Loading...
HomeMy WebLinkAboutBLD2022-00733 Demo - BLD Permit / Conditions - 10/28/2022 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 • 'a Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2022-00733 DEMO PROJECT DESCRIPTION: DEMO PERMIT ISSUED: 10/28/2022 SITE ADDRESS: 160 NE ANCHOR DR BELFAIR EXPIRES: 04/26/2023 PARCEL: 123305000024 APPLICANT: FASSIO EDWARD J JR OWNER: FASSIO EDWARD J JR 1013 SEDONIA ST 1013 SEDONIA ST BREMERTON,WA 98310 BREMERTON, WA98310 818-561-9970 OWNER'S REP: Gregory,William 2087 Mitchell Rd SE Port Orchard, WA 98366 3605099281 GENERAL CONTRACTOR'S LICENSE: Phoenix Dev. LLC License: phoend816nk 2087 Mitchell Rd SE Expires: 08/12/2023 PORT ORCHARD,WA 98366 360-509-9281 FEES: Paid Due Technology Flat Convenience $5.00 $0.00 Fee State Fee-Residential $6.50 $0.00 Demolition Fee $120.00 $0.00 Totals : $131.50 $0.00 REQUIRED INSPECTIONS Connection has been verified by Health or Utilities Demolition Final Inspection CONDITIONS For public safety, it is the responsibility of the applicant to confirm through written verification all utility services (electric, gas, water, sewer,...) have been terminated prior to demolishing a structure. Printed by:Ariane Paysse on:10/28/2022 03:44 PM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 � G •f,��. ?% Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us DEMO BLD2022-00733 " OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. • The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. • The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been removed from the area to be demolished.work shall not commence on an asbestos project or demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia WA 98502, 360-586-1044, 800-422-5623, www.orcaa.org * All construction and demolition debris must be removed from the beach after project completion. Proper disposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: (SSVI-b YIA OMLWE POKI-AL Contractor or Authorized Agent: Date: Printed by:Ariane Paysse on:10/28/2022 03:44 PM Page 2 of 2 CD O) cli V1 LO C) E � O 19 E M O O � v Cl) W W z z = _ co IL a N W LO F- W Q 0 ❑ >Q L a y z a� m 0 L 00 0 c Q CY) = O Q Q LEI a 0 o. Q Z o � ♦ � LO E c V O m co a) y m +- c Z X 3 uJ z LL c Uoo� oN O COo �_ o N O. Q U d _ V NmN L) Q' U � g ❑ �, ❑ co M r� 00 c.0 Q 0 O N M F F- �_ U U cn fn Z W NQ LLJQnQ W❑ H aa ❑ z r J`n E CD O U W Q Y C C° a w y -o z Cl) cic — U � ti N Q O O 3: a 0 0 p No 'n O X U w N c d m o < d W O c J U d a d y H 0 z L � U Q o 3 \ H W z Z z c Q O O o W \�ti a d 0 U U U