Loading...
HomeMy WebLinkAbout05-03 - Res. County Road Project 1772 MASON COUNTY COMMISSIONERS RESOLUTION NO . : 05 - 03 COUNTY ROAD PROJECT NO. : 1772 WHEREAS, on Mason County Road No . 75210 , known locally as Tahuya River Drive and more specifically located in Section 5 , Township 22 North, Range 2 West, WM , M.P . 0 . 85 and MP 1 . 17 , work defined as " construction" in the BARS Manual, Page II-63 , et seq, is determined to be necessary and proper; and, WHEREAS , this project is identified as # * * on the officially adopted County Annual Road Program . * *Emergency Culvert Replacements It is essential for public safety that these pipes be replaced promptly. Both culverts are severely corroded and have sections of culvert that are collapsing. THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to : Remove and replace (with fish-passable culverts)two 36-inch diameter culverts located on Tahuya River Drive, one located at mile post 0 . 85 and the second culvert located at MP 1 . 17 . SAID WORK is to be performed by Contract in accordance with the Washington State (day labor/contract) Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows : Engineering $ 25 ,000 . 00 Right-of-Way $ 1000 . 00 Road Construction $ 200 ,000 ,00 The County Road Project herein described is HEREBY DECLARED to be a public necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided and in accordance with WAC 136- 18 . ADOPTED this 14`h day of January , 2002 . BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON Absent 1 / 14 / 03 Chairperson Goner ATTEST : Cp ' ione _ 7 Clerk of the Board CC : Co . Commissioners Engineer JOURNAL : Publ . lt . : 01 / 23 / 03 ( Bill Rd . Dept . ) scv h : \ wp10 \ crp \ 1772 - CRP . wpd