HomeMy WebLinkAbout148-02 - Ord. Amending Res. 135-01 County Building Permit Fee Schedule and Valuation Criteria Ordinance No . 148 - 02
AMENDING OF RESOLUTION 135-01 : THE MASON COUNTY
BUILDING PERMIT FEE SCHEDULE AND VALUATION CRITERIA
IN THE MATTER OF :
Amending the Mason County Building Permit Fee Schedule and Valuation Criteria that is
used in the assessment of fees applicable to building and fire code related permits
required under the Mason County Code , Title 14 , Building and Construction .
WHEREAS , pursuant to the Mason County Code, Title 14 , Section 14 . 08 . 090 , fees shall
be assessed in accordance to the fee schedule adopted by the jurisdiction for all permits ;
and
WHEREAS , Mason County Resolution 135 - 01 , established the valuation criteria
presently used and is now inadequate for the services provided, and deficient in
comparison with current average construction cost data provided by the Building
Standards Magazine and published by the International Conference of Building Officials ;
and
WHEREAS , the Mason County Board of Commissioners held a public hearing on
November 19 , 2002 to receive comments and finalize the text of the Mason County
Building Permit Fee Schedule and Valuation Criteria;
NOW, THEREFORE BE IT RESOLVED THAT :
The Mason County Board of Commissioners hereby amend and adopt the Mason County
Building Permit Fee Schedule and Valuation Criteria, attached hereto as Exhibit A, which
establishes the standard procedures for the valuation and assessment of fees for all
required permits under Title 14 of the Mason County Code ; Further, the fee schedule and
valuation criteria, as applicable, shall be adjusted annually to concur with the Building
Valuation Data as published in May/June Building Standards Magazine published by the
International Conference of Building Officials and will also adjust with the adoption of
subsequent codes and tables within. These fees shall apply to all permit applications filed
on or after January 1 , 2003 .
DATED this �d y of November, 2002 .
ATTEST : BOARD OF COUNTY COMMISSIONERS
(Li - - (I �
Clerk o the Board Wesley E .(Tghns6n, Chair
APPROVED AS TO FORM : vet _
.' — Herb Baze
Deputy Prosecuting Attorney Robert Holter
EXHIBIT A
MASON COUNTY BUILDING PERMIT FEE SCHEDULE
AND
VALUATION CRITERIA
Effective date : January 1 , 2003
GROUP R
* R- 1 and R- 3 , New construction , Additions, Basements : Current Building
Standards Valuation Data at time of submittal
* R- 1 and R- 3 , Remodels greater than 50 % : Current Building Standards Valuation
Data for new construction at time of submittal
* R- 1 and R- 3 , Remodels less than 50 % . $ 19 . 50 sq ft
MANUFACTURED HOUSING
* Manufactured/ Modular Homes(foundation fee and plan review not included on modulars)
$ 422 . 10
* MH Title Elimination . $ 26 . 60
* MH Runners/Tiedowns . $ 56 . 80 permit $ 36 . 90 Plan review
GROUP U
* Garage, Carports/Covered Decks : Current Building Standard Valuation Data at
time of permit submittal
* Storage Buildings . $ 13 . 30 sq ft
* Green Houses . $ 13 . 30 sq ft
* Agricultural Buildings . $ 13 . 30 sq ft
* Fences $ 7 . 00 lineal foot
*Tanks/Tank Removal ( Res . only) $ 56 . 80 flat fee
SHORELINE RELATED PERMITS
* Bulkheads $ 11 . 40 sq ft
* Boat ramps $ 11 . 40 sq ft
* Docks, Piers, Floats $ 11 . 40 sq ft
* Stairs and Landings $ 11 . 40 sq ft
* Saltwater Pilings $ 1383 . 40 per piling
MISCELLANEOUS PERMIT FEES ( Plan Review fees may apply where
applicable)
* Foundation $ 120 . 50 flat fee * Change of Use $ 56 . 80
* Retaining Walls $ 11 . 40 sq ft * Re- inspect Fee $ 56 . 80
* Decks $ 11 . 40 sq ft * Demolition Fee $ 56 . 80
* Site Inspection $ 56 . 80 * Sideyard Variance $ 77 . 10
* Final Inspection/ Expired permit $ 56 . 80 ( Site inspection/ recording fees add 'I )
* Roofing - Residential $ 56 . 80 *Addressing Fee $ 140200
( Limited to tear off, no structural ) *Appeals
* Bldg Inspections/adj . Counties $ 113 . 60 Administrative decision $ 120 . 50
+ mileage Abatement Order $ 23830
* Site plan Revisions $ 56 . 80
OTHER
Structures or work requiring permits for which no fee is specifically indicated will
be valuated and assessed utilizing submitted written contractor/engineering cost
bid information or closest related item for which a fee is determined by Building
Standards valuation data criteria and/or at the discretion of the Building Official
and Fire Marshal .
PERMIT FEES / PLAN REVIEW
Permit fees shall be as set forth in Table 1 -A of the 1997 Uniform Building Code,
or codes adopted at time of submittal . Plan review fees, where not otherwise
provided for or indicated , shall be established at the rate of $ 56 . 80 per hour with
a one hour minimum charge .
Plan review fees for compliance to the Non - Residential Energy Code shall be
established at the rate of $ 56 . 80 per hour, with a 1/2 hour minimum and shall be
paid at the time the permit is issued .
i
EXHIBIT A
VIOLATION / STOP WORK ORDER
1ST violation posting : Permit fee x 2 ( Reference UBC Section 107 . 5 . 2 Fee)
2nd violation posting : Permit fee x 3 (Same site and owner)
COMMERCIAL STRUCTURES & IMPROVEMENTS
1 . ) Building Standards Valuation Data
2 . ) Contractor/ Engineer Estimate if not specified in standards
3 . ) Misc . Tank installation/ removal permit fees will be based upon the above
criteria or will be a minimum fee base of $ 120 . 50 , whichever is greater .
Additionally UFC and UBC plan check fees may apply .
4 . ) Re - roof permit fees for commercial structures will be based upon the above
criteria or will be a minimum fee base of $ 120 . 50 , whichever is greater .
Additionally UFC and UBC plan review fees may apply .
5 . ) Tenant Review Applications $ 120 . 50
Additionally, UFC and UBC plan review fees may apply
* PLUMBING FEES * MECHANICAL FEES
Base and fixture fees, Table 1 - 1 Base and unit fees, Table I -A
1997 Uniform Plumbing Code 1997 Uniform Mechanical Code or
or applicable code in effect or applicable code in effect at
at time of submittal time of submittal
Plan review fees may be assessed at discretion of Building Official
LAND MODIFICATION
Fees assessed pursuant to 1997 Uniform Building Code, Appendix 33 , Table A-
33 -A and Table A- 33 - B or code in effect at the time of submittal . Additional fees
may apply for review .
UNIFORM FIRE CODE / ASSOCIATED FEES
Automatic Fire Alarms : Fees to be assessed based upon submitted contractor bid
and Table 1 -A of 1997 Uniform Building Code . Exception . The permit fee will be
a minimum fee base of $ 100 . 00 . Plan review fees will be calculated at 65 % of
permit fee .
Fixed Fire Suppression : Fees to be assessed based upon submitted contractor bid
and Table 1 -A of the 1997 Uniform Building Code , Exception : The permit fee
will be a minimum fee base of $ 100 . 00 . Plan review fees will be calculated at
65 % of permit fee .
Automatic Sprinkler : Fees to be assessed per Building Standards valuation data
or upon submitted contractor bid at the discretion of the Fire Marshal . Exception .
The permit fee will be a minimum fee base of $ 100 . 00 . Plan review fees will be
calculated at 65 % of permit fee .
Plan review fees for fire code compliance on reviews not noted above, where
applicable, shall be established at 50 % of the UBC plan review fee .
Fireworks related fees - Local permit and license fee limits
Retail Fireworks Stand Permit : $ 100 . 00 for one retail sales permit for one selling
season in a year . Cost includes processing , permit, and inspections
Public Fireworks Display Permit : $ 100 . 00 minimum permit fee and min . 1/2 hr
plan review fee or the total hourly cost to the jurisdiction , whichever is the
greatest . This cost shall include supervision , overhead , equipment, hourly wages
and fringe benefits of the employees involved and include administrative costs .
In no case shall the costs total more than five thousand dollars for any one
display permit pursuant to RCW70 . 77 . 555
2