jim Fraser to HerboBaze on March 24, 1995. It is issued with the understanding that tie proposed work is necessary to address emergency conditions. 1. The eroding stream bank where recent bank protection work had been done may be repaired and protected from erosion by placement of additional trees, tree arts, rock riprap, and concrete chunks, trovided the diameter or the concrete chunks shall not exceed hree (3) times the thickness. 2. Project length shall not exceed 300 feet. 3. Bank protection work shall be restricted to work necessary to protect the eroding bank. 4. Equipment shall not enter the water. 5. Woody debris may be yarded by equipment stationed on uplands or dry gravel bars. 6. Placement -of bank protection material waterward of the bank shall be restricted to the minimum amount necessary to protect the toe of the bank or for installation of mitigation features approved by Washington Department of Fish and Wildlife (WDFW) . APR 0 61995 SEPA: Exempt, Emergency REGIONAL HABITAT MANAGER - Jim Fraser (360) 902-2571 MASON CO, PL411JNl4G DEPT. PATROL - Ohlde 029 (P1) APPLICANT - WILDLIFE - READER - PATROL - HAS. MGR. - WRIA DEPARTMENT OF FISHERIES ,�� ✓� DIRECTOR HYDRAULIC -PROJECT APPROVAL R.C.A. 75 .20 . DEPARTMENT OF FISHERIES - 1 0 0 General Administration Bldg. R.C.W. 7 5.2 0.10 3 Olympia, Washington 98504 DEPARTMENT OF FISHERIES 4❑ April 3, -1995 (206) 753-6650 (applicant should refer to this date in all correspondence) PAGE'A OF 2 PAGES 10 LAST NAME CONTACT "PHONE(S) CONTROL NUMBER Baze, Herb �$ (360) 427-1063 1 00-A5286-03 12 WATERSouth Fork Skokomish River QURIA 16.0001 7. The toe shall have been desi ned and shall be installed to protect the integrity of bank protection material. 8. Contact Jim Fraser, Area Habitat Biologist at telephone (360) 902-2571, immediately after project completion to arrange inspection. LOCATION: At address of permittee, on river bank side. 1t: 11.26 cc: Don rush�� Mason County Dept. of Community Development REV 10/16/88 STA7' O� o° £ 0 r �? 889 a0y State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N•Olympia,WA 98501-1091 •(360)902-2200.TDD(360)902-2207 Main Office Location: Natural Resources Building•1111 Washington Street SE•Olympia,WA April 3, 1995 }� 3:: . s . APR 0 6 1995 Herb Baze MASON CO. PLANNING DEPIT. West 5101 Skokomish Valley Road Shelton,Washington 98584 SUBJECT: Denial of Emergency Hydraulic Project Approval (HPA) - Channel Change, South Fork Skokomish River, Tributary to Skokomish River, Southeast 1/4, Section 12, Township 21 North,Range 05 West,Mason County, WDFW Log No. 00-A8035-01, WRIA 16.0001 Dear Mr. Baze: On March 24, 1995, Tim Fraser, Washington Department of Fish and Wildlife(WDFW)Area Habitat Biologist, met with you on-site to review your request for an emergency Hydraulic Project Approval (HPA)to do additional stream bank protection work on the South Fork Skokomish River approximately 10 miles upstream of the mouth of the mainstem Skokomish River. The proposed project location was at the same site for which an emergency HPA had previously been issued to your son-in-law,Rick Vickery, on December 30, 1994, for stream bank protection. An emergency verbal HPA for bank protection work was issued to you by Mr. Fraser on March 24, 1995. A copy of the written HPA, WDFW Log No. 00- A5286-03, is enclosed. Also on March 24, 1995,you requested an emergency HPA for a channel change that would include straightening the stream across a gravel bar. No emergency HPA for a channel change was issued by Mr. Fraser. His evaluation indicated that although there was an immediate need for direct bank protection, the existing high river flow made a channel change significantly impacting to fish, and impractical at that time. Mr. Fraser determined the channel would in all probability migrate back into its original channel after future high flows. Impacts to fish.life and habitat from the proposed channel change include: 1. Loss of in-gravel, developing eggs and embryos because of dewatering of salmon spawning nests (redds). Loss of flow through the gravel deprives developing eggs and embryos of oxygen and metabolic waste flushing. 2. Stranding of free-swimming salmon and trout in dewatered channels. 3. Stress to free-swimming salmon and trout from suspended sedimentation released after a river is diverted into a newly excavated channel. 4. Smothering of in-gravel deposited salmon eggs and embryos and bottom dwelling invertebrate fish food from streambed sedimentation after a river is diverted into a newly excavated channel. Herb Baze April 3, 1995 -Page 2 5. Continued detrimental impacts as mentioned above in both upstream and downstream areas that are influenced by a channel change as the affected reach of stream adjusts to a shortened and changed channel and regains its original meander length. Based on flow, landform gradient, and substrate resistance, a stream will adjust itself to reach and maintain a particular meander length. A project of this magnitude and impact to fish life requires thorough plan review for protection of fish life. Should you desire to pursue a channel change project,the following will be necessary. 1. An HPA application, which includes plans and specifications for the overall project and protection of fish life. Mitigation for unavoidable impacts will be required. The permanent new channel should, at a minimum, be similar in length, width, depth, floodplain configuration, and gradient, as the old channel. Additionally, the new channel will need to incorporate fish habitat components, streambed materials, meander configuration, and native or other approved vegetation equivalent to or greater than that which previously existed in the old channel. An application is enclosed. 2. Permits from other agencies (local, state, or federal) may be required. You may need a Shoreline Permit from Mason County, a Temporary Water Quality Modification from Washington Department of Ecology, and a 404 Permit from the U.S. Army Corps of Engineers. 3. By law, compliance with the State Environmental Policy Act(SEPA) is required before WDFW can issue an HPA for a proposed channel change. Please contact Mason County Planning Department at (360)427-9670 regarding SEPA. If a Shoreline Permit is required, Mason County would be the lead agency for SEPA. If you have any questions, please contact Mr. Fraser at (360) 902-2571 or his supervisor, Dave Gufler, at (360) 753-2600. We appreciate your cooperation in our efforts to protect, perpetuate, and manage the fish resources of the state of Washington. Sincerely, wvzw— Gayle Kreitman Regulatory Services Division Habitat Program Enclosures: Hydraulic Project Application Written Follow-up to Emergency Verbal HPA(00-A5286-03) cc: Tim Fraser, WDFW Dave Gufler, WDFW Gordon Zillges, WDFW ;Don Brush, Mason County Dept. of Community Development �/ P r we .. � s•(,.�z.5.-+ys,�,!. `fit _ � � y�. _ �- '�;, _ � �. A All �/r;�y /�.. V�� '+�} �ryi i � r •C J1:�_�..yC _ - � �. _ _ .. 'I • _ _ I • �i ii' -�r� - i fiz� •r yy� Y —- .. - . -__`:•.� a`. .� _ .� ^�y�� / �''" � . �� • ��y.► � ram! �, .�*�,�/ .� ..� t� `r- .\, / �C� � i, � - _. � _. ,may;' � � _ h• �I t ;it I i �. .sue • i t ' t