Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout12-05 - Res. County Road Project 1847 MASON COUNTY
COMMISSIONERS RESOLUTION NO : � ' C7
COUNTY ROAD PROJECT NO . 1847
WHEREAS , on Mason County Road No. 02000 , known locally as the Satsop-Cloquallum
Road , and more specifically located in Sec. 27, TI9N, R6W, WM, at the approximate mile posts listed
below ; work defined as " construction " in the BARS Manual, Page 1I-63 , et seq , is determined to be
necessary and proper ; and ,
WHEREAS, this project is identified as # 5 on the officially adopted County Annual Road
Program .
THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
that it is their intention to :
Remove two existing metal culvert crossings and replace them with concrete box culverts
Work to be performed at approximate mileposts : 5 . 57 and 5.60.
SAID WORK is to be performed by day labor in accordance with Washington State Standard
Specifications for Road and Bridge Construction as adopted by Mason County.
BE IT FURTHER RESOLVED that the described County Road Project is necessary and
proper, and the estimated costs of said project are herewith set out as follows :
Construction : $ 195 , 000
80 % of construction costs up to a maximum of $ 156 , 000 is to be reimbursed by the Salmon Recovery
Funding Board .
The County Road project herein described in HEREBY DECLARED to be a public
necessity , and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report
and proceed thereon as by law, provided and in accordance with WAC 13648.
ADOPTED this 15th day of February, 2005.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY , WASHINGTON
Or . ...
JAYNI Irk KAMIN, th jrperson
LYNDA RING ERIC >` ON, Commissioner
��,.V ,
TIM SHELDON, Commissioner
ATTEST :
Clerk of the Board
cc : Co . Commissioners
Engineer
JOURNAL : Publ . It: 2/ 17/05
robinb h : \wp\crp\ 1847-crp