HomeMy WebLinkAbout05-03 - Res. County Road Project 1772 MASON COUNTY
COMMISSIONERS RESOLUTION NO . : 05 - 03
COUNTY ROAD PROJECT NO. : 1772
WHEREAS, on Mason County Road No . 75210 , known locally as Tahuya River Drive
and more specifically located in Section 5 , Township 22 North, Range 2 West, WM , M.P . 0 . 85 and MP 1 . 17 , work
defined as " construction" in the BARS Manual, Page II-63 , et seq, is determined to be necessary and proper; and,
WHEREAS , this project is identified as # * * on the officially adopted County Annual Road Program .
* *Emergency Culvert Replacements
It is essential for public safety that these pipes be replaced promptly. Both culverts are severely
corroded and have sections of culvert that are collapsing.
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their
intention to :
Remove and replace (with fish-passable culverts)two 36-inch diameter culverts located on Tahuya River Drive,
one located at mile post 0 . 85 and the second culvert located at MP 1 . 17 .
SAID WORK is to be performed by Contract in accordance with the Washington State
(day labor/contract)
Standard Specifications for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper, and the
estimated costs of said project are herewith set out as follows :
Engineering $ 25 ,000 . 00
Right-of-Way $ 1000 . 00
Road Construction $ 200 ,000 ,00
The County Road Project herein described is HEREBY DECLARED to be a public necessity, and the County Road
Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in
accordance with WAC 136- 18 .
ADOPTED this 14`h day of January , 2002 .
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
Absent 1 / 14 / 03
Chairperson
Goner
ATTEST :
Cp ' ione _
7
Clerk of the Board
CC : Co . Commissioners
Engineer
JOURNAL : Publ . lt . : 01 / 23 / 03 ( Bill Rd . Dept . )
scv h : \ wp10 \ crp \ 1772 - CRP . wpd