Loading...
HomeMy WebLinkAbout77-06 - Res. County Road Projects 1880 through 1893RES u J100 7 7-06 1-1EFO E THE BO fir. RD OF COUNTY COMMISSIONERS O 11-4 MASO COUNTY, WASHINGTON. In the matter of initiating County Road Projects and assigning C32 numbers. IT IS HEREBY RESOLVED THAT the roads listed below be improved as s o own between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed as by law provided (RCW 36.75.050, 36.80.080, 36.80.070) (O ttional References). IT IS FURTHER RESOIJVED that appropriations from the officially adopteroad fund budget and based on the county engineers estimates are hereby made in the amount and for the purposes shown: Item 1 2 3 5 7 8 10 11 12 13 14 Road Name Lynch Rd Cloquallum Rd Bear Creek Dewatto Rd ?urdy Cut Off Rd Belfair Tahuya Rd ao®-m000000e_---moo. Sand 'dill d North Island Dr Highland Rd Shelton Matlock Rd McF,wan Prairie Rd Agatem'-d °oo= McReavy Rd Mason take Rd Co e''d Road No. 15500 10000 79800 41780 97500 86070 39630 04450 90100 51800 23910 97670 52210 5830 BMP s EMP 4.62 0 8.42 1_ .25 0 14.02 5.09 0 10.43 ,0000m =0--mo= 0.00 0 2.77 e�ooa= 0.00 8.16 �8._16_ 0.00 -5.82 o�oam�oe= 0.00 0 3.10 '1 C G 00 ciw c o0 fl = 0.00 0 7.93 ob�ooe-®� 6013.48 0.00 0 2.45 3.78 a 5.38 �0000a�o0t - 0.00 a 6.81 n00000�oo-0oo= 6.37 0 10.14 mCoeme°o� 0.00 0 3.26 (1) (2) (3 fie) (4) 'Y'YPF OF WORK CODE A. Preliminary IHngineering itight-of-Tay C. Grading, Draining, Surfacing D. I ,fight, tituminous Surface "Treatment .C. or P.C.C. Pavement OPTED this 25th day of July, 2006 ATTEST': 4 R^BECCA S. ROGERS, Clerk the Board cc: Commissioners Engineer JOURNAL: Publ. l t: 8 / 3 (Bill Rd Dept.) (3e) Length 3.80 12.77 5.34 2.77 8.16 5.82 3._10 7.9.E 12.02 �2.45 1.60 6.81 3.77 3.26 79.60 (3t) Work Code AH LN A4 H A , ll AaH 11 (4) Cont X X X X X X X X X X (5) F. Curbs and Gutters G. Sidewalks H. Traffic Facilities I. Bridge Construction J. Paths & Trails `1,CW 47.3 01) Day Labor X X X X (6) Cost Estimate (Thousand Engr I R/W Const 3 4 a a r 2 ° a ° a r 6 4 a a r 0 0 a ° a m a t 23 81 0 a 33 0 a a 18 0 0 ° 0 a 8- ° 0 ° L ° a 0 2 a a a a a 19 54 46 a a J. 49 12 0 18 2 a0 5 a a 0 3 3 a a a a ° 13 ° 45 a 0 0 23 0 a 22 54 0 0 0 456 (7p) (7r) (7c) Federal a Local 26 90 37 20 60 0 40 0 22 55 14 20 15 50 26 25 0 500 0 0 (70 (70 Annual Prog Number 04 04 04 04 04 04 04 04 04. u 04 04 04 u (8) (5) The construction is to be accomplished by contract in accordance with RCW 36.77.020 et. seq. (6) The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC BOARD OF COUNTY COMM -SSION F:, MASON COUNTY, SHING ON ING ERIC '4) JAYOJI L. RAM N, Chair , Commissioner S 36. 0 J TIM SHELDON, Co mm issioner CRP No 1880 1881 _882 1883 1884 885 1886 1887 1888 1889 1890 1891 1892 1893 (9)