Loading...
HomeMy WebLinkAbout12-04 - Res. County Road Projects 1806 though 1820 RESOLUTION NO. 12 - 04 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON. In the matter of initiating county road projects and assigning CRP numbers . IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36 , 75 . 0505 36 , 80 , 080 , 36 . 80 . 070) (Optional References) . IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineers estimates are hereby made in the amount and for the purposes shown : ( 1 ) (2) (3 ) (4) (5 ) (6) (7) ( 8) (9) DAY L COST ESTIMATE (THOUSANDS) ANNUAL C A CONST, TYPE OF O B ENG' R. CONSTRUCTION PROG. ROAD NAME AND/OR ROAD LOG WORK N O ------------------------------ -- ITEM CRP ITEM BRIDGE NUMBER NUMBER MP TO MP (see codes) T. R R/W FEDERAL LOCAL NO, NO, 1 . Boundary Cut-off West 00140 0. 00 0. 59 13-3rd shot X 9 . 15 2 1806 2. Fish Hatchery Road 00300 2 . 65 3 . 67 D-3rd shot X 15 . 81 2 1807 3 , Ford Road 01010 1 . 62 2. 56 D-3rd shot X 14. 57 2 1808 4. Bulb Farm Road 10290 0 .00 1 . 12 D-3rd shot X 17 .36 2 1809 5 , Craig Road 12080 0. 76 1 . 06 D-3rd shot X 4. 65 2 1810 6 . Col . Wright Road 36110 0. 00 0. 62 13-3rd shot X 9 . 61 2 1811 7 . Beeville Road 01650 2. 72 4. 15 D-2 shots X 85 . 80 2 1812 8 . Anderson Road 01770 0. 00 0 .40 D-2 shots X 24 .00 2 1813 9 . Kidd Road 04190 0. 00 0 . 32 13-2 shots X 19 .20 2 1814 10. Carmen Road North 08810 0 .34 0 .69 D-2 shots X 21 . 00 2 1815 11 . Carmen Road South 08690 0 .00 0 .27 D-2 shots X 16 .20 2 1816 12 . Cloud Place 22980 0 . 00 0.04 D-2 shots X 2 .40 2 1817 13 . Paradise Place 60991 0.00 0.08 D-2 shots X 4. 80 2 1818 14. Tina Drive 62440 0. 00 0.05 D-2 shots X 3 .00 2 1819 15 Murray Road North 63310 0. 00 0.43 D-2 shots X 25 . 80 2 1820 (4) TYPE OF WORK CODE (5) The construction is to be accomplished by contract A. Preliminary Engineering F. Curbs and Gutters in accordance with RCW 36. 77.020 et.. seq. B. Right-of-Way G. Sidewalks C. Grading, Draining, Surfacing H. Traffic Facilities (6) The construction is to be accomplished by county D. Light, Bituminous Surface Treatment L Bridge Construction forces in accordance with RCW 36 . 77. 060 and E. A.C. or P . C . C. Pavement J. Paths & Trails (RCW 474301) WAC 136418 , ADOPTED this 2' day of March, 2004. BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON Chairperso ATTEST: Member Clerk 6f the Board 1 \ cc: Commissioners ✓ Engineer *' r