Loading...
HomeMy WebLinkAbout107-02 - Res. County Road Project 1765 MASON COUNTY r COMMISSIONERS RESOLUTION NO . : ®�- COUNTY ROAD PROJECT NO. : 1765 WHEREAS, on Mason County Road No. 10000 , known locally as the Cloquallum Road , and more specifically located in Section 36 , Township 19 North, Range 6 West, WM , M.P . 18 .45 , work defined as "construction" in the BARS Manual, Page II-63 , et seq, is determined to be necessary and proper; and, WHEREAS, this project is identified as # 4 on the officially adopted County Annual Road Program, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Perform Preliminary Engineering and Right of Way acquisition only. Future construction will be : Protect the existing Cloquallum Road by stabilization of Cloquallum Creek bank. Build access to construction site, grade bank, to stabilize slope; and, armor the base of bank with heavy rip-rap to protect from erosion. Rebuild guardrail along roadway. SAID WORK is to be performed by Day Labor / Contract in accordance with the Washington State (day labor/contract) Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows : Engineering $ 109000 , 00 Right-of-Way $ 3 ,000 .00 Road Construction $ ------- The County Road Project herein described is HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136- 18 , ADOPTED this 6th day of August 2002 . BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON Chairperson Commissioner ATTEST : Commissioner aA11 z4 Clerk of the Board CC : Co . Commissioners Engineer JOURNAL : Publ . lt . : 08 - 15 - 02 ( Bill Rd . Dept . ) scv h : \ wp10 \ crp \ 1765 - crp . wpd