Loading...
HomeMy WebLinkAbout90-00 - Res. County Road Project 1687 MASON COUNTY COMMISSIONERS RESOLUTION NO. : 9 0- 00 COUNTY ROAD PROJECT NO. : 1687 WHEREAS , on Mason County Road No . 63630 , known locally as the Lombard Road North , and more specifically located in Section 7 , Township 21 North, Range 1 West, WM M.P . 0 . 00 to M.P . 0 . 77 work defined as " construction" in the BARS Manual, Page II-63 , et seq, is determined to be necessary and proper; and, WHEREAS , this project is identified as 44 on the officially adopted County Annual Road Program. THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to : Perform Preliminary Engineering, Right of Way Acquisition, Road Preparation, (road widening, construct culdesac, grade/drain/surface) and apply 2 shots of bituminous surfact treatment (BST) . SAID WORK is to be performed by day labor in accordance with the Washington State (day labor/contract) Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows : Construction/Engineering $ 3 000 . 00 Right-of-Way $ 1 . 500 . 00 Road Construction $ 30 ,000 . 00 The County Road Project herein described is HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136 - 18 . ADOPTED this 5th day of September 2000 . BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON JOIN A. BOLENDER, Chairperson MARY JO CADY, Commissio ATTEST : ... w: CYNTHIA D . OLSEN, Commissioner Clerk of the Board cc : Co . Commissioners Engineer JOURNAL : Publ . 1t . : 09 - 07 - 00 ( Bill Rd . Dept . ) scv h : Awp \ sm1 - wrks \ Crp- 1687 . res