HomeMy WebLinkAbout77-06 - Res. County Road Projects 1880 through 1893RES
u
J100 7 7-06
1-1EFO E THE BO fir. RD OF COUNTY COMMISSIONERS O 11-4 MASO COUNTY, WASHINGTON.
In the matter of initiating County Road Projects and assigning C32 numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as s o own between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed
as by law provided (RCW 36.75.050, 36.80.080, 36.80.070) (O ttional References).
IT IS FURTHER RESOIJVED that appropriations from the officially adopteroad fund budget and based on the county engineers estimates
are hereby made in the amount and for the purposes shown:
Item
1
2
3
5
7
8
10
11
12
13
14
Road Name
Lynch Rd
Cloquallum Rd
Bear Creek Dewatto Rd
?urdy Cut Off Rd
Belfair Tahuya Rd
ao®-m000000e_---moo.
Sand 'dill d
North Island Dr
Highland Rd
Shelton Matlock Rd
McF,wan Prairie Rd
Agatem'-d °oo=
McReavy Rd
Mason take Rd
Co
e''d
Road No.
15500
10000
79800
41780
97500
86070
39630
04450
90100
51800
23910
97670
52210
5830
BMP s EMP
4.62 0 8.42
1_ .25 0 14.02
5.09 0 10.43
,0000m =0--mo=
0.00 0 2.77
e�ooa=
0.00 8.16
�8._16_
0.00 -5.82
o�oam�oe=
0.00 0 3.10
'1 C G 00 ciw c o0 fl =
0.00 0 7.93
ob�ooe-®�
6013.48
0.00 0 2.45
3.78 a 5.38
�0000a�o0t -
0.00 a 6.81
n00000�oo-0oo=
6.37 0 10.14
mCoeme°o�
0.00 0 3.26
(1) (2) (3 fie)
(4) 'Y'YPF OF WORK CODE
A. Preliminary IHngineering
itight-of-Tay
C. Grading, Draining, Surfacing
D. I ,fight, tituminous Surface "Treatment
.C. or P.C.C. Pavement
OPTED this 25th day of July, 2006
ATTEST':
4
R^BECCA S. ROGERS, Clerk the Board
cc: Commissioners
Engineer
JOURNAL: Publ. l t: 8 / 3 (Bill Rd Dept.)
(3e)
Length
3.80
12.77
5.34
2.77
8.16
5.82
3._10
7.9.E
12.02
�2.45
1.60
6.81
3.77
3.26
79.60
(3t)
Work Code
AH
LN
A4 H
A , ll
AaH
11
(4)
Cont
X
X
X
X
X
X
X
X
X
X
(5)
F. Curbs and Gutters
G. Sidewalks
H. Traffic Facilities
I. Bridge Construction
J. Paths & Trails `1,CW 47.3 01)
Day Labor
X
X
X
X
(6)
Cost Estimate (Thousand
Engr I R/W Const
3
4
a
a
r
2 °
a
°
a
r
6
4
a
a
r
0
0
a
°
a
m
a
t
23
81
0 a 33
0 a
a 18
0
0
° 0
a
8-
° 0
°
L
°
a
0
2
a
a
a
a
a 19
54
46
a
a
J.
49
12
0 18
2 a0
5 a
a 0
3
3
a
a
a
a
° 13
° 45
a
0 0 23
0 a 22
54 0 0 0 456
(7p)
(7r)
(7c)
Federal a Local
26
90
37
20
60
0
40 0
22
55
14
20
15
50
26
25 0
500 0 0
(70
(70
Annual Prog
Number
04
04
04
04
04
04
04
04
04.
u
04
04
04 u
(8)
(5) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
BOARD OF COUNTY COMM -SSION F:,
MASON COUNTY, SHING ON
ING ERIC
'4)
JAYOJI L. RAM
N, Chair
, Commissioner
S
36.
0
J
TIM SHELDON, Co
mm
issioner
CRP No
1880
1881
_882
1883
1884
885
1886
1887
1888
1889
1890
1891
1892
1893
(9)